WFP Executive Board. 2 nd Informal Consultation Management Plan September 2016

Similar documents
WFP Executive Board. 2 nd Informal Consultation Management Plan September 2015

WFP Executive Board. 1 st Informal Consultation WFP Management Plan ( ) 13 July 2017

WFP Executive Board. 2 nd Informal Consultation Management Plan September 2017

Informal EB Briefing. Management Plan May 2018

UPDATE ON THE INTEGRATED ROAD MAP

First Informal Consultation on the Management Plan ( ) WFP Executive Board, 25 July 2018

Update on the Financial Framework Review. Informal Consultation 25 July 2016

KEY EXTRACTS OF THE DRAFT MANAGEMENT PLAN ( )

Hundred and Sixty-third Session. Rome, 2-3 November WFP Management Plan ( )

DRAFT UPDATE ON THE FINANCIAL FRAMEWORK REVIEW

Report of the Advisory Committee on Administrative and Budgetary Questions (ACABQ)

UPDATE ON THE FINANCIAL FRAMEWORK REVIEW DRAFT. Informal Consultation. 5 September World Food Programme Rome, Italy

Update on the Financial Framework Review

Report of the Advisory Committee on Administrative and Budgetary Questions (ACABQ)

October 2015 FC 159/5. Hundred and Fifty-ninth Session. Rome, October Update on the Financial Framework Review

UNDP Executive Board Funding Dialogue. January 2015

WFP Management Plan ( )

Report of the Advisory Committee on Administrative and Budgetary Questions (ACABQ)

PROGRESS UPDATE ON THE INTEGRATED ROAD MAP AND BACKGROUND TO PROPOSED AMENDMENTS TO THE GENERAL RULES AND FINANCIAL REGULATIONS

Financial Framework Review

Hundred and Fifty-ninth Session. Rome, October WFP Management Plan ( )

Utilization of the programme support and administrative equalization account reserve

Resource and Performance Management in WFP. Induction Session Executive Board Rome, 12 January 2015

Financial Framework Review

RESOURCE, FINANCIAL AND BUDGETARY MATTERS

October 2014 FC 155/5?? Hundred and Fifty-fifth Session. Rome, October Method for Determining the Indirect Support Cost Rate for WFP

Executive Board documents are available at:

E Distribution: GENERAL ORGANIZATIONAL AND PROCEDURAL MATTERS. Agenda Item 10 BIENNIAL PROGRAMME OF WORK OF THE EXECUTIVE BOARD ( )

Hundred and Forty-second Session. Rome, 7-8 November WFP Management Plan ( )

Resource management and accountability in WFP. Induction Session - Executive Board Rome, 21 January 2014

Routing Slip 13 (T-ICSP and Project BRs)

WFP Executive Board. Resource Management Seminar. 19 January 2016

Biennial programme of work of the Executive Board ( )

Midterm review of the UNICEF integrated budget, Report of the Advisory Committee on Administrative and Budgetary Questions

Work Plan of the External Auditor

October 2018 FC 172/3. Hundred and Seventy-second Session. Rome, 5-6 November Update on the Integrated Road Map

Economic and Social Council

POLICY ON COUNTRY STRATEGIC PLANS

Update on the Integrated Road Map

Report the Advisory Committee on Administrative and Budgetary Questions (ACABQ)

Biennial programme of work of the Executive Board ( )

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS

Resource Management Department SEMINAR

E Distribution: GENERAL RESOURCE, FINANCIAL AND BUDGETARY MATTERS. Agenda item 4 FINANCIAL FRAMEWORK REVIEW: WORKING CAPITAL FINANCING

April 2015 FC 158/2 E. Hundred and Fifty-eighth Session. Rome, May Audited Annual Accounts, 2014

April 2015 FC 158/4. Hundred and Fifty-eighth Session. Rome, May 2015

Work Plan of the External Auditor

Management response to the recommendations deriving from the evaluation of the Mali country portfolio ( )

Biennial programme of work of the Executive Board ( )

Biennial Programme of Work of the Executive Board ( )

Fortieth Session. Rome, 3-8 July Medium Term Plan and Programme of Work and Budget (Draft Resolution)

Biennial programme of work of the Executive Board ( )

Annex 1: The One UN Programme in Ethiopia

E Distribution: GENERAL RESOURCE, FINANCIAL AND BUDGETARY MATTERS. Agenda item 6 FORWARD PURCHASE FACILITY. For approval

We recommend the establishment of One UN at country level, with one leader, one programme, one budgetary framework and, where appropriate, one office.

