INVESTOR PRESENTATION JUNE 2018

Similar documents
INVESTOR PRESENTATION JUNE 2018

BMO Infrastructure & Utilities Conference February 8, 2018 Toronto

CIBC CALGARY FIXED INCOME CONFERENCE. April 11, 2018

2018 INVESTOR DAY PRESENTATION SEPTEMBER 14, 2018

CANADIAN UTILITIES LIMITED 2013 MANAGEMENT S DISCUSSION AND ANALYSIS

CANADIAN UTILITIES LIMITED ANNUAL INFORMATION FORM

EDITED TRANSCRIPT. Q ATCO Ltd. (TSX: ACO.X, ACO.Y) and Canadian Utilities Limited (TSX: CU, CU.X) Earnings Calls

CANADIAN UTILITIES LIMITED 2013 ANNUAL INFORMATION FORM

AltaGas Utilities Inc.

Decision D Alberta PowerLine L.P. Tariff Application. January 23, 2018

CU INC ANNUAL INFORMATION FORM

Forward looking statements

Debt Investor Meetings November 2013

Decision D Rebasing for the PBR Plans for Alberta Electric and Gas Distribution Utilities. First Compliance Proceeding

BMO 2015 Fixed Income Conference. Todd Stack VP & Treasurer

Brookfield Renewable Energy Partners (BEP)

Canadian Utilities Limited Year End 2018 Results Conference Call Transcript

Q2/17 Quarterly Report

Alberta Electric System Operator 2017 ISO Tariff Update

November th Annual EEI Financial Conference. Brett Gellner Chief Financial Officer

INVESTOR PRESENTATION. January, 2019

Wired for Growth First Quarter 2017

THIRD QUARTER REPORT FOR 2007

Alberta Electric System Operator 2018 ISO Tariff Application

Alberta Electric System Operator

Alberta Electric System Operator Amended 2018 ISO Tariff Application

Alberta Utilities Commission

Q INTERIM REPORT

Alberta Utilities Commission

2014 Investor Day Positioned for Growth

Fair Prices and Debt-Free Operation for Alberta s Electricity Market

Statement of Financial Position (unaudited)

EPCOR Energy Alberta GP Inc.

Immediate Attention for Piikani Nation Members

Enbridge Battle Sands 594S Substation Connection Needs Identification Document

Q INTERIM REPORT

Decision ATCO Electric Ltd. February 1, 2013 Interim Tariff. January 18, 2013

AltaLink, L.P. (unaudited)

FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS

portfolio is located primarily in eastern Canada and Washington State.

October 8, 2015 Brookfield Renewable Energy Partners

Decision D Generic Cost of Capital. Costs Award

Decision The ATCO Utilities. Corporate Costs. March 21, 2013

JULY 22, Readers should also read the "Forward-Looking Information" legal advisory contained at the end of this MD&A.

Statement of Financial Position (unaudited)

CONSOLIDATED FINANCIAL REVIEW

CIBC 11th Annual Whistler Institutional Investor Conference

Condensed Interim Financial Statements and Review. Balancing Pool. For the three months ended March 31, 2018 (Unaudited)

FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS

MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

ENMAX Power Corporation

CIBC 2014 Institutional Investor Conference Dawn Farrell Chief Executive Officer

Second Quarter & Year-to-Date 2007 Results

Positioned for Growth. Business Review & Outlook

Capital Power reports fourth quarter and year-end 2017 results

Decision ATCO Gas General Rate Application Phase I Compliance Filing to Decision Part B.

