TERMS OF REFERENCE CONSULTANT FOR THE DEVELOPMENT OF MONITORING AND EVALUATION MECHANISM FOR THE ASEAN LABOUR MINISTERS WORK PROGRAMME

Similar documents
TERMS OF REFERENCE CONSULTANT FOR THE DEVELOPMENT OF MONITORING AND EVALUATION MECHANISM FOR THE ASEAN LABOUR MINISTERS WORK PROGRAMME

ASEAN Charter ASEAN Community Vision 2025 ASCC Blueprint

ASEAN-ROK Cooperation Fund (AKCF) Manual

ASEAN- Australia- New Zealand Free Trade Area (AANZFTA) Economic Cooperation Support Programme (AECSP)

TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT

FINANCE CONSULTANT FOR ASEAN COOPERATIVE PROJECT ON FINANCING MECHANISMS DESIGN FOR ENERGY EFFICIENCY AND CONSERVATION (EE&C) PROJECT IMPLEMENTATION

REQUIRED DOCUMENT FROM HIRING UNIT

ASIAN DEVELOPMENT BANK

ASEAN Integration in Trade in Services. Tan Tai Hiong ASEAN Secretariat ASEAN Services Forum June 2015, ASEAN Secretariat Jakarta, Indonesia

Terms of Reference (ToR) Earthquake Hazard Assessment and Mapping Specialist

Terms of Reference. Contract #: (to be provided by PSU)

Mongolia: Development of State Audit Capacity

2 SCOPE OF WORK, RESPONSIBILITIES AND DESCRIPTION OF THE PROPOSED ANALYTICAL WORK

Open Call for Consulting Services Consultant for Mapping of funding opportunities for Roma integration measures, policies and programs

Terms of Reference. International Consultant to MTR of the 5 year implementation of the National Nutrition Strategy,

TERMS OF REFERENCE Final evaluation consultant AUP Project, Kayin State, Myanmar

Ministry of Finance, Banking & Postal Services Republic of the Marshall Islands

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA

Roma Integration 2020

TERMS OF REFERENCE. November, 2018 December, 2018 (40 effective person days) BACKGROUND

STATUTE OF THE EDUCATION REFORM INITIATIVE OF SOUTH EASTERN EUROPE (ERI SEE) Article 1

REPORT OF THE TWELVE MEETING OF ASEAN EXPERT GROUP ON FOOD SAFETY (12 TH AEGFS) 20 22OCTOBER 2015 YOGYAKARTA, INDONESIA

MAP Meeting Geneva, June 2012

Page 1 of 5. APPROVED e-requisition

EXTERNAL END OF PROJECT PERFORMANCE EVALUATION

UNICEF Moldova. Terms of Reference

Home & Community Care for Older People in ASEAN Member Countries

Technical Assistance for Nutrition (TAN)

ACTION PLAN FOR SGD. By : Wawan Erfianto Vice President National Executive Committee Confederation of Indonesia Trade Union

TERMS OF REFERENCE. Technical Working Group on the extension of social security to the informal economy

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Terms of Reference (ToR) Business Potential survey in Doti District

Technical Assistance Report

PROJECT PREPARATION TECHNICAL ASSISTANCE

ILO-Japan programmes on SPF

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE (PN-N ) for individual consultants and individual consultants assigned by consulting firms/institutions

TERMS OF REFERENCE FOR CONDUCTING MID-TERM EVALUATION FOR MALARIA PROJECT IN GEITA

Action 3: Development of extension materials of rights and duties on land and forest resources at village level

PROJECT PREPARATORY TECHNICAL ASSISTANCE

NDPHS Strategy Working Group 2014 Third Meeting Riga, Latvia 10 June 2014

12 th ASEAN-Japan High Level Officials Meeting on Caring Societies Resilient Communities for Active Ageing October 2014, Tokyo

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

Lao People s Democratic Republic: Strengthening the Capacity of the State Audit Organization

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization

LCRP Steering Committee Meeting 3 JULY 2018

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

TERMS OF REFERENCE FOR A JUNIOR CONSULTANT TO SUPPORT SOMALIA WORK PROGRAMME

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

INDONESIA-MALAYSIA-THAILAND GROWTH TRIANGLE PROJECT MANUAL

CONCORD, the European NGO Confederation for Relief and Development, is seeking a:

Terms of Reference (ToR)

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT. International Public Financial Management Specialist

GCF Readiness Programme Fiji

REQUIRED DOCUMENT FROM HIRING UNIT

TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT

TERMS OF REFERENCE Social protection technical support, Myanmar

THE WORLD BANK TERMS OF REFERENCE Impact of carbon pricing instruments on national economy and contribution to NDC

SUMMARY OF MINUTES OF THE FORTY-SEVENTH MEETING OF THE MRC JOINT COMMITTEE MEKONG RIVER COMMISSION AUGUST 2018, VIENTIANE, LAO PDR

Introduction Background of the ASEAN+3 Bond Market Forum and the Way Forward

Duration of Assignment: Approx. 150 working days from January to September 2015

(1) PROJECT COORDINATOR (2) SENIOR EXPERT RESILIENCE

Opinions on technical and scientific matters concerning mutual recognition: working procedure for the Biocidal Products Committee (BPC)

with Caribbean Community Climate Change Centre (5Cs) for Belize 14 December 2016 NDA Strengthening & Country Programming

JOINT IMPLEMENTATION MANAGEMENT PLAN (JI-MAP) (Version 02)

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Duration of Assignment: Apprx. 150 working days from January to September 2015

Universal access to health and care services for NCDs by older men and women in Tanzania 1

Oil for Development in South Sudan. Program Document for an Institutional Cooperation between

TERMS OF REFERENCE Ref: PN/FJI Taxpayer Onboarding Digitization of the tax system in the Solomon Islands

Facesheet. Date received by Secretariat:

Programming Documents Management Board meeting 12 December 2017

Assessment of the National Social Security Fund (NSSF) operations Cambodia TERMS OF REFERENCE

FCCC/SBI/2016/INF.5. United Nations

Terms of Reference for consultancy to carry out Project Base line study in the Malawi, Mozambique, Tanzania, Zambia and SADC region

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

with the National Agency on Climate Change for the People's Democratic Republic of Algeria 22 December 2017 NDA Strengthening & Country Programming

with UNDP for the Republic of Congo 12 May 2016 NDA Strengthening & Country Programming

Office of the Auditor General of Norway. Handbook for the Office of the Auditor General s Development Cooperation

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

MARITIME AFFAIRS & FISHERIES. EMFF Strategic Programming

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT

SAICM/ICCM.4/INF/9. Note by the secretariat. Distr.: General 11 August 2015 English only

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms

Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2

ACTIVITY COMPLETION SUMMARY (ACS)

THE NATIONAL CREDIT REGULATOR JUNE 2016 TERMS OF REFERENCE TO ACCREDIT TRAINING SERVICE PROVIDERS TO OFFER DEBT COUNSELLING COURSE

Annex XIV LDCF Timeline: COP guidance and GEF responses

Terms of Reference for the Mid-term Evaluation of the Implementation of UN-Habitat s Strategic Plan,

VACANCY ANNOUNCEMENT

South Sudan Common Humanitarian Fund Allocation Process Guidelines

Terms of Reference. Protection, Care and Support of Children and Families Living with HIV, Consultancy

The Joint Statement of the 15 th ASEAN+3 Finance Ministers and Central Bank Governors' Meeting

JOB DESCRIPTION. TBC within Asia region Asia Regional Office International/TBD 2 years (with possible extension) Head of Programmes

TERMS OF REFERENCE. 02 National Consultants. Consultancy: Vietnam (Ha Noi and selected provinces) Locality of Assignment:

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA

Handbook for Issuers making cross-border offers under the Streamlined Review Framework for the ASEAN Common Prospectus

Transcription:

TERMS OF REFERENCE CONSULTANT FOR THE DEVELOPMENT OF MONITORING AND EVALUATION MECHANISM FOR THE ASEAN LABOUR MINISTERS WORK PROGRAMME 2016-2020 I. BACKGROUND Established in 1975, the ASEAN Labour Ministers Meeting (ALMM) 1 is a sectoral ministerial body under the ASEAN Socio-Cultural Community (ASCC) that oversees ASEAN cooperation on labour issues. Its members are the ministers in charge of manpower and labour of ASEAN Member States (AMS). The ALMM meets every two years and is supported by Senior Labour Officials Meeting (SLOM). There are three subsidiary bodies reporting to SLOM, notably: i) Working Group on Progressive Labour Practices to Enhance Competitiveness of ASEAN (SLOM-WG); ii) ASEAN Committee on the Implementation of the ASEAN Declaration on the Protection and Promotion of the Rights of Migrant Workers (ACMW); and iii) ASEAN Occupational Safety and Health Network (ASEAN-OSHNET). The ALMM and its subsidiary bodies are guided by the five-year ASEAN Labour Ministers Work Programme. The ALM Work Programme 2016-2020 2, adopted by the 24 th ALMM in May 2016 in Vientiane, Lao PDR, is currently being implemented to achieve the overall objective of a better quality of life for ASEAN people through workforce with enhanced competitiveness and engaged in safe and decent work derived from productive employment, harmonious and progressive workplace, and adequate social protection. To achieve this objective, the ALM Work Programme 2016-2020 identified 23 thematic areas in which SLOM and its subsidiary bodies will be focusing their work until 2020. Eight thematic areas are under the ambit of SLOM. The remaining 15 thematic areas are implemented by SLOM-WG, ACMW, and ASEAN-OSHNET through projects and activities that are elaborated in their respective 2016-2020 Work Plan. All of those projects and activities are expected to enable ALMM to achieve the intermediate targets in the following four Key Result Areas (KRAs) by 2020: 1 More information on ALMM can be found at: http://asean.org/asean-socio-cultural/asean-labourministers-meeting-almm/overview/ 2 The ALM Work Programme 2016-2020 is available for downloading at: http://asean.org/storage/2012/05/updated_asean-labour-ministers-work-programme-2016-2020-and-work-plans-of-the-subsidiary-bodies.pdf 1

KRA skilled and adaptable productive harmonious, safe and expanded social workforce employment progressive workplace protection 2020 by Targets Intermedia te Improved workforce Improved level of Promoting sound Strengthened social competitiveness employment and industrial relation protection systems and productivity reduced levels of system o Raised awareness o Increased number unemployment and o Reduced on social of skilled workers under-employment incidence of protection in ASEAN in ASEAN Member labour disputes in o Expanded Member States States ASEAN Member coverage, o Improved labour Increased support States affordability, productivity of for workers in rural Increased capacity availability, ASEAN Member employment and and strengthened quality, equitability States Micro, Small and institutionalized and sustainability Strengthened Medium Enterprises mechanisms of of social capacities to (MSMEs) social dialogues protection promote skills and tripartite Reduced incidence development and cooperation in of workers in recognition (include ASEAN vulnerable but not limited to Fostered safe and situations, including LMIS, TVET, etc.) healthy forced labour, in environment in the ASEAN Member workplace States Strengthened capacity for labour inspection Increased capacities for labour law enforcement The extent to which the ALM Work Programme 2016-2020 s objectives and immediate targets are being achieved need to be monitored and evaluated. For this purpose, the ALM Work Programme 2016-2020 set the following mechanism: a. Annual progress reporting of the implementation of the ALM Work Programme by SLOM and its subsidiary bodies; b. Development of an output-level checklist to monitor progress of the ALM Work Programme to be completed by SLOM and its subsidiary bodies; c. Development of an outcome-based mid-term and final-term reviews of the ALM Work Programme. In May 2018, SLOM endorsed the project proposal entitled Development of the Monitoring and Evaluation Mechanism for the ASEAN Labour Ministers Work Programme 2016-2020. The proposal was further endorsed by the Committee of Permanent Representatives to ASEAN in June 2018 for implementation with financial support from the ASEAN Development Fund. II. OBJECTIVE The objective of the Project is to develop the M&E mechanism of the ALM Work Programme 2016-2020. The outputs of the Project will be: 2

