Express Pipeline LLC. Express Pipeline Ltd. as the general partner of Express Pipeline Limited Partnership. Platte Pipe Line Company, LLC

Similar documents
EXPRESS PIPELINE LLC. EXPRESS PIPELINE LTD. As the General Partner of Express Pipeline Limited Partnership PLATTE PIPE LINE COMPANY, LLC

Express Pipeline LLC. Express Pipeline Ltd. as the general partner of Express Pipeline Limited Partnership. Platte Pipe Line Company, LLC

EXPRESS PIPELINE LLC PLATTE PIPE LINE COMPANY, LLC

Express Pipeline LLC

NEB No. 430 FERC No Cancels NEB No. 425 Cancels FERC No ENBRIDGE PIPELINES (FSP) L.L.C. (FLANAGAN SOUTH PIPELINE SYSTEM)

NEB No. 425 FERC No Cancels NEB No. 422 Cancels FERC No ENBRIDGE PIPELINES (FSP) L.L.C. (FLANAGAN SOUTH PIPELINE SYSTEM)

NEB No. 441 FERC No Cancels NEB No. 436 Cancels FERC No ENBRIDGE PIPELINES INC. ENBRIDGE ENERGY, LIMITED PARTNERSHIP

NEB No. 423 FERC No Cancels NEB No. 414 Cancels FERC No ENBRIDGE PIPELINES INC. ENBRIDGE ENERGY, LIMITED PARTNERSHIP

NEB No. 435 FERC No Cancels NEB No. 424 Cancels FERC No ENBRIDGE PIPELINES INC. ENBRIDGE ENERGY, LIMITED PARTNERSHIP

NEB No. 360 FERC No Replaces NEB No. 359 Cancels FERC No ENBRIDGE PIPELINES (FSP) L.L.C. (FLANAGAN SOUTH PIPELINE SYSTEM)

FERC ICA Oil Tariff FERC No Cancels FERC No ENBRIDGE PIPELINES (FSP) L.L.C. (FLANAGAN SOUTH PIPELINE SYSTEM)

ENBRIDGE PIPELINES INC.

141 FERC 61,056 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

NORTH DAKOTA PIPELINE COMPANY LLC

NORTH DAKOTA PIPELINE COMPANY LLC

Dakota Energy Connection, LLC

NORTH DAKOTA PIPELINE COMPANY LLC

Notice Text. Non-Binding Open Season Notice Kinder Morgan Powder River Lateral NGL Pipeline Project June 23, 2014

April 29, Filed Electronically Original via Mail

Presentation to the Crude Oil Quality Group. Norm Rinne Director, Business Development

Negative Price Differential Pressure on the Williston Basin Crude Oil Market: Contributing Factors and Potential Solutions

Presentation to National Academy of Sciences

MAGELLAN PIPELINE COMPANY, LLC

royalty rate on all properties and the Dunvegan Unit were primarily due to the lower royalties paid under the NRF due to significantly lower prices.

The Bison Pipeline Project. Public Disclosure Document

KUPARUK TRANSPORTATION COMPANY LOCAL PIPELINE TARIFF. Containing the QUALITY BANK METHODOLOGY

KUPARUK TRANSPORTATION COMPANY LOCAL PIPELINE TARIFF. Containing the QUALITY BANK METHODOLOGY

LETTER DECISION Kinder Morgan Cochin ULC (KM Cochin) Application pursuant to section 58 and Part IV (Application) of the National Energy Board Act

Kinder Morgan Canada

Requested Amendment to the National Energy Board Cost Recovery Regulations (Regulation)

THROUGHPUT AND DEFICIENCY AGREEMENT BY AND BETWEEN BENGAL PIPELINE COMPANY LLC AND [ ] DATED: JANUARY 29, 2008

Tar Sands US Infrastructure Development

Chapter 200 Light Sweet Crude Oil Futures

Spectra Energy Partners: Moving Ahead, Building Value

CONDITIONS OF SERVICE AND TARIFF. April 1, 2018

Investor Presentation: May 2016

HARVEST OPERATIONS ANNOUNCES YEAR END 2010 RESERVES

Holly Energy Partners, L.P. Reports First Quarter Results

National Energy Board. Reasons for Decision. Murphy Oil Company Ltd. OH March Application

