Briefing Memorandum: Second Nile Crossing at Jinja- Uganda. ICA Meeting: Financing Transport for Growth in Africa

Similar documents
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3202 Project Name. Kenya Nairobi Urban Toll Road PRG Region

Investment for African Development: Making it Happen

Draft PPP Policy Outline

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE UGANDA ELECTRICITY TRANSMISSION COMPANY LIMITED

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Transit Transport Co-ordination Authority

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

KENYA S PPP EXPERIENCE AND PIPELINE PROJECTS

STUDY SCHEDULE STUDY PURPOSE

Updated Project Information Document (PID) Report No: AB793. UGANDA - THIRD PHASE OF THE ROAD DEVELOPMENT PROGRAM Region.

PIDA: Africa s Time for Action Interconnecting, Integrating, and Transforming a Continent

Treasury Board Secretariat. Follow-Up on VFM Section 3.07, 2015 Annual Report RECOMMENDATION STATUS OVERVIEW

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6976 DRC-Multimodal Transp Additional Financing. AFRICA Sector.

Partnerships in Transportation Workshop Transportation PPPs beyond Toll Roads

Executive Summary: Review Result of Jakarta MRT Project

Implementation of the EAC Common Market Protocol:

NORTH LUZON, PHILIPPINES. Case Study (Transportation) Project Summary:

India: Public Private Partnerships in Highways Sector

A. H THAKKAR & SONS. The following are the most prominent revenue measures in the 2015/16 GOU budget:

Guidelines For Rajasthan Infrastructure Project Development Fund (RIPDF)

East African Community Overview of Regional Road Infrastructure Projects

Research: Research and Technology Transfer Office Sept. 1, 1996-Dec. 31, 1996 P.O. Box 5080

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region

Ex-Ante Evaluation (for Japanese ODA Loan)

SEMINAR PARIS NOVEMBER 2003 CONTRIBUTION

Introduction to the Toolkit Financial Models

BUILDING THE FUTURE A LOOK AT THE ECONOMIC POTENTIAL OF EAST AFRICA

PIDA. Work Based Project Focus for IS4D-- Per Learning Agreement. Agency. WBP Milestone or Output Progress June Corridor

Construction Mitigation Management

1 ST ISTANBUL PPP SUMMIT, 2015

Headline Verdana Bold. Uganda PPP Act - Implications for Public Sector Accounting Kenneth LEGESI Deloitte (Uganda) Limited

SEETO priority projects rating methodology. July, SEETO Priority Projects rating methodology 13/07/2012 Page 1

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Receive and file capital works report CW providing an update on the Burloak grade separation.

IFC Transaction Advisory Services Creating opportunity where it s needed most. From Concept Design to Project Execution

PPP in Korea. Highlights on its Institutions. Director General Hyoung-Kwon, Ko. Ministry of Strategy and Finance. November 11.

Environmental Analysis, Chapter 4 Consequences, and Mitigation

PUBLIC-PRIVATE PARTNERSHIPS AND INVESTMENT INCENTIVES. Maria Luísa Perdigão Abrantes Secretary of State and CEO of ANIP

Regulatory Impact Statement. Maritime New Zealand Funding Review: Proposal for Consultation Agency Disclosure Statement

Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009

CHALLENGES IN FINANCING ROAD MAINTENANCE IN SUB-SAHARA AFRICA.

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)

Financing the State A review of the main coalitions manifestos

XIV. SELECTED INSTITUTIONAL PROPOSALS FOR CONSIDERATION

Investment Opportunities in the Nigerian Public Enterprise Reform & Privatisation Programme APRIL 17-20

EXECUTION VERSION JULY 31, 2012 COMPREHENSIVE AGREEMENT RELATING TO THE I-95 HOV/HOT LANES PROJECT DATED AS OF JULY 31, 2012 BY AND BETWEEN

GLOBAL INFRASTRUCTURE FACILITY. A partnership platform for greater investment in the infrastructure of emerging markets and developing economies

Region Sector. Updated Project Information Document (PID) Report No: AB542

Overview of the framework

IFC S EXPERIENCE IN THE TRANSPORT SECTOR

N2 WILD COAST TOLL ROAD PROJECT

FINANCIAL ANALYSIS. 2. Taking into account the financial costs, the total amount needed to finance the Padma Bridge Project is presented in Table 1.