Private Fundraising: 2013 workplan and proposed budget

May 2018 FC 171/3. Hundred and Seventy-first Session. Rome, May Update on the Integrated Road Map

Report on the midterm review of the UNICEF integrated budget,

UN BHUTAN COUNTRY FUND

KEY EXTRACTS OF THE DRAFT MANAGEMENT PLAN ( )

Economic and Social Council

The UNOPS Budget Estimates, Executive Board September 2013

Audited Annual Accounts, 2016

Policy on Country Strategic Plans

ADOPTION OF THE AGENDA

UPDATE ON THE INTEGRATED ROAD MAP: PROPOSED INTERIM GOVERNANCE ARRANGEMENTS

Report of the Seventeenth Meeting of the Independent Expert Oversight Advisory Committee (IEOAC) of the World Health Organization

REPORT 2015/095 INTERNAL AUDIT DIVISION

BUDGET REVISION TO PROTRACTED RELIEF AND RECOVERY OPERATION:

Implementation of the Integrated Road Map

May Food and. Agricultura. Organization of the United Nations. Hundred and Forty-fourth Session. Rome, May Forward Purchase Facility

Key elements of the 2012 Financial Statements Financial Seminar

Hundred and Thirty-ninth Session. Rome, 30 May 1 June Audited Annual Accounts, 2010

Institutional budget for

Economic and Social Council

MTSP Planned Financial Estimates Executive Board September 2011

CORPORATE RESULTS FRAMEWORK ( )

POLICY ON COUNTRY STRATEGIC PLANS

November 2016 CL 155/11 COUNCIL. Hundred and Fifty-fifth Session. Rome, 5-9 December 2016

Economic and Social Council

E Distribution: GENERAL ORGANIZATIONAL AND PROCEDURAL MATTERS. Agenda item 11 BIENNIAL PROGRAMME OF WORK OF THE EXECUTIVE BOARD ( )

WFP ADVOCACY FRAMEWORK GRAND BARGAIN SPECIAL EDITION

Office of the Secretary of the Executive Board EXECUTIVE BOARD DECISION MONITORING TABLE

Supplementary matrix 1

Grand Bargain annual self-reporting exercise: DFID. Work stream 1 - Transparency Baseline (only in year 1) Progress to date...

Draft annual workplan 2015 of the Executive Board of UNDP, UNFPA and UNOPS

Joint report on cost recovery

E Distribution: GENERAL EVALUATION REPORTS. Agenda item 5

PROJECT REVISION FOR THE APPROVAL OF: Deputy Executive Director and Chief Operating Officer

Induction Session Resource Management Department

UNFPA EXECUTIVE BOARD DECISION-TRACKING MECHANISM

Annual Report of the Audit Committee

Economic and Social Council

Procedures for financing the evaluation of initiatives funded by voluntary contributions FAO evaluation policy guidance

Annotated Outline - Joint Cost Recovery Paper Background. I. Introduction. Presentation/Discussion of Proposals

Supplementary budget for the implementation of the medium-term strategic and institutional plan

Economic and Social Council

UNICEF Integrated Budget Informal Briefing to the Executive Board

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE TOR - CONSULTANCY IC/2012/026. Date: 16 April 2012

Hundred and Fifty-third Session. Rome, May 2014

Transcription:

WFP Executive Board 2 nd Informal Consultation Management Plan 2017-2019 2 September 2016

Upcoming Key dates for the Management Plan (2017-2019) Second Informal Consultation 2 September FAO Finance 2-3 November 2016 September October ACABQ November Executive Board 24 October 15 November Present for approval the 2017-19 Management Plan for the Second Regular Session of the Executive Board 2 2