Investor Presentation: UBS MLP Conference January 2016

Natural Gas Pipeline Company of America LLC Part 6. Eighth Revised Volume No. 1 Version GENERAL TERMS AND CONDITIONS

WRB Refining Wood River CORE Project Expanding heavy oil processing

Dakota Midstream, LLC

Attachment 1 to IOL-Enbridge 131(a)

PEMBINA PIPELINE CORPORATION

All amounts in U.S. dollars unless otherwise noted. Kinder Morgan and Terasen August 2005

File OF-Surv-Inc May 2013

NATIONAL ENERGY BOARD HEARING ORDER OH TRANSCANADA KEYSTONE PIPELINE GP LTD. ( KEYSTONE ) KEYSTONE XL PIPELINE APPLICATION

Conditions of Service and Tariff

Trust Fund for Abandonment of the Pipeline Assets of Foothills Pipe Lines Ltd. Trust Fund Financial Statements

BELLATRIX ANNOUNCES 2018 YEAR END RESERVES HIGHLIGHTED BY 13% RESERVE GROWTH AND LOW COST RESERVE ADDITIONS

Imperial Oil announces estimated fourth quarter financial and operating results

RMP Energy Announces Record Quarterly Cash Flow and Production

Conditions of Service and Tariff. Effective as of December 21, 2016

IPL Energy Inc. annual report Brought to you by Global Reports

The Alliance System. Alliance Pipeline Limited Partnership Management s Discussion and Analysis For the year ended December 31, 2016

FERC GAS TARIFF VOLUME NO. 1 RAGER MOUNTAIN STORAGE COMPANY LLC. Filed with the FEDERAL ENERGY REGULATORY COMMISSION

Addendum to Enbridge s 2013 Corporate Social Responsibility Report (with a focus on 2013 data)

OASIS PIPELINE, LP FERC NGPA GAS TARIFF STATEMENT OF OPERATING CONDITIONS VERSION EFFECTIVE AUGUST 1, 2014 OPTION CODE A

Holly Energy Partners, L.P. Reports Second Quarter Results

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501

Liquids Pipelines. Excellent Foundation for Continued Growth. ~25% of all crude oil produced in N. America. ~2/3 rds of Canadian crude exports

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C

OIL AND NATURAL GAS RESERVES AND NET PRESENT VALUE OF FUTURE NET REVENUE

As the production of natural gas liquids

Rally Canada Resources Ltd.

Crude Oil Forecast, Markets and Pipeline Expansions June 2007

Relentless Resources Agrees to Acquire Alberta Assets in Exchange for Loverna Property

SECTION 4 BILLING AND PAYMENT A. PAYMENT OF BILLS

RESOLUTION CONNECTION CHARGES, PLANT INVESTMENT FEES, AND UTILITY RATES FOR WATER AND SEWER SERVICE

ENBRIDGE INCOME PARTNERS LP MANAGEMENT S DISCUSSION AND ANALYSIS

FERC GAS TARIFF ORIGINAL VOLUME NO. 1 RUBY PIPELINE, L.L.C.

Casper Terminal Acquisition

CURRENTLY EFFECTIVE RATE SCHEDULES AND STATEMENT OF OPERATING CONDITIONS OF ONEOK GAS TRANSPORTATION, L.L.C. SUBJECT TO THE JURISDICTION OF

ENBRIDGE INCOME FUND MANAGEMENT S DISCUSSION AND ANALYSIS

The Shape I m In - Western Canadian Crude Price Collapse

PAN ORIENT ENERGY CORP.

CIBC 2014 Whistler Institutional Investor Conference

Northern Gateway is directed to submit its response with the Panel and send a copy to the OH Parties by noon, Mountain Time, 25 January 2012.

Glacier Montney Outperformance Improves Capital Efficiencies, Enables Lower Capital and Maintains Future Production Growth. Highly Efficient 2014

Eagle Energy Inc. Announces Second Quarter 2018 Results and Previously Announced Sale of Twining Assets

National Energy Board Suite 210, 517 Tenth Avenue SW Calgary, Alberta T2R 0A8. Attention: Ms. Sheri Young, Secretary of the Board. Dear Ms.

