HARLAN MUNICIPAL UTILITIES

Similar documents
SECTION INSTRUCTIONS TO BIDDERS

Demolition of Water Ground Storage Tanks

SPECIFICATIONS FOR. Straits Area Snowmobile Club Carp River Iron Bridge Mackinac County S Prepared by:

BIDDING AND CONSTRUCTION STANDARDS

Project Manual. For. Peachtree City LMIG Paving Projects for 2017

INSTRUCTIONS TO BIDDERS

Project Manual. For Glenloch Splash Pad And Pool Renovations

PROPOSAL WATER PLANT LAB SCADA SYSTEM/AUTOMATION UPGRADE ASSUMPTION PARISH WATERWORKS DISTRICT NO. 1 NAPOLEONVILLE, ASSUMPTION PARISH, LOUISIANA

2015 HELLWINKEL CHANNEL PROJECT

(SECCRA) SECCRA COMMUNITY LANDFILL LONDON GROVE TOWNSHIP CHESTER COUNTY, PENNSYLVANIA

PROPOSAL REQUIREMENTS AND CONDITIONS

CONSTRUCTION DOCUMENTS FOR: City of Lovington. Water Meter Improvements. Lovington, NM. Funding Source:

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project

RENOVATION CONTRACT. Borrower Name(s): Phone #: Phone #:

INSTRUCTIONS TO BIDDERS

TABLE OF CONTENTS CONTRACT PROVISIONS

THIS CONSTRUCTION CONTRACT ( Contract ) dated as of ( Owner ) and ( Contractor ) having a principal place of business at.

AIA Document A201 TM 1997

SPECIFICATIONS AND BIDDING DOCUMENTS USED ASPHALT PAVER

BIDDING REQUIREMENTS, CONTRACT DOCUMENTS TECHNICAL SPECIFICATIONS CONTRACT PLANS

UNIVERSITY OF ROCHESTER INSTRUCTIONS TO BIDDERS

WHITMAN COUNTY TRANSFER STATION PRECAST CONCRETE WALL PANEL REPLACEMENT PROJECT

SECTION NOTICE TO BIDDERS

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES

CONTRACT DOCUMENTS FOR: CONSTRUCTION YEAR 2018 DIRECTIONAL DRILLING FOR THE WAYNE COUNTY WATER AND SEWER AUTHORITY

Document A201 TM 2007 SP

REQUEST FOR SEALED BID PROPOSAL

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE

General Conditions of the Construction Contract Between OWNER AND CONTRACTOR

PROJECT MANUAL TO BE RETAINED BY BIDDER STREET PAVING PROJECT

Document A201 TM. General Conditions of the Contract for Construction. (Name and location or address)

Document A Standard Abbreviated Form of Agreement Between Owner and Contractor

TOWN OF BURLINGTON PURCHASING DEPARTMENT New Four Stage Breathing Air Compressor Contract #17S

City of Detroit Detroit, Oregon

Contractor for any and all liability, costs, expenses, fines, penalties, and attorney s fees resulting from its failure to perform such duties.

SAMPLE DOCUMENT SUBCONTRACT AGREEMENT

General Conditions of the Construction Contract Between CONSTRUCTION MANAGER AND CONTRACTOR

B. The Bid is made in compliance with the Bidding Documents.

AIA Document A701 TM 1997

Document A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition

Document A Standard Form of Agreement Between Contractor and Subcontractor

AIA Document A201 TM 2007

AIA Document A201 TM 1997

Standard Form of Agreement Between Contractor and Subcontractor

Document A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition

City of Portsmouth Portsmouth, New Hampshire Department of Public Works. Plumbing and Heating Repair Services

INSTRUCTIONS TO BIDDERS

NOTICE INVITING SEALED BIDS FOR THE SR-91 EASTBOUND ON- AND OFF-RAMPS AT BELLFLOWER BOULEVARD PHASE 2 LANDSCAPE IMPROVEMENTS

Document A401 TM. Standard Form of Agreement Between Contractor and Subcontractor

This page intentionally blank. VTSV MBR System Procurement Bid Set - 11/28/ Notice to Proceed. Copyright 2013 National Society of

CONSTRUCTION CONTRACT EXAMPLE

SPECIFICATIONS AND CONTRACT DOCUMENTS FOR. Underground Electric System Facilities Locating and Marking Services

Town of Manchester, Connecticut General Services Department. Request for Proposals for Fingerprinting Services 17/18-85.

