SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1

Similar documents
Republic of the Philippines: KALAHI CIDSS National Community-Driven Development Project (Additional Financing)

SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT

Document of. The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL LOAN IN THE AMOUNT OF US$59.

PROMOTING INCLUSIVE GROWTH: LOCAL PARTICIPATION AND GOVERNANCE. Francisco A. Magno, PhD De La Salle University

A. Community-Driven Development

DSWD s Contribution to Ending the Poverty Cycle

DBM-DILG-DSWD-NAPC Joint Memorandum Circular No. 4

SECTOR ASSESSMENT (SUMMARY): Community-Driven Development. 1. Sector Performance, Problems, and Opportunities

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-71470, IBRD-79590, TF-11939) ON A LOAN IN THE AMOUNT OF US$ 100.

ENHANCING COMMUNITY-DRIVEN DEVELOPMENT THROUGH CONVERGENCE

Expenditure Management September 2015

The Philippine Rural Development Project (PRDP) Terms of Reference for the Conduct of Mid-term Evaluation Study. 1. Background.

PHILIPPINES New Commitments for Open Governance

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform

Section 3.07 is deleted and the following is substituted therefor:

PROJECT PREPARATION TECHNICAL ASSISTANCE

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

TERMS OF REFERENCE FOR JOINT PPCR MISSION

SUMMARY PROGRAM IMPACT ASSESSMENT. I. Introduction

Republic of the Philippines: Support to Local Government Financing

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH

SUMMARY FINANCIAL MANAGEMENT ASSESSMENT

RURAL DEVELOPMENT & NATURAL RSOURCE MANAGEMENT: TRENDS, STRATEGY IMPLEMENTATION AND FRAMEWORK PERFORMANCE INDICATOR SYSTEM May 2, 2000

The Philippine Evaluation Policy Framework: Supporting Evidence-based Decision Making

CBMS. Institutionalizing the Community-Based Monitoring System (CBMS) in the Philippines. 6th PEP Research Network General Meeting. Erlinda M.

Open Government and Budgeting: Their Role in Poverty Reduction in the Philippines

SECTOR ASSESSMENT (SUMMARY): HEALTH AND SOCIAL PROTECTION 1

Technical Assistance Republic of the Philippines: Harmonization and Managing for Results

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2

BUDGET PHILOSOPHY AND REFORMS

Report and Recommendation of the President to the Board of Directors

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Director Erlinda M. Capones Social Development Staff 10 December 2008

CBMS Network Evan Due, IDRC Singapore

Document of The World Bank ONA PROPOSED LOAN TO THE FOR

NATIONAL LIVELIHOOD COORDINATOR FOR LIVELIHOOD IMPROVEMENT AND NUTRITIONAL SECURITY (LN) PROJECT POVERTY REDUCTION FUND (PRF) Terms of Reference

Japan PHRD Technical Assistance Program Application for Project Preparation Technical Assistance Grant FY Round 2

Philippines: Mindanao Basic Urban Services Sector Project

November 18, Background

OFFICIAL -1 L(-L DOCUMENTS. Between. and

Session 2. Discussion: The MDGs Localization in the Philippines

Session 8 Case Study: PHI: Development Policy Support Program Kelly Bird Southeast Asia Regional Department

Impact Evaluation KALAHI-CIDSS

PSA Small Area Poverty Estimation Project

PROJECT AGREEMENT. (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. and

Second Disaster Risk Management Development Policy Loan with a CAT-DDO (P155656)

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

Efforts of the Philippine Statistical System in Poverty Mapping

PROJECT PROPOSAL PAPER FOR GPSA GRANT US$ 800,000 OXFAM NOVIB NIGER FOR A

Lack of implementing rules and regulations governing procurement of foreignfunded

State Secretariat for Planning, Science and Technology (SEPLAN)

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

Harnessing LGUs Capacities on Disaster Risk Reduction and Climate Change Adaptation

Completion Report. Project Number: Loan Number: 1472 August Philippines: Small Towns Water Supply Sector Project

