COOPERATION AGREEMENT. between NORDIC DEVELOPMENT FUND. and INTER-AMERICAN DEVELOPMENT BANK. For the Cofinancing of Programs and Projects

Similar documents
International Bank for Reconstruction and Development International Development Association

TRUST FUNDS AND COFINANCING FRAMEWORK AGREEMENT. between. THE EUROPEAN COMMUNITY, represented by the COMMISSION OF THE EUROPEAN COMMUNITIES.

(Donor Reference No )

Global Environment Facility Trust Fund Grant Agreement

Guarantee Agreement. (Woodworking Projects-1961) REPUBLIC OF FINLAND INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT DATED AUGUST 9, 1961

7,1980s Public Disclosure Authorized MEMORANDUM OF AGREEMENT. between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and

PAD Project Agreement. (Second Transport Sector Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and PORT AUTONOME DE DAKAR. Dated May 13, 1999

DOCUMENTS CO-FINANCING FRAMEWORK AGREEMENT. between ASIAN INFRASTRUCTURE INVESTMENT BANK. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

RS Project Agreement. (Second Local Initiatives (Microfinance) Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and REPUBLIKA SRPSKA

Lenders' Agreement CONFORMED COPY LOAN NUMBER 1167 KE KREDITANSTALT FUR WIEDERAUFBAU INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Project Agreement INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT MAJLIS AMANAH RA'AYAT SHARIKAT JENGKA SENDIRIAN BERHAD CONFORMED COPY

Project Agreement. (Agricultural and Rural Market Development Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and BANQUE NATIONALE DU RWANDA

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Dated: 0 VltA r. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

DOCUMENTS ADMINISTRATIONAGREEMENT BETWEEN. Estimate Dates for Installment Deposits. * Within 30 days after countersignature of this Agreement; and

ECG Project Agreement

PROJECT AGREEMENT. (Supporting Human Capital Development in Meghalaya) between ASIAN DEVELOPMENT BANK. and STATE OF MEGHALAYA. and

PROJECT AGREEMENT. (Conflict-Affected Region Emergency Project) between ASIAN DEVELOPMENT BANK. and CEYLON ELECTRICITY BOARD

PROJECT AGREEMENT. (Power Distribution Enhancement Investment Program Tranche 1, Investment Project and Support Project) between

OFFICIAL Woch DOCUM ENTS

OFFICIAL DOCUMENTS)'

Project Agreement. Public Disclosure Authorized CONFORMED COPY. Public Disclosure Authorized. Public Disclosure Authorized

Tazama Project Agreement

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Project Agreement CONFORMED COPY LOAN NUMBER CHA. (Hubei Shiman Highway Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Project Agreement CREDIT NUMBER 3991 MOZ. (Beira Railway Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and

Regional Project Agreement

Project Agreement CONFORMED COPY LOAN NUMBER 1130 TU. (Corum-Cankiri Rural Development Project) BETWEEN

February 1, 2011 CONFORMED COPY

Nile Basin Trust Fund Grant Agreement

[Date] [Name [Title [Office [Address

Development Cr edit. Agreement. (Second Railroad Project) REPUBLIC OF KOREA INTERNATIONAL DEVELOPMENT ASSOCIATION CREDIT NUMBER 110 KO

Proj ect Agreement OFFICIA1 DOCU M ENTS. Public Disclosure Authorized LOAN NUMBER 2384 BT. Public Disclosure Authorized

Loan Agreement. Public Disclosure Authorized CONFORMED COPY. Public Disclosure Authorized. (Sixth Korea Development Finance Corporation Project)

MEMORANDUM OF UNDERSTANDING

Restated and Amended Project Agreement

Project Agreement CONFORMED COPY CREDIT NUMBER 455 BO INTERNATIONAL DEVELOPMENT ASSOCIATION BANCO INDUSTRIAL S.A. DATED JANUARY 18, 1974

Project Agreement. (Energy Efficiency Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1674 PA. Public Disclosure Authorized

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1419 PA. Public Disclosure Authorized. (Industrial Credit Project)

CONFORMED COPY LOAN NUMBER 3717 PE LOAN NUMBER 3717 PE

Loan Agreement. (Industrial Finance Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and

