RP Page 1. RP Page 1

Minutes Standing Policy Committee on Finance July 6, 2017 REPORTS

SENIOR MANAGEMENT AND BUDGET ANALYST Budget and Management Services

COUNTY OF ROCKLAND Department of General Services Purchasing Division

SCADA Data Across the Organization

REQUEST FOR PROPOSALS

COUNTY of KANE PURCHASING DEPARTMENT KANE COUNTY GOVERNMENT CENTER

MR 80/2017 TENDER FOR ENGINEERING CONSULTANCY SERVICES FOR REMOTE CONTROL OF NADARIVATU AND WAINIKASOU HYDRO STATION

Interfaced vs. Integrated Process. BAE Systems Electronics and Integrated Solutions Operating Group Nashua, New Hampshire USA

REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES

VACANCY ANNOUNCEMENT

WATER AND WASTEWATER FUND REVENUES

Request for Proposal #12PSX0392

Request for Proposals

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

SAN RAFAEL CITY COUNCIL AGENDA REPORT

EAST NILES COMMUNITY SERVICES DISTRICT

JCI Energy Savings Performance Contract (ESPC) Services AMI System & Water Meter Replacements Water System SCADA Upgrades Acoustic Leak Survey August

SIGNIFICANT BUDGET CHANGES

AGENDA Utilities Committee Regular Meeting 3:30 PM - Thursday, February 23, 2017 Council Conference Room, 7th Floor, City Hall 1055 S.

Request for Qualifications RFQ Continuing Services Contracts for Professional Engineering Services

REQUEST FOR PROPOSALS RFP #6570 EXHIBIT 3: SCOPE OF WORK

1. Intake Radio Site, (IRS), N, W General Scope: One indoor rack with two hot standby radios and equipment.

Prince William County 2004 Building Development SEA Report

Pensions Administration Software. Supporting in-house administration excellence

Request for Proposals: Data Collection Services in Haiti

CORK COUNTY COUNCIL. IS Technical Support Officer

Impact of VAT Compliance on Business. Pierre Arman Market Lead for Tax & Accounting Thomson Reuters MENA Qatar Chamber of Commerce February 2018

Information Technology and GIS

Town of Holly Springs

Stock Report on. Microsoft Corporation, Pfizer Incorporated and Starbucks Corporation. BSAD B20: Introduction to Business

N A S H V I L L E J U N E

2017 ENTERPRISE ASSET MANAGEMENT PLAN

County of Orange IT Quarterly Status Report Risk Assessment. Fiscal Year rd Quarter, January - March

Emerson + Rockwell Automation: A Compelling Value Creation Opportunity for Shareholders. November 16, 2017

PREPARED DIRECT TESTIMONY OF JONATHAN B. ATUN CHAPTER 4 ON BEHALF OF SAN DIEGO GAS & ELECTRIC COMPANY

CORK COUNTY COUNCIL. IS Analyst/Developer

REQUEST FOR QUALIFICATIONS (RFQ) PROFESSIONAL ENGINEERING SERVICES ON A CONTINUING CONTRACT BASIS

2015 Update of Water and Wastewater Impact Fees

SIGNIFICANT BUDGET CHANGES

SUPERSTITION MOUNTAINS COMMUNITY FACILITIES DISTRICT NO S.

PUBLIC ANNOUNCEMENT. By order of the Board of County Commissioners, Warren County, Ohio.

PCLender - InHouse Mortgage DocMagic Interface Guide Version 1.0

Request for Proposal;

State of Louisiana Department of Revenue

SCADA System Upgrades #

RICHMOND HEIGHTS LOCAL SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS ( RFQ ) FOR OWNER S REPRESENTATIVE SERVICES

This page intentionally left blank.

Annual Budget. Fiscal Year Prepared by Division of Management and Budget Lyle G. Beefelt, Director. Exceptional Water Service

REQUEST FOR QUALIFICATIONS

FEASIBILITY STUDY FOR THE DEVELOPMENT OF A REGIONAL WATER PRODUCTION UTILITY

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

OpenScape Enterprise Express. Streamlined, Integrated, and Simple Advanced Unified Communication solution for mid-sized enterprises.