1. Output-level checklist to monitor progress of the ALM Work Programme 2016-2020; 2. Key Performance Indicators (KPIs) and baseline data (and year) to track progress towards the intermediate targets by 2020; and 3. Recommendations of subjects/topics for qualitative research/studies to complement the outcome-based mid-term and/or final reviews. III. THE PURPOSE OF THIS TERMS OF REFERENCE This TOR will guide the hiring of a consultant who will be engaged to develop the M&E mechanism of the ALM Work Programme 2016-2020 for consideration and endorsement by SLOM. IV. DELIVERABLES AND SCOPE OF WORK TO BE PERFORMED The consultant will be responsible to produce the following deliverables: a. Output 1 of the Project: Output-level checklist to monitor progress of implementation of the projects in the ALM Work Programme 2016-2020 b. Output 2 of the Project: Key Performance Indicators (KPIs) and baseline data (and year) of the ALM Work Programme 2016-2020 to track progress towards the intermediate targets by 2020, which will include: Articulation on the conceptualisation and definition of the KPIs Articulation on the contribution of ALM Work Programme 2016-2020 to the ASCC Blueprint 2025 s Strategic Measures and Key Result Areas Baseline data culled from existing data sources such as official country databases or reports, research studies from ASEAN Member States and/or from reliable sources such as ILO, ADB and ASEAN. c. Output 3 of the Project: Recommended subjects/topics for qualitative research/studies to complement the outcome-based mid-term and/or final reviews, including their rationale and scope, as applicable. All deliverables of the consultants shall be in English and in electronic form. In developing and finalising the above deliverables, the consultant will: i. Conduct desk review of ALM Work Programme 2016-2020 and other relevant documents including ASCC Blueprint 2025 and its M&E mechanisms and tools 3 ; and of existing labour-related data 3 The M&E tools include: Tool 1: ASCC Blueprint 2025 Implementation-Focused Monitoring Systems: Framework for Reporting on ASCC Sectoral Bodies Implementation of the Sectoral Work Plans Tool 2: ASCC Blueprint 2025 Implementation-Focused Monitoring Systems: Monitoring Matrix of Declarations/Statements under ASCC 3

ii. iii. iv. Attend three Workshops 4 under the Project and present the draft deliverables to and facilitate the discussion during the Workshops; Revise and finalise the draft deliverables based on inputs of SLOM and the ASEAN Secretariat given during the Workshops and through ad-referendum consultation; Submit all deliverables to the ASEAN Secretariat for adoption of SLOM and ALMM, respectively; V. INDICATIVE WORK PLAN The entire project is envisioned to be completed within an eight-month period tentatively from October 2018 to May 2019. The indicative work plan of the consultant is as follows: Task Indicative timeline i Conduct desk review of ALM Work Programme 2016- September October 2018 2020 and other relevant documents, and draft initial output-level checklist (output 1), zero-draft KPIs and baseline data (output 2) which will be used as starting point of discussion at the first Workshop ii Submit outputs 1 and 2 to ASEAN Secretariat 5 October 2018 iii Attend and facilitate the first Workshop which will be 14-15 October 2018 chaired by the SLOM Chair iv Revise outputs 1 and 2 based on the inputs from the first October November 2018 Workshop and from SLOM and submit to the ASEAN and prior to the second Secretariat Workshop v Attend and facilitate the second Workshop which will be November 2018 (TBC) chaired by the SLOM Chair vi Revise outputs 1 and 2 based on the inputs from SLOM December 2018 January and ASEAN Secretariat during and after the first 2019 and prior to the third Workshop and submit to ASEAN Secretariat Workshop vii Prepare recommendations of subjects/topics for qualitative research/studies to complement the outcomebased mid-term and/or final reviews (output 3) viii Attend and facilitate the third Workshop which will be February March 2019 chaired by the SLOM Chair ix Finalise outputs 1, 2, 3 based on the inputs from SLOM February March 2019 and ASEAN Secretariat during and after the third Workshop for endorsement by SLOM Tool 3: ASCC Blueprint 2025 Result Framework (draft indicators were developed following the 1st and 2nd ASCC M&E Workshops in March and April 2018 and are expected to be finalised by by 4 The 1 st and 2 nd Workshops will be hosted by Ministry of Human Resources of Malaysia on 3-4 October and 26-27 November 2018, respectively. The 3 rd Workshop will be hosted by the ASEAN Secretariat in Jakarta, Indonesia in Q1 of 2019. 4

