January 1, 2015 thru March 31, 2015 Performance Report

Similar documents
October 1, 2011 thru December 31, 2011 Performance Report

April 1, 2011 thru June 30, 2011 Performance Report

July 1, 2010 thru September 30, 2010 Performance Report

April 1, 2011 thru June 30, 2011 Performance Report

October 1, 2017 thru December 31, 2017 Performance

January 1, 2015 thru March 31, 2015 Performance Report

Oct 1, 2009 thru Dec 31, 2009 Performance Report

B-11-MN October 1, 2015 thru December 31, 2015 Performance. Community Development Systems Disaster Recovery Grant Reporting System (DRGR)

B-08-MN April 1, 2018 thru June 30, 2018 Performance Report. Community Development Systems Disaster Recovery Grant Reporting System (DRGR)

January 1, 2016 thru March 31, 2016 Performance Report

January 1, 2016 thru March 31, 2016 Performance Report

October 1, 2011 thru December 31, 2011 Performance Report

B-11-MN October 1, 2018 thru December 31, 2018 Performance. Community Development Systems Disaster Recovery Grant Reporting System (DRGR)

July 1, 2014 thru September 30, 2014 Performance Report

January 1, 2016 thru March 31, 2016 Performance Report

July 1, 2016 thru September 30, 2016 Performance Report

October 1, 2014 thru December 31, 2014 Performance Report

April 1, 2013 thru June 30, 2013 Performance Report

B-11-MN April 1, 2017 thru June 30, 2017 Performance Report. Community Development Systems Disaster Recovery Grant Reporting System (DRGR)

B-08-MN October 1, 2016 thru December 31, 2016 Performance. Community Development Systems Disaster Recovery Grant Reporting System (DRGR)

July 1, 2011 thru September 30, 2011 Performance Report

B-11-UN October 1, 2017 thru December 31, 2017 Performance. Community Development Systems Disaster Recovery Grant Reporting System (DRGR)

October 1, 2016 thru December 31, 2016 Performance

July 1, 2014 thru September 30, 2014 Performance Report

July 1, 2013 thru September 30, 2013 Performance Report

January 1, 2012 thru March 31, 2012 Performance Report

January 1, 2017 thru March 31, 2017 Performance Report

January 1, 2016 thru March 31, 2016 Performance Report

April 1, 2017 thru June 30, 2017 Performance Report

January 1, 2017 thru March 31, 2017 Performance Report

October 1, 2011 thru December 31, 2011 Performance Report

October 1, 2015 thru December 31, 2015 Performance

April 1, 2013 thru June 30, 2013 Performance Report

July 1, 2011 thru September 30, 2011 Performance Report

January 1, 2014 thru March 31, 2014 Performance Report

October 1, 2014 thru December 31, 2014 Performance Report

July 1, 2014 thru September 30, 2014 Performance Report

January 1, 2017 thru March 31, 2017 Performance Report

B-08-MN October 1, 2016 thru December 31, 2016 Performance. Community Development Systems Disaster Recovery Grant Reporting System (DRGR)

B-11-DN October 1, 2015 thru December 31, 2015 Performance. Community Development Systems Disaster Recovery Grant Reporting System (DRGR)

July 1, 2013 thru September 30, 2013 Performance Report

April 1, 2011 thru June 30, 2011 Performance Report

July 1, 2016 thru September 30, 2016 Performance Report

January 1, 2016 thru March 31, 2016 Performance Report

January 1, 2012 thru March 31, 2012 Performance Report

Reviewed and Approved

July 1, 2017 thru September 30, 2017 Performance Report

B-09-DN-DE April 1, 2018 thru June 30, 2018 Performance Report. Community Development Systems Disaster Recovery Grant Reporting System (DRGR)

