Risk Management for Tunnel Planning, Design and Construction

Similar documents
Guidelines for Improved Risk Management on Tunnels and Underground Structures in the United States of America

Risk Management Guidelines

Item. Metro Contingency and Risk Management

Risk Management Framework

Cost Risk Assessment Building Success and Avoiding Surprises Ken L. Smith, PE, CVS

Project Management Certificate Program

Cost Risk Assessments Planning for Project or Program Uncertainty with Confidence Brian Bombardier, PE

Contractor Prebid and Schedule Risk

Risk management procedures

Risk Management Framework. Group Risk Management Version 2

RISK MANAGEMENT ON USACE CIVIL WORKS PROJECTS

RISK AND OPPORTUNITY ASSESSMENT GUIDE RISK CRITERIA

Best Practices for Capital Projects. Agenda

Approved by: Diocesan Council 17 December 2015

CRAVE. Cost Risk Assessment + Value Engineering. CSVA 2011 Conference Toronto, Ontario Nov 14-16, Ken L. Smith, PE, CVS

RISK MANAGEMENT FRAMEWORK

The Engineers Joint Contract Documents Committee Releases 2013 editions of the EJCDC Construction Series (C-Series) documents

NIAGARA TUNNEL PROJECT QUALITATIVE RISK ASSESSMENT REPORT

GOV : Enterprise Risk Management Policy

Risk Workshop Session 1. Malcolm Leinster

Risk Assessment of the Niagara Tunnel Project

Kidsafe NSW Risk Management Plan. August 2014

RISK MANAGEMENT FRAMEWORK

Presented to: Eastern Idaho Chapter Project Management Institute. Presented by: Carl Lovell, PMP Contract and Technical Integration.

Crowe, Dana, et al "EvaluatingProduct Risks" Design For Reliability Edited by Crowe, Dana et al Boca Raton: CRC Press LLC,2001

SIL and Functional Safety some lessons we still have to learn.

Project Selection Risk

Conceptualisation Stage Continued

A Study on Risk Analysis in Construction Project

CNAM Risk Management for Utility Managers

Risk Allocation in Underground Construction and the Benefits of the ECI/Portland Model Approach

Contract HSE Management/Part I

Risk Management & FMEAs. By Jay P. Patel, ASQ Fellow CEO & President QPS Institute

Risk Management Plan for the <Project Name> Prepared by: Title: Address: Phone: Last revised:

BENCHMARK ANALYSIS ON- LAND PIPELINE SAFETY SYSTEMS

Every project is risky, meaning there is a chance things won t turn out exactly as planned.

CITY OF PORT ORCHARD DEPARTMENT OF PUBLIC WORKS REQUEST FOR QUALIFICATION (RFQ) Pavement Repair Projects Ad Ready Design (PS&E) August 2018

How to Avoid the Common Problems When Using Risk Management

Common Safety Methods CSM

London 2012 Risk Management. 12 th May 2011

Sections of the ORSA Report

RISK ANALYSIS GUIDE FOR PRIVATE INITIATIVE PROJECTS

Fire Australia 2017 Quantification of Fire Safety Fire Safety Engineering Stream

APPENDIX 1. Transport for the North. Risk Management Strategy

Topic RISK MANAGEMENT Procedure Category Risk Management Updated 07/2011

Integrated Risk Management Framework Sept Page 1 of 17

Audit Department. Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2017 Qtr 1

Audit Department. Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2015 Qtr 3

Master Class: Construction Health and Safety: ISO 31000, Risk and Hazard Management - Standards

SCAF Workshop Integrated Cost and Schedule Risk Analysis. Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol

2014 Own Risk and Solvency Assessment (ORSA) Feedback Pilot Project Observations of the Group Solvency Issues (E) Working Group

Table of Contents Advantages Disadvantages/Limitations Sources of additional information. Standards, textbooks & web-sites.