Non-Conforming, Negotiated Rate Transportation Service Agreement Filing; El Paso Natural Gas Company, L.L.C.; Docket No. RP17-

GENERAL TERMS AND CONDITIONS to GROWMARK, Inc. Energy Forward, Index Sales, Sales Agreements and Confirmations

Plains Midstream Canada ULC

PEMBINA PIPELINE CORPORATION

Spectra Energy Partners Roni Cappadonna

RELENTLESS RESOURCES ANNOUNCES NON-BROKERED PRIVATE PLACEMENT OFFERING AND RESERVES INFORMATION REGARDING ASSETS BEING PURCHASED

NOTICE TO MEMBERS No May 14, 2010

2017 ANNUAL ALLIANCE PIPELINE LIMITED PARTNERSHIP. Management s Discussion and Analysis

ARKANSAS PUBLIC SERVICE COMMISSION Second Revised Sheet No /41. Replacing: First Revised Sheet No /40

ALLIANCE PIPELINE LIMITED PARTNERSHIP

GENERAL INFORMATION. CONTRACT means any contract awarded resulting from this invitation for Bids.

National Energy Board. Reasons for Decision. Express Pipeline Ltd. OH June Facilities and Toll Methodology

EVANSVILLE WESTERN RAILWAY, INC.

Page 1 ARR

Number Revision Number Revision Schedule or Rule Number th th Determination of Gas Cost Adjustment. Introduction and Request for Waiver

PAINTED PONY ANNOUNCES A 52% INCREASE IN PROVED PLUS PROBABLE RESERVES TO 1.7 TCFE WITH A NET PRESENT VALUE DISCOUNTED AT 10% OF $1.

What Is WTI Actually Worth in Canada?

Transcription:

National Energy Board FERC No. 167.11.0 NEB No. 148 Cancels FERC No. 167.10.0 Cancels NEB No. 145 Express Pipeline LLC In Connection with Express Pipeline Ltd. as the general partner of Express Pipeline Limited Partnership and Platte Pipe Line Company, LLC International Joint and Proportional Term Rate Tariff Governing the Transportation of Petroleum in Common Carrier Service Governed, except as otherwise provided herein, by the Rules and Regulations published by: Express Pipeline Ltd., NEB No. [W]146 141, and successive issues thereof, on file with the National Energy Board, for transportation from Alberta to the International Boundary near Wild Horse, Alberta (Express Pipeline Ltd. s Rules and Regulations); and Express Pipeline LLC, FERC No. [W] 164.16.0 164.14.0, and successive issues thereof, for transportation from the International Boundary near Wild Horse, Alberta to Edgar Station, and to Wood River, Illinois (Express Pipeline LLC s Rules and Regulations); and Platte Pipe Line Company, LLC, FERC No. [W] 2.9.0 2.7.0 and successive issues thereof (Platte Pipe Line Company, LLC s Rules and Regulations). ISSUED: January 29, 2018 EFFECTIVE: March 1, 2018 The provisions published herein will, if effective, not result in an effect on the quality of the human environment. ISSUED BY: Ranjana Martin Director, Regulatory Services Enbridge Pipelines Inc. 200, 425-1 st Street S.W. Calgary, AB T2P 3L8 COMPILED BY: Sharon Zaidi Regulatory Services Enbridge Pipelines Inc. (403) 767-3705 E-mail: Enbridge-Tariffs@enbridge.com Express and logo is a registered trademark