Money Matters: Designing Effective CDD Disbursement Mechanisms

P. O. Box 3243, Addis Ababa, ETHIOPIA Tel.: (251-11) Fax: (251-11)

Reforms and the OGP. The Open Government Initiative in the Philippines. Usec. Richard Moya August 04, 2015 Richmonde Hotel

INTRODUCING RESULTS-BASED APPROACHES INTO PUBLIC SECTOR MANAGEMENT PROCESSES: The Philippine Experience

Guidelines. e Passbook. STATE BANK OF PAKISTAN Agricultural Credit Department

Secretary Esperanza I. Cabral 20 August 2008

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015

Money Matters: Designing Effective CDD Disbursement Mechanisms

Proposed Policy-Based Loan for Subprogram 2 Local Government Finance and Fiscal Decentralization Reform Program (Philippines)

PROJECT PREPARATORY TECHNICAL ASSISTANCE

EXECUTIVE SUMMARY INTRODUCTION

FOR OFFICIAL USE ONLY

Assessment of Bottom-up Budgeting: FY 2015 Cycle

United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF)

Loan Agreement. (Second Social Expenditure Management Project) between REPUBLIC OF THE PHILIPPINES. and

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Climate Finance. Philippines. Helena Gaddi Climate Change Office Climate Change Commission. Session 5: Climate Finance

Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda

Republic of the Philippines: Government-Owned and -Controlled Corporations Reform

Fiji Agricultural Partnership Project (FAPP) Negotiated financing agreement

2009 Official Poverty Statistics

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1

Q&A THE MALAWI SOCIAL CASH TRANSFER PILOT

Decision 3/CP.17. Launching the Green Climate Fund

Local Road Management Performance Assessment Manual

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT

Poverty Reduction Strategy and Poverty Monitoring: Philippine Case Study. Celia M. Reyes and Lani E. Valencia *

UN BHUTAN COUNTRY FUND

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming

PNPM SUPPORT FACILITY (PSF) Project Proposal

Project Implementers: A Single Drop for Safe Water inc. Institute for the Development of Educational and Ecological Alternatives

OFFIC9AL Tho!- 3 3 DOCUMENTS

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2168 Support for Strategic Local Development and Investment Project

Session 4 Status of Climate Finance in the Philippines

GAMAS means Mongolia Customs Automated Data Processing

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context

Democratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement

Forest Carbon Partnership Facility (FCPF) Readiness Fund

MFF - Bihar Urban Development Investment Program (Facility Concept)

Report and Recommendation of the President to the Board of Directors

FINAL 26 February PARTNERSHIP FOR PROGRESS: UN Civil Society Fund

CITIZEN ENGAGEMENT IN BUDGETING AND PUBLIC ACCOUNTABILITY

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization

Effectiveness of Aid for Trade

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized

Governance of CC Finance to Benefit the Poor and Vulnerable in Asia-Pacific

Transcription:

KALAHI CIDSS National Community-Driven Development Project (RRP PHI 46420) SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1 A. Program Objective and Outcomes 1. The National Community-Driven Development Program (NCDDP) is the scaled up version of Kapit-Bisig Laban sa Kahirapan (Linking Arms against Poverty) Comprehensive and Integrated Delivery of Social Services (KALAHI CIDSS), a 10-year old tested program of community-driven development (CDD). It incorporates lessons learned from research and experience from KALAHI CIDSS pilots and Indonesia s CDD program. Its development objective is communities in targeted poor municipalities empowered to achieve improved access to services and to participate in more inclusive local planning, budgeting and implementation. 2. The NCDDP s target outcomes are (i) empowered communities [20,691 barangays or villages], 2 (ii) responsive local governments [900 poor municipalities], and (iii) reduced poverty. The program will cover an estimated 5 million households, and aim to reduce average poverty incidence in poor municipalities by 30% from 41.6% in 2009 3 to 29.1% by 2024. B. Official Approval 3. The NCDDP was approved by the President during the National Economic Development Authority Board meeting of 18 January 2013. It was endorsed by the Human Development and Poverty Reduction Cluster (HDPRC) consisting of Department of Education (DepED), Department of Agrarian Reform, Department of Agriculture (DA), National Anti-Poverty Commission, Presidential Commission on Urban Poor, Department of Energy, Department of the Interior and Local Government, Department of Budget and Management, Department of Labor and Employment, Department of Health (DOH), Department of Environment and Natural Resources, and Department of Social Welfare and Development (DSWD). One hundred sixtyfive municipal mayors supported the NCDDP. C. Area Coverage 4. The NCDDP expands the coverage of the existing KALAHI CIDSS from 50% of poor municipalities to 100%. NCDDP targets municipalities with poverty incidence above the national average of 26.5% using the 2009 Small Area Estimates of NSCB. Table 1: NCDDP Area Coverage Number of Number of Provinces Municipalities Number of Barangays Regions Luzon 26 290 6,575 Visayas 16 310 8,107 Mindanao 21 300 6,009 Total 63 900 20,691 Source: Asian Development Bank. 1 Much of this note was drawn from the NCDDP project document that was submitted by DSWD to the National Economic and Development Authority (NEDA)-Investment Coordinating Committee (ICC) on 31 May 2012. The NCDDP was renamed KALAHI-CIDSS National Community-Driven Development Project after the NEDA Board approval on 18 January 2013. 2 All barangays in a target municipality will be included in the project. 3 Based on the 2009 Small Area Estimates of National Statistical Coordination Board

2 D. Program Components 5. Subproject Cycle. The NCDDP facilitates community planning at the barangay level, where community subprojects will be identified for submission to a municipal local government forum. Community leaders and volunteers, selected by barangay residents, will attend and represent their barangays in the forum. Community organizing and facilitation is undertaken by program staff, in cooperation with volunteers who have been trained in participatory planning and subproject preparation and implementation. Priority subprojects may vary across barangays, depending on the most pressing need. The municipal forum prioritizes subprojects for financing, given the budget envelope for each municipality and the locally formulated poverty criteria. 6. Prioritized subprojects will be subjected to readiness filters consisting of technical, economic and financial viability assessments before funding is released. Barangays with approved subprojects will organize volunteers into finance, procurement, audit, and implementation teams, who will take the lead in the execution of the approved subprojects. Technical support will be provided by the project and LGUs in the course of implementation. 7. Each NCDDP municipality will pass through 4 cycles. Cycles 1 and 2 will each entail 14 months, and cycles 3 and 4 will each last 12 months. In cycle 1, municipalities are led and supported by the DSWD. In cycles 2 4, they are led by the local governments but supported by the DSWD or select agencies (see paragraph 10). After the 4 th cycle, municipalities can continue to practice CDD via the grassroots participatory budgeting process (GPBP) 4 initiative of the government. 8. Component 1: Barangay Grants. The NCDDP will provide two types of grants to participating barangays. Planning grants will support orientation, consultation, participatory priority-setting, action planning and workshop activities at the barangay and inter-barangay levels, as well as the delivery of appropriate technical assistance inputs to ensure proper implementation. Consultation activities will involve residents of the barangay convened as a barangay assembly. This is equivalent to 15% of investment grants per municipality. Investment grants will support proposals made by barangays to implement community subprojects and activities that respond to community-identified priorities. Community priorities eligible for support from the investment grants is based on an open menu using the KALAHI CIDSS project experience. Moreover, the NCDDP will also consider for inclusion in the open menu proposals that will be prioritized by communities on local disaster response and prevention. 9. Amount of Grants. Investment grants are based on a formula using population size and poverty rates: (i) municipalities where the poverty incidence is over 60% will receive a grant of approximately $15 per capita per cycle; (ii) municipalities with poverty incidence of 40% to 60% get a per capita allocation of $12.50; and (iii) municipalities with poverty incidence below 40% get a per capita allocation of $7. Total annual municipal grants per cycle are capped at $480,000. In peso terms, the grants range from a minimum of PhP2 million to a maximum of PhP20 million per cycle. 10. Sources of Block Grant Funding. In 2013 2015, NCDDP grants will be funded out of the DSWD budget, under WB and ADB financing. Then in 2016 2019, DSWD will still manage NCDDP grants under ADB and WB financing, but the funds will attributed to the budgets of selected HDPRC agencies (e.g., DOH, DepEd, DA). Moreover, municipalities that finish 4 4 Formerly known as bottom-up budgeting (BUB).