Risk Management Plan for the Ocean Observatories Initiative

Risk Assessment for Drug Products with Device Components

Risk Management Strategy

Risk assessment Policy and Procedures

Managing Project Risk DHY

UNIVERSITY OF ABERDEEN RISK MANAGEMENT FRAMEWORK

P3 Fundamentals and Best Practices in Resource and Project Management

MINDA INDUSTRIES LIMITED RISK MANAGEMENT POLICY

An Update On Association Policies, Health Checks & Guidelines To A Safer Hockey Association. Lauren Woods Member Engagement & Operations

Audit Department. Winnipeg Police Service Headquarters Construction Project Status of Audit Recommendations 2015 Qtr 2

Risk Management Framework. Metallica Minerals Ltd

Applying Risk-based Decision-making Methods/Tools to U.S. Navy Antiterrorism Capabilities

Objectives. What is Risk? But a Plan is not Reality. Positive Risks? What do we mean by Uncertainty?

BASE CAPEX PROPOSAL - QUALITATIVE INFORMATION

Risk and Risk Management. Risk and Risk Management. Martin Schedlbauer, Ph.D., CBAP, OCUP Version 1.1

A SIMPLE METHOD OF RISK/HAZARD ASSESSMENT IN DREDGING

Risk Management Policy and Framework

Classification Based on Performance Criteria Determined from Risk Assessment Methodology

Gr an t Writing Federal Non-Construction Proposal Elements

HSC Business Services Organisation Board

EZ Way Lunch & Learn Webinar Series Presented by Equitable Safety Group. Making Cents. The Business Case for Safe Patient Handling November 13, 2008

Presented at the 2010 ISPA/SCEA Joint Annual Conference and Training Workshop -

Revenue for the engineering and construction industry

Risk Assessment Procedure

Scouting Ireland Risk Management Framework

Project Risk Management. Prof. Dr. Daning Hu Department of Informatics University of Zurich

Use of QRM to Quantify Particulate Contamination Risks

M_o_R (2011) Foundation EN exam prep questions

Information Technology Project Management, Sixth Edition

Note: This policy incorporates key elements of the former Risk Taking and Assessment Policy (SO-0080).

USF System Compliance & Ethics Program. Risk Assessment Process. Enterprise-Wide Risk Assessment

Evaluating Schedule Impacts. By: Wendy Kaszycki, PE Randa Jarjour, CCE 12/06/06

Managing Project Risks. Dr. Eldon R. Larsen, Marshall University Mr. Ryland W. Musick, West Virginia Division of Highways

People s Republic of China TA 8940: Municipality-Level Public Private Partnership (PPP) Operational Framework for Chongqing

2013 Construction Series. Highlights

YACHTING AUSTRALIA. Club Risk Management Template. A Practical Resource for Clubs and Centres

BCE Guidance. Advanced Wastewater Treatment Plant. Version 1.0

Impressions from Applying ISO to an Avalanche Mitigation Project

Risk Management Guideline July, 2017

Guide to an ERM Risk Map and Working in Practice

CITY OF PORT ORCHARD DEPARTMENT OF PUBLIC WORKS REQUEST FOR QUALIFICATION (RFQ)

Fundamentals of Project Risk Management

Value for Money Analysis: Choosing the Best Project Delivery Method. Ken L. Smith, PE, CVS -HDR Engineering, Inc.

Nagement. Revenue Scotland. Risk Management Framework. Revised [ ]February Table of Contents Nagement... 0

FIRMA Nashville Tennessee April 21, 2015

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF PROGRAM MANAGER 1. BASIC SERVICES A-1 2. GENERAL PROGRAM SERVICES A-6

Qualitative versus Quantitative Analysis. two types of assessments Qualitative and Quantitative.

Operational Risk Management

Transcription:

ALDEA SERVICES Risk Management for Tunnel Planning, Design and Construction Robert J F Goodfellow, P.E. Senior Vice President August 14, 2017

UNIVERSAL LAWS OF TUNNELING Major Tunnel Project? DON T TAKE THE BUS!

CUT AND COVER IS LOW RISK

GEOTECHNICAL RISK MUST BE MANAGED

STATE OF THE PRACTICE REVIEW Topics Covered Principles of risk management Risk registers and their use at all stages of a tunnel project Risk Allocation Report and its use in design, procurement and construction Quantitative Risk Analysis What is risk management? EVERYTHING YOU HEAR THIS WEEK!