Express Pipeline Ltd, Express Pipeline LLC, and Platte Pipe Line Company, LLC International Joint Rates in *, US dollars [C] per barrel for 3-4 Year Ter 8 Super- (Inlet to Silver Tip, ExxonMobil Pipe Line Company) Sinclair Pipeline, County, Wyoming Casper, Natrona 5,000 bpd 2 2.3227 [N] /bbl 2.5082 [N] /bbl 2.8334 [N]/bbl 2.9496 [N] /bbl 795 m 3 /d 2 [N] 14.6093/m 3 [N] 15.7761/m 3 [N]17.8215/m 3 [N]18.5524/m 3 5,000 bpd 2 2.4483 [N] /bbl 2.6443 [N]/bbl 2.9871 [N] /bbl 3.1095 [N] /bbl (inlet to Platte Pipe Line Company, LLC or CCR Pipeline, LLC) 795 m 3 /d 2 [N]15.3993/m 3 [N]16.6321/m 3 [N] 18.7883/m 3 [N]19.5582/m 3 5,000 bpd 2 2.6415 [N] /bbl 2.8531[N] /bbl 3.2224 [N] /bbl 3.3548 [N] /bbl 795 m 3 /d 2 [N]16.6145/m 3 [N] 17.9455/m 3 [N] 20.2683/m 3 [N] 21.1011/m 3 Guernsey, Platte County, Wyoming 7 5,000 bpd 2 3.2581[N] /bbl 3.4696 [N] /bbl 3.8388 [N] /bbl 3.9714 [N] /bbl 795 m 3 /d 2 [N] 20.4928/m 3 [N] 21.8231/m 3 [N] 24.1453/m 3 [N] 24.9794/m 3 5,000 bpd 2 4.9941[N] /bbl 5.2056 [N] /bbl 5.5748 [N] /bbl 5.7073 [N] /bbl 795 m 3 /d 2 [N] 31.4119/m 3 [N] 32.7422/m 3 [N] 35.0644/m 3 [N] 35.8978/m 3 Express Pipeline Ltd, Express Pipeline LLC, and Platte Pipe Line Company, LLC International Joint Rates in US dollars [C] per barrel for 5-9 Year Term *, 8 Super- (Inlet to Silver Tip, ExxonMobil Pipe Line Company) Sinclair Pipeline, Casper, Natrona County, Wyoming (inlet to Platte Pipe Line Company, LLC or CCR Pipeline, LLC) 5,000 bpd 2 2.3014 [N] /bbl 2.4854 [N] /bbl 2.8076 [N] /bbl 2.9227[N] /bbl 795 m 3 /d 2 [N] 14.4754/m 3 [N] 15.6327/m 3 [N] 17.6593/m 3 [N] 18.3832/m 3 5,000 bpd 2 2.4261[N] /bbl 2.6202 [N] /bbl 2.9599 [N] /bbl 3.0810 [N] /bbl 795 m 3 /d 2 [N] 15.2597/m 3 [N]16.4806/m 3 [N]18.6172/m 3 [N]19.3789/m 3 5,000 bpd 2 2.6174 [N] /bbl 2.8270 [N] /bbl 3.1930 [N] /bbl 3.3242 [N] /bbl 795 m 3 /d 2 [N] 16.4630/m3 [N]17.7813/m 3 [N] 20.0834/m 3 [N] 20.9086/m 3 Guernsey, Platte County, Wyoming 7 5,000 bpd 2 3.2284 [N] /bbl 3.4379 [N] /bbl 3.8038 [N] /bbl 3.9351 [N] /bbl 795 m 3 /d 2 [N] 20.3060/m3 [N] 21.6237/m 3 [N] 23.9252/m 3 [N] 24.7510/m 3 5,000 bpd 2 3.8525*** [N] /bbl 4.0621***[N] /bbl 4.4176***[N] /bbl 4.5489*** [N] /bbl 795 m 3 /d 2 [N] 24.2315 /m 3 [N] 25.5498/m 3 [N] 27.7859/m 3 [N] 28.6117/m 3 5,000 bpd 2 4.9485 [N] /bbl 5.1581 [N] /bbl 5.5240 [N] /bbl 5.6552 [N] /bbl 795 m 3 /d 2 [N] 31.1251/m3 [N] 32.4435/m 3 [N] 34.7449/m 3 [N] 35.5701/m 3 2

