IRENA & QUALITY INFRASTRUCTURE FOR ENERGY EFFICIENCY AND RENEWABLE ENERGY IN LATIN AMERICA AND THE CARIBBEAN

Similar documents
Improving the Financeability and Attractiveness of Sustainable Energy Investments in Photovoltaics

An Assessment of Technical Risks in PV Investments

SOLAR BANKABILITY. Caroline Tjengdrawira (3E) PRESENTED BY. Funded by the Horizon 2020 Framework Programme of the European Union

Technical Bankability Guidelines

Module Quality Assurance: Risk Mitigation and Safeguarding Project Value

LIMITED WARRANTY MITSUBISHI ELECTRIC US, INC. PHOTOVOLTAIC MODULES

AHK Business Trip - Tunisia

Economic and financial feasibility of PV projects

Back stop of performance guarantees in solar and storage

THE POWER OF ASTRONERGY

Combiner Box Manual 0

72cel Module made with mm Monocrystal ine Solar cel s 96cel Module made with mm Monocrystal ine Solar cel s

Unsubsidised rooftop PV markets in Singapore: when do we get grid parity back?

A review of DECC s Impact Assessment of Feed-in-Tariff rates for small-scale renewables

Feed-in tariff determination Best practice and cross-country coordination

PHOTOVOLTAIC INSTALLATIONS Equipment Overview / Property Insurance Exposures and Underwriting Considerations

LIMITED WARRANTY CERTIFICATE FOR TALESUN BRAND CRYSTALLINE SOLAR PHOTOVOLTAIC MODULE

UK Solar Investment. 8% return per annum. Defined exit strategy at the end of year 3 with option to extend. Pension Compatible.

Analytics across the asset life cycle

EU-wide solar PV business models: guidelines for implementation (D4.4)

Raising Equity for large biomass to power projects

ET Solar New Energy Co., Ltd Photovoltaic Module Limited Warranty

72cel Module made with mm Monocrystal ine Solar cel s 96cel Module made with mm Monocrystal ine Solar cel s

THE POWER OF ASTRONERGY

D2.6 Business Model Report

LIMITED WARRANTY TERMS FOR PV MODULES

THE POWER OF ASTRONERGY

Joint venture for a PV project in Honduras. January 2015

The Economics and Financing of Distributed Generation Investment. Budapest, Hungary November 17, 2016

CENTRAL ELECTRONICS LIMITED 4, INDUSTRIAL AREA, SAHIBABAD (U.P) Telephone: NOTICE INVITING EXPRESSION OF INTEREST

Uni-Solar PVL Installation Approval & Warranty

Microinverter Limited Warranty

THE POWER OF ASTRONERGY

Risk & Contract Management

Cross-sector opportunities to improve solar data analysis and capabilities

Conditions for tender of aid for electricity generated by onshore wind turbines, open door offshore wind turbines, and solar PV installations

SOLAHART PV SYSTEM AND/OR BATTERY WARRANTY - AUSTRALIA ONLY

APPENDIX A - GLOSSARY

GREEK RENEWABLES SUPPORT SCHEME PROPOSALS

Solar PV where the sun doesn t shine: Estimating the economic impacts of support schemes for residential PV with detailed net demand profiling

PHOTOVOLTAIC SYSTEM PROPOSAL

UNITED STATES 5 YEAR CONSUMER WARRANTY. (Repair or replacement only)

WARRANTY CERTIFICATE

Checklist for PV Installations Feb 2012

GENERAL TERMS AND CONDITIONS OF WARRANTY Limited warranty on PV modules

Three Components of a Premium

CHANGZHOU TRINA SOLAR ENERGY CO.,LTD. LIMITED WARRANTY FOR TRINA SOLAR BRAND CRYSTALLINE SOLAR PHOTOVOLTAIC MODULES PS M 0020 Rev.

Quantification of risk reduction measures

UNDA RENEWABLE ENERGY ESCWA PIPELINE PROJECTS

Tamil Nadu Energy Development Agency

Renewable Energy and Mining Summit. Toronto, September 25th, 2013

Limited Warranty Letter for BYD Photovoltaic Module

UNITED STATES I TERMS AND CONDITIONS

SCHNEIDER ELECTRIC CONTRACTUAL WARRANTY

Warranty Terms DMK-0011B Jan. 01 st,

INVESTOR PRESENTATION Q3 2018

Overview of cogeneration project development

SOLAR POWER PROJECT ECONOMICS

Butimanu 3,36 MWp. nature technology energy

WARRANTY TERMS 1 DEFINITIONS 2 LIMITED WARRANY. [Hier eingeben] 1

INVESTOR PRESENTATION Q1 2018

Supersedes: 9/01/11 (Rev.5) Preparer: Owner: Approver: Team Member, North America Process Safety Center of Expertise

MP URJA VIKAS NIGAM LTD.