July 1, 2014 thru September 30, 2014 Performance Report

October 1, 2011 thru December 31, 2011 Performance Report

January 1, 2011 thru March 31, 2011 Performance Report

July 1, 2018 thru September 30, 2018 Performance Report

July 1, 2011 thru September 30, 2011 Performance Report

July 1, 2018 thru September 30, 2018 Performance Report

Reviewed and Approved

April 1, 2012 thru June 30, 2012 Performance Report

Reviewed and Approved

Reviewed and Approved

October 1, 2011 thru December 31, 2011 Performance Report

July 1, 2011 thru September 30, 2011 Performance Report

Grantee: Grant: Neighborhood Housing Services of South Florida, Inc. B-09-CN-FL-0020 April 1, 2010 thru June 30, 2010 Performance Report

B-08-UN October 1, 2018 thru December 31, 2018 Performance. Community Development Systems Disaster Recovery Grant Reporting System (DRGR)

Reviewed and Approved

October 1, 2010 thru December 31, 2010 Performance Report

April 1, 2011 thru June 30, 2011 Performance Report

April 1, 2011 thru June 30, 2011 Performance Report

Reviewed and Approved

April 1, 2011 thru June 30, 2011 Performance Report

July 1, 2011 thru September 30, 2011 Performance Report

July 1, 2018 thru September 30, 2018 Performance Report

January 1, 2018 thru March 31, 2018 Performance Report

B-08-MN April 1, 2014 thru June 30, 2014 Performance Report. Community Development Systems Disaster Recovery Grant Reporting System (DRGR)

July 1, 2013 thru September 30, 2013 Performance Report

October 1, 2014 thru December 31, 2014 Performance Report

January 1, 2011 thru March 31, 2011 Performance Report

January 1, 2010 thru March 31, 2010 Performance Report

April 1, 2014 thru June 30, 2014 Performance Report

January 1, 2012 thru March 31, 2012 Performance Report


January 1, 2016 thru March 31, 2016 Performance Report

April 1, 2012 thru June 30, 2012 Performance Report

April 1, 2016 thru June 30, 2016 Performance Report

July 1, 2017 thru September 30, 2017 Performance Report

July 1, 2017 thru September 30, 2017 Performance Report

HUD NSP-1 Reporting Apr 2010 Grantee Report - New Mexico State Program

July 1, 2015 thru September 30, 2015 Performance Report

January 1, 2016 thru March 31, 2016 Performance Report

July 1, 2013 thru September 30, 2013 Performance Report

October 1, 2013 thru December 31, 2013 Performance

City of Billings. Substantial Amendment to Annual Action Plan. FY Year Five. of the FY Consolidated Plan.

U.S. Department of Housing and Urban Development. Program Income. August 23, HUD Community Planning and Development

Reviewed and Approved

THE NSP SUBSTANTIAL AMENDMENT

October 1, 2011 thru December 31, 2011 Performance Report

April 1, 2014 thru June 30, 2014 Performance Report

October 1, 2011 thru December 31, 2011 Performance Report

January 1, 2017 thru March 31, 2017 Performance Report

July 1, 2014 thru September 30, 2014 Performance Report

July 1, 2015 thru September 30, 2015 Performance Report

DRGR Help Desk FAQ Updates: Non-Account Issues

Transcription:

Grantee: Grant: Pembroke Pines, FL B-11-MN-12-0022 January 1, 2015 thru March 31, 2015 Performance Report 1