IFB F B-WING RENOVATIONS IFB F C OFFICES BUILD OUT. Addendum 3

ARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES

Document A701 TM. Instructions to Bidders

MASTER SUBCONTRACT AGREEMENT

Document A201 TM. General Conditions of the Contract for Construction

SUGGESTED FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (COST-PLUS)

THE CITY OF FOREST PARK PLANNING, BUILDING AND ZONING DEPARTMENT JONATHAN JONES, DIRECTOR 785 Forest Parkway Forest Park, GA 30297

W I T N E S S E T H:

SARPY COUNTY AND SARPY CITIES WASTEWATER AGENCY

EXHIBIT A CONTINUED GENERAL CONDITIONS

ANNEX A Standard Special Conditions For The Salvation Army

INSTRUCTIONS TO BIDDERS

1. ADVERTISEMENT FOR BIDS... AB-1 2. INSTRUCTIONS TO BIDDERS... IB-1 3. BID FORM... BF-1 4. AGREEMENT... AG-1 6. GENERAL CONDITIONS...

Document A107. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope

PROPOSAL AND SPECIFICATIONS FOR FURNISH, HAULING AND SPREADING PROCESSED ROAD GRAVEL

C R D A Capital Region Development Authority

AIA Document A201 TM 2007

CITY OF CUMMING WILLIAMS CIRCLE LOW PRESSURE SEWER

THE CONSTRUCTION MANAGEMENT ASSOCIATION OF AMERICA, INC. CMAA Document CMAR-2 (2013 Edition)

SHORT FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES

University of California, Riverside Barn Expansion

PROJECT MANUAL QUEEN ANNE'S COUNTY, MARYLAND DEPARTMENT OF PARKS & RECREATION. April 11, 2016

Standard Form of Agreement Between Contractor and Subcontractor

Document A201/CMa. General Conditions of the Contract for Construction where the Construction Manager is NOT a Constructor

PROJECT MANUAL BID DOCUMENTS, CONTRACT DOCUMENTS. and CONSTRUCTION SPECIFICATIONS. for the construction of NATURAL GAS SYSTEM EXPANSION BENNETT ROAD

REQUEST FOR PROPOSAL. PIKES PEAK LIBRARY DISTRICT Colorado Springs, CO

VIRGIN ISLANDS PORT AUTHORITY ENGINEERING DIVISION

DEPARTMENT OF HOUSING & ECONOMIC SUSTAINABILITY BID PROPOSAL - HOUSING REHABILITATION PROGRAM

STANDARD FORM OF MASTER AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES

WINDSOR NORTH WEST PARK NATURE CENTER ADDITION AND STRUCTURE PROJECT 145 LANG ROAD. WINDSOR, CT

SSOE Group Standard General Conditions of the Construction Contract

STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT

TOWN OF ERWIN REQUEST FOR PROPOSALS FOR GRASS MOWING SERVICES - ADDENDUM

CENTRAL COAST WATER AUTHORITY. Bid Documents For Furnishing and Delivery of Bulk Water Treatment Chemicals Ammonium Hydroxide

AIA Document A103 TM 2007

CHEROKEE NATION BUSINESSES, L.L.C. REQUEST FOR PROPOSAL ( RFP ) PROJECT NAME: CNE Ad Agency RFP NUMBER: DATED: TABLE OF CONTENTS

GENERAL CONDITIONS of the CONTRACT FOR CONSTRUCTION for the ARCHDIOCESE OF CHICAGO (2004 Archdiocese Edition)

ACSA Landfill Shooting Range Pump Station Force Main 6/8/2016 TABLE OF CONTENTS

SUBCONTRACTOR AGREEMENT

REQUEST FOR PROPOSALS Public Relations Services ALBANY CAPITAL CENTER TABLE OF ARTICLES 1. DEFINITIONS 5. CONSIDERATION OF RESPONSES

EXHIBIT A: SECTION INSTRUCTIONS TO BIDDERS

BETWEEN name. address. AND name (hereinafter called the Subcontractor ) address

Washington University in St. Louis

ICSC CENTERBUILD CONFERENCE DECEMBER 2-5, 1998 ARIZONA BILTMORE PHOENIX, ARIZONA

Document A201 TM. General Conditions of the Contract for Construction

BIDDING DOCUMENTS FOR. Contract No. PTSA Brush Run WPCP Roof Replacement Project

Document A104 TM. Standard Abbreviated Form of Agreement Between Owner and Contractor

Transcription:

HARLAN MUNICIPAL UTILITIES 2017-2018 CONVERSION PROJECT METER CONVERSION CONTRACT CONTRACT DOCUMENTS, SPECIFICATIONS, AND DRAWINGS ISSUED FOR BIDDING 07/26/2018