3 cycles will graduate to the GPBP, which will access allocations from various national government agencies. Even after NCDDP ends, CDD will thus continue under the mantle of the GPBP. 11. Eligible Services or Subprojects. The NCDDP will use an open menu for subprojects and any subproject is eligible for financing under the investment grant, subject to a negative list. 5 The most common subprojects under the KALAHI CIDSS include new water systems, school building, access roads, day care centers, health stations, post-harvest facilities and small irrigation facilities. 12. Component 2: Capacity Building and Implementation Support. This component includes support to local NCDDP and local government unit (LGU) staff implementation and training, continuing capacity building, and grievance redress and social accountability activities. The component will support the costs of training of volunteers, staff of DSWD and local governments, and staff of other line agencies; the cost at the municipal and barangay levels for the municipal area coordination teams, facilitators, and volunteers; and the cost of inter-agency coordination at the municipal and provincial government levels. It will also support the enhancement of a performance system for LGUs. 13. Component 3: Program Management and M&E. This component constitutes program administration, which includes incremental program management and operational costs of the DSWD and costs of monitoring and evaluation (M&E). This covers costs of supervision, consultants and specialists at the national and regional levels; costs of operational monitoring and oversight activities at the national and regional levels; support for the management information system and database; and the costs of studies and impact monitoring. E. Implementation Arrangements 14. The NCDDP shall expand existing institutional and implementing arrangements in KALAHI CIDSS. The expansion will complement current programs of social and rural development agencies, e.g., Department of Health, Department of Education, Department of Agrarian Reform, Department of Agriculture, and Department of Environment and National Resources. 15. National Steering Committee (NSC). The NSC will be composed of representatives from national government line agencies, including the DSWD, the National Anti-Poverty Commission, the National Economic and Development Authority, the Department of the Interior and Local Government, the Department of Finance, and the Department of Budget and Management, representatives of civil society organizations (CSO) representing the basic sectors, and other sectors and agencies in the HDPRC. The NSC will provide policy guidelines on poverty targeting, sets goals for the implementing agency, and assures institutional convergence on poverty reduction outcomes. It will also ensure the continuous review of the Project's contributions to the achievement of the goals of the Philippine Development Plan, particularly those relating to poverty reduction and Millennium Development Goals. 5 The project uses an open menu for subprojects and any subproject may be proposed subject to a negative list of activities that may be harmful to the environment or social safeguards including (i) weapons, chainsaws, explosives, pesticides, insecticides, herbicides, asbestos, and other potentially dangerous materials and equipment, fishing boats and nets above the government prescribed size and weight, (ii) road construction into protected areas, (iii) use of project funds for purchase or compensation for land, (iv) political and religious activities, rallies, and materials, (v) activities that employ children below the age of 16 years, and (vi) activities that unfairly exploit women or men at any age.