Grant Number: B-11-MN-12-0022 Grantee Name: Pembroke Pines, FL Grant Award Amount: $2,330,542.00 LOCCS Authorized Amount: $2,330,542.00 Budget: $2,330,542.00 Obligation Date: Contract End Date: Grant Status: Active Estimated PI/RL Funds: Award Date: Review by HUD: Reviewed and Approved QPR Contact: Stephanie Hahn Disasters: Declaration Number NSP Narratives Summary of Distribution and Uses of NSP Funds: The City used NSP1 funds to address 44 units within its NSP1 target area. Among those 44 units, 36 were purchased directly by low-to-middle income households. The remaining 8 were/are being acquired and are being rehabilitated by the City for resale to low- to- middle income households.the City mapped its NSP1 assisted properties and used this data as a starting point for identifying potential NSP3 target areas. Since all of the NSP1 assisted units were purchased after July 2009, those REO units are being counted toward addressing 20% of the units within the target area identified for NSP3. The City s NSP3 award, potential NSP1 program income, and average subsidy likely needed, were used to calculate how many units could be addressed and ultimately determined the size of the NSP3 area. The City s original NSP3 target area is bordered by the Florida Turnpike to the east, Southwest 72nd Avenue to the west, Pembroke Road to the south and Pines Boulevard, Southwest 64th Way, Southwest 5th Street, Southwest 67th Avenue, Southwest 8th Street, Southwest 68th Boulevard, and Southwest 9th Street to the north. This area is located within Census Tract 1101 block group 1, 2 and a potion of block group 3. On June 20, 2012, the City commission approved to expand the NSP3 target area to all areas east of Flamingo Road within the City boundaries. The new target area was approved after a formal amendment process and 15 day comment period. How Fund Use Addresses Market Conditions: The funded activities are designed to address the abundance of vacant foreclosed properties in the City by facilitating the purchase of them by qualified low to middle income buyers with conventional, FHA and other approved loan products with responsible lending guidelines. The purchase assistance and rehabilitation programs will address the market demand for quality affordable housing. The primary purpose of the rehabilitation assistance is to provide repairs necessary to ensure safe and decent housing, and eliminate any instances of substandard housing in the market. Ensuring Continued Affordability: The City will ensure affordability of NSP assisted by implementing a 15 year affordability period for all assistance provided. Assistance will be secured by a mortgage and note held by the City. Recapture provisions involves the City receiving 100% of the NSP funding on an assisted unit or a portion of it should that housing unit cease to be the primary residence of the household receiving the assistance for the duration of the period of affordability or the terms that are agreed to between the City and household. Definition of Blighted Structure: The City s Property Maintenance Code is found under Chapter 150, Building, Section 150.95 Property Maintenance. The Property Maintenance Code declares the City s policy as the following: B) Findings and declaration of policy. (1). It is hereby found and declared that there exist in the city structures used for residential and nonresidential use which are or may become in the future, substandard with respect to structure, equipment or maintenance. (2). Conditions, including, but not limited to, structural deterioration, lack of maintenance, and appearance of exterior premises, infestation, lack of essential plumbing facilities, lack of maintenance or upkeep of essential utilities and facilities, existence of fire hazards, inadequate provisions for light and air, unsanitary conditions and overcrowding, constitute a 2