The offices responsible for coordination of all matters related to the implementation of this arrangement are:

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized LOAN NUMBER 3334 IN

Loan Agreement _IV. (Fourth KDB Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and KOREA DEVELOPMENT BANK

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Letter No. SK-519/PSF/XII/2010 December 6, 2010

Project Agreement CONFORMED COPY CREDIT NUMBER 419 MAS INTERNATIONAL DEVELOPMENT ASSOCIATION DEVELOPMENT WORKS CORPORATION DATED JULY 9, 1973

OFFICIAL -OV"o DOCUMENTS

Project Agreement. Public Disclosure Authorized OFFICIAL LOAN NUMBER 1878 PAN DOCUMENPS. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Development Credit Agreement

PROJECT AGREEMENT. (Low-Carbon District Heating Project in Hohhot in Inner Mongolia Autonomous Region) between ASIAN DEVELOPMENT BANK.

Dated October 15, Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1290 BO. Public Disclosure Authorized PROJECT AGREEMENT

CONFORMED COPY. Dear Dr. Jones:

Project Agreement INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT YAWATA IRON & STEEL CO., LTD. LOAN NUMBER 133 JA. (Yawata Steel Project)

HAINAN Project Agreement

MULTI-DONOR TRUST FUND GRANT AGREEMENT

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Loan Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1438 KE. Public Disclosure Authorized

Development Financing Agreement

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM between THE KINGDOM OF NORWAY,

OFrJCIALr DOCUMENTS. - 91xvv / '4K FINANCIAL PROCEDURES AGREEMENT. between INTERNATIONAL FINANCE CORPORATION. and

Section (a) ADB and Uzbekenergo shall cooperate fully to ensure that the purposes of the Loan will be accomplished.

Joint Financing Agreement

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Loan Agreement. (Capital Goods Importation Credit Program) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT BANCO CENTRAL DE COSTA RICA

Project Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY

MEMORANDUM OF UNDERSTANDING ON COOPERATION BETWEEN EUROPEAN DEVELOPMENT FINANCE INSTITUTIONS AND OVERSEAS PRIVATE INVESTMENT CORPORATION.

PROJECT AGREEMENT. (Greater Dhaka Sustainable Urban Transport Project) between ASIAN DEVELOPMENT BANK. and BANGLADESH BRIDGE AUTHORITY

LOAN AGREEMENT (Ordinary Operations) (Ulaanbaatar Urban Services and Ger Areas Development Investment Program Project 1) between MONGOLIA.

Project Agreement. Public Disclosure Authorized. LOAN NUMBER 1412-T-SE jcumems J LOAN NUMBER 1413-SE. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

DOCU MENTS FOFFRCIAL71?

UNITED STATES OF AMERICA BEFORE THE BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM WASHINGTON, D.C. CONSENT ORDER

Maharashtra Project Agreement

Project Agreement CONFORMED COPY CREDIT NUMBER 400 IND INTERNATIONAL DEVELOPMENT ASSOCIATION BANK RAKYAT INDONESIA DATED JUNE 22, 1973

CONFORMED COPY May 4,2011

(Taunsa Barrage Emergency Rehabilitation and Modernization Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.

Instrument for the Establishment of the Restructured Global Environment Facility

DOCUMENTS OFFICIAL. Public Disclosure Authorized. INTERNATIONAL DEVELOPMENT ASSOCIATION U.S.A. Cable Address: INDEVAS. Public Disclosure Authorized

Loan Agreement. Dated July 26, Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1611 YU. Public Disclosure Authorized

Development Credit Agreement

CLIMATE INVESTMENT FUNDS

OFFM.tA DOCUMENTS. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

SECOND AMENDED AND RESTATED

MEMORANDUM OF UNDERSTANDING. between THE EUROPEAN INVESTMENT BANK. and THE INTER-AMERICAN DEVELOPMENT BANK

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 2224 BR. Public Disclosure Authorized. (Third Feeder Roads Project)

UNITED STATES OF AMERICA BEFORE THE BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM WASHINGTON, D.C.