4 16. National Inter-Agency Preparation and Implementation Team (NIAPIT). The NIAPIT is drawn from technical departments of the agencies represented in the NSC and the HDPRC. The NIAPIT will be responsible for coordinating technical support services of different agencies at the national, regional and provincial levels, and providing technical inputs to, as well as reviewing results of, the continuing development of NCDDP implementation systems, processes, and technical manuals. 17. Regional and Provincial Coordination Mechanisms. At the regional level, the NCDDP shall enhance engagement through existing mechanisms for inter-agency coordination, such as the Regional KALAHI CIDSS Convergence Groups. Under the NCDDP, increasing the number of covered municipalities creates tremendous potential for provincial poverty reduction. Clearly, there will be benefits from the establishment of inter-municipal or inter-provincial coordination mechanisms. In addition, there are opportunities for inter-provincial coordination in certain regions where all the provinces have municipalities involved in NCDDP. 18. Program Implementation Management (National, Regional, and Municipal). At the national and regional levels, NCDDP implementation will be managed by a mainstreamed Program Management Office (PMO), headed by DSWD officials who are assisted by core organic staff from the department and contractual staff hired to fill strategic gaps. 19. Current KALAHI CIDSS CDD municipalities that show exceptional achievements in sustaining development processes and enhancing local governance systems will be encouraged to undertake the CDD process themselves, with the NCDDP providing block grant support for community subprojects. These municipalities will be identified by the National and Regional Program Management Teams through a filtering process using good governance indicators related to people s participation, transparency, and social accountability. Specific provisions relating to LGU-management and to the facilitation of CDD will be built into an enhanced MOA for these municipalities. For maximum focused support, and for long-term financing sustainability, the said municipalities will be linked to programs existing at the national level, designed to assist or channel resources to poor municipalities. 20. In the new target municipalities of NCDDP, a pool of community facilitators shall be contracted to facilitate participatory planning, implementation and monitoring activities at the municipal and barangay levels. Facilitators at the barangays and municipalities will be assisted by local volunteers. Participating communities may also procure technical assistance, on a competitive basis, from LGUs, other government agencies, CSOs, or the private sector, for specific technical needs. Procurement of goods and services will be undertaken in accordance with the guidelines of ODA partners and the GOP. 21. Role of Provincial Governments. The NCDDP will provide excellent opportunities for enhancing the role of the provincial LGU in (i) providing technical assistance and coordinating provincial-level inter-agency support for CDD implementation; (ii) monitoring and oversight of municipal good governance and development planning systems, as these impact on municipal facilitation of CDD; (iii) creating mechanisms for improved inter-municipal coordination and support among NCDDP municipalities, and between NCDDP and non-ncddp municipalities within the province, and (iv) enhancing provincial-level poverty targeting and development planning to leverage development resources to the poorest and to rationalize resource use for higher-order infrastructure investments. Related to this, the regional offices of DSWD will create satellite subregional program management teams at the provincial level to facilitate operations.

5 22. Role of Municipal Local Government Units. The critical role of MLGUs in KALAHI CIDSS CDD implementation is expected to continue under NCDDP. In both existing and new municipalities, MLGU responsibilities will include: (i) Creation of local policy environments supportive of community-driven development and participatory, transparent, and accountable governance; (ii) Provision of local counterpart contributions, both in cash and in kind, for NCDDP subproject implementation, and for capacity building and implementation support; 6 (iii) Strengthening LGU capabilities to support CDD, including the formation of Municipal Coordinating Teams (MCTs) to partner with NCDDP-hired staff, the formation and strengthening of the Municipal Inter-Agency Committee (MIAC), and strengthening the Local Poverty Reduction Action Team (LPRAT) of the LGU; (iv) Monitoring implementation; (v) Providing technical assistance to barangays and community volunteers on various aspects of implementation; and (vi) Supporting efforts to sustain community investments by integrating key CDD process into the municipal development planning process. 23. These responsibilities will be contained in a MOA between the DSWD and the MLGU, which will be signed prior to the start of implementation. To enable the MLGUs to fulfill these roles, capacity building in project planning, implementation, operations and maintenance, financial management, etc. will be provided. 24. The NCDDP will further enhance engagement with the MIAC, the LPRAT, and other mechanisms for inter-agency coordination, to support field-level implementation. At the barangay level, the DSWD and the barangay LGU (BLGU), will enter into a MOA spelling out the roles of each party. Barangay governments assist the DSWD project team in information dissemination and in providing support to the barangay assemblies in the conduct of participatory situational analysis. The BLGUs provide contributions to locally developed subprojects. Officials of the barangay are also members of the subproject implementing teams, ensuring that efforts of the project are integrated into the existing structures of the barangays. F. Funds Flow 25. Funds Flow for Loan Proceeds. Close to 90% of the loan proceeds shall be used as barangay grants. Both ADB and the World Bank invest in the barangay subprojects, and to preserve order, all approved subprojects will be allocated a specific identifier number. The subproject identifier number will be used as the transaction reference throughout the disbursement and reporting process. Loan proceeds for barangay investment grants shall flow 6 In setting LCC commitments and following up municipal LGUs fulfillment of their commitments, the KALAHI CIDSS Project does the following: (i) LCC commitments are discussed with LGU and community representatives, and incorporated in the LGU regular budget and development plans; (ii) together with KALAHI CIDSS barangay volunteers and officials from the barangays concerned, KALAHI CIDSS conducts follow-up meetings with the MLGU mayor and representatives of the municipal inter-agency committee (MIAC); (iii) KALAHI CIDSS reviews MLGUs performance of their commitments in the Project MOA with members of the MIAC, and (iv) as a mitigation measure, KALAHI CIDSS advises the MLGUs concerned to increase their in-kind/materials contributions and restructure or re-plan their LCC commitments. Counterpart contributions of municipal and barangay LGUs for social preparation and local capability-building activities of KALAHI CIDSS include hiring LGU-KALAHI CIDSS counterpart staff, providing municipal office space for the project, providing program staff access to selected office equipment, and giving in-kind contributions during barangay and municipal-level meetings.