Key extracts provided in advance of today s informal consultation Management Plan (2017-2019) Executive Summary Draft Decisions Section I: Introduction Section II: Funding Context and Resourcing Assumptions Section III: Prioritized Plan of Work Section IV: Programme Support and Administrative Budget Section V: Provision of Corporate Services and Business Services: Special Accounts Annex on Office of Evaluation Workplan Other Annexes Key Extracts Released August 19 th A complete draft of the Management Plan (2017-2019) will be distributed by October 15 th 3 3

Agenda for Informal Consultation I. Directions of Change Introduced in the Management Plan (2017-2019) II. Section-by-Section Review of the Document Section I: Introduction Section II: Funding Context and Resourcing Assumptions Section III: Prioritized Plan of Work Section IV: Programme Support and Administrative Budget Section V: Provision of Corporate Services and Business Services: Special Accounts III. Draft Decisions 4 4

I. Directions of Change Introduced in the Management Plan (2017-2019) 5 5

Management Plan (2017-2019) will prepare WFP for the new integrated roadmap Resource Based VfM Focused Performance Informed Standardized Resource Based Plans drafted for each project based on funding projections PSA budget focused on delivering on Board commitments 2017-2019 budgeting process linked to the Annual Performance Report (APR) and the current Management Plan (MP) MP (2017-2019) plans to be realigned to the new Corporate Results Framework 6 6

II. Section-by-Section Review of the Document 7 7

Section I: Introduction 8 8

Introduction provides a framework for understanding the drivers of the Management Plan Structure of the Document Overview of purpose and content of each section Emphasis on resource based planning as the foundation for financial planning, and the integrated road map Global Economic & Political Context Assessment of external factors that may impact WFP s work: Funding environment Climate-related change Commitments made in global summits and conferences Strategic & Organizational Context Outline of internal considerations for plans: Initiate implementation of the new roadmap, particularly the Financial Framework Analysis of global support costs Commitment to Cost Excellence primarily through process improvements Para. 6-7 Para. 8-20 Para. 21-35 9 9

WFP is actively working to follow up on the World Humanitarian Summit and the Grand Bargain Working towards 47 commitments across 10 Grand Bargain workstreams Assigning ownership of commitments Looking to also establish timeframes and KPI s in partnership with others Continuing dialogue with partners Para. 39-40 WFP is Areas of work include: Transparency and improved data Improved partnerships with first responders Cash programming Reducing costs and measuring efficiency gains Joint assessments 10 10

Section II: Funding Context and Resourcing Assumptions 11 11

Provides the details of WFP s 2017 revenue forecast of USD 5.2B Financial Context Funding trends, 2017-2019 funding forecast Diversify donor base and encourage multilateral/ multi-year contributions Predictable, Flexible Funding for Efficient Planning Impact of contribution restrictions on operations and advance financing Initiatives undertaken by RM & PG to support flexible funding Improved operational efficiency of multi-year and/or multilateral funding Harmonizing Cost Recovery Rates Alignment with other agencies which are harmonized Increase competitiveness Reduced transaction costs Para. 36-56 Para. 57-62 Para. 55-56 WFP is committed to creating a realistic plan, while advocating for needs, and emphasising the importance of flexibility and predictability 12 12

USD millions 2017 forecast of general trends is based on an aggregation of projections for individual projects 6000 Recent Revenue Trends and Forecasts Figure II.3 (pg.9) 5000 4000 3000 2000 Forecast USA Non-Top 10 Donors Top 10 (excl. USA) 1000 0 Trend Forecasts 2013 2014 2015 2016 2017 2018 2019 * Given the current level of humanitarian needs and donor intelligence, contributions are expected to exceed USD 5 billion over the next few years *To be adjusted 13 13

Harmonize Private Sector ISC rate to 7% Para. 55-56 Harmonizing ISC rate for Private Sector to the Corporate 7% would: Make WFP more competitive in the private sector area, and align the organization with other UN agencies Reduce transaction and administrative costs 7% ISC rate for Private Sector* is already taken into account in the Corporate ISC income forecast of USD 335.4 M** * Private sector also provides substantial in-kind capacity development and technical assistance ** Impact of reduction in ISC rate from 10% to 7% is USD 3 M, assuming no increase in Private Sector income as a result of lowering the ISC rate 14 14