CORRECTLY ASSESSING YOUR PROJECT RISKS IS IMPORTANT

PRINCIPLES OF RISK MANAGEMENT

RISK MANAGEMENT IS A PROCESS START Identify Risks What Could Go Wrong? Assess Risks Quantify / Rank Identify Control Measures Mitigation / Management / Control Risk Mitigated Risk & Opportunity Register N Y Risk Eliminated Update Risk Register Residual Risk Acceptable? Risk Allocated Implement Control Measures Monitor

SOMETIMES THE RISKS ARE OBVIOUS TO ANYBODY

DON T WORRY, THERE IS GUIDANCE FOR THE UNDERGROUND INDUSTRY Code of practice exists for underground risk management Particulars include: Experience most important aspect of project team Use risk registers to present and organize hazards Be open and transparent about awareness of project risks

TUNNEL PROJECT RISK MANAGEMENT US Practice established by this document Published and available online Rigorous industry review carried out prior to publication Published by UCA of SME

GOODFELLOW S PREFERRED RISK REGISTER FORMAT Risk Description Risk likelihood Financial Project Schedule Risk consequence Social Environment Regulatory/ Legal Health and Safety Operating & Maintenance Natural Environment Risk Score Indicators Control or Metrics Measures (Measurin Implemented g the (actually in place effect of today) Control Measures) Residual Likelihood - After Mitigation (Blank = Risk Closed) Residual Consequence - Once Controls in Place Financial Project Schedule Social Environment Regulatory/ Legal Health and Safety Operating & Maintenance Natural Environment Residual Risk Score - After Mitigation Action Action Item for Risk Mitigation Action Item Completion Date (Target Date) Respon sible Party or Risk Owner Actual ground conditions different to GBR baselines, due to unexpected changes in ground conditions, that leads to minor DSC claims, increased project costs, and/or project delays 4 4 4 16 Geotechnical Distributio investigation and n of lab laboratory testing test results 2 4 4 8 Create contractual baselines see schedule J. Doe

RISK REGISTERS IDENTIFICATION AND INITIAL ASSESSMENT OF RISK Risk consequence Risk Description Actual ground conditions different to GBR baselines, due to unexpected changes in ground conditions, that leads to minor DSC claims, increased project costs, and/or project delays Risk likelihood Financial Project Schedule Social Environment Regulatory/ Legal Health and Safety Operating & Maintenance Natural Environment Risk Score 4 3 4 16

LIKELIHOOD RATINGS AND RISK SCORE TABLE Probability Rating AKA 5 Consequence 5 Probable 4 4 Likely 3 3 Possible 2 2 Unlikely 1 1 Improbab le 1 2 3 4 5 Probability

CONSEQUENCE SCORING CATEGORIES Risk Consequence Rating Consequence Low High Criterion 1 2 3 4 5 Financial Less than $100k $100k $750k $750k $2 million $2 million $13 million Greater than $13 million Project Schedule 1 to 7 days 7 to 21 days 21 to 90 days 3 to 9 months 9 months to 1 year or Impacts Social environment Complaints from local public Regulatory / Legal Isolated noncompliance Inquiry from local officials/ politicians Potential noncompliance with potential for thirdparty claims Complaints from local officials/ politicians Systematic noncompliance with potential for fines or third party claims less than $100k Major local impact or minor national impact Systematic noncompliance with potential for fines or third party claims greater than $100k more National and international adverse coverage or impacts Non-compliance with potential for significant implications for senior personnel and potentially large damages Health & Safety Operating and Maintenance Natural Environment Minor injury or near-miss (nonreportable) Minor increase in expected O&M activity (barely measurable) Minor short term local impact Minor injury (reportable) Measurable increase in expected O&M activity Major short term local impact Major injury and/ or multiple minor injuries, including minor traffic accidents-public Major increase in O&M activity or any shutdown not requiring access to tunnel short term regional impact Multiple major injuries, minor injury to public Planned shutdown of tunnel for 3 to 6 months or any unplanned shutdown involving surface work Long term local impact Significant injury to public or any fatalities Unplanned loss of service or shutdown requiring access to tunnel, or catastrophic loss of service to tunnel or valves Long term regional impact

RISK REGISTERS RISK MANAGEMENT AND ALLOCATION Control Measures Implemented (actually in place today) Indicators or Metrics (Measuring the effect of Control Measures) Residual Likelihood - After Mitigation (Blank = Risk Closed) Residual Consequence - Once Controls in Place Financial Project Schedule Social Environment Regulatory/ Legal Health and Safety Operating & Maintenance Natural Environment Residual Risk Score - After Mitigation Action Action Item for Risk Mitigation Action Item Completio n Date (Target Date) Respons ible Party or Risk Owner Geotechnical investigation and laboratory testing Distribution of lab test results 2 3 4 8 Create contractual baselines see schedule J. Doe

USING THE RISK REGISTER TO MANAGE RISK Should be a single consolidated location for all foreseeable project risk Owner, designer, contractor must use the same risk register Forward-looking document to consider upcoming hazards NOT a checklist of all the bad things that have happened!

