INVESTMENTS IN GENERATING CAPACITY: THE ROLE OF RISK AND LONG-TERM CONTRACTS

Similar documents
Practice of Finance: Advanced Corporate Risk Management

Report. by the Comptroller and Auditor General. Department for Business, Energy & Industrial Strategy. Hinkley Point C

What next for UK auctions of renewable Contracts for Difference?

In April 2013, the UK government brought into force a tax on carbon

UK New Nuclear: Hinkley Point C Case Study

New Build. John E. Parsons. Université Paris Dauphine.

The role of electricity demand reduction in managing Levy Control Framework costs

Contract length analysis for Feed-in Tariff with Contracts for Difference. Summary of onshore and offshore wind analysis

How to get a CfD: Allocation Process and the Transition from the RO 11/06/14

Resource Planning with Uncertainty for NorthWestern Energy

Report. by the Comptroller and Auditor General. Department for Business, Energy & Industrial Strategy. Hinkley Point C

Real Options for Real Communities: Incorporating Uncertainty into Small- Scale Energy Planning

HINKLEY POINT C, a project of the EDF Group for the future. 27 June 2016

CFE: Level 1 Exam Sample Questions

Computational Finance Improving Monte Carlo

Real Options. Katharina Lewellen Finance Theory II April 28, 2003

Cost Risk Assessment Building Success and Avoiding Surprises Ken L. Smith, PE, CVS

Real Options: Creating and Capturing the Option Value in Regulated Assets

UNIQUE ATTRIBUTES OF RENEWABLE POWER PURCHASE AGREEMENTS

CMA Report and Summer Budget Implications for the UK energy sector July 2015

The effects of Brexit on the UK power market Part One

UPDATED IAA EDUCATION SYLLABUS

Detailed Overview of the Course Content

Chapter 5: Trading. Industry Guide to the I-SEM

Handbook of Financial Risk Management

Notes. Cases on Static Optimization. Chapter 6 Algorithms Comparison: The Swing Case

INTRODUCTION TO THE ECONOMICS AND MATHEMATICS OF FINANCIAL MARKETS. Jakša Cvitanić and Fernando Zapatero

Corporate Valuation and Financing Real Options. Prof. Hugues Pirotte

UK Offshore Wind Market Study Final Report (Executive Summary) A report by Redpoint Energy Limited in association with GL Garrad Hassan

Sanjeev Chowdhri - Senior Product Manager, Analytics Lu Liu - Analytics Consultant SunGard Energy Solutions

SSE Response to Powering Britain: One Nation Labour s plans to reset the energy market, March 2014

One-Period Valuation Theory

Market Volatility and Risk Proxies

Math 623 (IOE 623), Winter 2008: Final exam

RFP 2012 Credit Security Requirements Methodology

The impact of Brexit on the UK energy sector

POSSIBILITY CGIA CURRICULUM

NINTH EDITION FUNDAMENTALS OF. John C. Hüll

DEPARTMENT OF FINANCE. Undergraduate Courses Postgraduate Courses

The expanded financial use of fair value measurements

Accelerated Option Pricing Multiple Scenarios

On Arbitrage Possibilities via Linear Feedback in an Idealized Market

Chapter 22 examined how discounted cash flow models could be adapted to value

UK Onshore Wind. Investment Fundamentals

Practice of Finance: Advanced Corporate Risk Management

Understanding Risk and Preparing the RFP

RE: Initial Comments on the Integrated Program Review and Debt Service Options

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON

The Economics and Financing of Distributed Generation Investment. Budapest, Hungary November 17, 2016

FUNDAMENTALS OF FUTURES AND OPTIONS MARKETS

THE ELECTRIC HONEYPOT: THE PROFITABILITY OF DEREGULATED ELECTRIC GENERATION COMPANIES By Edward Bodmer

WHITE PAPER THINKING FORWARD ABOUT PRICING AND HEDGING VARIABLE ANNUITIES

Common Knowledge Base

Thoughts about Selected Models for the Valuation of Real Options

Economic Viability of High-temperature Nuclear Reactors for Industrial Cogeneration

