A. INTRODUCTIONS. (Sign-In Sheet Attached)

Similar documents
Request for Proposal

Windham School District Procurement Policy for Federal Funds

REQUEST FOR PROPOSAL (RFP) FOR ENGINEERING DESIGN SERVICES FOR THE Electrical and Stage Lighting Upgrades at B Street Community Center.

REQUEST FOR QUALIFICATIONS (RFQ)

Request for Proposal. For. Unemployment Insurance Services. November 9, 2016

TERMS OF REFERENCE FOR THE PROVISION OF OUTSOURCED INTERNAL AUDIT SERVICE

The University of Tennessee REQUEST FOR QUALIFICATIONS (RFQ)

CITY OF SAN MATEO, CALIFORNIA

VILLAGE OF SCHILLER PARK COOK COUNTY, ILLINOIS

Producer Statements will be accepted only in accordance with this policy.

HOC Works Program Requirements

REQUEST FOR PROPOSAL CITY OF DEVILS LAKE October 2018 DOWNTOWN REVITALIZATION PROJECT

Request for Proposals # Tulsa Transit CNG Fuel Station Maintenance Amendment# 3 October 9, 2018

Grant Application Guidelines

TASSAL GROUP LIMITED ABN Procedures for the Oversight and Management of Material Business Risks. (Approved by the Board 28 May 2015)

The Lockwood Foundation Grant Application Instructions

APPLICATION FORM FOR ASSISTANCE FROM THE AFRICAN WORLD HERITAGE FUND

Audit and Risk Management Committee Charter

CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF PLURALSIGHT, INC. Adopted May 3, 2018

Approval Process and Arrangements for University Consultancy Work

OFFICE OF THE PRESIDENT HUMAN RESOURCES POLICY MANUAL SECTION 11 JULY 28, 2006 REDUCTION IN FORCE GUIDELINES

Quality Management_300_Quality Proccess Audit Procedure

NHCAC North Hudson Community Action Corporation

JAUPT Appraisal Criteria Centre Application. November 2016

A. Project Name: Precious People Learning Center HVAC Equipment Replacement Project.

Design Council CONSULTANT GUIDELINES

Audit Committee Charter. St Andrew s Insurance (Australia) Pty Ltd St Andrew s Life Insurance Pty Ltd St Andrew s Australia Services Pty Ltd

Strategic Plan Request for Proposals. March 2018

NATIONAL IDENTITY THEFT VICTIM ASSISTANCE NETWORK EXPANSION PROGRAM (NITVAN II)

BCECM Community Project Grant - Program Guidelines and Application Form

Position Description: Contracts Administrator Reports to: Project Manager

CÉGEP HERITAGE COLLEGE POLICY # 42 CONCERNING THE CONTRACT RULES COMPLIANCE MONITOR (CRCM) ADMINISTRATOR: Director of Building and Computer Services

Audit & Risk Committee Charter

Audit Committee Charter

Stakeholder Relations and Communications Policy

Artists working with communities; communities working with artists providing arts access to all.

SCOPE OF WORK AND DELIVERABLES Whitewater State Park Culvert Rehabs

CONSTRUCTION DIVISION

ENVIRONMENTAL STEWARDSHIP AND CLIMATE CHANGE GROUP PROGRAM

Village of Midlothian

CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF DROPBOX, INC.

Closing Out Award. The PI will work with ORA in obtaining the applicable resolution. Residuals

GSS Research Award 2019 Guidelines

AUDIT & RISK COMMITTEE CHARTER

Copiague Chamber of Commerce

PROJECT SUPPORT FUND OVERVIEW

Siding Program Application

Health, Safety and Environment Committee Charter

TERMS OF REFERENCE FOR CONSULTANTS

WRITTEN DIRECTIVES & POLICY DESSEMINATION SOG

Partner Agency Application Toque Campaign 2017/18

Final Audit Follow Up

VA/DoD Health Executive Committee Joint Incentive Fund (JIF) New Program Manager Training. March 2015

[AGENCY NAME] Mandate and Roles Document. (Pure Advisory Committees)