VI. SUBMISSION OF DELIVERABLES The consultant will submit the deliverables to the ASEAN Secretariat for consultation with SLOM Chair and SLOM focal points. VII. EXPERTISE REQUIRED A consultant with the following qualifications and experiences will be considered: Advanced university degree in monitoring and evaluation, applied research, international development or other field relevant to the assignment. Advanced knowledge on labour issues and statistics. Proven ability to effectively process and evaluate qualitative and quantitative data. At least 10 years of professional experience in monitoring and evaluation especially for government policies and programmes, including at least three years at the regional level. Experience in developing monitoring and evaluation mechanisms for ASEAN Sectoral Bodies or for regional multi-year projects in Southeast Asia will be an advantage. Experiences working with governments and with official data of the government. Excellent verbal and written command of English and speedy responsiveness to communications Ability to communicate effectively and facilitate discussion with government officials with tact, diplomacy and cultural sensitivity. Ability to meet deadlines and deliver quality output under pressure. Familiarity in working in Southeast Asia. VIII. PROFESSIONAL FEE The consultant will be paid professional fee in tranches in accordance with the contract and subject to submission of satisfactory outputs as determined by the ASEAN Secretariat. In addition to the professional fee, international airfare and per diem (inclusive of accommodation) for the consultant to attend the three Workshops under the Project will be covered by the ASEAN Secretariat in accordance with its rules and regulations. The consultant will be responsible for his/her own travel insurance coverage during his/her travel and attendance to all the three Workshops. IX. TIMELINE OF THE PROJECT AND LOCATION OF ASSIGNMENT The assignment shall take place intermittently between September 2018 and May 2019 and is in line with the work plan of the Project. The indicative work plan 5 of the Project is as follows: 5 The timeline of the Project may be revisited and revised by SLOM. 5

Time-frame Planned Activities Sept- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- 18 18 18 18 19 19 19 19 19 Desk review and drafting of initial output-level checklist (output 1) and zero-draft KPIs and baseline data (output 2) by the Consultant Submission of outputs 1 and 2 by the consultant to the ASEAN Secretariat The 1 st Consultation Meeting/Workshop (Malaysia) Ad-referendum consultation of the outputs 1 and 2 with SLOM for comment Revision of the draft project outputs by the Consultant and submission to the ASEAN Secretariat The 2 nd Consultation Meeting/Workshop (Malaysia) Ad-referendum consultation of the revised outputs 1 and 2 with SLOM for comment Revision of outputs 1 and 2 by the Consultant and submission to the ASEAN Secretariat Preparation of recommendations of subjects/topics for qualitative research/studies to complement the outcome-based mid-term and/or final reviews (output 3) by the Consultant The 3 rd Consultant Meeting/Workshop (Jakarta) Ad-referendum consultation of the outputs 1, 2 and 3 with SLOM for final comment and endorsement Finalisation of outputs 1, 2 and 3 by the Consultant and submission to the ASEAN Secretariat Endorsement by SLOM Ad-referendum consultation with ALMM for adoption Location of the assignment will be in home country of the consultant. The consultant is required to travel and attend the three workshops under the Project. 6

X. SUBMISSION DEADLINE AND ENQUIRIES The recruitment and selection of the consultant will be conducted with formal method of quotations in line with ASEAN Secretariat Financial and Administrative Rules and Procedures 2018. Interested candidate is requested to submit his/her CV together with the quotation and other relevant documents in English language to the ASEAN Secretariat by postal mail via courier or hand delivery at: Chair of the Quotation Panel The ASEAN Secretariat 70A Jalan Sisingamangaraja, Jakarta, 12110 Indonesia The deadline of submission is 14 September 2018. Any submission beyond the deadline will not be considered. Interested candidate may contact ASEAN Secretariat to obtain further clarification and understanding of the scope of work and responsibility prior to the submission of the application. Please send your query to ASEAN Secretariat at procurement@asean.org. ************************** 7