As we saw in Chapter 12, one of the many uses of Monte Carlo simulation by

The Case for a Hedge Exemption From the Mandatory Clearing of Derivatives

Offshore Wind Cost Reduction Recent and future trends in the UK and Europe

Support regimes for offshore wind in Europe Florian Bauernfeind

Advanced Quantitative Methods for Asset Pricing and Structuring

ENTELLIGENT S SMART CLIMATE PORTFOLIO OPTIMIZER Smart Climate Data Solutions

Interest Rate Modeling

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner

Lehman Brothers CEO Energy/Power Conference September 5, 2007

Potential Financial Exposure (PFE)

Advanced Quantitative Methods for Asset Pricing and Structuring

******************************* The multi-period binomial model generalizes the single-period binomial model we considered in Section 2.

How to Consider Risk Demystifying Monte Carlo Risk Analysis

PHASE I.A. DIRECT TESTIMONY OF DR. KARL MEEUSEN ON BEHALF OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION

Introduction to EMR Arrangements. Thursday 18 May 2017

(Only the English version is authentic) (Text with EEA relevance)

The Merton Model. A Structural Approach to Default Prediction. Agenda. Idea. Merton Model. The iterative approach. Example: Enron

2011 IRP Public Input Meeting. October 5, Pacific Power Rocky Mountain Power PacifiCorp Energy

Annex C Renewables Obligation transition

1. Traditional investment theory versus the options approach

Nuclear Revenue Certainty

Electricity Market Reform

Delivering on CAP 2030

Learning takes you the extra mile. Rabobank Global Learning

Portfolio Risk Management and Linear Factor Models

Spinning Reserve Market Event Report

Contribution from the World Bank to the G20 Commodity Markets Sub Working Group. Market-Based Approaches to Managing Commodity Price Risk.

SIMULATION OF ELECTRICITY MARKETS

It doesn't make sense to hire smart people and then tell them what to do. We hire smart people so they can tell us what to do.

Introduction to Financial Mathematics

Do You Really Understand Rates of Return? Using them to look backward - and forward

Understanding Index Option Returns

Executive Summary: A CVaR Scenario-based Framework For Minimizing Downside Risk In Multi-Asset Class Portfolios

Real Options for Engineering Systems

ECON FINANCIAL ECONOMICS

All Energy 2015 CfD: The New Normal?

Improving Withdrawal Rates in a Low-Yield World

UK ELECTRIC MARKET REFORM APPLICATION TO TEXAS POWER MARKET. Ingmar Sterzing CEIC Seminar April 10, 2013

ASC Topic 718 Accounting Valuation Report. Company ABC, Inc.

STOCHASTIC VOLATILITY AND OPTION PRICING

Financial Models with Levy Processes and Volatility Clustering

Stochastic Analysis Of Long Term Multiple-Decrement Contracts

Financial Incentives for Deploying Carbon Capture and Storage: Tom Wilson Sr. Program Manager CSLF Financing Roundtable 2010 April 6, 2010

Finance (FIN) Courses. Finance (FIN) 1

Monte Carlo Methods in Structuring and Derivatives Pricing

Transcription:

INVESTMENTS IN GENERATING CAPACITY: THE ROLE OF RISK AND LONG-TERM CONTRACTS John Parsons, MIT Sloan School of Management and MIT Center for Energy and Environmental Policy Research relying on work by Fernando de Sisternes, MIT Engineering Systems Division Charlotte Bonnin, MIT Sloan School of Management CEEPR / EPRG / Iberdrola European Electricity Workshop, Madrid, July 2-3, 2014 1

Outline Motivation Research Results Lessons 2

Motivation 3

Hinkley Point C Proposed 2 EPR reactors totaling 3,260 MW capacity. Southwest England (Somerset) at the site of Hinkley A (closed) and B (operating). Lead contractor, EDF. Equity partners with AREVA and Chinese nuclear corps. Total installed cost estimated at 16 billion, including 2 billion already invested in site preparation and other start-up costs. 13 TWh/year equal to approx. 7% of the UK's electricity. If built, it will be the first new UK reactor in over 20 years. 4