TAX LEVY A. TAX AT A GLANCE B. TAX LEVY SOURCES VIII-1

in Emerging Economies

APPENDIX FOR THE METROPOLITAN LONG RANGE TRANSPORTATION PLAN Forecast of State and Federal Revenues for Statewide and Metropolitan Plans

PPIAF Assistance to the Republic of Cameroon

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Presentation to the Ethiopia Government Delegation to Canada on PPP. Peter Kieran May 15, 2014 Ottawa, Ontario

Fiscal Year VDOT Annual Budget June 2017

Region of Waterloo Transportation and Environmental Services Rapid Transit

Management Compensation Framework

Good afternoon, For further details regarding the Don River Replacement Project, please refer to the attached project description.

Financing Megaprojects In The Rail Sector. Andreas Klocke, Head of KfW Regional Office, Bangkok

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN])

Reshaping Transport Institutional Framework

CHALLENGES BEFORE THE INDIAN RAILWAYS

Preliminary evaluation table of the project 1. Subject name Country name 2. Background and necessity of the project

Economic Assessment of a Fixed Link across the Fehmarn Belt

AFGHANISTAN RESOURCE CORRIDOR STRATEGY AND PLAN. Executive Summary

Benefit-Cost Analysis

Tonga Cable Limited. Compensation and resettlement framework Tonga Connectivity

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

GOLDEN EARS BRIDGE. Alternative Transportation Financing ITE Quad Conference - May Fred Cummings Vice-President, Major Construction Projects

in Developing Countries in FY2010 Access Road in Republic of Indonesia SUMMARY March 2011

Model Concession Agreement for Highways: An Overview

Construction projects, Oil & Gas, Mining, Export Processing Zones, Ports and Power in Myanmar James Finch, Partner

ECONOMIC AND FINANCIAL ANALYSIS

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT

Tax Policy and Administration: Case of Uganda. 20 December

COUNTRY REPORT ON INFRASTRUCTURE AND FINANCE BULGARIA TABLE OF CONTENT

Tibar Bay Port Timor-Leste

Bringing Virginia s Transportation Funding Up to Speed. August 25, 2014 John W. Lawson Chief Financial Officer

Outline. Laos in Brief. Battery of Asia and Land-Linked. Investment Support in Lao for investors

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Manoj Kumar Dubey Executive Director Finance/ Public Private Partnership Ministry of Railways

Mainstreaming Disaster Risk Reduction in. Project Cycle Management

OECD-India Investment Roundtable. India s Investment Policies and Outlook

Inverurie and Kintore (Potentially Vulnerable Area 06/13) Local Plan District Local authority Main catchment North East Aberdeenshire Council River Do

Project ADC I TBILISI JULY 2018

PUBLIC PRIVATE PARTNERSHIP IN THAILAND HIGHWAYS A CASE STUDY ON AN EXTENSION OF DONMUANG TOLLWAY PROJECT

Key issues considered in the dialogue: - what financing measures will best ensure bankable projects. Specifically, the dialogue focused on:

Strategic Asset Management Policy

Transportation Investment Corporation Service Plan 2012/ /15

Study on Private-Initiative Infrastructure Projects. in Developing Countries in FY2009. Project in Socialist Republic of Viet Nam SUMMARY.

FREE ZONES DEVELOPMENT IN UGANDA

Overview of the framework

RF Law on Concessions and prospects for private-public partnership infrastructure projects in Russia

PROJECT OVERVIEW PROJECT HIGHLIGHTS. August The first multi-asset PPP to be undertaken in the US using a bundled approach;

Thank you Chairman Leone, Chairman Lemar, Ranking Member Martin, Ranking Member Devlin and members of the Transportation Committee.

Transcription:

Briefing Memorandum: Second Nile Crossing at Jinja- Uganda ICA Meeting: Financing Transport for Growth in Africa December 3-4, 2007

TABLE OF CONTENTS 1. Summary 2. Economic Rationale 3. The Project 4. Feasibility Analysis 5. Development Status 6. Project Contacts ICA Meeting: Financing Transport for Growth in Africa 1