Section III: Prioritized Plan of Work 15 15

Before, let s take a second to reflect on definitions and figures 1 2 3 Funding Project Plan Forecast Prioritise activities and adjust requirements Resource Based Plan Operational Requirements (OR): All direct operational needs & direct costs related to approved projects and their logical extensions. Includes ISC, and excludes Trust Funds. Total: USD 9.0 B Prioritized Plan of Work (PPoW): Sets out the utilization of anticipated funding on the basis of project funding forecasts. Includes ISC, and excludes Trust Funds. Total: USD 5.4 B The Operational Requirements are needs based, while the Prioritized Plan of Work (PPoW) reflects available resources 16 16

PPoW forms the basis of the Management Plan and presents needs aligned to the funding forecast 1 Prioritized Plan of Work 2 Cost and Reach of Food Assistance 3 Global Analysis by Thematic Area 4 Implementation Plan Presented by : - Strategic Objective - Activity - Activity - Programme category - Programme category - Transfer type - Region Shows Impact on: - Rations - # of Beneficiaries - Duration Avg. cost of daily rations by: Progressively attempt to estimate Tier 2 beneficiaries* Overview of: Thematic areas that will shape the implementation of the Prioritized Plan Consists of: Prioritized Plan of Work All work undertaken by WFP irrespective of funding source or category Para. 111-144 Para. 94-110 Para. 111-144 Para. 150 Introduced in Management Plan 2015-2017 17 17

Key concept of the Management Plan 2017-2019 is planning around resources, while advocating for needs Funding anticipated No funding anticipated Resource Based Plans: plan based on forecasted resources, for calendar year Implementation Plan, which includes Prioritized Plan of Work (Aggregation of Resource Based Project Plans) and operational Trust Funds Analysis of funding shortfalls (or Gap): effect of unfunded Operational Requirements in terms of estimated number of beneficiaries not reached, reduced beneficiary days, and reduced ration size 18 18

2017 From Operational Requirements to Prioritized Plan of Work (including ISC) 2a Activity Prioritization 9.0B 2b Project Foreseen Operational Requirements Adjustments of rations, beneficiaries and duration 5.4B Available Funding for Projects Funding gap Associated costs prioritization 5.4B 1 3 4 2c Prioritized Plan of Work (PPoW) Process (excl.t/f) 1. Operational Requirements: WFP establishes the Operational Requirements based on assessed needs 2a-2c. Prioritization Process: Considering available and forecasted funding, WFP goes through a prioritization process 3. PPoW: WFP reaches a Prioritized Plan 4. Funding gap: The difference between the PPoW and available resources reflected in terms of beneficiary impact 19 19

2017 Operational Requirements and Prioritized Plan: Key Figures USD 9.0 B Needs 88 M beneficiaries 21.5 B rations USD 5.4 B 68 M beneficiaries Prioritized Plan 16.5 B rations 20 20

2017 (2016) Prioritized Plan: Key Figures USD 5.4 B (USD 4.6 B ) prioritized plan 3.27 M mt (2.5 M mt )/ USD 2.8 B of food 143 Projects in 77 Countries USD 1.1 B (1.1* B cash-based transfers) 16.5 B (13.7 B) rations 68 M beneficiaries 36m W 32m M Plan is prepared within the context of assessed needs, forecasted funding, the scope of the Strategic Plan and organizational capacity * 2016 figure includes vouchers 21 21

Life-saving activities are the majority of the 2017 Prioritized Plan of Work Strategic Objective SO 3 accounts for USD 493 M, an increase of USD 9 M from 2016 SO3 9% SO4 9% SO 4 accounts for USD 497 M, a decrease of USD 99 M from 2016 SO 2 accounts for USD 744 M SO2 14% SO1 68% SO 1 accounts for the largest portion of the Prioritized Plan, with USD 3 651 B Figure III.1 (pg.13) *Excludes trust fund projects 22 22

Life saving activities, within donor conditions, are prioritized < GD for L3 s is 79% and 47% for non- L3 s Table III.2 (pg.15) General distributions are the main activity in emergency settings *Excludes trust fund projects 23 23