menace to the health, safety, welfare, and reasonable comfort of the citizens and inhabitants of the cit (3). It is further found and declared that by reason of lack of maintenance and because of progressive deterioration, certain properties have the further effect of creating blighting conditions and initiating slums, and that if the same are not curtailed and removed, these conditions will grow and spread and will necessitate in time the expenditure of large amounts of public funds to correct and eliminate the same, and that by reason of timely regulations and restrictions as herein contained, the growth of slums and blight may be prevented and the neighborhood and property values thereby maintained, the desirability and amenities of residential and nonresidential uses and neighborhood enhances and the public health, safety, and welfare protected and fostered. For the purposes of the NSP, a blighted structure echoes the criteria for slum and blight found in Florida Statutes Chapter 163.340, which outlines the following conditions: 1. Building deterioration 2. Site deterioration or site deficiencies 3. Unsanitary and unsafe conditions and incompatible uses 4. Six or more ownership parcels per block 5. Buildings greater than 40 years of age 6. Presence of closed/vacant buildings 7. Presence of vacant lots 8. Buildings in violation of property maintenance code violations 9. Presence of buildings scheduled for demolition A blighted structure will meet one or more of the aforementioned criteria. Definition of Affordable Rents: The City will utilize the HOME affordable rents as published and currently available should it decide to take on rental units. Housing Rehabilitation/New Construction Standards: The City of Pembroke Pines will use adopted rehabilitation standards to guide all work specifications written for NSP rehabilitated properties. The City s rehabilitation standards to the extent feasible, incorporate green rehabilitation techniques to the areas addressed in the City s residential rehabilitation standards document. The areas addressed include: A. Exterior Surface B. Foundations and Structures C. Windows and Doors D. Roofing E. Insulation/Ventilation F. Interior Standards (Including Lead and Asbestos Compliance) G. Electrical H. Plumbing, HVAC and other major mechanical systems. The City s residential rehabilitation standards comply with all applicable state and local building codes and Federal regulations that govern the CDBG/NSP program. Vicinity Hiring: To the maximum extent possible, the City will utilize Section 3 guidelines to hire residents from the local vicinity to carry out any aspect of this activity should the need arise for additional employees or contractors. The City s Section 3 (Local Jobs Initiative) forms are being incorporated into RFQ processes for NSP3. Contractors will have to submit the required forms regarding Section 3 preference and certification with the RFQ package and will provide current labor needs and proposed labor needs. Contractors will have to submit an updated report regarding their labor needs as well as the labor needs of their sub contractors (if they are using subs to meet their goals) for the specific job they are being awarded. This information will be collected prior to a Notice to Proceed being issued. The jobs utilized to meet Section 3 compliance, will once again be verified prior to the release of final payment to the contractor. Numerical goals and a hiring scale have been established for this effort. Any professional services utilized are also subject to Section 3 compliance for new hires. The City of Pembroke Pines Program Administrator will develop resources to provide training and employment opportunities to Section 3 residents by one or all of the following: posting training opportunities, contacting neighborhood organizations, and including section 3 provisions in contracts. Procedures for Preferences for Affordable Rental Dev.: The City is not undertaking rental activity. Grantee Contact Information: City of Pembroke Pines 10100 Pines Boulevard Pembroke Pines, Florida 33026 dfrank@ppines.com (954)437-1107 3

Overall Projected Budget from All Sources Budget Obligated Funds Drawdown Program Funds Drawdown Program Income Drawdown Program Income Received Funds Expended Match Contributed To Date $2,330,542.00 $2,330,542.00 $2,330,542.00 $2,330,542.00 $2,330,542.00 $876,153.40 $2,330,542.00 Progress Toward Required Numeric Targets Requirement Required Overall Benefit Percentage (Projected) Overall Benefit Percentage (Actual) Minimum Non-Federal Match Limit on Public Services $349,581.30 Limit on Admin/Planning $233,054.20 Limit on State Admin To Date 0.00% 0.00% $160,656.00 $160,656.00 Progress Toward Activity Type Targets Activity Type Target Actual Administration $233,054.20 $160,656.00 Progress Toward National Objective Targets National Objective Target Actual NSP Only - LH - 25% Set-Aside $582,635.50 $928,580.90 Overall Progress Narrative: The City's goal is to assist 15 low to middle income buyers. As of December 30,2014, 11 properties have been purchased by low- to middle-income buyers. HUD has been made aware of the competitiveness of the local market, the significantly decreased inventory of eligible NSP properties in the City and the difficulty experienced in meeting the low-income housing set aside. Previous amendments have been made to the City's NSP3 Action Plan to address meeting the low-income set-aside requirement include expanding the target area to provide a greater range of NSP eligible housing choices and increasing the level of assistance for low-income households to the amount necessary to keep housing ratio expense at 35% of total gross income or less. These steps are in addition to working with lenders, real estate agents and providing information on "First-Look" programs to applicants and continuously obtaining feedback about market conditions. Due to lack of property availability, HUD has granted the City an extension to complete expenditures. An amendment was approved during the City's May 7, 2014 Commission agenda to allow the City to 4

undertake acquisition with balance of funds available. in non-administrative NSP3 funds were allocated to activity Acq/Rehab 33. As of September 30, 2014, 100% of these funds have been expended. 100% of program funds have been expended to date. Expenditure information was mistakenly not reported on the October-December 2015 QPR. Expenditure information was mistakenly not reported on the July - September 2015 QPR. The City will be assisting additional beneficiaries with NSP1 program income. Project Summary Project #, Project Title To Date Program Funds Drawdown Project Funds Budgeted Program Funds Drawdown 9999, Restricted Balance AcqRehab--003, Acquisition/Rehab (0 to 50% AMI) Admin-004, Program Administration $160,656.00 $160,656.00 PA-001, Purchase Assistance - Financing Mechanisms (51- $546,040.00 $546,040.00 Purchase Assistance LH 25--005, Purchase Assistance $125,000.00 $125,000.00 Rehab -002, Rehabilitation (51-120% AMI) $695,265.10 $695,265.10 Rehab LH 25--006, Rehab LH25 $142,249.75 $142,249.75 5