TransAlta Corporation

Audited Financial Statements For the years ended December 31, 2017 and 2016

Financial Statements. AltaLink, L.P. Years ended December 31, 2010 and 2009

Investor Relations Presentation Q Investing in Our Networks

Media Inquiries: Glenn Herchak/Kurt Kadatz (403) Analyst Inquiries: David Moneta (403)

APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST

TransAlta Corporation Investor Presentation November 2018

contents Page Part 1 Introduction 2 Part 2 Performance Review 3 Part 3 Analysis of Consolidated Financial Statements 29

Unaudited Interim Financial Statements For the three months ended March 31, 2017

Audited Financial Statements For the years ended December 31, 2018 and 2017

J.P.Morgan Energy Equity Conference June 27, 2017 FORTIS INC. WIRED FOR GROWTH

2018 Annual General and Special Meeting

Brookfield Renewable Energy Partners L.P. Q INTERIM REPORT

TRANSALTA CORPORATION

CANADIAN UTILITIES LIMITED FOR THE YEAR ENDED DECEMBER 31, CONSOLIDATED FINANCIAL STATEMENTS

Q4/17 Analyst Conference Call

Brookfield Renewable Partners

EPCOR Utilities Inc. Investor Presentation May President & Chief Executive Officer Senior Vice President & Chief Financial Officer

Building on strengths

British Columbia s Business Advantages

Decision D FortisAlberta Inc PBR Capital Tracker True-Up and PBR Capital Tracker Forecast

Decision D FortisAlberta Inc. Light-Emitting Diode (LED) Lighting Conversion Maintenance Multiplier Filing for 30 Customers in 2018

Energy BUSINESS PLAN ACCOUNTABILITY STATEMENT THE MINISTRY

Unaudited Condensed Interim Financial Statements For the three months ended March 31, 2018

EPCOR Distribution & Transmission Inc.

TransAlta Renewables Inc. Investor Presentation January 2018

Financial Statements For the years ended December 31, 2015 and 2014

Shell Canada Limited and Canadian Natural Resources Limited

Filed: , EB /EB , Exhibit JT1.21, Attachment 1, Page 1 of November 2017

Daishowa-Marubeni International Ltd.

Brookfield Renewable Energy Partners L.P. INVESTOR SUPPLEMENT FOR THE YEAR ENDED DECEMBER 31, 2011

TRANSALTA CORPORATION

Decision D FortisAlberta Inc Performance-Based Regulation Capital Tracker True-Up. January 11, 2018

Investing in Our Networks

Q I N T E R I M R E P O R T. Brookfield Renewable Partners L.P.

Brookfield Renewable Partners

Brookfield Renewable Energy Partners L.P. ANNUAL REPORT 2012

2011 ANNUAL REPORT. WorldReginfo - 38b4bd71-660b-4b68-ad0e-b077329f96bc

Alberta Utilities Commission

Unaudited Condensed Interim Financial Statements For the three and nine months ended September 30, 2018

EPCOR Distribution & Transmission Inc.

Service area. EPCOR Distribution & Transmission Inc. a) Subject to rules b), c), d), and e),

Operations. Total Assets $15 Billion (as at December 31, 2012) Non-Regulated Operations. Regulated Utility Operations.

Kneehill Rural Electrification Association Ltd.

Transcription:

INVESTOR PRESENTATION JUNE 2018

LEGAL DISCLAIMER Statements made by representatives for ATCO Ltd. and Canadian Utilities Limited and information provided in this presentation JUNE be considered forward-looking statements. By their nature, such statements are subject to numerous known and unknown risks and uncertainties and therefore actual results JUNE differ materially from those currently anticipated. ATCO Ltd. and Canadian Utilities Limited disclaim any intention or obligation to update or revise such statements. Due to the nature of the Corporation s operations, quarterly revenues and earnings are not necessarily indicative of annual results. 1

ORGANIZATIONAL STRUCTURE 1 Retail Energy was launched in early 2016 to provide retail, commercial and industrial electricity and natural gas service in Alberta. 2 Regulated operations include ATCO Gas, ATCO Pipelines, ATCO Gas Australia, ATCO Electric Distribution, and ATCO Electric Transmission. 3 Alberta PowerLine General Partner Ltd. is the general partner of Alberta PowerLine Limited Partnership (Alberta PowerLine or APL), a partnership between Canadian Utilities Limited (80 per cent) and Quanta Services, Inc. (20 per cent). 2