HARLAN MUNICIPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract Installation Contract Index SECTION TITLE Contract Sections 00100 Notice of Hearing and Letting 00101 Notice of Bidding 00200 Instructions to Bidders 00300 Bid Proposal 00520 Agreement 00700 General Conditions of the Contract Construction Specifications 01000 General Requirements 16403 Construction Specifications Construction Drawings E9380-570 Location 267 Elevations E9380-571 Location 267 Roof Plan E9380-572 Location 267 Interior Plan E9380-573 Location 267 Details E9380-580 Locations 124, 212, 224, and 286 E9380-581 Locations 230, 233, 281, 284, and 463 E9380-582 Locations 1063, 221, 231, 247, 372, 392, 469, 507, and 544 P & E Engineering Co. 00000-1 July 26, 2018

NOTICE OF HEARING AND LETTING 2017-2018 Conversion Project Meter Conversion Contract A public hearing and bid letting will be held at 4:00 P.M August 23, 2018 on the proposed plans, specifications, form of contract and estimate of cost for improvements identified as the Meter Conversion Contract, which is a portion of the 2017-2018 Conversion Project. At the hearing any interested person may appear and file objections to the project or to the cost of the improvements. The extent of the improvements that are included in the Contract are as follows. Furnish and install meter sockets, conduit, wiring, and other electrical equipment to convert existing overhead electric services to underground supply and make other modifications to existing service equipment as shown on the drawings. P & E Engineering Co. 00100-1 July 26, 2018

NOTICE OF BIDDING 2017-2018 Conversion Project Meter Conversion Contract Sealed proposals will be received by the Board of Trustees of Harlan Municipal Utilities (Owner) until 2:00 P.M. local time on August 21, 2018 for the Meter Conversion Contract, which is a portion of a project identified as 2017-2018 Conversion Project, and as described in detail in the specifications now on file in the Owner s office. Proposals must be delivered to the following address prior to that time. Harlan Municipal Utilities Attn: Mr. Kenneth Weber 2412 Southwest Avenue Harlan, IA 51537 Phone 712-755-5182 Proposals will be opened in public session at that time. Proposals will be acted upon by the Board of Trustees at a meeting to be held in the board room of the Harlan Municipal Utilities Office at 4:00 P.M. local time on August 23, 2018 or at such later time and place as may then be fixed. The bidding documents can be obtained by contacting Al Powers at P&E Engineering Co. by email at arpower@peengr.com. Extent of Improvements Furnish and install meter sockets, conduit, wiring, and other electrical equipment to convert existing overhead electric services to underground supply and make other modifications to existing service equipment as shown on the drawings. Schedule of Proposed Work Work under the Contract is to commence on or about Sept. 1, 2018. Work must be substantially complete by Feb. 15, 2019 with all work completed by Feb, 28, 2019. Each bid must be accompanied in a separate envelope by a bid bond, certified check or cashier s check in an amount of five per cent (5%) of the total value of the Proposal, and made payable to the Owner as a security that the bidder will enter into a contract for the Work within ten (10) days after the award of the contract to such bidder. P & E Engineering Co. 00101-1 July 26, 2018

HARLAN MUNICIPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract SECTION 00200 Instructions to Bidders ARTICLE 1 - DEFINED TERMS 1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below: A. Issuing Office--The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered. The Issuing Office for this project will be P & E Engineering Co., 245 S. 5 th Street, PO Box 620, Carlisle, IA 50047. ARTICLE 2 - COPIES OF BIDDING DOCUMENTS 2.01 Bidding documents may be obtained electronically at no cost. Bid sets may be provided via e- mail or on CD in PDF format. A single copy of the Bidding Documents in paper form may also be obtained at no cost from the Engineer. 2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use. 2.04 Unsuccessful Bidders shall return all copies of Bidding Documents to Engineer and/or destroy electronic copies. ARTICLE 3 - QUALIFICATIONS OF BIDDERS 3.01 To demonstrate Bidder s qualifications to perform the Work, within five days of Owner s request, Bidder shall submit written evidence such as financial data, previous experience, present commitments, available resources, and other similar data as may be requested. ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE 4.01 Hazardous Environmental Condition A. No Hazardous Environmental Conditions are known to exist at the Site. 4.02 It is the responsibility of each Bidder before submitting a Bid to: P & E Engineering Co. 00200-1 July 26, 2018

HARLAN MUNICIPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract SECTION 00200 Instructions to Bidders A. examine and carefully study the Bidding Documents, the other related data identified in the Bidding Documents, and any Addenda; B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work; C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work; D. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents; E. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents; F. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work. 4.03 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents, that Bidder has given Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work. ARTICLE 5 - PRE-BID CONFERENCE 5.01 A pre-bid conference will NOT be held for this project. Prospective bidders are encouraged to make arrangements with Owner to visit the site and to inspect the existing conditions. ARTICLE 6 - SITE AND OTHER AREAS 6.01 All work under this contract is on private property owned by customers of the Owner. Owner will contact all property owners and obtain permission for Contractor to work on the site. ARTICLE 7 - INTERPRETATIONS AND ADDENDA 7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such P & E Engineering Co. 00200-2 July 26, 2018