Supporting New Investments with Long-Term Contracts The UK s Electricity Market Reform employs a specialized contract design the Contract-for-Differences as an essential tool for lowering the cost of capital intensive generation projects. Each of the low-carbon technologies the Government is considering differs materially from this standard investment choice. In particular, low-carbon generation typically has high construction (capital) costs and low operating costs, and as a result low-carbon plants are wholesale price takers. It is therefore difficult to make an investment case for them in a market where wholesale electricity prices are predominantly set by the short-run marginal costs of unabated gas and coal plant, even if the carbon price was high enough for their levelised costs to be similar. These long-term contracts, Feed-in Tariffs with Contracts for Difference (FiT CfDs), which stabilise revenues, should increase the rate of investment and lower the cost of capital, thereby reducing costs to consumers. In our central scenario, the FiT CfD reduces the cost of decarbonisation to 2030 by 2.5 billion compared to using the Premium Feed-in Tariff (PFiT) to deliver the same investment. 5

The October 2013 Agreement The price: 92.50/MWh guaranteed for 35 years; if Sizewell C does not go ahead; 89.50/MWh if it does; inflation-adjusted. A Contract-for-Differences (CfD) arrangement; power is sold into the market. If the market price is below the strike price, the generator receives a top-up payment; objective is to assure a 10% IRR to EDF. Construction risk falls to EDF and partners, although savings in construction costs are shared with the public through a lower strike price. In addition, there is a separate UK government guarantee of debt financing 65% of the costs. 6

Conflicting views on the role long-term contracts A tool for lowering the cost of financing and thereby lowering the cost of electricity. An expensive giveaway. A lifeline for costly technologies. 7

The same issue arises in other contexts Long-term contracts are widely used in the US to spur deployment of renewables. An exception to the usual prohibition on long-term contracts. Massachusetts Green Communities Act. Cape Wind offshore wind farm. The six states of New England are exploring financing natural gas pipeline expansion with a charge to electricity ratepayers. What should be the term for capacity mandates, capacity markets? What products should be included? New California mandates for ramping capacity and for storage. 8

Research Results 9

Current Approaches to Risk Valuation A widely used approach leans on the now widespread availability of computing to generate large Monte Carlo distributions of payoffs to different assets or for the same asset financed with different contract. Usually the different distributions are compared on the basis of means and variances. For example, fixing the mean, a distribution with a higher variance is considered worse than a distribution with a lower variance. One shortcoming of this approach is its failure to connect with the standard tools of modern valuation and asset pricing. #1 This approach ignores the key insight from portfolio theory that expected return is not a function of total variance, but rather of the component of variance that is correlated to macroeconomic variables. #2 It also ignores the key insight from derivative pricing that variance in the final payoff is a poor tool for ranking risk. The non-linearity of many payoffs makes the problem more difficult than is acknowledged in a simple mean-variance framework. This disconnect undermines the reliability of many conclusions drawn from these Monte Carlo simulations, and it undermines the confidence we might have in the specific values calculated using the simulations. 10

The Poster Child: the UK EMR & CfDs The UK EMR fancies that CfDs reduce the cost of capital, without shifting an equivalent cost onto taxpayers. This result is produced using a Monte Carlo simulation of project level earnings. It employs a completely arbitrary discount for TOTAL risk. 11

Our Contribution We show how to incorporate standard risk pricing principles into the popular Monte Carlo simulation analysis. Our methodology has many conservative advantages. The foundation is identical with core principles of valuation and asset pricing. The structure is a transparent generalization of traditional DCF. The structure is consistent with widely applied Monte Carlo approaches. Our methodology has one key radical advantage. It makes explicit demands on the modeler to be precise about the critical elements of risk and the price of risk. "Whereof one cannot speak, thereof one must be silent." Ludwig Wittgenstein, Tractatus Logico-Philosophicus 12

The General Algorithm Macro Perspective: the Market Price of Risk Micro Perspective: Analyze Project Risk Valuation: Discount CF for Market Risk Further Analysis: Report on Discount Factors 13