Implementation plan combines the prioritized plan of work and trust funds to provide a holistic plan of field operations (including ISC) Regional bureau 2017 Implementation Plan Prioritized Trust Plan of funds Work Total Para. 150 USD Millions RBB 401 21 442 RBC 2,292 7 2,300 RBD 676 3 680 RBJ 524 21 545 RBN 1,403 13 1,417 RBP 88 27 116 Subtotal 5,385 95 5,480 Corporate trust funds By Regional Bureau 21 21 related to field activity Total 5,385 116 5,502 Table III.6 (pg.26) RBN 26% RBJ 10% RBP 2% RBD 12% RBB 8% RBC 42% 24 24

To improve understanding of the cost of assistance, WFP is using daily rations # of Rations Billions Tracking daily rations better demonstrates the volume and frequency of assistance Prioritized Plan of Work 16.5 Average Weighted Daily Ration Cost USD Prioritized Plan of Work 0.30 Costs per ration are baselined for future comparisons Cost per food ration average: between USD 0.24 and USD 0.34 Cost per ration for general distribution is the least expensive activity, while Nutrition is the highest Para. 64-68 25 25

WFP provides assistance to beneficiaries in a multitude of ways Para. 70-71 Tier 1 Approx. 68 mill. Tier 1 is direct beneficiaries of food or cash transfers Tier 2, or secondary beneficiaries of assets created by WFP Tier 2 Approx. 13.1 mill. Tier 3 beneficiaries are those benefitting from WFP s capacity development activities Tier 3 40% of Tier 1 direct food assistance beneficiaries are in the Syrian crisis countries, South Sudan, Yemen, Iraq and the El Niño affected countries in Southern Africa 26 26

Para. 114-127 Overview of thematic areas that will shape operations Emergency and Transition Programming Social Protection and Safety Nets Food Security and Joint Assessments Climate and Disaster Risk Reduction Market Access for Smallholder Farmers South-South &Triangular Cooperation Monitoring & Reporting 27 27

Selected other areas that will shape operations Accelerating Gender Mainstreaming Resources allocated to gender-related activities in PPoW are estimated at 13% 2015-2020 Gender Policy will ensure gender equality and women s empowerment are integrated in all activities Cash Based Transfers Strengthening internal capacity and partnerships to enhance the outcomes achieved with cash based programming Nutrition Account for 10% of Prioritized Plan Other programmes being modified to enhance nutritional effects (eg. Increased dietary diversity, behavior change commitments) 28 28

Section IV: Programme Support & Administrative Budget 29 29

Key principles for Management Plan 2017-19 PSA planning Budget Envelope Ensure PSA budget is within our means Use PSA Budget to increase beneficiary value-transfer Maintain 7% Indirect Support Cost (ISC) rate Maintain PSAEA at minimum 5-month PSA spend level Resource Allocation Documented 5% Churn of 2016 PSA budget level Increases documented by investment cases and in line with corporate commitments, VfM and field focused Limited growth for Global HQ PSA CCIs postponed until February 2017 30 30

PSA Overview: Living with our Means Para. 151-153 400 350 300 250 335.4 M 35.1 M 10 M Technical adjustment for centralized DSC Global HQ PSA 200 150 290.3 M 2016 Approved PSA 100 50 0 USD ISC Income 2017 PSA PSA expenditures proposed at USD 300.3 M, a growth of 3.4% 31 31

USD 35.1 M technical adjustment will cover some of the DSC costs with ISC funding Country Office (Normal) HQ Centralized Costs Country Office (35.1 M) Costs In USD Food & Related 33 CBT 50 DSC 10 ISC 7 Total 100 Costs charged per person In USD IT 3 Security 2 Costs In USD Food & Related 38 CBT 50 DSC 5 ISC 7 35.1 M technical adjustment Total 100 5 Value Transfer USD 83 Value Transfer USD 88 The USD 35 M will help cover direct costs for programming and pass savings on to beneficiaries 32 32