HARLAN MUNICIPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract SECTION 00200 Instructions to Bidders questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Engineer. ARTICLE 8 - BID SECURITY 8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder s maximum Bid price and in the form of a cashier s or certified check, or bank money order, or certified share draft drawn on a credit union in Iowa or charted under the laws of the United States, or a Bid bond (on the form attached or on the standard form of the issuing surety) issued by a surety company that is duly licensed or authorized to issue bonds for the limits and coverages required in the State of Iowa. 8.02 The Bid security of the apparent Successful Bidder will be retained until such Bidder has executed the Contract Documents, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of other Bidders whom Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Agreement or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be returned. 8.03 Bid security of other Bidders whom Owner believes do not have a reasonable chance of receiving the award will be returned within seven days after the Bid opening. ARTICLE 9 - CONTRACT TIMES 9.01 The work schedule is set forth in the Agreement. ARTICLE 10 LOCAL PREFERENCE 10.01 By virtue of statutory authority a preference will be given to products and provisions grown or produced within the State of Iowa and to Iowa domestic labor. ARTICLE 11 NOT USED P & E Engineering Co. 00200-3 July 26, 2018

HARLAN MUNICIPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract SECTION 00200 Instructions to Bidders ARTICLE 12 NOT USED ARTICLE 13 - PREPARATION OF BID 13.01 The Bid Form is included with the Bidding Documents. Additional copies may be obtained from Engineer. 13.02 All blanks on the Bid Form shall be completed by printing in ink or by typewriter and the Bid signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternative, adjustment unit price item, and unit price item listed therein, or the words No Bid, No Change, or Not Applicable entered. 13.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied. The corporate address and state of incorporation shall be shown below the signature. 13.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature. The official address of the partnership shall be shown below the signature. 13.05 A Bid by a limited liability company shall be executed in the name of the firm by a member. The state of formation of the firm and the official address of the firm shall be shown below the signature. 13.06 A Bid by an individual shall show the Bidder s name and official address. 13.07 A Bid by a joint venture shall be executed by each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown below the signature. 13.08 All names shall be typed or printed in ink below the signatures. 13.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form. 13.10 The address and telephone number for communications regarding the Bid shall be shown. ARTICLE 14 - BASIS OF BID; COMPARISON OF BIDS 14.01 Lump Sum A. Bidders shall submit a Bid on a lump sum basis for the base Bid and include a separate price for each alternate described in the Bidding Documents as provided for in the Bid Form. The price for each P & E Engineering Co. 00200-4 July 26, 2018

HARLAN MUNICIPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract SECTION 00200 Instructions to Bidders alternate will be the amount added to or deleted from the base Bid if Owner selects the alternate. In the comparison of Bids, alternates will be applied in the same order as listed in the Bid form. 14.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in Paragraph 11.02 of the General Conditions. ARTICLE 15 - SUBMITTAL OF BID 15.01 With each copy of the Bidding Documents, a Bidder is furnished one separate unbound copy of the Bid Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security. 15.02 One original and one copy of the Bid shall be submitted. A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the Advertisement or Invitation to Bid and shall be enclosed in an opaque sealed envelope plainly marked with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by other required documents. This envelope shall be plainly labeled BID ENCLOSED. The bid security shall be enclosed in a separate opaque sealed envelope plainly marked with the project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder. The words BID SECURITY ENCLOSED shall be plainly printed on the envelope. Both envelopes shall be placed in a separate envelope plainly marked on the outside with the notation BID ENCLOSED. 15.03 A Bid sent by mail shall be addressed to: Harlan Municipal Utilities Attn: Mr. Kenneth Weber 2412 Southwest Avenue P.O. Box 71 Harlan, IA 51537 15.04 A Bid sent by delivery service or hand delivered shall be delivered to: Harlan Municipal Utilities Attn: Mr. Kenneth Weber 2412 Southwest Avenue Harlan, IA 51537 Phone 712-755-5182 ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID 16.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. P & E Engineering Co. 00200-5 July 26, 2018

HARLAN MUNICIPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract SECTION 00200 Instructions to Bidders 16.02 If within 24 hours after Bids are opened, any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work. 16.03 Any change in the official Bid Form, or any addition thereto, may cause the rejection of the Bid. No Bid will be considered which contains a clause in which the Bidder reserves the right to accept or reject the Agreement issued by Owner. 16.04 The Bid must be valid for at least 30 days after the due date. Owner may, in his sole discretion, release any Bid and return to Bidder prior to that date. ARTICLE 17 - OPENING OF BIDS 17.01 Bids will be opened at the time and place indicated in the Advertisement or Invitation to Bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids. ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE 18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period. ARTICLE 19 EVALUATION OF BIDS AND AWARD OF CONTRACT 19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible. Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder. 19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest. 19.03 In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award. P & E Engineering Co. 00200-6 July 26, 2018