Express Pipeline Ltd, Express Pipeline LLC, and Platte Pipe Line Company, LLC International Joint Rates in *, US dollars [C] per barrel for 10-14 Year Ter 8 Super- Buffalo Station, Fergus (Inlet to Buffalo Station)** County, 5,000 bpd 2 1.8774** [N] /bbl 1.8774** [N] /bbl 1.8774 [N] /bbl 1.8774 [N] /bbl 795 m 3 /d 2 [N] 11.8085/m 3 [N] 11.8085/m 3 [N] 11.8085/m 3 [N] 11.8085/m 3 (Inlet to Silver Tip, ExxonMobil Pipe Line Company) 5,000 bpd 2 2.2827**[N] /bbl 2.4650**[N] /bbl 2.7846**[N] /bbl 2.8988**[N] /bbl 795 m 3 /d 2 [N] 14.3578/m 3 [N] 15.5044/m 3 [N] 17.5146/m 3 [N] 18.2329/m 3 Sinclair Pipeline, County, Wyoming Casper, Natrona 5,000 bpd 2 2.4062 [N] /bbl 2.5987 [N] /bbl 2.9357 [N] /bbl 3.0559 [N] /bbl 795 m 3 /d 2 [N] 15.1345/m 3 [N] 16.3453/m 3 [N] 18.4650/m 3 [N] 19.2210/m 3 (inlet to Platte Pipe Line Company, LLC or CCR Pipeline, LLC) 5,000 bpd 2 2.5961[N] /bbl 2.8040 [N] /bbl 3.1668 [N] /bbl 3.2970 [N] /bbl 795 m 3 /d 2 [N] 16.3290/m 3 [N] 17.6366/m 3 [N] 19.9186/m 3 [N] 20.7375/m 3 Guernsey, Platte County, Wyoming 7 5,000 bpd 2 3.2020 [N] /bbl 3.4098 [N] /bbl 3.7727 [N] /bbl 3.9029 [N] /bbl 795 m 3 /d 2 [N] 20.1400/m 3 [N] 21.4470/m 3 [N] 23.7296/m 3 [N] 24.5485/m 3 2 5,000 bpd 3.7796*** [N] /bbl 4.0183*** [N] /bbl 4.3812*** [N] /bbl 4.5115*** [N] /bbl 795 m 3 /d 2 [N] 23.7730/m3 [N] 25.2743/m 3 [N] 27.5569/m 3 [N] 28.3765/m 3 5,000 bpd 2 4.9081 [N] /bbl 5.1159 [N] /bbl 5.4788 [N] /bbl 5.6090 [N] /bbl 795 m 3 /d 2 [N] 30.8710/m 3 [N] 32.1780/m 3 [N] 34.4606/m 3 [N] 35.2795/m 3 3

Express Pipeline Ltd, Express Pipeline LLC, and Platte Pipe Line Company, LLC International Joint Rates in US dollars [C] per barrel for 15-19 Year Term *, 8 Super- Buffalo Station, Fergus County, (Inlet to Buffalo Station)** 5,000 bpd 2 1.8774 ** [N] /bbl 1.8774** [N] /bbl 1.8774 [N] /bbl 1.8774 [N] /bbl 795 m 3 /d 2 [N] 11.8085/m 3 [N] 11.8085/m 3 [N] 11.8085/m 3 [N] 11.8085/m 3 (Inlet to Silver Tip, ExxonMobil Pipe Line Company) Sinclair Pipeline, Casper, Natrona County, Wyoming 5,000 bpd 2 2.2356 [N] /bbl 2.4142 [N] /bbl 2.7272 [N] /bbl 2.8391[N] /bbl 795 m 3 /d 2 [N] 14.0615/m 3 [N] 15.1849/m 3 [N] 17.1536/m 3 [N] 17.8574/m 3 5,000 bpd 2 2.3739 [N] /bbl 2.5639 [N] /bbl 2.8964 [N] /bbl 3.0149 [N] /bbl 795 m 3 /d 2 [N] 14.9314/m 3 [N] 16.1264/m 3 [N] 18.2178/m 3 [N] 18.9632/m 3 (inlet to Platte Pipe Line Company, LLC or CCR Pipeline, LLC) 5,000 bpd 2 2.5613 [N] /bbl 2.7664 [N] /bbl 3.1244 [N] /bbl 3.2528 [N] /bbl 795 m 3 /d 2 [N] 16.1101/m 3 [N] 17.4001/m 3 [N] 19.6519/m 3 [N] 20.4595/m 3 Guernsey, Platte County, Wyoming 7 5,000 bpd 2 3.1591[N] /bbl 3.3642 [N] /bbl 3.7222 [N] /bbl 3.8506 [N] /bbl 795 m 3 /d 2 [N] 19.8701/m 3 [N] 21.1602/m 3 [N] 23.4119/m 3 [N] 24.2195/m 3 5,000 bpd 2 3.7448 ***[N]/bbl 3.9498*** [N]/bbl 4.3079*** [N]/bbl 4.4363*** [N]/bbl 795 m 3 /d 2 [N] 23.5541/m 3 [N] 24.8435/m 3 [N] 27.0959/m 3 [N] 27.9035/m 3 5,000 bpd 2 4.8422 [N]/bbl 5.0473 [N]/bbl 5.4053 [N]/bbl 5.5338 [N]/bbl 795 m 3 /d 2 [N] 30.4565/m 3 [N] 31.7466/m 3 [N] 33.9983/m 3 [N] 34.8066/m 3 4