The USD 35 M will allow WFP to improve competitiveness in the coming year Transfers value from ISC in a centralized and traceable manner Will be used to cover existing (not additional) DSC Equitably distributes extra PSA based on CO staff Improves value transfer for donors, by using ISC to cover some direct project costs With an average 2017 ration cost of USD 0.30, this proposal would represent about 117 million additional daily rations 33 33

WFP proposes to limit increase in regular PSA to support growth in baseline 2016 Cost Excellence savings of USD 3.8 M integrated into 2016 baseline 3.4% increase largely to augment HQ and RBx capacity USD M 290.3 10.0 300.3 Within Baseline Re-programming USD 3 M from Fx gains 5% churn in all departmental budgets towards corporate priorities 2016 PSA authorization Increase in regular PSA 2017 proposed regular PSA level 34 34

Highlights of 5% Churn from Departmental 2017 Submissions Para. 151-152, 188, Box IV.1 PG Berlin Office to be strengthened by redistributing funds within the department RM DED OED OS Shifting resources to digital transformation activities such as SCOPE, CBT and CRF, leveraging re-prioritization of budgets of the IT Division and Budget and Programming Division Staff resources shift to provide additional support to key intergovernmental processes OEV will augment support to decentralized evaluations OMS will place emphasis on the management of the project approval system to implement the new CSP process Use funds from the Chief Advisor s office to mainstream support to sustainable food systems and small holder productivity Procurement will shift from strategy and performance to strengthen work for CBT retail sector Logistics will reorganize support units to create a Logistics Field Support service and Governance Unit 35 35

Increases and reallocations within the regular PSA budget are based on investment cases and criteria to deliver value-for-money Increase to implement boardapproved policies Cash based transfers and SCOPE Other increases USD 6.0 million will be allocated to implement board-approved policies: USD 2.45 M: Evaluation policy implementation including $800,000 for OEV USD 0.9 M: Gender investment to ensure stronger institutional commitment and leadership for gender equality and women s empowerment programmes. USD 2.6 M: Reshaping the landscape of WFP s learning resources and mainstreaming the Career Development Centre. USD 6.1 million will be allocated towards: USD 4.1 M: Cash-based transfer support for normalizing and mainstreaming the oversight, technical support and maintenance of CBT systems, processes and tools USD 2.0 M: Support to the digital solution for beneficiary and transfer management so that solution will continue to address programmatic requirements. USD 0.94 million will be allocated towards: USD 0.44 M: Partnership Resource Centre for support of staff in maintaining effective partnerships USD 0.50 M: WFP s Emergency Operations Centre for information sharing and global coordination 36 36

Recommended PSA Allocations for 2017 Implementation of Board Approved Policies Proposal USD '000 Evaluation Policy Implementation 2,460 Gender Strategy 880 People Strategy 2,620 Cash Based Transfer Support 4,100 SCOPE 2,000 Other Emergency Preparedness, Partnerships 940 Total Allocations 13,000 PSA Increases focused on Executive Board Commitments 37 37

Analysis of Table IV.6: PSA, by appropriation line 2016 estimated 2017 movements 2017 projected Post Count Post Count Post Count Prof. Total Prof. Total Prof. Total Appropriation Lines Programme Support - RBx and COs 263 840 13 18 276 858 Programme Support - HQ 152 238 29 29 181 267 Management and Administration 305 563 8 3 313 566 -------- -------- -------- -------- -------- -------- Subtotal 720 1641 50 50 770 1691 Cost excellence re-engineering -20-20 -20-20 -------- -------- -------- -------- -------- -------- Total 720 1641 30 30 750 1671 The cost excellence exercise will redistribute resources and shift and re-profile positions in headquarters and the field 38 38

A healthy 2017 year-end balance will still be maintained in the PSA Equalization Account if CCIs reach the set-aside* estimate Estimated Planning 2016 2017 PSAEA Opening Balance (USD M) 138.3 169.9 Estimated ISC Income(USD M) 341.9 335.4 Regular PSA (USD M) 290.3 300.3 Technical adjustment for centralised costs (USD M) 35.1 Total PSA Expenditure (USD M) 290.3 335.4 Cost Excellence drawdown (USD M) 3.0 - Critical Corporate initiatives (USD M) 17.0 *15.0 Estimated Year end PSAEA Balance (USD M) 169.9 154.9 Current PSAEA Target Level @ 5 months (USD M) 121.0 139.8 Balance over 5 month target (USD M) 48.9 15.1 Estimated months of PSA Reserve 7.0 5.5 Estimated balance of PSA Equalization Account at end of 2017 exceeds target level agreed with the Executive Board in 2015 [WFP/EB.A/2015/6-C/1] 39 39