Activities Project # / Title: AcqRehab--003 / Acquisition/Rehab (0 to 50% AMI) Grantee Activity Number: Activity Title: Activitiy Category: Acquisition - general Project Number: AcqRehab--003 Projected Start Date: 03/09/2011 Benefit Type: Acq/Rehab 33 Acq/Rehab-13 SF Units (0 to 50% AMI) Activity Status: Planned Project Title: Acquisition/Rehab (0 to 50% AMI) Projected End Date: 03/09/2014 Completed Activity Actual End Date: National Objective: NSP Only - LH - 25% Set-Aside Responsible Organization: Overall Projected Budget from All Sources Budget Obligated Funds Drawdown To Date Program Funds Drawdown Program Income Drawdown Program Income Received Funds Expended Jan 1 thru Mar 31, 2015 Match Contributed Activity Description: The City will acquire NSP eligible properties, rehabilitate them, and then resell or rent them to NSP eligible buyers participating in the program. The City will focus attention on those properties that are difficult to purchase due to extensive repairs, code violations, etc. The intent is to rehabilitate them, remove signs of blight, and then put them on the market. All properties will be purchased according to appropriate program guidelines, including the minimum discount requirement and after environmental reviews have been completed. Location Description: On June 20, 2012, the City commission approved to expand the NSP3 target area to all areas east of Flamingo Road within the City boundaries. The new target area was approved after a formal amendment process and 15 day comment period. The City s original NSP3 target area is bordered by the Florida Turnpike to the east, Southwest 72nd Avenue to the west, Pembroke Road to the south and Pines Boulevard, Southwest 64th Way, Southwest 5th Street, Southwest 67th Avenue, Southwest 8th Street, Southwest 68th Boulevard, and Southwest 9th Street to the north. 6

Activity Progress Narrative: An amendment was approved on May 7th 2014 which reallocated in non-administrative balances to this strategy. During previous quarters 3 properties were acquired under this activity. These residences were acquired, rehabilitated and are pending lottery and sale to income eligible families. In expenditures were mistakenly not reported during the October 1, 2014 - December 31, 2014 QPR reporting period. The QPR was approved prior to this reporting error being corrected. Accomplishments Performance Measures # of Properties 0 Cumulative Actual / Expected 0/3 # of Housing Units 0 # of Singlefamily Units 0 Cumulative Actual / Expected 0/0 0/0 Beneficiaries Performance Measures No Beneficiaries Performance Measures found. Activity Locations No Activity Locations found. Other Funding Sources Budgeted - Detail No Other Match Funding Sources Found Other Funding Sources No Other Funding Sources Found Other Funding Sources Amount Project # / Title: Admin-004 / Program Administration Grantee Activity Number: Activity Title: Activitiy Category: Administration Project Number: Admin-004 Projected Start Date: 03/09/2001 Admin 043 Program Admin - Consultant Activity Status: Under Way Project Title: Program Administration Projected End Date: 03/09/2001 7