ASSET MANAGEMENT WEBINAR SERIES

P14 EME Africa CTI PFAN

PV O&M Workgroup Kick- off

ANTI-FRAUD CODE CONTENTS INTRODUCTION GOAL CORPORATE REFERENCE FRAMEWORK CONCEPTUAL FRAMEWORK ACTION FRAMEWORK GOVERNANCE STRUCTURE

BIDDING DOCUMENT FOR. Comprehensive Maintenance of 100KWp roof-top off-grid Solar PV plant hybrid model installed at

INSTALLER PARTNERSHIP PROGRAMME PRE-QUALIFICATION QUESTIONNAIRE & APPLICATION FORM

PV Financing Guidelines

VALIDATION REPORT BELECTRIC SOLAR LTD.

How multi-technology PPA structures could help companies reduce risk

Risk Management Process-02. Lecture 06 By: Kanchan Damithendra

Development of Reliability-Based Damage Tolerant Structural Design Methodology

Developing a reserve range, from theory to practice. CAS Spring Meeting 22 May 2013 Vancouver, British Columbia

Energy Efficiency (EE) Financing Strategies and Considerations in Commercial Real Estate

Risk Management Disclosures

CHANGZHOU TRINA SOLAR ENERGY CO.,LTD. LIMITED WARRANTY FOR TRINA SOLAR BRAND CRYSTALLINE SOLAR PHOTOVOLTAIC MODULES PS-M-0020 Rev. M Nov.

Warranty Smart Hybrid Battery Enclosure BE13200 V1.0

presentation 2016 VHM GROUP OF COMPANIES

Review of Financial Analysis Terms

SMA SOLAR TECHNOLOGY AG Analyst / Investor Presentation Financial Results 2017

RENOVATE AMERICA GREEN BOND

S-ENERGY LIMITED WARRANTY FOR PV MODULES

FIRST SOLAR INVESTOR OVERVIEW

Gabriel Zeitouni, COWI A/S

Security Risk Management

2015S Utah Solar Request for Proposals Bidders Workshop North Temple Office, Room 130K Salt Lake City UT 84116

RISK MANAGEMENT. Budgeting, d) Timing, e) Risk Categories,(RBS) f) 4. EEF. Definitions of risk probability and impact, g) 5. OPA

Renewable Energy Guidance

Applied Risk Assessment into EPC Projects By Pulung Susilo Rahardjo

We believe our human capital is the key factor to success, as well as the reason r upholding a leading position on the Bulgarian financial market.

Intro Public-Private Partnership (P3) Finance Course

VALIDATION REPORT BELECTRIC SOLAR LTD.

Warranty Smart Hybrid Inverter SH5000 V1.0

Request for Proposal

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support

M_o_R (2011) Foundation EN exam prep questions

General terms of business Obad Beschriftungen GesmbH Amended terms for selling hard- and software products (DISIPOS)

California Electric Rates: 30 Years

Transcription:

IRENA & QUALITY INFRASTRUCTURE FOR ENERGY EFFICIENCY AND RENEWABLE ENERGY IN LATIN AMERICA AND THE CARIBBEAN Forum on Regional Cooperation: Developing Quality Infrastructure for Photovoltaic Energy Generation Santiago (CHILE) Sep 12-13 th 2017 Solar Bankability Mitigating Technical Risks in PV Investment through Quality Infrastructure Caroline TJENGDRAWIRA, Tractebel Engineering SA (Belgium) Funded by the Horizon 2020 Framework Programme of the European Union

Shaping our world Together with our clients it s our mission to shape the world of tomorrow. Backed by 150 years of experience in energy, water and infra, we can provide you engineering, consultancy and project management services and be your partner in innovative solutions, the energy transition & digital transformation. Daniel Develay, CEO 2

2016 key figures Wherever you are located 2,500 850 4,400 employees 150 33 offices worldwide 900 605 MEUR turnover <10 projects 100-500 projects 10-50 projects >1,000 projects 50-100 projects offices 3