THE ATCO GROUP OF COMPANIES With approximately 7,000 employees and assets of $22 billion, ATCO is a diversified corporation providing sustainable, innovative and comprehensive energy solutions globally. Electricity 87,000 kms of electric power lines 19 power plants globally 2,517 MW power generating capacity Structures & Logistics Operations on 4 continents 7 manufacturing plants and nearly 1,000,000 sq ft of manufacturing space globally Current Operations ATCO (TSX: ACO.X / ACO.Y ) ~$5 billion common equity capitalization Canadian Utilities (TSX: CU / CU.X) ~$9 billion common equity capitalization CU Inc. ~$7.5 billion debt capitalization Pipelines & Liquids 64,500 kms of pipelines 85,200 m 3 /d water infrastructure capacity 52 PJ natural gas storage capacity 400,000 m 3 hydrocarbon storage capacity 3

ASSET GROWTH We have more than doubled in size since 2009 ATCO Canadian Utilities $4.1B $21.8B $4.1B $20.8B $7.6B $7.6B $10B $0.1B $9.1B Structures Electricity Pipelines 2016 2009 2017 & Logistics & Liquids 2009 Electricity Pipelines & Liquids 2017 4

REGULATED UTILITY GROWTH Regulated Capital Investment $2.2B $1.5B $1.1B $1.2B $8.9B Mid-Year Rate Base $10.3B $11.9B $13.0B $12.5B $190M Regulated Adjusted Normalized Earnings $230M $252M $291M $318M $2.3B 2013 2014 2015 2016 2017 2013 2014 2015 2016 2017 2013 2014 2015 2016 2017 5

UTILITIES ACHIEVE TOP TIER RETURNS ON EQUITY 14% 13% 12% 11% 10% 9% CU Inc. ROE +2.33% on average above AUC approved ROE from 2007-2017 8% 7% 6% 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Alberta Utility Average (excluding CU) CU Inc. Average AUC Approved Alberta Utility average is a simple average and includes: AltaGas, AltaLink, Enmax Distribution, Enmax Transmission, EPCOR Distribution, EPCOR Transmission, and Fortis Alberta. ** CU Inc. average is a simple average and includes: Electric Distribution, Electric Transmission, Natural Gas Distribution, and Natural Gas Transmission. Further details on the individual ROEs can be found in this Appendix. 6

GROWING A HIGH QUALITY EARNINGS BASE REGULATED ADJUSTED EARNINGS AS A PERCENTAGE OF TOTAL ADJUSTED EARNINGS ATCO Canadian Utilities 93% 99% 51% 65% 2013 2017 2013 2017 7

CONTINUED DIVIDEND GROWTH ATCO 25 year track record of increasing common share dividends* $1.51 per share Canadian Utilities $1.57 per share Longest track record of annual dividend increases of any Canadian publicly traded company* 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 * On April 4, 2018, ATCO declared a second quarter dividend of $0.3766 per share, or $1.51 per share annualized. *On April 4, 2018, Canadian Utilities declared a second quarter dividend of $0.3933 per share, or $1.57 per share annualized. 8

GROWTH: $1.8B OF CAPITAL INVESTMENT IN 2017 5% 29% Regulated Utility Capital Long-term Contracted Capital Other 66% 9

CONTINUED REGULATED UTILITY CAPITAL INVESTMENT ELECTRIC TRANSMISSION $211M NATURAL GAS DISTRIBUTION $372M ELECTRIC DISTRIBUTION $227M NATURAL GAS TRANSMISSION $297M 10 INTERNATIONAL NATURAL GAS DISTRIBUTION $92M

2017 ADJUSTED EARNINGS ATCO Canadian Utilities $590M $602M $360M $335M 2016 2017 2016 2017 11

REGULATED EARNINGS GROWTH IN 2017 ATCO Adjusted Earnings Canadian Utilities Adjusted Earnings $550M $593M $292M $313M $68M $22M $40M $9M 2016 2017 2016 2017 Regulated Businesses Non-Regulated Segment Businesses & Corporate 2016 2017 2016 2017 Regulated Businesses Non-Regulated Segment Businesses & Corporate 12