1. Summary The Ugandan Ministry of Works, Housing and Communications (MOWHC) has expressed its interest in the construction of a bridge across the Nile River. The design of a new bridge has been prompted by concerns over the current state of the bridge at the Nalubaale Dam. The existing bridge, which is supported by the dam, is the only Ugandan road connection across the Nile and, as such, is integral to the region s transportation network. The bridge also forms a key link along the Northern Corridor Route (NCR), Uganda s most important highway. Recent studies, however, have shown that the dam and bridge suffer from insufficient maintenance and will need extensive rehabilitation works. Any closure of the bridge would block transportation across the Nile and effectively divide the country in two. In order to avoid this potential disruption, the government of Uganda has expressed its interest in building a new crossing point at Jinja. The government has also expressed its desire to secure private sector funding for the project. The terms and conditions of such a deal would be negotiated between the Ugandan government and the private sector investors. Any negotiation would likely include the assignment of a portion of the tolling revenues to the private sector investors. A pre-feasibility study for the project was completed in March of 2006. The government has approached the Japan International Cooperation Agency (JICA) for funding for the next stage feasibility study. ICA Meeting: Financing Transport for Growth in Africa 2

2. Economic Rationale 2.1 Uganda Uganda is a developing landlocked country in Eastern Africa. Its per capita income is roughly USD 330 p.a. The country has been economically stable with real GDP growing at an average of 6.5% over the past 10 years. Roads form the backbone of Uganda s transportation network. The country has only one international airport, at Entebbe, and only 205 km of functioning rail network, the Kampala-Malaba line. 2.2 The Northern Corridor Route The Northern Corridor Route (NCR) is Uganda s most important national highway. It forms 6.8% of Uganda s road network and carries 31.5% of its traffic. Combined transit and transhipment traffic exceeds 2.2 million tonnes a day, and that rate has been growing at 20% annually. The road connects Uganda to the port of Mombasa, and is the preferred shipping route for much of Uganda s trade and commerce. The road is also critical to the transportation networks of Rwanda, Burundi and the Democratic Republic of the Congo. The NCR currently has only one crossing point across the Nile River in Uganda, the Nalubaale Dam/Bridge, located near the source of the Nile River, at Jinja. Over 90% of the Ugandan traffic along the NCR crosses over the Nalubaale Dam/Bridge. Any closure of the bridge would result in immense economic disruptions and would effectively separate the south-eastern portion of the country from the western and northern portions. The bridge at Nalubaale is supported by the existing dam structure that was created 50 years ago. Since construction, the dam and bridge have received only minimal repairs. The lack of proper maintenance has resulted in deteriorating conditions for both structures. The government has been making ad-hoc repairs designed to keep the conditions from deteriorating further but large scale repairs have yet to be undertaken. The MOWHC has decided that another bridge must be established to secure transportation along the Northern Corridor Route. 3. The Project 3.1 The Bridge The new bridge would be a second crossing point close to the existing Nalubaale Dam/ Bridge. A pre-investment study conducted by Mott MacDonald, Kagga and Partners in March 2006 investigated several alternative bridge alignments and structures. The study concluded that the best option with the lowest capital cost was a cable stayed bridge with two spans of 90 meters and 210 meters respectively. The bridge would include the construction of an 80 meter tower on the Nalufenya bank of the river. In order to minimize the costs, the use of the Nile Island as a pier was recommended. ICA Meeting: Financing Transport for Growth in Africa 3

3.2 Environmental Impact The 2006 pre-investment study included an environmental project brief. A project brief is a first, and necessary step in obtaining project approval from the Ugandan National Environmental Management Authority (NEMA). The project brief lays out the scope of the project, possible environmental impacts, and possible measures that could be undertaken to mitigate the environmental impacts. A full environmental study will need to be undertaken before the project can get final approval. The project brief s initial assessment considered several different possible environmental factors including: Noise; Dust; Accidents; Potential loss of employment; Land taking for access roads; Disturbance to and displacement of people; and Ecological impact. The project brief concluded that any negative externalities generated by the project could be reduced significantly with appropriate mitigation measures. 3.3 Legal Framework Uganda has had limited experience with public-private partnerships (PPP), and as such, its legal structure has yet to develop laws to facilitate such arrangements. Its constitution, which was adopted relatively recently on October 8 th, 1995, specifically forbids any tax that is not issued by parliament. Any attempt to levy a toll, even if alternative routes were available, without parliament s direct approval, could be challenged as a tax and therefore unconstitutional. The 2006 pre-investment study recommends that the government of Uganda enacts legislation through its stakeholder ministries that envisions PPP concessions. It further recommends that subsidiary legislation be issued that supports the project specifically. 4. Feasibility Analysis 4.1 Options The 2006 pre-investment study considered several different bridge designs. It also analyzed two possible bridge alignments, one utilizing an existing railroad bridge for support and the other using the Nile Island as a pier. The study then considered 5 possible bridge setups: ICA Meeting: Financing Transport for Growth in Africa 4