Express Pipeline Ltd, Express Pipeline LLC, and Platte Pipe Line Company, LLC International Joint Rates in US dollars [C] per barrel for 20 or more Year Term *, 8 Super- Buffalo Station, Fergus County, (Inlet to Buffalo Station)** 5,000 bpd 2 1.8774 ** [N]/bbl 1.8774 ** [N]/bbl 1.8774 [N]/bbl 1.8774 [N]/bbl 795 m 3 /d 2 [N] 11.8085/m 3 [N] 11.8085/m 3 [N] 11.8085/m 3 N] 11.8085/m 3 (Inlet to Silver Tip, ExxonMobil Pipe Line Company) 5,000 bpd 2 2.2190 [N]/bbl 2.3964 [N]/bbl 2.7070 [N]/bbl 2.8182 [N]/bbl 795 m 3 /d 2 [N] 13.9571/m 3 [N] 15.0729/m 3 [N] 17.0265/m 3 [N] 17.7259/m 3 Sinclair Pipeline, Casper, Natrona County, Wyoming 5,000 bpd 2 2.3392 [N] /bbl 2.5264 [N]/bbl 2.8539 [N]/bbl 2.9708 [N]/bbl 795 m 3 /d 2 [N] 14.7131/m 3 [N] 15.8906/m 3 [N] 17.9505/m 3 [N] 18.6858/m 3 (Inlet to Platte Pipe Line Company, LLC or CCR Pipeline, LLC) 5,000 bpd 2 2.5238 [N] /bbl 2.7259 [N]/bbl 3.0787 [N]/bbl 3.2053 [N]/bbl 795 m 3 /d 2 [N] 15.8742/m 3 [N] 17.1454/m 3 [N] 19.3644/m 3 [N] 20.1607/m 3 Guernsey, Platte County, Wyoming 7 5,000 bpd 2 3.1129 [N]/bbl 3.3148 [N]/bbl 3.6677 [N]/bbl 3.7943 [N]/bbl 795 m 3 /d 2 [N] 19.5796/m 3 [N] 20.8495/m 3 [N] 23.0691/m 3 [N] 23.8654/m 3 5,000 bpd 2 3.6765*** [N]/bbl 3.8785*** [N]/bbl 4.2313*** [N]/bbl 4.3577***[N]/bbl 795 m 3 /d 2 [N] 23.1245/m 3 [N] 24.3950/m 3 [N] 26.6141/m 3 [N] 27.4091/m 3 5,000 bpd 2 4.7715 [N]/bbl 4.9736 [N]/bbl 5.3262 [N]/bbl 5.4528 [N]/bbl 795 m 3 /d 2 [N] 30.0118/m 3 [N] 31.2830/m 3 [N] 33.5008/m 3 [N] 34.2971/m 3 * Indicated Term Rates are available to Committed Shipper that acquired s through the Open Season held between June 5 and August 9, 2013 and the Open Season held between October 20, 2016 and February 23, 2017. **All shipments made for delivery to the inlet to Buffalo Station will be subject to the applicable local rate to the inlet to [W] Phillips 66 Carrier LLC s Glacier Pipeline ConocoPhillips Pipe Line Company; in accordance with FERC No. [W] 164.16.0 164.14.0, a discount of $[W] US 0.22 per barrel [N] ($US 1.38 per cubic meter) will apply for all monthly shipments of a minimum of 5,000 barrels/day [N] (795 cubic meters/day) for and Petroleum from the inlet to Buffalo Station to the inlet to [W] Phillips 66 Carrier LLC s Glacier Pipeline system ConocoPhillips Pipe Line Company. *** Indicated Term Rates are available to Committed Shippers that acquired s through the Open Season held between October 20, 2016 and February 23, 2017. 5