HARLAN MUNICIPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract SECTION 00200 Instructions to Bidders 19.04 In evaluating Bidders, Owner will consider the qualifications of Bidders. 19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities to perform the Work in accordance with the Contract Documents. ARTICLE 20 - CONTRACT SECURITY AND INSURANCE 20.01 Article 5 of the General Conditions sets forth Owner s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it shall be accompanied by such bonds. ARTICLE 21 - SIGNING OF AGREEMENT 21.01 When Owner gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within 5 days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to Owner. Within 5 days thereafter, Owner shall deliver one fully signed counterpart to Successful Bidder with a complete set of the Drawings with appropriate identification. ARTICLE 22 - SALES AND USE TAXES 22.01 Owner is subject to state and local sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes shall be included in the Bid. P & E Engineering Co. 00200-7 July 26, 2018

HARLAN MUNICIPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract Section 00300 Bid Form PROJECT IDENTIFICATION 2017-2018 Conversion Project Distribution Construction Contract Contract includes: A. Furnish and install meter sockets, conduit, and wiring to convert overhead electric services to underground supply. THIS BID IS SUBMITTED TO (Owner): Harlan Municipal Utilities 2412 Southwest Avenue Harlan, Iowa 51537 THIS BID IS SUBMITTED BY (Bidder): 1.01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included with the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions in the Bidding Documents 2.01 Bidder accepts all terms and conditions of the Agreement, the Notice of Letting and Public Hearing, and Instructions to Bidders, including without limitation those dealing with the disposition of Bid Security. The Bid will remain subject to acceptance for 30 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner. P & E Engineering Co. 00300-1 July 26, 2018

HARLAN MUNICIPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract 3.01 In submitting this Bid, Bidder represents, as set forth in the Agreement, that: A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of all which is hereby acknowledged. Addendum No. Addendum Date B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. Bidder is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress and performance of the Work. D. Bidder declares that Bidder has examined to Bidder s own satisfaction the Drawings, Specifications, and other Bidding Documents, the character and location of the work, the character, quality and quantity of materials to be supplied, the character of equipment and facilities needed preliminary to and during the prosecution of the work, the general and local conditions, and other matters which can affect the work under this contract; and that this proposal is made with full knowledge of the intent and purpose of the same. Bidder further declares that in respect to these matters he is not relying upon any representation made to him by any officer, agent, or employee of the Owner, or by any other person on behalf of Owner, but that Bidder relies solely upon his own investigation. E. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents. F. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by Engineer is acceptable to Bidder. G. The Bidding Documents are generally sufficient to indicate and convey all terms and conditions of the performance of the Work for which this Bid is submitted. H. The undersigned certifies that the bid prices contained herein have been carefully checked and are submitted as correct and final. It is proposed to do the work at the prices set out for each item. P & E Engineering Co. 00300-2 July 26, 2018

HARLAN MUNICIPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract 4.01 Bidder further represents that: A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and D. Bidder has not sought by collusion to obtain for itself any advantage over any other bidder or over Owner. 5.01 Bidder ( ) will complete the Work in accordance with the Contract Documents for the following price(s). LUMP SUM BASE BID (use words) Dollars($ ) (figures) 5.02 All bidders must list the hourly cost for labor classifications and major equipment that Bidder expects to utilize in the performance of the Work. These rates may be utilized for determining pricing of Extra Work. Bidder may furnish this information by attaching Bidder s standard listing format and noting that reference below. HOURLY RATES for Bidder ( ) Straight Time Over Time Classification or Equipment Hourly Rate Hourly Rate P & E Engineering Co. 00300-3 July 26, 2018

HARLAN MUNICIPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract 6.01 Bidder agrees that the Work will commence on or about Sept. 1, 2018, that work will be substantially complete by Feb. 15, 2019, and that all work will be completed by Feb. 28, 2019. 7.01 Attached is a Bid Security in the amount of 5% of the Lump Sum Base Bid amount indicated above. In case of default or failure on the part of the undersigned to enter into said contract for the construction of the above work and to furnish the required bond within ten days, Bidder hereby agrees that the accompanying Bid Security may be cashed and deposited with the Owner, and Bidder further agrees that in that case the Sum of Dollars ($ ) which is the amount of the Bid Security accompanying this proposal, is the fair measure of the amount of the damages that Harlan Municipal Utilities will sustain in case the undersigned shall fail or refuse to enter into the Agreement or furnish bond if said Contract is awarded to him. 8.01 The terms used in this Bid with initial capital letters have the meanings indicated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions. Submitted on, 2018. BIDDER Firm Name By (typed or printed) (individual s signature) Title Business address Phone No. FAX No. Email P & E Engineering Co. 00300-4 July 26, 2018