STATING THE OBVIOUS IS HELPFUL SOMETIMES

RISK REGISTER DURING DESIGN BUILD PROCUREMENT Risk register should be a contract document Well established process Risk register requested as part of the bid used during one-on-one meetings Best value selection Allows the risk mitigation strategy to be used as part of selection Process can be molded to suit agency

RISK REGISTER THROUGH DESIGN BID BUILD PROCUREMENT Risk register should still be a contract document but rarely used this way Remove fully mitigated risks Issues such as obtained permits, finance, design process risks etc. Be clear on contractual allocation of residual risk Location in contract where risk considered Use a Risk Allocation Report

WHAT IS A RISK ALLOCATION REPORT? Purpose: clarify how risks are considered in contract document Assists contractor with familiarization of contract documents Narrative support to risk register References contract clauses Explains how risks are allocated States mitigation action necessary Considers all sources of potential conflict

DO YOU KNOW THE RISKS YOU ARE TAKING?

WRITING A RISK ALLOCATION REPORT? Written at 90% design stage Should contain no new information Most risks require a single simple reference to the contract Some risks need a more detailed narrative to describe fully Writing report is similar to claim analysis In depth analysis of each major risk issue Narrative description of that issue

USING A RISK ALLOCATION REPORT Does not supersede any other contract document Helps to promote a well thought out design Subject of discussion during procurement Pre-advertisement workshop Pre-bid meeting Assists with administration of contract during construction

QUANTIFICATION RISK RATING TABLE

BASE COST TEMPORAL DISTRIBUTION

ESCALATION AND TOTAL CONSTRUCTION COST Year 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Annual Escalation Rate 2.3% 2.5% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% 3.1% Compounded Escalation Rate 2.3% 4.9% 8.1% 11.5% 14.9% 18.5% 22.2% 25.9% 29.9% 33.9% 38.0% 42.3% 46.7% 51.3% 55.9% 60.8% Based on ENR's Construction Cost Index (CCI). 2015 historic data, 2016 ENR predicted, 2017-2029 estimated same as previous 20 year average Color Key: Escalation Purple Risk Cost Red Base cost Blue

CONSTRUCTION COST DISTRIBUTION PROFILE

CONSTRUCTION COST CONFIDENCE LEVELS

CONSTRUCTION TIME DELAY PROBABILITY DISTRIBUTIONS Pre-Mitigation Post-Mitigation

CRITICAL PATH DELAY DISTRIBUTION PROFILE

QUANTITATIVE ANALYSIS BE CAREFUL WITH STATISTICS Critical factors in this process include: Experience in obtaining correct input Strict mathematical discipline with analysis and model Clarity rather than over-simplification in output There is a right answer but you must be ready to defend your method Useful analysis at milestone points of design and construction Assessing prudent budget contingency required during design Assessing when to release that contingency during construction Not as effective in managing day-to-day project risk as qualitative methods

CONCLUSIONS Risk register should be a contract document Risk register supported by a Risk Allocation Report Design risk register should be scrubbed thoroughly before being used during procurement Risk register should have contractor-identified risks added in a workshop held before NTP All contractual parties must respond positively for full project risk management benefits to be recognized Use qualitative methods for day-to-day management of project risk Quantitative methods can be used effectively at project milestones to check and potentially release contingency

ACKNOWLEDGE THE POTENTIAL HAZARDS AROUND YOU

BE JUDICIOUS ABOUT YOUR RISK ASSESSMENT

AVOID THE BAD GUYS

DON T GO INTO RISK MANAGEMENT HALF WAY!

QUESTIONS? The Documents Better Contracting Practices Manual 2008 Update Codes of Practice BTS (2003) and ITIG (2012) Guidelines for Improved Risk Management UCA of SME (2015) The Tools The Contract! Risk register Risk Allocation Report Qualitative and quantitative management of risk