Solar PV Scope of services Tractebel can provide Technical Advisory & Owner s Engineer services at all stages of project development covering Concept / basic / detailed design Solar Resource Assessment & Energy Yield Assessment Grid connection, grid impact and grid code compliance studies Permitting assistance, ESIA Tendering and contracting Construction & commissioning follow-up Tractebel can team-up with legal and financial advisors where required 4

Solar Bankability Project Overview Objective: Improving the finance-ability and attractiveness of PV investments through common tools and best-practice guidelines for professional risk assessment which will serve to reduce the technical risks associated with investments in PV projects Funded by European Union Horizon 2020 Work Programme March 2015 February 2017 5 consortium partners: 3E (BE), Accelios Solar (DE), EURAC Research (IT), SolarPower Europe (BE), TUV Rheinland (DE) www.solarbankability.eu 5

Bankability of PV Project Solar bankability: active quality management process where all stakeholders in PV project approval process attempt to identify, manage and control potential risks (technical, legal & economical) through entire project lifecycle Different stakeholders different focus 6

Risk Management Framework I. Risk identification II. Risk assessment III. Risk management IV. Risk controlling Solar Bankability has developed a set of useful tools and best-practice guidelines for professional risk assessment and management in PV investment: De-risking tools to reduce technical risks Standardization tools as common approach for risk assessment 7

(I) Risk Identification Risk identification Risk assessment Risk management Risk controlling Two tools to help identify PV investment technical risks: 1. Top 20 LCOE technical risks most common 20 incorrect technical assumptions in calculating PV LCOE 2. Technical risk matrix database of PV plant failures 8

(I) Risk Identification Common LCOE Technical Risks Risk Phase/field Identified critical technical gaps Year-0 Procurement/ product selection and testing Surveys conducted: 1. Insufficient EPC technical specifications to ensure that selected components are suitable for use in the specific PV plant environment of application. 2. Inadequate component testing to check for product manufacturing deviations. 3. Absence of adequate independent product delivery acceptance test and criteria. Financial Planning/ models, EPC 4. The + effect O&M of long-term contracts, trends in the yield solar resource estimation is not fully reports accounted lifetime energy for. Large yield scale estimation and commercial PV projects assuming a normal distribution for all elements contributing to the overall uncertainty. Several countries in 6. EU: Incorrect FR, degradation UK, DE, rate and IT, behavior NL over time assumed in the yield estimation. Developed in 2011 7. Incorrect 2016 availability assumption to calculate the initial yield for project Risks during operation 5. Exceedance probabilities (e.g. P90) are often calculated for risk assessment investment financial model (vs O&M plant availability guarantee). Transportation 8. Absence of standardized transportation and handling protocol. Installation/ construction Installation/ provisional and final acceptance Operation Maintenance 9. Inadequate quality procedures in component un-packaging and handling during construction by workers. 10. Missing intermediate construction monitoring. 11. Inadequate protocol or equipment for plant acceptance visual inspection. 12. Missing short-term performance (e.g. PR) check at provisional acceptance test, including proper correction for temperature and other losses. 13. Missing final performance check and guaranteed performance. 14. Incorrect or missing specification for collecting data for PR or availability evaluations: incorrect measurement sensor specification, incorrect irradiance threshold to define time window of PV operation for PR/availability calculation. 15. Selected monitoring system is not capable of advanced fault detection and identification. 16. Inadequate or absence of devices for visual inspection to catch invisible defects/faults. 17. Missing guaranteed key performance indicators (PR, availability or energy yield). 18. Incorrect or missing specification for collecting data for PR or availability evaluations: incorrect measurement sensor specification, incorrect irradiance threshold to define time window of PV operation for PR/availability calculation. 19. Missing or inadequate maintenance of the monitoring system. 20. Module cleaning missing or frequency too low. Impact on installation quality Impact on cash flow model Impact on installation quality Impact on risk/cost ownership Impact on risk/cost ownership & O&M strategy 9

(I) Risk Identification Database of PV Plant Failures Tickets from O&M operators from preventive and corrective maintenance Visual and detailed PV plant inspections Total number of plants Total power [kwp] Average number of years TOTAL 772 441,676 2.7 Components No. of tickets No. cases No. of components Modules 473 678,801 2,058,721 Inverters 501 2,583 11,967 Mounting structures 420 16,147 43,916 Connection & distribution boxes 256 12,387 25,305 Cabling 682 384,600 246,084 Transformer station & MV/HV 57 224 759 TOTAL 2,379 1,094,742 2,386,742 10