REQUEST FOR PROPOSAL FOR ACTUARIAL SERVICES FOR OTHER POST EMPLOYMENT BENEFITS (O.P.E.B.) # FN-P

SunGard Public Sector PLUS SERIES Product Line tel fax

LCS International, Inc. PMP Review. Chapter 5 Developing Project Budgets. Presented by David J. Lanners, MBA, PMP

Unitronics (1989) (R G) Ltd Periodic and Annual Report for 2017

Asseco StarINS Insurance Software Suite. January

VACANCY ANNOUNCEMENT

Judicial Council of California Administrative Office of the Courts Court Case Management System (CCMS)

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

FINRA 2018 Annual Budget Summary

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE

Solved MCQs Of CS615 effort, risks, and resources are the factors included in

FORT WAYNE-ALLEN COUNTY AIRPORT AUTHORITY REQUEST FOR PROPOSALS Business Continuity Service Fort Wayne-Allen County Airport Authority

City of Ocean City Permit and Application Process Quality Improvement

TRANSBAY JOINT POWERS AUTHORITY

Request for Qualifications RFQ # Continuing Services Contracts for Professional Engineering Services

Bid/Offer Spreads. June 18, 2007

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY

BIDDER S QUALIFICATION AND EXPERIENCE STATEMENT

Overview of Public Schools CIP

PIPELINES 101 BASIC PRINCIPLES OF ONSHORE PIPELINES

Issues covered in the presentation

PENSION ADMINISTRATION SOLUTION REQUEST FOR INFORMATION

REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL ENGINEERING SERVICES FOUR CORNERS COUNTY WATER & SEWER DISTRICT BOZEMAN, MONTANA RFQ#

The following answers are provided in response to questions received:

ADVERTISEMENT FOR REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL COST ESTIMATING AND SCHEDULING SERVICES FOR THE MIAMI DADE AVIATION DEPARTMENT RFQ NO

REQUEST FOR PROPOSALS (C3) RFP Integration and Programming Services for Wastewater Utility SCADA System Software Platform Consolidation

The Project Times and Costs

Russian Treasury Modernization Project Implementation Experience. Deputy Head of the Russian Treasury S.B. Guralnikov 1

RECEIVED for the RECORD DOCUMENTS - April 5 & 10, 2019

PURCHASING SECTION Avenue, Surrey, BC V3T 1V8 Tel: ADDENDUM NO. 1

Fiscal Year Budget Proposal

Computer and Informational Technology Services FOR THE

FAIRFIELD AREA SCHOOL DISTRICT

Department of Homeland Security Office of Inspector General

FINANCIAL ACCOUNTING I

CITY OF SIGNAL HILL SUBJECT: AUTHORIZE RELEASE OF REQUEST FOR PROPOSALS FOR ON- CALL ENGINEERING DESIGN SERVICES

REQUEST FOR PROPOSALS Consulting Engineering Services for: Troutdale Water Master Plan

REQUEST FOR PROPOSALS PENSION ADMINISTRATION SOFTWARE SERVICES

EAST WAREHOUSE EXPANSION CHATTANOOGA, TENNESSEE 11/03/14 TECHNICAL PROPOSAL & EVALUATION GUIDE

INVITATION FOR BID VENDOR: BID OPENING:

Corporate Services Committee Agenda. 1. Planning and Development Organizational Chart

Princess Nora University Computer Science and Information Faculty Information Systems Department IS321

Coordinated Issue All Industries Research Tax Credit - Internal Use Software (Effective Date: August 26, 1999)

PARTNERS PROJECT IDENTIFICATION PROJECT IDENTIFICATION

LOS ANGELES UNIFIED SCHOOL DISTRICT

P.U.C. DOCKET NO. BEFORE THE PUBLIC UTILITY COMMISSION OF TEXAS APPLICATION OF TEXAS-NEW MEXICO POWER COMPANY FOR AUTHORITY TO CHANGE RATES

PROGRESS IN PUBLIC SECTOR ACCOUNTING AND REPORTING REFORMS IN KAZAKHSTAN

Transcription:

Customer: Prince William County Service Authority Project Title: Distribution and Collection SCADA Replacement Project To: Antonella Reed, Prince William County Service Authority CC: Purchasing Group, Prince William County Service Authority Subject: E-Merge Response to SA Post-Interview Questions Date: May 22, 2013 We thank you for the opportunity to submit detailed answers to each Post-Interview question posed by the Prince William County Service Authority (SA). Each of the three (3) questions from the document titled Post-Interview Questions for E-Merge REV1 has been restated and answered in detail on the following pages. This is a very important project for E-Merge Systems (E-Merge) and each of our Team members, and we take our commitment to project execution very seriously. Our attention to detail in this project will directly translate into the SA s ability to provide exceptional service to their customers. If you have any questions, please call me at (804) 344-3511 or email me at jlester@emergesystems.com. Sincerely; Jim Lester Project Manager E-Merge Response to SA Post-Interview Questions Page 1

SA Question #1 BUDGET - Please complete the attached table based on project estimates for the scope described in the Request for Detailed Proposals. The SA expects this to be reasonably accurate, but does not consider this a firm quote: Pilot Project Estimated Level of Effort and Costs Total One-Time Total Remote Pilot Sites Office Level of Effort: Hours @ average $/hr Project Management Planning, Workshops, Design, Standards Development Programming, HMI Configuration, software testing, etc. Field Cost Provide and install all hardware, enclosures, PLCs, and related materials (NOT including cellular equipment) Provide all software NOTE: The Pilot Project includes a requirement for 100% design documents and standards for the pilot project sites only. The Service Authority does not anticipate requiring 100% design documents for the remainder of the remote sites to establish the Guaranteed Maximum Price agreement. During the pilot phase the Contractor will have access to the remaining facilities for a site survey similar to what was done during the detailed proposal phase. E-Merge Response to SA Question #1 Pilot Project Estimated Level of Effort and Costs Total One-Time Total Remote Pilot Sites Office Level of Effort: 3717 hrs @ average _$153.32_/hr Project Management $43,098.20 $33,456.67 Planning, Workshops, Design, Standards $118,012.00 $164,000.00 Development Programming, HMI Configuration, software testing, etc. $134,772.00 $76,524.00 Field Cost Provide and install all hardware, enclosures, $48,600.00 $309,781.02 PLCs, and related materials (NOT including cellular equipment) Provide all software $128,437.64 $0.00 NOTE: Expenses are not factored into the Budget estimates and will be billed at cost. We estimate that expenses shall not exceed 10% of the services value. The following guidelines, which are based on information obtained during the conference call between the SA and E-Merge, were used in preparing the Pilot Project Estimated Level of Effort and Costs. E-Merge Response to SA Post-Interview Questions Page 2

All estimates are based on Office services and Field materials required to successfully execute all tasks listed under Project Phases 1a, 1b and 2, as outlined in the SA Request for Detailed Proposals. All estimates are based on observations made during walkthroughs of the following eight SCADA Pilot Project sites: o Nottoway Elevated Storage Tank (T28) o Potomac Mills Elevated Storage Tank (T23) Assumed to be typical of the Nottoway Elevated Storage Tank (T28) and was not visited by the E-Merge team o Airport Elevated Storage Tank (T03) o Cow Branch Booster Pump Station (F07) o Lake Ridge Booster Pump Station (F02 & MS27) o Rollingbrook Booster Pump Station (F08 & MS14) o Lift Stations L1 and L15 All estimates are based on the SA original RFP baseline solution for the D&C SCADA System, which is shown on page 3 of the Detailed Proposal Architecture drawings. o Wonderware System Platform 2012 or current version o VMware based application, historian, and terminal servers o Microsoft 2008 Server or current version o Allen-Bradley CompactLogix PLCs o RSLogix 5000 Enterprise PLC programming software o Local HMI displays, including thin clients and panel mounted Operator Interfaces with integrated I/O All Office Total One-Time cost estimates account for the following budget items: o Services necessary for the Planning, Workshops, Design, Standards Development Phases that apply to the entire Pilot D&C SCADA System o Services necessary to develop, test and deliver re-usable PLC, OIT and SCADA/HMI software components that are reusable across the entire Pilot D&C SCADA System o Services required for Factory Acceptance Test (FAT) for the Pilot D&C SCADA System o Project Management services necessary to manage and coordinate above services with SA Team and E-Merge Team All Field Total One-Time cost estimates account for the following budget items: o Total Hardware and Installation costs required for one time installation of the SCADA/HMI Head-End o Total one time Software costs required for ALL SCADA/HMI Head-End, PLC and OIT development and runtime software packages All Office Total Remote Pilot Site cost estimates account for the following budget items: o Services necessary for the Planning, Workshops, Design, Standards Development Phases that are specific to one or more of the Remote Pilot Sites o Services necessary to deploy and test PLC, OIT and SCADA/HMI software components that are specific to one or more of the Remote Pilot Sites o Services required for Site Acceptance Test (SAT) for each of the Remote Pilot Sites o Project Management services necessary to manage and coordinate above services with SA Team and E-Merge Team All Field Total Remote Pilot Sites cost estimates account for the following budget items: o Total Hardware and Installation costs required for each of the Remote Pilot Sites E-Merge Response to SA Post-Interview Questions Page 3