Benefit Type: National Objective: NSP Only - LMMI Completed Activity Actual End Date: Responsible Organization: Overall Projected Budget from All Sources Budget Obligated Funds Drawdown To Date $159,990.00 $159,990.00 $159,990.00 $159,990.00 Program Funds Drawdown $159,990.00 Program Income Drawdown Program Income Received Funds Expended Jan 1 thru Mar 31, 2015 $159,990.00 $159,990.00 Match Contributed Activity Description: This activity will fund the planning and administrative costs related to overseeing the program, reporting and other general administrative activities. The administration of the program will be administered in by the City and City s contracted program administrator. Location Description: Activity Progress Narrative: Community Redevelopment Associates of Florida, Inc.(CRA) serves as grant administrator and oversees intake, purchase transactions and repair activities on behalf of the City of Pembroke Pines. CRA also oversees general program compliance. CRA has worked with the City to inform and consult with HUD regarding the competitiveness of the local market, the significantly decreased inventory of eligible NSP properties in the City and the difficulty experienced in meeting the low income housing set aside. CRA collaborated with the City on a final proposed amendment to expend balance of NSP3 funding. On May 7th, 2014 the City Commission approved an agenda item allowing the City to undertake acquisition with balance of funds available. With the acquisition and rehabilitation of 3 single-family residences, this strategy has since been completed. Accomplishments Performance Measures No Accomplishments Performance Measures 8

Beneficiaries Performance Measures No Beneficiaries Performance Measures found. Activity Locations No Activity Locations found. Other Funding Sources Budgeted - Detail No Other Match Funding Sources Found Other Funding Sources No Other Funding Sources Found Other Funding Sources Amount 9

Grantee Activity Number: Activity Title: Activitiy Category: Administration Project Number: Admin-004 Projected Start Date: 03/09/2011 Benefit Type: National Objective: Admin 053 Program Admin - City Activity Status: Under Way Project Title: Program Administration Projected End Date: 03/09/2014 Completed Activity Actual End Date: Responsible Organization: Overall Projected Budget from All Sources Budget Obligated Funds Drawdown To Date $666.00 $666.00 $666.00 $666.00 Program Funds Drawdown $666.00 Program Income Drawdown Program Income Received Funds Expended Jan 1 thru Mar 31, 2015 $666.00 $666.00 Match Contributed Activity Description: This activity will fund the planning and administrative costs related to overseeing the program, reporting and other general administrative activities. The administration of the program will be administered in by the City and City s contracted program administrator. Location Description: Activity Progress Narrative: The balance of funding has since been reprogrammed to assist with meeting the LH25 set-aside and close out the NSP3 grant. Accomplishments Performance Measures No Accomplishments Performance Measures 10

Beneficiaries Performance Measures No Beneficiaries Performance Measures found. Activity Locations No Activity Locations found. Other Funding Sources Budgeted - Detail No Other Match Funding Sources Found Other Funding Sources No Other Funding Sources Found Other Funding Sources Amount Project # / Title: PA-001 / Purchase Assistance - Financing Mechanisms (51- Grantee Activity Number: Activity Title: PA 013 Purchase Assistance-S. Family Units (51-120%) Activitiy Category: Homeownership Assistance to low- and moderate-income Project Number: PA-001 Projected Start Date: 03/09/2011 Benefit Type: Direct Benefit (Households) National Objective: NSP Only - LMMI Activity Status: Under Way Project Title: Purchase Assistance - Financing Mechanisms (51- Projected End Date: 03/09/2014 Completed Activity Actual End Date: Responsible Organization: Overall Jan 1 thru Mar 31, 2015 To Date Projected Budget from All Sources $546,040.00 Budget Obligated Funds Drawdown $546,040.00 $546,040.00 $546,040.00 Program Funds Drawdown $546,040.00 Program Income Drawdown Program Income Received Funds Expended $546,040.00 11