(I) Risk Identification Technical Risk Matrix Product Development Assessment of PV Plants Product testing Planning Transportation / installation O&M Decommissioning Modules..... Insulation Inverter test Soiling.. Module mishandling. Hotspot.. Undefined product Incorrect cell soldering Shadow diagram (glass breakage) Delamination recycling procedure Undersized Mounting bypass structure diode Modules mismatch.. Module mishandling. (cell Glass breakage.. Junction box adhesion Modules not certified breakage) Soiling Delamination Connection at the edges & distribution Flash report. not available. Module mishandling. Shading.. Arcing boxes spots on the or incorrect (defective backsheet) Snail tracks module Special climatic Incorrect connection of Cell cracks Visually Cabling detectable hot conditions. not considered. modules. PID.. spots (salt corrosion, ammonia, Bad wiring without Failure bypass diode and Incorrect Potential power rating equalization...)&.. fasteners List of. failures junction box.. (flash grounding, test issue) LPS Incorrect assumptions of Corrosion in the junction Uncertified components module degradation, light box or production Weather line station, induced degradation... Theft of modules.. unclear Module degradation communication, Module quality unclear Slow reaction time for monitoring (lamination, soldering) warranty claims, vague or Simulation Infrastructure &. parameters.. inappropriate. definition of. (low irradiance, procedure for warranty environmental influence temperature.) unclear, claims Storage system missing PAN. files.. Spare modules. no longer available, costly string. reconfiguration Miscellaneous..... 11

(II) Risk Assessment Risk identification Risk assessment Risk management Risk controlling Three tools to assess technical risk impacts: 1. CPN methodology assess economic impacts of technical risks on PV plant operation 2. LCOE sensitivity analysis excel tool assess impacts of technical risks on PV LCOE 3. Cash flow risk categorization assess impacts of technical risks on PV business models 12

Planning during development phase O&M phase (II) Risk Assessment Quantifying Economic Impacts Risks to which we assign uncertainty Impact on financial exceedance probability parameters Risks to which we assign economic value ( /kwp/yr) Impact on cash flow 13

(II) Risk Assessment Uncertainties during Planning Utilization rate @P90 positively affected by reduction in uncertainty Link with business models and LCOE calculation Typical uncertainty values (irradiance, temperature, soiling, shading, etc.) = 5-10% 14

(II) Risk Assessment Improving Uncertainties Exceedance probabilities obtained by assuming normal distribution when calculating different uncertainties from dataset More precise estimation of uncertainty in yield estimation to reduce uncertainties Using empirically established probability distribution instead Challenge: need sufficiently large dataset! σ (k=1) P50 (kwh/kwp) P90 (kwh/kwp) P90/P50 (P50 ref. case) Reference case (PVSYST, not all contributions 4.3% 1440 1360 94% included) Ref. case (sum of squares) 8.7% 1445 1283 89% Low end scenario 4.6% 1445 1365 94% High end scenario 9.3% 1445 1273 88% Worst case scenario 16.6% 1445 1138 79% Worst case scenario (different mean value) 16.6% 1314 1034 72% 22% difference in yield used in the business model! 15

(II) Risk Assessment Quantifying Economic Impacts during Plant Operation Cost Priority Number new methodology! gives an indication of economic impacts of a failure due to downtime and fixing cost CPN ( /kwh/year) C down impact due to downtime and/or power loss (kwh to ) C fix impact due to repair/ substitution costs ( ) Reduce income Reduce savings Increase maintenance costs Reduction of reserves 16

(II) Risk Assessment CPN Analysis of Failures in Risk Matrix 17

(II) Risk Assessment e.g. CPN Ranked PV Module Failures (Utility Scale) Installation failures dominant (mishandling, connection failures, missing fixation, etc. ) Variety of failures detected by different techniques (VI, IR, EL, IV-curve tracing) 18

(II) Risk Assessment Impacts on LCOE Sensitivity analysis by varying LCOE inputs by ±20% 3 market segments 3 scenarios of CAPEX + OPEX (low, medium, high) LCOE calculation excel tool available for public download on project website 19