FIRST QUARTER 2018 ADJUSTED EARNINGS $116M $99M Lower earnings mainly due to rate rebasing under Alberta s regulated model Q1 2017 Q1 2018 13

FIRST QUARTER 2018 ADJUSTED EARNINGS: OPERATING IMPROVEMENTS FLOW INTO CUSTOMER RATES ELECTRIC DISTRIBUTION DEEMED REVENUE FOR OPERATING COSTS 14

PBR 2.0 HIGHLIGHTS Productivity Adjuster (X Factor) PBR 1.16% PBR 2.0 0.30% O&M Treatment of Capital Expenditures Based on approved 2012 forecast O&M levels; inflated by I-X thereafter over the PBR term Recovered through going-in rates inflated by I-X Significant capital expenditures not fully recovered by the I-X formula and meeting certain criteria recovered through a K Factor Based on the lowest annual actual O&M level during 2013-2016, adjusted for inflation, growth and productivity to 2017 dollars; inflated by I-X thereafter over the PBR term Recovered through going-in rates inflated by I-X and a K Bar that is based on inflation adjusted average historical capital expenditures for the period 2013-2016. The K Bar is calculated annually and adjusted for the actual WACC Significant capital costs that are extraordinary, not previously incurred and required by a third party recovered through a Type I K Factor Efficiency Carry-over Mechanism (ECM) ECM up to 0.5% additional ROE for the years 2018 and 2019 based on certain criteria ECM up to 0.5% additional ROE for the years 2023 and 2024 based on certain criteria 15

REGULATORY UPDATE Getting back to prospective rate making 2018 to 2020 Generic Cost of Capital (GCOC) 2017 2018 Decision Expected Decision Expected 2019 2020 Decision Expected Gas and Electric Distribution 2018 to 2020 Performance Based Regulation (PBR) 2.0 2017 2018 Decision Received Decision Expected 2019 2020 Decision Expected Electric Transmission 2018 to 2019 General Tariff Application (GTA) 2017 2018 Decision Expected Decision Expected 2019 2020 Decision Expected Gas Transmission 2017 to 2018 General Rate Application (GRA) 2017 2018 Decision Received 2019 to 2020 GRA expected filing Decision Expected 2019 to 2020 Decision Expected 2019 2020 Decision Expected 16

STRATEGIC PRIORITIES FOR 2018 AND BEYOND 17

STRUCTURES & LOGISTICS LOWER EARNINGS BUT CONTINUED STRONG CASH FLOW GENERATION Adjusted Earnings Funds Generated By Operations $110M $85M $43M $6M 2016 2017 2016 2017 18

GROWTH STRATEGY: STRUCTURES & LOGISTICS Right-sizing space rental fleet to lower fixed operating costs Improving space rental utilization 13,629 13,456 8,723 9,419 2016 2017 Total Space Rental Units 2016 2017 Total Space Rental Units Utilized 19

GROWTH STRATEGY: STRUCTURES & LOGISTICS Diversifying the global customer base into non-traditional modular markets such as public education facilities, high density urban residential housing and correctional facilities 130-student dormitory Langley, Canada Melbourne Girls Grammar Melbourne, Australia 20

GROWTH STRATEGY: STRUCTURES & LOGISTICS EXPANDING GEOGRAPHICALLY IN SELECT GLOBAL MARKETS Current Operations 21

GROWTH: CONTINUED CAPITAL INVESTMENT $4.5B OF PLANNED CAPITAL INVESTMENT 2018 TO 2020 22

RATE BASE GROWTH Regulated Capital Investment Mid-Year Rate Base Expected to Grow 4% - 5% per year $1.2B $1.1B $1.5B $1.1B $1.2B $1.2B $8.9B $10.3B $11.9B $12.5B $13.0B $2.2B $2.3B 2013 2014 2015 2016 2017 2018 2019 2020 2013 2014 2015 2016 2017 2018 2019 2020 23