$546,040.00 Match Contributed Activity Description: The City of Pembroke Pines will make available financing mechanisms with favorable terms to eligible homebuyers with various options to be applied towards the costs of purchasing an NSP eligible property. Location Description: On June 20, 2012, the City commission approved to expand the NSP3 target area to all areas east of Flamingo Road within the City boundaries. The new target area was approved after a formal amendment process and 15 day comment period. The City s original NSP3 target area is bordered by the Florida Turnpike to the east, Southwest 72nd Avenue to the west, Pembroke Road to the south and Pines Boulevard, Southwest 64th Way, Southwest 5th Street, Southwest 67th Avenue, Southwest 8th Street, Southwest 68th Boulevard, and Southwest 9th Street to the north. Activity Progress Narrative: As of September 30, 2014, 9 properties have been purchased and have transitioned to home repair assistance. The balance of funds have been reprogrammed to acquisition strategy to assist with meeting the LH25 set-aside and close out the NSP3 grant. Accomplishments Performance Measures # of Housing Units 0 # of Singlefamily Units 0 Cumulative Actual / Expected 9/12 9/12 Beneficiaries Performance Measures Cumulative Actual / Expected Low Mod Low Mod Low/Mod # of Households 0 0 0 0/0 7/6 9/12 77.78 # Owner Households 0 0 0 0/0 7/6 9/12 77.78 Activity Locations No Activity Locations found. Other Funding Sources Budgeted - Detail No Other Match Funding Sources Found Other Funding Sources No Other Funding Sources Found Other Funding Sources Amount Project # / Title: Purchase Assistance LH 25--005 / Purchase Assistance Grantee Activity Number: 063 12

Activity Title: Purchase Assistance LH 25 Activitiy Category: Homeownership Assistance to low- and moderate-income Project Number: Purchase Assistance LH 25--005 Projected Start Date: 02/06/2013 Benefit Type: Direct Benefit (Households) National Objective: NSP Only - LH - 25% Set-Aside Activity Status: Under Way Project Title: Purchase Assistance Projected End Date: 03/01/2014 Completed Activity Actual End Date: Responsible Organization: Overall Projected Budget from All Sources Budget Obligated Funds Drawdown To Date $125,000.00 $125,000.00 $125,000.00 $125,000.00 Program Funds Drawdown $125,000.00 Program Income Drawdown Program Income Received Funds Expended Jan 1 thru Mar 31, 2015 $125,000.00 $125,000.00 Match Contributed Activity Description: Purchase Assistance for LH25 Location Description: All Areas East of Flamingo within Pembroke Pines. Activity Progress Narrative: A total of two households have purchased homes. All drawdowns and expenditures have been reconciled. Repairs on the last home is complete. On May 7th an amendment was passed to reallocated the remaining $125,000 to the Acquisition strategy. Activity is complete. Accomplishments Performance Measures # of Housing Units 0 Cumulative Actual / Expected 2/5 13

# of Singlefamily Units 0 2/5 Beneficiaries Performance Measures Cumulative Actual / Expected Low Mod Low Mod Low/Mod # of Households 0 0 0 2/5 0/0 2/5 100.00 # Owner Households 0 0 0 2/5 0/0 2/5 100.00 Activity Locations No Activity Locations found. Other Funding Sources Budgeted - Detail No Other Match Funding Sources Found Other Funding Sources No Other Funding Sources Found Other Funding Sources Amount Project # / Title: Rehab -002 / Rehabilitation (51-120% AMI) Grantee Activity Number: Activity Title: Rehab 023 Rehabilitation (51-120% AMI) Activitiy Category: Rehabilitation/reconstruction of residential structures Project Number: Rehab -002 Projected Start Date: 03/09/2011 Benefit Type: Direct Benefit (Households) National Objective: NSP Only - LMMI Activity Status: Under Way Project Title: Rehabilitation (51-120% AMI) Projected End Date: 03/09/2014 Completed Activity Actual End Date: Responsible Organization: Overall Jan 1 thru Mar 31, 2015 To Date Projected Budget from All Sources $695,265.10 Budget Obligated Funds Drawdown $695,265.10 $695,265.10 $695,265.10 Program Funds Drawdown $695,265.10 14