Option A1 : Balanced Cantilever Bridge, Alignment A Island Route Option A2 : Cable Stay Bridge, Alignment A Island Route Option B1 : Balanced Cantilever Bridge, Alignment B Railway Route Option B2 : Cable Stay Bridge, Alignment B Railway Route Option B3 : Spandrel Bridge, Alignment B Railway Route The study also considered 4 different financing options. The first two were build, operate and transfer (BOT) arrangements whereby the private sector would finance the construction of the bridge in exchange for a 30 year concession. During the concession period, the private investor would be responsible for the bridge s maintenance and operations and would be able to collect toll revenues from the bridge. The first BOT option assumed the project would be financed through a subsidised soft loan with a 3% annual interest rate. The second BOT option assumed the project would be financed through a loan with an 11% annual interest rate. In the third option it was assumed that the government finances the construction of the bridge and that the private sector would receive a contract for the operation and maintenance of the bridge. In exchange, the operators would be paid a set fee that would be taken from the tolling revenues. Any excess revenues would be given to the Ugandan Road Fund. This option was considered in order to show that the project revenues could cover maintenance and operations costs. In the fourth option, a leasing arrangement was considered whereby the government would finance the construction of the bridge and the private sector would finance a portion of the bridge s construction costs in order to secure a 30 year contract under which it would maintain and operate the bridge in exchange for toll revenues. The study utilized a model whereby the government funded approximately 85% of the project s initial construction costs and the private sector funded the remaining 15%. The timeline of the project was a three year construction period with construction costs of roughly USD 35 million, of which the private sector was expected to finance approximately USD 5.5 million. Maintenance and operation costs were estimated at USD 1.05 million in the first year of operations (the fourth year of the project) and were expected to grow at 5% per annum. Total maintenance and operations costs during the 27 operational years of the contract were projected at approximately USD 70 million. The study s analysis also included taxes and annual fees that would be paid by the operator to the government, although a detailed analysis of these fees is unavailable. 4.2 Traffic Growth The report used statistical information gathered from the government of Uganda to estimate traffic growth along the proposed route. The estimates included are still preliminary and based on past traffic trends. ICA Meeting: Financing Transport for Growth in Africa 5

Although these growth rates have not accounted for changes in traffic patterns due to the installation of a toll, the consultants expected that diversions would be relatively low due to the lack of other crossing points for road traffic. One potential cause for concern is the planned rehabilitation of an existing railline across the Nile. The rehabilitation works could make the railway more appealing as a means of transportation across the river. A more detailed traffic study will need to be undertaken to generate more accurate projections. 4.3 Conclusions The pre-investment analysis of the project was conducted with the consultants results summarized below: Internal Rate of Return The consultants were able to draw several conclusions from the data; although the study is still preliminary and a more extensive feasibility study will be required. The study concluded that Option A2, a cable stay bridge using the Nile Island as a pier, generated the lowest capital cost and was the optimal bridge alignment and design. The BOT options were not found to be viable. The financial IRR for the project was negative in both the case of a commercial loan with an 11% interest rate and a soft loan with a 3% interest rate. The contract option for operations and maintenance was shown to be profitable, with toll revenues exceeding the costs of maintenance and operations. The leasing option was shown to be financially viable with an IRR of 18.72%. ICA Meeting: Financing Transport for Growth in Africa 6

The results indicate that the project is not a financially viable option if it were to be wholly financed by the private sector. They do indicate, however, that private sector involvement is possible, provided that a large portion of the initial construction costs were to be financed by the government of Uganda. 5. Development Status In August of 2007 the MOWHC requested funding from the Japanese government to finance a feasibility study for the bridge project. A response is awaited. The government of Uganda has expressed an interest in financing the project with the support of private investors. The government has yet to establish the exact nature of private sector involvement in the project and remains open to negotiations involving a variety of possible financing scenarios. 6. Project Contacts Jeremy Bassy Aguma Transport Economist Road Agency Formation Unit (RAFU) Ministry of Works and Transport Tel: +256 31 233100/ +231 41 318000/ (direct) +256 31 2233215 Fax: +256 41 232807/ +256 41 347616 Email: jaguma@rafu.or.ug ICA Meeting: Financing Transport for Growth in Africa 7