NOTES: 1. ESCALATOR Carrier shall have the right, from time to time, at its sole discretion, but no more frequently than once in any Year, and on not less than sixty (60) Days advance written notice to Shipper, to adjust the rates payable under the Petroleum Rate Schedule, provided that the cumulative increase to the rates shall not exceed three percent (3%) per year, from April 1, 2014. Carrier will also have the right to further discount all or some of the rates at levels below the initial or escalator adjusted rates, at its sole discretion. 2. VOLUME The named rates apply only for Shippers with a Volume specified in Appendix A of the TSA Tendering a minimum of 5,000 bpd [N] (795 m3/d) on a yearly average, but does not apply to volumes Tendered in excess of contracted amounts specified by Shipper in Appendix A of the TSA. 3. LIGHT PETROLEUM Petroleum having a density up to but not including 876 kilograms per cubic meter (kg/m 3 ) and a viscosity up to but not including 20 square millimeters per second (mm 2 /s) will be classified as Petroleum. Petroleum has been assessed no surcharge. 4. MEDIUM PETROLEUM Petroleum having a density from 876 kilograms per cubic meter (kg/m 3 ) up to but not including 904 kg/m 3 and a viscosity from 20 up to but not including 100 square millimeters per second (mm 2 /s) will be classified as Petroleum. Petroleum will be assessed a surcharge of 8%, which is incorporated in the applicable rate found in the Rates section of the Tariff. 5. HEAVY PETROLEUM Petroleum having a density from 904 kilograms per cubic meter (kg/m 3 ) to 927 kg/m 3 and viscosity from 100 up to 250 square millimeters per second (mm 2 /s) will be classified as Petroleum. Petroleum has been assessed a surcharge of 22%, which is incorporated in the applicable rate found in the Rates section of the Tariff. 6. SUPER-HEAVY PETROLEUM Petroleum having a density above 927 kilograms per cubic meter (kg/m 3 ) up to and including 940 (kg/m 3 ) and viscosity above 250 up to and including 350 square millimeters per second (mm 2 /s) will be classified as Super- Petroleum. Super- Petroleum has been assessed a surcharge of 27%, which is incorporated in the applicable rate found in the Rates section of the Tariff. 7. RE-ORIGINATION FEE: A Shipper that Nominates and Tenders Petroleum for transportation at for Delivery to Wood River, Illinois may request that the Carrier Deliver its Petroleum to an intermediate Delivery Point downstream of Casper, Wyoming as identified herein for up to a twenty-four month period. Within that twenty-four month period, the Shipper may Nominate for Delivery of its Petroleum to a final downstream Delivery Point identified herein. The Petroleum will be transported, as soon as feasibly possible subject to operational conditions, and at such time the Shipper will be charged a re-origination fee of $US 0.1587 per barrel [N] ($US 0.9982 per cubic meter). Nominations for re-origination will be subject to the same specifications, obligations and limitations as initial Nominations under the Platte Pipe Line Company, LLC Rules and Regulations as provided in exception [W] 9 8 below. 8. ABANDONMENT FUND SURCHARGE: There shall be a surcharge on each of the rates of $[W] US 0.0113/bbl [N] ($US 0.0711/m 3 ), effective January 1, 2015. [N] 9. CUBIC METERS: means the volume of Petroleum which occupies one cubic meter when such Petroleum is at a temperature of fifteen degrees Celsius (15ºC) and at a pressure of 101.325 kilopascals and equals 264.1721 United States gallons and 6.2898108 barrels, under the same conditions. Term rates have been converted to cubic meters using a conversion factor of 1 cubic meter = 6.2898108 barrels. JOINT ROUTING: Hardisty to Casper and destinations in Wyoming and Illinois: Express Pipeline Ltd. Alberta to International Boundary near Wild Horse, Alberta (Express ) connecting to; Express Pipeline LLC International Boundary near Wild Horse, Alberta to Casper, Wyoming (Express U.S.) or for further delivery in connection with; Platte Pipe Line Company, LLC Casper, Wyoming to Wood River, Illinois. EXCEPTIONS: For exceptions to Express Pipeline LLC s Rules and Regulations, Express Pipeline Ltd s Rules and Regulations or Platte Pipe Line Company, LLC s Rules and Regulations, see the following: 1. Exception to Express Pipeline Ltd. s Rules and Regulations Item 8, Payment of Tariff Charges and Lien for Unpaid Charges: The exchange rates, if required, in any transaction will be the average of the daily Bank of exchange rate of the Month [W] WM/Reuters 4:00 pm London Close Rate when shipments occurred. [C] 2. Exception to Express Ltd. s Rules and Regulations Item 21, Renewals: For the purposes of this international joint tariff, Item 21 is not applicable. [W] 2. 3. Exception to Express Pipeline LLC s Rules and Regulations Item 2.13, Express Pipeline Ltd. s Rules and Regulations Item 13, and Platte Pipe Line Company, LLC s Rules and Regulations Item 2.13, Prorationing: The rights and obligations of Express Pipeline Ltd., Express Pipeline LLC or Platte Pipe Line Company, LLC and the Express Pipeline Shippers, on Express Pipeline, will not be altered or diminished by reason of Express, Express U.S., and Platte Pipe Line Company, LLC having to prorate its capacity. All volumes tendered for delivery to destinations serviced by Platte Pipe Line Company, LLC, will be governed by the Platte Pipe Line Company, LLC s 6