Program Income Drawdown Program Income Received Funds Expended $80,750.00 $695,265.10 Match Contributed Activity Description: $80,750.00 $695,265.10 The City is providing home repair assistance to households, who received NSP funds to purchase an eligible home. The activity is made possible by the financial mechanisms in place as permitted by CDBG entitlement regulations and NSP eligible uses. Location Description: On June 20, 2012, the City commission approved to expand the NSP3 target area to all areas east of Flamingo Road within the City boundaries. The new target area was approved after a formal amendment process and 15 day comment period. The City s original NSP3 target area is bordered by the Florida Turnpike to the east, Southwest 72nd Avenue to the west, Pembroke Road to the south and Pines Boulevard, Southwest 64th Way, Southwest 5th Street, Southwest 67th Avenue, Southwest 8th Street, Southwest 68th Boulevard, and Southwest 9th Street to the north. Activity Progress Narrative: $80,750.00 in rehabilitation expenses were mistakenly not reported in the October 1, 2014 - December 31 2014 QPR. These expenses were completed and drawn in the previous reporting period. The October 1, 2014 - December 31, 2014 QPR was approved prior to the neccessary correction being made. Per an amendment approved on May 7th 2014, all remaining funds have been moved to the Acquisition strategy. Activity complete. As of September 30, 2014, 9 properties have been purchased for households within this income category and have transitioned to home repair assistance. All 9 units have been completed. Beneficiary data reconciled. Accomplishments Performance Measures # of Housing Units 0 # of Singlefamily Units 0 Cumulative Actual / Expected 8/12 8/12 Beneficiaries Performance Measures Cumulative Actual / Expected Low Mod Low Mod Low/Mod # of Households 0 0 0 0/0 5/6 8/12 62.50 # Owner Households 0 0 0 0/0 5/6 8/12 62.50 Activity Locations No Activity Locations found. Other Funding Sources Budgeted - Detail No Other Match Funding Sources Found 15

Other Funding Sources No Other Funding Sources Found Other Funding Sources Amount Project # / Title: Rehab LH 25--006 / Rehab LH25 Grantee Activity Number: Activity Title: 073 Rehab LH 25 Activitiy Category: Rehabilitation/reconstruction of residential structures Project Number: Rehab LH 25--006 Projected Start Date: 02/06/2013 Benefit Type: Direct Benefit (Households) National Objective: NSP Only - LH - 25% Set-Aside Activity Status: Under Way Project Title: Rehab LH25 Projected End Date: 03/01/2014 Completed Activity Actual End Date: Responsible Organization: Overall Projected Budget from All Sources Budget Obligated Funds Drawdown To Date $142,249.75 $142,249.75 $142,249.75 $142,249.75 Program Funds Drawdown $142,249.75 Program Income Drawdown Program Income Received Funds Expended Jan 1 thru Mar 31, 2015 $134,072.25 $134,072.25 $142,249.75 $142,249.75 Match Contributed Activity Description: Rehab of LH25 properties Location Description: All areas East of Flamingo Activity Progress Narrative: 16

An addtional property transitioned to this category during the January - March of 2014 quarter. Repairs have been completed. $81,625.00 In expenditures in this category were mistakenly not reported in the October 1, 2014 - December 31, 2014 reporting period. These expenditures were completed and drawn in the previous reporting period. The October 1, 2014 - December 31, 2014 QPR was approved prior to these corrections being made. $52,447.25 In expenditures in this category were mistakenly not reported in the July 1, 2014 - September 30, 2014 reporting period. These expenditures were completed and drawn in the July 1,2014 - September 30,2014 reporting period. The July 1, 2014 - September 30, 2014 QPR was approved prior to these corrections being made. The remaining balance has been reprogrammed to assist with meeting the LH25 set-aside and closing out the NSP3 grant with the extension provided by HUD. Accomplishments Performance Measures # of Housing Units 0 # of Multifamily Units 0 # of Singlefamily Units 0 Cumulative Actual / Expected 0/10 0/5 0/5 Beneficiaries Performance Measures Cumulative Actual / Expected Low Mod Low Mod Low/Mod # of Households 0 0 0 0/5 0/0 0/5 0 # Owner Households 0 0 0 0/5 0/0 0/5 0 Activity Locations No Activity Locations found. Other Funding Sources Budgeted - Detail No Other Match Funding Sources Found Other Funding Sources No Other Funding Sources Found Other Funding Sources Amount 17