Section V: Provision of Corporate Services and Business Services: Special Accounts 40 40

Provision of Corporate Services and Business Services: Special Accounts Section Description Corporate Services Review of corporate services financing mechanism Corporate services envelope to remain at USD 82 million, accommodating the financing of capital improvements through the Capital Budgeting Facility Business Services Overview of largest special accounts and estimated volume of business Para. 245-246 41 41

WFP anticipates a total volume of USD 389 million in transactions for business servicerelated special accounts Special Account Aviation Cash-based transfers UNHRD Self-Insurance Gender Description Supports WFP s ability to transport relief supplies by air when necessary Enables WFP to extend use of CBT delivery platform for benefit of humanitarian partners Services provided consist of (a) those directly related to use of the CBT delivery platforms, (e.g. assistance in performing beneficiary registration and distribution cycles) and (b) additional services, including M&E Manages donor contributions and revenue from services provided through its six-hub network UNHRDs provide standard and specific services to 75 partners Risk mitigation tool to minimize the economic effects of food losses Dedicated resources will accelerate gender mainstreaming; support implementation of the Gender Action Plan; exceed all UNSWAP requirements; implement regional gender strategies and country-level action plans; and enhance Gender Results Network 83 percent of special account activity is within Aviation, Cash-based transfers and UNHRD 42 42

III. Draft Decisions 43 43

Draft decisions relating to Operations Takes note: that the 2017 Programme Support and Administrative appropriation assumes a funding level of USD 5.2 billion in 2017; of the projected operational requirements of USD 9.0 billion for 2017 and the prioritization proposals to align this with anticipated funding, as outlined in Section III; 44 44

Draft decisions relating to PSA and ISC Approves: a 2017 PSA appropriation of USD 335.4 million, to be allocated as follows: Programme support: RBx and CO Programme support: Headquarters Management and administration Total USD 145.4 million USD 54.3 million USD 135.7 million USD 335.4 million A corporate indirect support cost recovery rate of 7.0 percent for 2017; 45 45

Other draft decisions Approves: the harmonization of indirect support cost recovery rate for Private Sector to the Corporate rate; and a ceiling of USD 82 million for corporate services advances from 2017 and looks forward to reviewing this regularly as part of future management plans. 46 46

Thank You 47 47

Acronym List ACABQ: Advisory Committee on Administrative and Budgetary Matters APR: Annual Performance Report CBT: Cash Based Transfer CCI: Critical Corporate Initiatives CP: Country Plan CRF: Corporate Results Framework CSP: Country Strategic Plan DEV: Development Operations FFR: Financial Framework Review GD: General Distribution ISC: Indirect Support Costs KPI: Key Performance Indicator M&E: Monitoring & Evaluation MP: Management Plan mvam: Mobile Vulnerability Assessment Mapping OEV: Office of Evaluation OR: Operational Requirement P4P: Purchase for Progress PG: Partnerships, Governance and Advocacy Department PPoW: Prioritized Plan of Work PSA: Programme Support & Administration PSAEA: Programme Support & Administration Equalization Account RBA: Rome-based Agencies RBB: Regional Bureau, Bangkok RBC: Regional Bureau, Cairo RBD: Regional Bureau, Dakar RBJ: Regional Bureau, Johannesburg RBN: Regional Bureau, Nairobi RBP: Regional Bureau, Panama RBx: Regional Bureaux RM: PRRO: Protracted Relief and Recovery Operation SCOPE: SCOPE is WFP s beneficiary and transfer management platform SO: Strategic Objective TF (T/F): Trust Funds UNHRD: UN Humanitarian Response Depot UNSWAP: UN System-wide Action Plan [on Gender Equality and the Empowerment of Women] VfM: Value for Money WHS: World Humanitarian Summit 48 48