HARLAN MUNICPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract Section 00520 Agreement THIS AGREEMENT is by and between Harlan Municipal Utilities (Owner) and (Contractor). Owner and Contractor, in consideration of the mutual covenants set forth herein, agree as follows: ARTICLE 1 - WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: a. Furnish and install meter sockets, conduit, and wiring to convert existing overhead electric services to underground supply. ARTICLE 2 - THE PROJECT 2.01 The Project for which the Work under the Contract Documents is only a part is generally described as follows: Rebuild and convert the electric distribution system and substations from overhead 4 kv to underground 12 kv. ARTICLE 3 - ENGINEER 3.01 The Project has been designed by P & E Engineering Co. (Engineer), who is to act as Owner s representative, assume all duties and responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents. ARTICLE 4 - CONTRACT TIMES 4.01 All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. P & E Engineering Co. 00520-1 July 26, 2018

HARLAN MUNICPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract Section 00520 Agreement 4.02 Dates for Substantial Completion and Final Payment A. The Work will be substantially completed on or about Feb. 15, 2019, and fully completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions on or before Feb. 28, 2019. ARTICLE 5 - CONTRACT PRICE 5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents an amount in current funds as follows: A. A Lump Sum of: (use words) ($ ) (figures) ARTICLE 6 - PAYMENT PROCEDURES 6.01 Submittal and Processing of Payments A. Contractor shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions. 6.02 Progress Payments; Retainage A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor s Applications for Payment on or about the First day of each month during performance of the Work as provided in Paragraphs 6.02.A.1 below. All such payments will be measured by the schedule of values established as provided in Paragraph 2.07.A of the General Conditions or, in the event there is no schedule of values, as provided in the General Requirements: 1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Engineer may determine or Owner may withhold, in accordance with the General Conditions: a. 95 percent of Work completed (with the balance being retainage). and; b. 95 percent of cost of materials and equipment stored on site but not yet incorporated in the Work, with the balance being retainage. 2. Following Substantial Completion, partial payment of retainage may be made in accordance with the Contract Documents and applicable State Law. P & E Engineering Co. 00520-2 July 26, 2018

HARLAN MUNICPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract Section 00520 Agreement 6.03 Final Payment A. Upon final completion and acceptance of the Work in accordance with the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in Paragraph 14.07 of the General Conditions. ARTICLE 7 CONTRACTOR S REPRESENTATIONS 7.01 In order to induce Owner to enter into this Agreement Contractor makes the following representations: A. Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work. D. Contractor does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. E. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. F. Contractor has correlated the information known to Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. G. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor. H. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. ARTICLE 8 - CONTRACT DOCUMENTS 8.01 Contents A. The Contract Documents consist of the following: P & E Engineering Co. 00520-3 July 26, 2018

HARLAN MUNICPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract Section 00520 Agreement 1. This Agreement (pages 1 to 6, inclusive). 2. Performance bond. 3. Payment bond. 4. General Conditions (Section 00700, pages 1 to 15, inclusive). 5. General Requirements (Section 10000, pages 1 to 4, inclusive) 6. Specifications and drawings as listed in the table of contents of the Project Manual. 7. Addenda (numbers to, inclusive). 8. Exhibits to this Agreement (enumerated as follows): a. Contractor s Bid (pages 1 to 4, inclusive). 9. The following which may be delivered or issued on or after the Effective Date of the Agreement and are not attached hereto: a. Notice to Proceed. b. Work Change Directive(s). c. Change Order(s). B. The documents listed in Paragraph 9.01.A are attached to this Agreement (except as expressly noted otherwise above). C. There are no Contract Documents other than those listed above in this Article 9. D. The Contract Documents may only be amended, modified, or supplemented as provided in Paragraph 3.04 of the General Conditions. P & E Engineering Co. 00520-4 July 26, 2018

HARLAN MUNICPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract Section 00520 Agreement ARTICLE 9 - MISCELLANEOUS 9.01 Terms A. Terms used in this Agreement will have the meanings stated in the General Conditions and the Supplementary Conditions. 9.02 Assignment of Contract A. No assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 9.03 Successors and Assigns A. Owner and Contractor each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 9.04 Severability A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. P & E Engineering Co. 00520-5 July 26, 2018

HARLAN MUNICPAL UTILITIES 2017-2018 Conversion Project Meter Conversion Contract Section 00520 Agreement IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement in duplicate. One counterpart each has been delivered to Owner and Contractor. All portions of the Contract Documents have been signed or identified by Owner and Contractor or on their behalf. This Agreement will be effective on, (which is the Effective Date of the Agreement). OWNER: CONTRACTOR Harlan Municipal Utilities By: Title: By: Title: Attest: Title: Attest: Title: Address for giving notices: Harlan Municipal Utilities 2412 Southwest Avenue P.O. Box 71 Harlan, IA 51537 License No. (Where Applicable) If Contractor is a corporation or partnership, attach evidence of authority to sign. P & E Engineering Co. 00520-6 July 26, 2018

STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page ARTICLE 1 - DEFINITIONS AND TERMINOLOGY... 2 ARTICLE 2 - PRELIMINARY MATTERS... 2 ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE... 2 ARTICLE 4 NOT USED ARTICLE 5 - INSURANCE... 3 ARTICLE 6 - CONTRACTOR S RESPONSIBILITIES... 4 ARTICLE 7 - OTHER WORK AT THE SITE... 7 ARTICLE 8 - OWNER S RESPONSIBILITIES... 7 ARTICLE 9 - ENGINEER S STATUS DURING CONSTRUCTION... 8 ARTICLE 10 - CHANGES IN THE WORK; CLAIMS... 9 ARTICLE 11 NOT USED ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES... 10 ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK... 10 ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION... 11 ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION... 13 ARTICLE 16 - DISPUTE RESOLUTION... 14 ARTICLE 17 - MISCELLANEOUS... 14 00700-1

GENERAL CONDITIONS ARTICLE 1 - DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in the Bidding Requirements or Contract Documents, the terms listed below will have the meanings shown. 1. Addenda--Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement--The written instrument which is evidence of the agreement between Owner and Contractor covering the Work. 3. Application for Payment--The form acceptable to Engineer which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos--Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Bid--The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 6. Bidder--The individual or entity who submits a Bid directly to Owner. 7. Bidding Documents--The Bidding Requirements and the proposed Contract Documents (including all Addenda). 8. Bidding Requirements--The Advertisement or Invitation to Bid, Instructions to Bidders, bid security of acceptable form, if any, and the Bid Form with any supplements. 9. Change Order--A document recommended by Engineer which is signed by Contractor and Owner and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date of the Agreement. 10. Claim--A demand or assertion by Owner or Contractor seeking an adjustment of Contract Price or Contract Times, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Claim. 11. Contract--The entire and integrated written agreement between the Owner and Contractor concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 12. Contract Documents-- Those items so designated in the Agreement. Only printed or hard copies of the items listed in the Agreement are Contract Documents. Approved Shop Drawings, other Contractor s submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 13. Contract Price--The moneys payable by Owner to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 14. Engineer P&E Engineering Co. 14. Owner-- Harlan Municipal Utilities. 15. Successful Bidder--The Bidder submitting a responsive Bid to whom Owner makes an award. ARTICLE 2 - PRELIMINARY MATTERS 2.01 Delivery of Bonds and Evidence of Insurance A. When Contractor delivers the executed counterparts of the Agreement to Owner, Contractor shall also deliver to Owner such bonds as Contractor may be required to furnish. B. Evidence of Insurance: Before any Work at the Site is started, Contractor shall deliver to the Owner, with copies to each additional insured identified in the Supplementary Conditions, certificates of insurance in accordance with Article 5. ARTICLE 3 - CONTRACT DOCUMENTS: AMENDING, REUSE 3.01 Intent INTENT, A. The Contract Documents are complementary; what is required by one is as binding as if required by all. 00700-2 B. It is the intent of the Contract Documents to describe a functionally complete Project (or part thereof) to be constructed in accordance with the Contract Docu-

ments. Any labor, documentation, services, materials, or equipment that may reasonably be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the intended result will be provided whether or not specifically called for at no additional cost to Owner. C. Clarifications and interpretations of the Contract Documents shall be issued by Engineer as provided in Article 9. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies 1. Contractor s Review of Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein and all applicable field measurements. Contractor shall promptly report in writing to Engineer any conflict, error, ambiguity, or discrepancy which Contractor may discover and shall obtain a written interpretation or clarification from Engineer before proceeding with any Work affected thereby. 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by either a Change Order or a Work Change Directive. 3.05 Drawings A. Details of construction and other engineering data are shown on the included Drawings. In addition to these drawings, other drawings or data may hereafter be furnished and issued by Engineer to explain portions of the work covered by these Specifications in more detail. B. The Drawings, in general, are to scale, but figured dimensions shall always be followed and Drawings shall not be scaled. C. Engineer will give Contractor reasonable assistance in interpreting the Drawings and Specifications, but such assistance shall not relieve Contractor from any responsibility for his work. ARTICLE 4 NOT USED ARTICLE 5 - INSURANCE 5.01 Not Used 5.02 Not Used 5.03 Certificates of Insurance A. Contractor shall deliver to Owner, with copies to each additional insured, certificates of insurance which Contractor is required to purchase and maintain. 5.04 Contractor s Liability Insurance A. Contractor shall purchase and maintain such liability and other insurance as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor s performance of the Work and Contractor s other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor s employees; 3. claims for damages because of bodily injury, sickness or disease, or death of any person other than Contractor s employees; 4. claims for damages insured by reasonably available personal injury liability coverage which are sustained: a. by any person as a result of an offense directly or indirectly related to the employment of such person by Contractor, or b. by any other person for any other reason; 5. claims for damages, other than to the Work itself, because of injury to or destruction of tangible property wherever located, including loss of use resulting therefrom; and 6. claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, maintenance or use of any motor vehicle. 00700-3 B. The policies of insurance required by this Paragraph 5.04 shall: 1. with respect to insurance required by Paragraphs 5.04.A.3 through 5.04.A.6 inclusive, include