AMENDMENT NO. 2 TO TERM LOAN CREDIT AGREEMENT

Financing Agreement. (Additional Financing for Village Communities Support Program (Phase I)) between REPUBLIC OF GUINEA. and

Global Environment Facility Grant Agreement

NOW THEREFORE, the Parties hereto agree as follows: 1. Trustee Allocation and Commitment of Funds

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM between THE KINGDOM OF NORWAY,

Project Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Project Agreement DOCUMENTS. Public Disclosure Authorized LOAN NUMBER PE. Public Disclosure Authorized. (Lima Metropolitan Development Project)

Transcription:

COOPERATION AGREEMENT between NORDIC DEVELOPMENT FUND and INTER-AMERICAN DEVELOPMENT BANK For the Cofinancing of Programs and Projects Dated as of October 2, 1994 Amended and restated as ofianuary 26, 2010

COOPERATION AGREEMENT dated as of October 2, 1994, amended and restated as of January 26, 2010, between NORDIC DEVELOPMENT FUND (hereinafter called NDF), on the one hand, and INTER-AMERICAN DEVELOPMENT BANK (hereinafter called IDB), on the other. WHEREAS the Nordic Council of Ministers, on May 19, 1988, decided to establish NDF for the purpose of providing financing on concessional terms to developing countries thereby contributing to the social and economic development ofthese countries; ( WHEREAS the Nordic Council of Ministers, on May 5, 2009, decided to include financing in the form of grants into the operational modalities of NDF, such grants to be provided primarily for the mitigation of and adaptation to climate change; WHEREAS NDF complements the activities of (a) the Nordic Investment Bank (NIB) which provides financing on normal banking terms for investment projects of Nordic Interest both within and outside Nordic countries, and (b) Nordic Environment Finance Corporation (NEFCO), which finances investments and projects to generate positive environmental effects of interest to the Nordic region; WHEREAS the financing to be provided by NDF is intended to be offered in cofinancing with other multilateral financial institutions; WHEREAS NDF and IDB have cooperated in the cofinancing of development projects and programs of mutual interest in developing member countries of IDB pursuant to a Cooperation Agreement dated October 2, 1994; WHEREAS NDF and IDB wish to cooperate in promoting additional cofinancing opportunities on the terms and conditions hereinafter set forth or otherwise agreed between NDF and IDB; NOW THEREFORE the parties hereto have agreed to amend and restate the Cooperation Agreement dated October 2, 1994 to read as foliows:

ARTICLE 1 Methods and Application of Cofinancing 1. The financing to be provided by NDF for cofinancing with IDB will be made available pursuant to this Agreement in a form permitted by the Statutes of NDF, i.e interest free Ioans, subordinated Ioans, equity capital and grants. Untess otherwise notified by NDF, new financing will be made available in the form of grants. 2. The financing to be provided by NDF pursuant to this Agreement is intended to contribute to the financing of development projects and programs of interest to the Nordic countries. 3. Cofinancing by NDF may be provided on a joint or parallel financing basis, but will be provided on a parallel basis unless expressly agreed otherwise. ARTICLE II Project and Program Selection 1. Each development project or program to befinanced by NDF pursuant to this Agreement will be selected by NDF, in consultation with IDB and the intended recipient, from a list of projects and programs prepared and updated semi-annually by IDB and submitted to NDF for such purpose. 2. Consultative meetings will beheld by IDB and NDF at Ieast once a year for the purpose of reviewing the Iist of projects and programs referred to in paragraph 1 of this Article II. Foliowing each such review, NDF shall inform IDB of the projects and programs (if any) that it is interested in cofinancing, and the amount of funds NDF intends to make available for the respective projects and programs. It will be the responsibility of NDF to indicate to potential recipients its interest in making funds available for the cofinancing of specific projects or programs. The decision to include NDFs cofinancing proposal in the financing pian for a project or program will be made by the intended recipient in consultation with IDB. During the consultative