o Software costs for the Remote Pilot Sites are considered to be limited to PLC and OIT development packages, and have been accounted for under One Time costs E-Merge Response to SA Post-Interview Questions Page 4

SA Question #2 PROJECT RESPONSIBILITIES The SA is concerned about the potential for confusion and fragmented ongoing support based on having multiple companies providing programming services for the HMI and the PLCs. Question: Would E-Merge, as the Prime Contractor, consider/agree revising the split of project responsibilities to ensure that all programming for the SCADA Pilot Project is performed by local E- Merge resources? We recognize the value in bringing multiple backgrounds and opinions to the planning and design activities, but want first-hand experience and support available to work on-site as needed after the project is completed. E-Merge Response to SA Question #2 All programming support for the SCADA Pilot Project will be performed by local E-Merge resources in complete collaboration with the SA SCADA Program Manager. E-Merge Response to SA Post-Interview Questions Page 5

SA Question #3 SUCCESSION PLANNING Please provide a written statement identifying who will be the replacement for each of the key production staff listed on your organizational chart in the event they leave the project: Jim Lester Dean Foote Padraic Gray E-Merge Response to SA Question #3 Since E-Merge is the Prime, we have identified a Replacement Staff Member for Jim Lester who was identified as a project staff member in the original RFP Response. As a member of the team staff this person would already have familiarity with the project, and therefore provide project continuity to make the transition seamless. The table below summarizes the Replacement Staff Members for each firm on the E-Merge Team, followed by a summary of each Replacement Staff Member s experience and qualifications. Team Firm Primary Staff Member Replacement Staff Member E-Merge Jim Lester Anand Dixit Westin Dean Foote Bill Dang WR&A Padraic Gray Charles Luck Anand Dixit, PMP, CCNA, E-Merge Mr. Dixit is a System Architect/Project Manager with over 15 years of experience in process control and industrial automation. He has worked with a wide array of technologies to support applications in Water/Wastewater, Flue Gas Desulphurization systems, Electroplating plants, High speed machinery, DM & Softening plants, and Injection molding machines. Mr. Dixit's job responsibilities include managing and executing large systems integration projects that involve design, development and implementation of HMI, database and PLC applications for process control and automation. Mr. Dixit holds a Master s degree in Instrumentation and a Bachelor s degree in Electronics Engineering. Mr. Dixit holds certifications as a Project Management Professional (PMP), Cisco Certified Network Associate (CCNA), and in Wonderware System Platform. Bill Dang, PE, Westin Mr. Dang has a combined 20 years of experience in project management, instrumentation and control system design including SCADA projects, construction administration, and implementation. His experience includes projects that evolved from master planning/pre-design stages to project E-Merge Response to SA Post-Interview Questions Page 6

completion. He has also during his career performed HMI/PLC programming for numerous water/wastewater treatment plants with DCS and other systems such as GE Proficy ifix and Wonderware. Mr. Dang is a registered PE in the States of Texas and Virginia, and holds a Bachelor s degree in Electrical Engineering. Charles Luck, PE, WR&A Mr. Luck has 27 years of experience working in all aspects of Water and Wastewater projects including many treatment plants, pumping stations and other facilities requiring extensive Instrumentation & Control designs and integration into existing SCADA systems. Mr. Luck s professional design responsibilities also include serving as project manager for several I&C and SCADA related projects. His experience includes SCADA master planning, conceptual designs, preparation of plans and specifications, cost estimates, engineering services during construction, and operations assistance. Mr. Luck is a registered PE in the State of Virginia, and holds a Bachelor s degree in Civil Engineering. E-Merge Response to SA Post-Interview Questions Page 7