6 from the Land Bank of the Philippines (LBP) accounts maintained by DSWD regional offices to the barangay accounts maintained at local LBP bank branches (Figure 1). Barangay accounts are owned by the barangay assembly. 26. DSWD is deconcentrating the processing work to the regional offices. The latter receive Requests for Funds Release (RFRs) for each subproject tranche from the ACTs, through the subregional (provincial) offices. Upon approval of the RFR, following the prescribed approval process, disbursement vouchers are prepared and the funds are disbursed to barangay community subproject accounts. Communities withdraw and utilize funds for subprojects, according to their approved project plan. 27. The remaining portion of the loan proceeds will partially finance the two other components of NCDDP. Part of these funds will be sub-allotted to the regional offices together with the GOP counterpart. A portion of the GOP counterpart will be sub-allotted to the regional PMOs, to cover operating expenses and disbursements of Program component activities implemented by the regional PMOs. Figure 1: Funds Flow of Loan Proceeds ADB Bureau of Treasury direct payment suppliers/service providers Direct Payment Outputs Components 2 &3 Withdrawal Application Replenishment Component 1 - RFR based on preidentified approved subprojects ADB US$ Imprest Account NCDDP Peso Conduit Account Reporting transfers to Barangay accounts by sub project Direct Payment Outputs Components 2 & 3 Goods and Services Component 1 RFR based on pre- identified approved subprojects Regional Bank Accounts Block Grant Tranches Community Block Grant Bank Accounts Reporting transfers to Barangay accounts by sub project RFR = request for fund release. Legend: = funds flow = documents flow

7 28. Program Financial Management. The financial system for NCDDP shall be the same as that of the ongoing KALAHI CIDSS CDD project. Since NCDDP implementation is mainstreamed into the operations of DSWD, overall financial management of NCDDP is at the Central Office Finance Service. 29. The Central Finance Service is responsible for the following: (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) Prepares the Annual Financial Plan, consistent with the physical targets set by the national PMO; In consultation with the national PMO, provides the NCDDP Program Director with recommendations on the effectiveness, efficiency and economic management of the financial resources of the project; Implements the financial management system prescribed for NCDDP, specifically, the procedures for fund release to the regional offices and barangays in coordination with oversight agencies; Designs, installs and maintains the internal control system to safeguard resources of the project; Manages the Special Account, prepares withdrawal applications, and ensures adequacy of Special Account balances; Liaises with development partners, DBM and LBP for timely releases of project funds; Maintains books of accounts, subsidiaries, records, and files of all financial transactions; Processes all financial transactions for the program; Ensures legality, propriety, accuracy and completeness of all financial transactions; Prepares and submits periodic financial reports to higher authorities; and Prepares financial monitoring and other regulatory reports. 30. Following the government accounting rules and regulations, the DSWD Finance Service has adopted the new Electronic National Government Accounting System for both loan proceeds and the Government of the Philippines counterpart. Apart from the regular Agency Books, the DSWD Finance Service will maintain separate Books of Accounts for the Program. There is a separate subsidiary ledger for each component in order to facilitate reporting of total utilization by component. The Finance Service also consolidates the regional offices records of local counterpart contributions.