meetings the parties will explore ways of strengthening their cooperation and mutual assistance. 3. NDF may bring to the attention of IDB other projects and programs which it considers may be of interest to IDB and provide suggestions concerning the possible extent of participation of NDF therein. NDF may from time to time aiso inform IDB of the particuiar developing countries of 1DB and the specific sectors in which NDF has a special interest. 4. If NDFs cofinancing is to be provided in connection with existing financing of IDB, IDB will seek to reach agreement with the recipient on the necessary amendments to its financing agreement to reflect the new cofinancing arrangement. ARTICLE III Administration of Cofinancing 1. Unless otherwise agreed, the recipient wili be responsible for the execution of each project or program, including the evaluation, award and administration of contracts the reunder. 2. Unless otherwise agreed, in the case of parallel financing, NDF s procedures wiil apply to the procurement of goods, works and services to be financed by NDF; and, in the case of joint financing, IDB s procedures will apply to the procurement of goods, works and services to be financed by NDF and 1DB. ARTICLE IV Cooperation and Consuitation 1. 1DB wiii identify, prepare and appraise the projects and programs to be cofinanced with NDF in accordance with 1DB s normal policies and procedures. IDB wili share with NDF the reports relating to such identification, preparation and appraisai. Ali decisions by NDF to take or refrain from taking action concerning a project or program wili be based exclusiveiy on its own judgment.

2. In the normal course of the inspection and supervision of its projects and programs, IDB will from time to time inspect and supervise, on behalf of NDF, the component of the project or program cofinanced by NDF. At its exclusive discretion, IDB may make recommendations based on the inspection and supervision of such component. 3. NDF and IDB will keep each other informed of the progress of the projects and programs cofinanced by them and will, at the request of either party, exchange views with regard to the projects and programs and any other matters retating to their respective financing thereof. To that end, IDB will, subject to the ( consent of the recipient, provide NDF with an opportunity to participate in appraisal and supervision missions relating to such projects and programs and will inform of the findings of such missions. NDF 4. NDF and IDB will inform each other promptly of any significant modification of its financing agreements and of any contractual remedy that is applied in respect thereof. To the extent practicable, each party will afford the other a reasonable opportunity to exchange views before effecting any such modification or exercising any such contractual remedy. 5. Subject to the agreement of the recipient, the financing agreements of NDF and IDB concluded in connection with the projects and programs to be cofinanced pursuant to this agreement will include cross-effectiveness provisions. NDF and IDB will inform each other when conditions precedent to effectiveness of the respective financing agreements have been met. 6. In connection with each specific project or program cofinanced hereunder, NDF and IDB will exchange Ietters that will reaffirm the provisions of this Agreement and, if necessary, provide for any specific arrangement not contemplated herein, including an agreement on fees when the supervision required by NDF goes beyond the scope agreed herein, or the component cofinanced by NDF incorporates an additional dimension to the project not contemplated at the time of its design.

1. ARTICLE V Miscellaneous 1. This Agreement entered into force on the day of its signature being October 23, 1991. 2. The amendments to the original Agreement will enter into force on the day of the signature ofthis amended and restated Agreement. 3. This Agreement will remain in effect unless terminated by any party upon six months prior written notice to that effect to the other party; provided, however, that unless otherwise mutually agreed, the activities to be carried out by the parties under this Agreement in relation to on-going projects for which NDF is providing cofinancing will not be effected by such termination. 4. Written communications required or permitted by this Agreement will be directed to the following addresses: For NDF: Nordic Development Fund P.O.Box 185 Fl-00171 Helsinki Finland Telefax: +358 9 622 1491 For the IDB: AlI communications pertainingto donor relations and resource mobilization shall be directed to: Attention: Advisor Office of Outreach and Partnerships lnter-american Development Bank 1300 New York Ave., NW Telefax: +1202 3214072 Washington, D.C. 20577 U.S.A. E-mail: partnerships@iadb.org

Day-to-day communications regarding the imptementation of this Framework Agreement, or any Agreements, and management of contributions shall be directed to: Attention: Chief, Grants and Co-financing Management Unit Vice Presidency for Countries lnter-american Development Bank 1300 New York Ave., NW Telefax: +1202 623 3171 Washington, D.C. 20577 U.S.A. E-mail: vpc-gcm@iadb.org 5. This Agreement may be amended only by written agreement of the parties hereto. Done at Helsinki, Finland on the date indicated above in two English language originals, one for each of the parties hereto. FOftTHE NQ1DIC DEVELOPMENT FUND (, Helge Semb, Managing Director FOR THE INTER-AMERICAN DEVELOPM ENT BANK Bernardo Guillamon Advisor