(II) Risk Assessment LCOE Sensitivity Ranking Sensitivity of LCOE in 2015-2016 on its input parameters Yield CAPEX Lifetime or Discount rate OPEX Degradation 20

(II) Risk Assessment Impacts on Business Model Modelling economic impact of technical risks on PV project cash flow requires: Select business model to use Identify associated technical risks Determine likely risk scenario Taking assumptions of underlying costs Case studies in Solar Bankability: 1. 4 business models 2. Introduce risk scenario 3. Simulation using in-house developed financial modelling software 4. Assess impacts on 12-month revenue 21

Utility scale Residential (II) Risk Assessment Case Studies for Risk Impacts on Business Model 4 business models Introduce up to 4 technical risks: 2 from technical risk matrix + 2 generic technical risks 22

(II) Risk Assessment Failure Categories The impact of risks is measured by failure categories based on a 12-month revenue 23

Cumulative cash flow (II) Risk Assessment Cash Flow Modelling of Technical Risk Impacts on Business Model #3 (example) Risk scenario - business model 3 Risk Risk numberrisk name Start Date Case Phase Risk 1 3020 Hotspot of modules 01.01.2012 Best Infant Risk 2 2) 3101 Flooding of inverter 01.08.2017 Worst Mid-life Risk 3 1) 3051 Lightning strike of inverter 01.06.2020 Worst Mid-life Risk 4 3011 Failure of bypass diode and juction box 01.10.2026 Worst Wear-out Comments 1) External cause independent from project phase 2) Business model specific risk, i.e. due to system design/technology, geographic/climatic conditions 6,000,000 EUR 4,000,000 EUR 2,000,000 EUR CAT 1 (insurance) 0 EUR -2,000,000 EUR -4,000,000 EUR -6,000,000 EUR CAT 1 (insurance) CAT 3 (no risk transfer) -8,000,000 EUR -10,000,000 EUR CAT 1 (EPC / module manufacturer) 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Base case Risk scenario 24

(II) Risk Assessment Case Studies Results Residential Business Model 1 Business Model 2 Utility scale Business Model 3 Business Model 4 Residential-sized business models are most affected by impact of technical failures: Labor + spare parts costs + prolonged downtime costs due to missing monitoring systems Utility PV system more robust: Online monitoring + O&M service contract reduce downtime Economies of scale 25

(III) Risk Management Risk identification Risk assessment Risk management Risk controlling Two tools to mitigate and manage technical risks: 1. List of mitigation measures recommended mitigation measures to manage common PV technical risks 2. Best practice guidelines 6 checklists as guidelines for best practices in EPC and O&M contract technical aspects In addition to risk mitigation, risk transfer is also a risk management strategy! 26

Risk CAPEX OPEX Risk CAPEX OPEX (III) Risk Mitigation Why & How 100% ΣCPNs = ~120 /kw/year 100% Who bears the cost? Who bears the risk? Risk minimization ΣCPNs = ~XX /kw/year 0% 0 /kwp 0 /kwp/a 0% 0 /kwp 0 /kwp/a CAPEX & OPEX depending on mitigation measures CAPEX & OPEX depending on mitigation measures 27

(III) Risk Mitigation Measures 8 mitigation measures proposed based on analysis of technical failures in Risk Matrix Preventive measures (CAPEX) Mitigation Measure Improving Costs (medium scenario) Component testing PV modules number of failures 3 /kwp Design review + construction monitoring number of failures 20 /kwp Qualification of EPC number of failures 3 /kwp Advanced monitoring system time to detection 2 /kwp/year Corrective measures (OPEX) Basic monitoring system time to detection 0.5 /kwp/year Advanced inspection time to detection 2 /kwp/year Visual inspection time to detection 1 /kwp/year Spare part management time to repair/substitution 0.5 /kwp/year 28

(III) Risk Mitigation Measures Impacts on CPN Different combinations of 8 mitigation measures and resulting CPN Preventive measures have higher impacts in reducing CPN, especially for poor quality plant. For good quality plan, CPN helps to understand the impacts of corrective measures. Base Case (no MM) EPC qual Design review Component test Component test + EPC qual Design review + EPC qual Component test + design review Component test + design review + EPC qual 29