GROWTH: LONG-TERM CONTRACTED CAPITAL INVESTMENT HYDROCARBON STORAGE COGENERATION HYDROELECTRIC GENERATION FORT MCMURRAY WEST 500 KV TRANSMISSION $1.0 BILLION (2018 2020) 24

GROWTH: GLOBAL EXPANSION Mexico Hydro Acquisition and Cogeneration In December 2017, Canadian Utilities announced the $114 million acquisition of a long-term contracted, 35 MW hydroelectric power station based in Veracruz, Mexico. In March 2018, Canadian Utilities announced it will build a 26 MW electricity cogeneration facility under a long-term contract near Gomez Palacio, Mexico. Gomez Palacio San Luis Potosi Mexico City Facility Type Generating Capacity Owned (MW) Distributed Generation 11 MW Hydroelectric Generation 35 MW Cogeneration 26 MW 25 Veracruz

GROWTH: ALBERTA POWERLINE Fort McMurray West 500 kv Transmission Project The design and planning phases were completed and construction commenced in August 2017. Land preparation and tower foundation installation and tower assembly is proceeding ahead of schedule. The target energization date of June 2019 remains on track. * More information is available at www.albertapowerline.com. 26

ALBERTA POWER MARKET DEVELOPMENTS IMPROVING CLARITY Capacity Market in Alberta Market design discussions under way with the AESO; expect final market design in summer 2018 Capacity market framework expect first auctions in 2019 for 1 year terms beginning 2021; draft framework appears supportive for incumbent electricity generators WELL POSITIONED Phase-in of Renewable Generation Clean Power Call First contracts awarded for 600MW to other parties in 2017; next two auctions for 700MW total in 2018 Hydro continue to explore potential developments in Northern Alberta Coal Battle River unit 5 PPA turnback terms under discussion; coal to gas conversions under review MINIMAL RISK EXPOSURE Carbon Tax Compliance costs recovered through Thermal PPAs Longer term anticipate carbon costs will largely be recovered through the Alberta power market GHG emission expected to be recovered in utility rates on a go-forward basis 27

FINANCIAL STRENGTH: FUNDING SOURCES Canadian Utilities Funding Sources 2013 2017 26% 5% 63% 3% 3% Funds Generated by Operations Dividend Reinvestment (DRIP) Capital Redeployment Debt Issues (net of repayment) Preferred Shares 28

FINANCIAL STRENGTH: BALANCE SHEET 29

FINANCIAL STRENGTH: CAPITAL MARKETS ACCESS $1,600 $1,400 IN 2017, CANADIAN UTILITIES ISSUED DEBT AT THE LOWEST LONG-TERM INTEREST RATE IN COMPANY HISTORY 12% 10% BOND AMOUNT ($M) $1,200 $1,000 $800 $600 $400 $200 3.548% 8% 6% 4% 2% INTEREST RATE $0 0% BOND AMOUNT INTEREST RATE 30

FINANCIAL STRENGTH: CAPITAL MARKETS ACCESS $1,385M In 2017, Alberta PowerLine Completed The Largest Public-Private Partnership Debt Financing in Canadian History Other Public-Private Financings Alberta PowerLine 31

FINANCIAL STRENGTH: LIQUIDITY EXCELLENT LIQUIDITY POSITION $3.3B of readily accessible lines of credit $600M of available cash on the balance sheet * Amounts as at the first quarter ended March 31, 2018 32

SUMMARY GROWTH COST EFFICIENCY FINANCIAL STRENGTH 33

APPENDIX 34

STRUCTURES & LOGISTICS We offer workforce housing, innovative modular facilities, construction, site support services, and logistics and operations management 7 manufacturing plants globally Nearly 1,000,000 sq ft of manufacturing space Subsidiary: Sustainable Communities 35