Rules and Regulations, Item 2.13. [W] 3. 4 Exception to Express Pipeline LLC s Rules and Regulations and Express Pipeline Ltd. s Rules and Regulations Definition of Delivery Point: For the purposes of this international joint tariff, all references to Delivery Point(s) in Express Pipeline LLC s Rules and Regulations and Express Pipeline Ltd. s Rules and Regulations, are changed to show the Delivery Point as the inlet meter(s) at Buffalo Station, Fergus County,. [W] 4. 5. Exception to Express Pipeline LLC s Rules and Regulations, Item 2.1.5 and Express Pipeline Ltd. s Rules and Regulations Item 1.5 Definition of Carrier: Carrier will mean Express Pipeline Ltd., Express Pipeline LLC or Platte Pipe Line Company, LLC. [W] 5. 6. Exception to Express Pipeline LLC s Rules and Regulations, Item 2.6.1, Monthly Nominations: Express Pipeline Ltd. will receive Nominations on behalf of all Carriers under the conditions set forth in Item 6 of its Rules and Regulations. [W] 6. 7. Exception to Express Pipeline LLC s Rules and Regulations, Item 2.8.5, and Express Pipeline Ltd. s Rules and Regulations, Item 6.6, Term Shipper Nominations: To the extent Shipper Tenders a volume of Petroleum less than the Monthly Volume, Shipper shall pay to Carrier an amount equal to the sum of (i) the product of the volume Tendered and the Term Rate and (ii) the product of the volume equal to the difference between the Monthly Volume and the volume utilized in (i) above and the greater of the applicable Term Rate for light petroleum deliveries at Casper, Natrona County, WY (Inlet to Platte Pipe Line Company, LLC), and the applicable Term Rate for light petroleum deliveries at the Primary Destination identified by the Shipper in Appendix A of the TSA. [W] 7. 8. Exception to Express Pipeline LLC s Rules and Regulations, Item 2.12, Force Majeure: An event of Force Majeure on Platte Pipe Line Company, LLC shall not relieve a Shipper on Express Pipeline LLC from its obligations to Express Pipeline LLC. An event of Force Majeure on Express Pipeline LLC shall not relieve a Shipper on Platte Pipe Line Company, LLC from its obligations to Platte Pipe Line Company, LLC. [W] 8. 9. Exception to Express Pipeline LLC s Rules and Regulations, Item 2.16, Measurements: The procedures in Express Pipeline LLC s Rules and Regulations, Item 2.16 will apply to Petroleum while it is being transported on Express Pipeline LLC, but will not apply once such Petroleum is Delivered to Platte Pipe Line Company, LLC. [W] 9. 10. Applicable Rules and Regulations for transportation of Petroleum Tendered for Re-origination: At such time as Petroleum is Tendered for re-origination it will be transported, subject to operational conditions, pursuant to the Platte Pipe Line Company, LLC Rules and Regulations. [W] 10. 11. Application of Rates: This Tariff applies only to volumes physically Tendered by Shipper at and delivered at the Delivery Point(s) named herein by such Shipper. Shipments redirected to Delivery points on Platte Pipe Line Company, LLC pursuant to Item 2.20 of the Express Pipeline LLC s Rules and Regulations, will be charged the applicable local rate on Platte Pipe Line Company, LLC. NOMINATIONS: See Express Pipeline Ltd. Rules and Regulations for Nominations information. EXPLANATION OF REFERENCE MARKS: [C] Cancel [N] New [U] Unchanged [W] Change in wording only 7