(III) Risk Mitigation Measures Impacts on LCOE Different combinations of 8 mitigation measures and resulting LCOE Mitigation measures increases CAPEX and OPEX but also yield (utilization rate)! Preventive measures have higher impacts in lowering LCOE PV LCOE reduction up to 4 to 5% is observed in all cases. The different combinations of mitigation measures have a larger i scenarios where the higher CAPEX, OPEX, and/or discount rate re Mitigation measures which are most effective in lowering PV LC market segments and for all scenarios. The most effective mitigation measures are those implemented lifecycle. Those implemented in the operation phase still show som less gain is found. Although the implementation of mitigation measures increase eith overall LCOE decreases as the gain in yield surpasses the extra c Mitigation measures most effective in lowering PV LCOE are: 1. Qualification of EPC; 2. Component testing prior to installation; and 3. Advanced monitoring system for early fault detection. 30

(III) Risk Mitigation Measures LCOE after Mitigations Implementation 3.6 to 5.1% reduction in LCOE observed Market segment Low scenario Medium scenario High scenario LCOE without any mitigation [ cents/kwh] [ cents/kwh] [ cents/kwh] Ground-mounted utility ( 1 MWp) 5.4 8.1 6.2 9.3 10.3 15.5 Commercial rooftop Market segment (< 1 MWp) 5.8 Low 8.7 7.0 Medium 10.7 11.8 High 17.8 Residential (up to 5 kwp) 6.9 scenario 10.6 7.9 scenario 12.2 12.5 scenario 19.2 % maximum LCOE reduction Ground-mounted utility ( 1 MWp) 3.6% 3.8% 4.2% Commercial rooftop (< 1 MWp) 4.6% 4.8% 5.0% Residential (up to 5 kwp) 4.8% 5.0% 5.1% LCOE after best mitigation combination [ cents/kwh] [ cents/kwh] [ cents/kwh] Ground-mounted utility ( 1 MWp) 5.2 7.8 5.9 8.9 9.9 14.8 Commercial rooftop (< 1 MWp) 5.5 8.4 6.7 10.3 11.2 17.0 Residential (up to 5 kwp) 6.6 10.1 7.5 11.6 11.9 18.2 31

(III) Risk Management Best Practice Guidelines 1. Best practice checklist for EPC technical aspects 2. Best practice checklist for O&M technical aspects 3. Best practice checklist for long-term yield assessment 4. Checklist for as-built documents types and details 5. Checklist for record control 6. Checklist for reporting indicators 32

(III) Technical Aspects to Look for in EPC & O&M Contracts 33

Transfer of technical risks (III) Risk Transfer to Manage Risks Engineering Procurement Construction Operations Decommissioning Year 0 Year 1-N Year N EPC/ Installer Service warranty (material & workmanship) O&M Service warranty (material & workmanship) Component manufacturer Product warranty (material & workmanship) Performance guarantee Product return and disposal guarantee General liability insurance General liability insurance Insurance Construction risk insurance Property damage insurance Business interruption insurance Performance guarantee insurance Investor (Owner/Operator) Residual risks Residual risks Residual risks Bank Creditor default risk (Pre-financing) Creditor default risk (Financing) 34

(IV) Risk Controlling Risk identification Risk assessment Risk management Risk controlling Improve regulation in PV project financing: 1. Financial market regulations improve transparency for institutional investors (banking insurance investment fund) 35

(IV) Risk Controlling Capital Market Regulation In a harmonized effort, financial regulatory bodies on a global, European and national level have developed a set of regulations for each capital market sector: Banking (Basel III) Insurance (Solvency II) Investment Funds (UCITS V / AIFM) 36

Solar Bankability In summary 37

Solar Bankability Tools & Best-Practice Guidelines for Professional Risk Assessment & Management 1. Top 20 LCOE technical risks 2. Technical risk matrix 3. CPN methodology 4. LCOE sensitivity analysis excel tool 5. Cash flow risk categorization I. Risk identification II. Risk assessment IV. Risk controlling III. Risk management Capital market regulations 6. 8 mitigation measures 7. 6 best-practice checklists 38

Project Reports: www.solarbankability.eu 39

Thank you! Caroline Tjengdrawira caroline.tjengdrawira@tractebel.engie.com David Moser david.moser@eurac.edu This project has received funding from the European Union s Horizon 2020 research and innovation programme under grant agreement No 649997. The content of this report reflects only the author s view and the Commission is not responsible for any use that may be made of the information it contains Funded by the Horizon 2020 Framework Programme of the European Union