Step #1: The Market Price of Risk We employ a model that is consistent with the two most familiar asset pricing models: the CAPM Beta the Black-Scholes-Merton derivative pricing model Cumulative stock market returns evolve as a random walk arithmetic Brownian motion. We derive the stochastic discount factors pertinent to discounting cash flows for risk. This is unfamiliar territory for many analysts, but entirely old news for finance. This is the simplest model. One could get fancy and use a different model of the underlying market risk factor or complicate it with multiple factors. 14

Step #2: Overlay a Model of Electricity Price Risk Assume that electricity demand growth is stochastic, but correlated with returns on the stock market. Yields a stochastic electricity price as follows given installed capacity, demand growth increases the electricity price, but, at a high enough price, capacity additions become profitable, and this caps the price; given installed capacity, demand drops decreases the electricity price and halts any new capacity additions. The result is a regulated Brownian motion tied to the stochastic demand and to the stochastic stock market returns. 15

Step #2: Overlay a Model of Electricity Price Risk 16

Step #3: Value a Project Model the project cash flows; specify how the electricity price enters the cash flow; both price risk, but also dispatch risk; other risks. Valuation enumerate the states; calculate the probability; calculate the cash flow; calculate the state-contingent discount factor; sum across states; present value using the risk-free rate. 17

Applied to Sample Electricity Assets #1 An electricity price swap. #2 A baseload generation plant. #3 A peaker generation plant. 18

The Risk Premium on 3 Different Electricity Assets peaker baseload price swap 19

The Risk-Return Staircase for Nuclear New Build Work backwards Later project operation contains modest amounts of priced market risk. But early project development is an option on this completed project. It contains MUCH more priced market risk. Returns are levered. 30% 9% timeline of nuclear power plant life 20

Caveats This is more of a demonstration than a reliable set of values. The logic is correct, and the relationships shown are solid, but the specific values can only be consumed with the help of a heap of salt. The stochastic discount factor methodology puts great demands on risk modeling. The underlying priced risk factor, and The specific project representation how the priced risk enters. The precision of the tools in principle far exceeds our ability to accurately calibrate them. So what is the point? 21

Lessons 22

One Positive & One Negative We can get part way in resolving a puzzle surrounding the cost of capital for nuclear new build: Traditional methodologies for calculating a discount rate, such as the CAPM model, give figures that are too low. This is due to a failure to recognize the leverage involved with development. We cannot justify long-term contracts, such as CfDs, as a tool for lowering the cost of capital. The claim that capital intensive projects have a higher cost of capital is wrong. It is inconsistent with all standard models of pricing risk. It overlooks quantity risk, that is the risk of dispatch. 23

The Contract-for-Difference is a Stalking Horse The price guarantee matters. But the issue has nothing to do with the volatile natural gas price. Look at the fine print of the Hinkley Point C Agreement. Arrangements whereby the Strike Price could be adjusted, upwards or downwards, in relation to operational and certain other costs (including balancing and transmission charges and business rates) at certain fixed points, and in relation to certain future changes in law (including in respect of specific nuclear taxes, and uranium and generation taxes). Arrangements whereby Hinkley Point C would be protected from being curtailed without appropriate compensation, with reviews expected to occur at 7.5 years, 15 years and 25 years after the commercial operations date of the first reactor as well at the end of the contract term. Protection would be provided for any increases in nuclear insurance costs as a result of withdrawal of HMG cover or in certain circumstances where market cover in the nuclear insurance market is no longer available, with compensation limited to the cost of additional capital required to self-insure. Compensation to the Hinkley Point C investors for their expected equity return would be payable in the event of a Government directed shut down of Hinkley Point C other than for reasons of health, safety, security, environmental, transport or safeguards concerns. The arrangements include the right to transfer to Government, and for Government to call for the transfer to it of, the project company which owns Hinkley Point C in the event of a shutdown covered by these provisions. The compensation arrangements would be supported by an agreement between the Secretary of State for DECC and the investors. 24

Commitment by the State is the Key Long-term fixed investments often exposes one party to exploitation by another party ex post opportunism. Long-term contracts are a longstanding tool for trying to minimize ex post opportunism. This is at odds with the tactics used to restructure and open up these markets. Long-term contracts were viewed as a tool of monopoly incumbents and were proscribed. Can we reintroduce long-term contracts while preserving the liberalized market? 25