as additional insured Owner and Engineer, and include coverage for the respective officers, directors, partners, employees, agents, consultants and subcontractors of each and any of all such additional insureds, and the insurance afforded to these additional insureds shall provide primary coverage for all claims covered thereby; 2. include at least the specific coverages and be written for not less than the limits of liability provided below or required by Laws or Regulations, whichever is greater; 3. include completed operations insurance; 4. include contractual liability insurance covering Contractor s indemnity obligations under Paragraphs 6.11 and 6.20; 5. Not used 6. remain in effect at least until final payment and at all times thereafter when Contractor may be correcting, removing, or replacing defective Work. C. The limits of liability for the insurance required by Paragraph 5.04 of the General Conditions shall provide coverage for not less than the following amounts or greater where required by Laws and Regulations: 1. Workers Compensation and related coverages under Paragraphs 5.04.A.1 and 5.04.A.2 of the General Conditions: a. State: Statutory b. Applicable Federal Statutory c. Employer s Liability $1,000,000 2. Contractor s General Liability under Paragraphs 5.04.A.3 through 5.04.A.6 of the General Conditions which shall include completed operations and product liability coverages and eliminate the exclusion with respect to property under care, custody and control of Contractor: a. General Aggregate: $1,000,000 b. Products Completed operations Aggregate: $1,000,000 c. Personal and Advertising Injury $1,000,000 d. Each Occurrence (Bodily Injury and Property Damage) $1,000,000 e. Excess or Umbrella Liability 2) Each Occurrence $1,000,000 3. Automobile Liability under Paragraph 5.04.A.6 of the General Conditions: a. Bodily Injury: Each Person $500,000 Each Accident $1,000,000 b. Property Damage: Each Accident $500,000 c. Combined Single Limit of: $1,000,000 4. The Contractual Liability coverage required by Paragraph 5.04.B.4 of the General Conditions: a. Bodily Injury: Each Accident $1,000,000 Annual Aggregate $2,000,000 b. Property Damage: Each Accident $1,000,000 Annual Aggregate $2,000,000 5. All policies must name the following as additional insured, in accordance with Paragraph 5.04.B.1 of the General Conditions a. Harlan Municipal Utilities (Owner) b. P & E Engineering Co. (Engineer) ARTICLE 6 - CONTRACTOR S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent superintendent. The superintendent will be Contractor s representative at the Site and shall have authority to act on behalf of Contractor. All communications given to or received from the superintendent shall be binding on Contractor. 6.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. 1) General Aggregate $1,000,000 00700-4

6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified and shall be of good quality and new, except as otherwise provided in the Contract Documents. C. All materials and equipment shall be installed in accordance with instructions of the applicable Supplier. 6.04 Progress Schedule A. Contractor shall work diligently to maintain the schedule of the work. 6.05 Not Used 6.06 Subcontractors, Suppliers, and Others A. Contractor shall be fully responsible to Owner and Engineer for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor s own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between Owner or Engineer and any such Subcontractor, Supplier or other individual or entity, nor 2. shall anything in the Contract Documents create any obligation on the part of Owner or Engineer to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. D. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. 6.07 Not Used 6.08 Permits A. Contractor shall obtain and pay for all construction permits and licenses. 6.09 Laws and Regulations A. Contractor shall comply with all Laws and Regulations applicable to the performance of the Work. 6.10 Taxes A. Contractor shall pay all sales, consumer, use, and other similar taxes required to be paid by Contractor in accordance with Laws and Regulations. 6.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site or to areas under the control of the Contractor. Contractor shall assume full responsibility for any damage to the areas and structures where work is being performed, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. Should any claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly settle with such other party by negotiation or otherwise resolve the claim by arbitration or other dispute resolution proceeding or at law. 3. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless Owner and Engineer, and the officers, directors, partners, employees, agents, consultants and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against Owner, Engineer, or any other party indemnified hereunder to the extent caused by or based upon Contractor's performance of the Work. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Not Used D. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.12 Not Used 00700-5