ELECTRICITY DISTRIBUTION & TRANSMISSION We build, own and operate electrical distribution and transmission facilities 256,000 farm, business and residential customers in 241 Alberta communities Approximately 11,000 km of transmission lines, and delivers power to and operates 4,000 km of lines owned by Rural Electrification Associations, and 72,000 km of distribution lines Subsidiaries: ATCO Electric Yukon Northland Utilities 36

FINANCIAL STRENGTH: ELECTRIC DISTRIBUTION RETURN ON EQUITY 14% 13% 12% 11% 10% 9% ROE +2.88% on average above AUC approved ROE from 2007-2017 and +3.03% on average in the last 5 years 8% 7% 6% 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Electric Distribution AUC Approved 37

FINANCIAL STRENGTH: ELECTRIC TRANSMISSION RETURN ON EQUITY 14% 13% 12% 11% 10% 9% 8% ROE +0.83% on average above AUC approved ROE from 2007-2017 7% 6% 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Electric Transmission AUC Approved 38

ELECTRICITY GENERATION We have an ownership position in 19 power generation plants in Alberta, British Columbia, Saskatchewan, Ontario and Mexico Electricity Market Exposure Portfolio: 1,610 MW Contract (69%) 731 MW Merchant (31%) 39

ELECTRICITY GENERATION We operate two power generation facilities with a combined capacity share of 176 MW Provides energy infrastructure for thousands of public sector, domestic and industrial clients across Australia Electricity Market Exposure Portfolio: 176 MW Contract (100%) 40

NATURAL GAS DISTRIBUTION We build, own and operate natural gas distribution facilities in Alberta Alberta s largest natural gas distribution company Serves approximately 1.2 million customers in nearly 300 Alberta communities We build, maintain, and operate 41,000 km of natural gas distribution pipelines 41

FINANCIAL STRENGTH: NATURAL GAS DISTRIBUTION RETURN ON EQUITY 17% 16% 15% 14% 13% 12% 11% 10% 9% 8% 7% 6% 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Natural Gas Distribution AUC Approved ROE +3.11% on average above AUC approved ROE from 2007-2017 and +4.23% on average in the last 5 years 42

NATURAL GAS TRANSMISSION We build, own and operate key high-pressure natural gas transmission facilities in Alberta Transports clean, efficient energy from producers and other pipelines to utilities, power generators and major industries Owns and operates 9,400 km of pipeline Delivers a peak of 3.7 billion cubic ft/day of natural gas to customers ~ 3,500 receipt and delivery points Interconnections facilitate access to multiple intra-alberta and export markets 24/7 monitoring of pipelines and facilities via a specialized control centre 43

FINANCIAL STRENGTH: NATURAL GAS TRANSMISSION RETURN ON EQUITY 14% 13% 12% 11% 10% 9% ROE +2.11% on average above AUC approved ROE from 2007-2017 8% 7% 6% 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Natural Gas Transmission AUC Approved 44

STORAGE & INDUSTRIAL WATER We build, own and operate nonregulated industrial water, natural gas storage, hydrocarbon storage, and NGL related infrastructure 85,200 m 3 /day water infrastructure capacity 400,000 m 3 hydrocarbon storage capacity 52 PJ natural gas storage capacity ~ 116 km pipelines 45

INTERNATIONAL NATURAL GAS DISTRIBUTION We provide safe and reliable natural gas service to the Perth metropolitan area and the wider Western Australian community Approximately 753,000 customers 14,000 km of natural gas distribution pipelines 46

FINANCIAL STRENGTH: BALANCE SHEET AS AT Q1 2018 ATCO Canadian Utilities 10% 9% 57% 33% 60% 31% Debt (net of cash) Preferred Shares Equity Debt (net of cash) Preferred Shares Equity 47

www.atco.com www.canadianutilities.com Tel: 403.292.7500 Investor Relations 5302 Forand Street SW Calgary, Alberta T3E 8B4 Canada 48