Independent Director and Audit Committee

Procurement Update

ABORIGINAL ECONOMIC PARTNERSHIPS Program Application Guidelines

THE CLOROX COMPANY AUDIT COMMITTEE CHARTER. [Effective May 8, 2017]

TOPIC 12: PART 1 WAYS OF GATHERING AUDIT EVIDENCE

Academic and Administrative and Other Related Staff Annual Review

Project: Agriculture sector development support program through labour intensive works

POSITION DESCRIPTION

Vacant Home Program Application

SOUND TRANSIT STAFF REPORT MOTION NO. M Contract Amendment for Construction Management Services

Attachments Location Map Exhibit 1 Park Center Elevated Tank Rehabilitation IPO Budget Information

TERMS OF REFERENCE. Audit and Risk Committee (the "Committee") of Wilmcote Holdings Plc (the "Company")

EXECUTIVE SUMMARY INTERNAL AUDIT REPORT. IOM Kingston JM JULY 2017

UNITED REPUBLIC OF TANZANIA

NUMBER: BUSF 3.30 Business and Finance. Other Educational and General Program Accounts ("E" Funds) Date: October 18, 2006 I. PURPOSE OF THE POLICY

HSBC USA INC. HSBC BANK USA, N.A. CHARTER OF THE COMPLIANCE COMMITTEE

APPENDIX A TECHNICAL SPECIFICATIONS REWARDS AND RECOGNITION PROGRAM

Request for Proposals: GMIA International Concourse Redevelopment, Feasibility Study General Mitchell International Airport

EXECUTIVE SUMMARY INTERNAL AUDIT REPORT. IOM Mogadishu SO November 7 December 2018

inemi Statement of Work (SOW) Name TIG Name Project

PERFORMANCE DEVELOPMENT SYSTEM. Supervisory and Management Staff Appraisal. Department: Reviewer s Name: Review Period:

Topic: SAP PPM Close Project. Contents

AUDIT & RISK COMMITTEE (ARC)

CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF ON DECK CAPITAL, INC.

*** A DRAFT starting point *** South Central Fresno Community Steering Committee Charter

1 st Floor, Building 32 The Woodlands Office Park Woodlands Drive, Woodmead 2148, Johannesburg, South Africa

Terms of Reference - Board of Directors (approved by the Board on 12 April 2018)

Policy Coversheet. Link Tutors: appointment and responsibilities

ABORIGINAL ECONOMIC PARTNERSHIPS Program Grant Application Guidelines

HUD s HAP Support Services PROCUREMENT: A PRIMER Presented by Barbara A. Duncombe Taft Stettinius & Hollister, LLP January 11, 2018

Pre-Qualification Form: RISK ASSESSMENT STUDY Consultants

These Budget Preparation Guidelines are primarily directed towards preparation of the Operating Budget and Supplemental Items.

ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS

CCREEE VACANCY ANNOUNCEMENT CALL FOR APPLICATIONS, DEADLINE: 17 NOVEMBER 2017 JOB DESCRIPTION

Standard Operating Procedure Payment Requisition

INDEPENDENT ACCOUNTANTS' REPORT ON APPLYING AGREED-UPON PROCEDURES

NATCHITOCHES HISTORIC DISTRICT DEVELOPMENT COMMISSION STATE OF LOUISIANA

1 SPECIFICATION AND COSTS NATURAL GRASS CONSULTANCY

June Dear Chairman Cuttita and Members of the Board of Fire Commissioners:

CITY OF GREATER SUDBURY PROGRESS PAYMENT STATEMENTS, PROGRESS PAYMENT CERTIFICATE AND INVOICING PROCEDURE. ENG-PM-S001 v.1.01

Risk Management Policy

Pre-Proposal Application For Production & Post-Harvest Research Projects

REQUEST FOR QUALIFICATIONS FOR OWNERS REPRESENTATIVE SERVICES KLAMATH RIVER DAM REMOVAL PROJECT NOVEMBER 18, 2016

Guidelines for submission to the NSW Population and Health Services Research Ethics Committee. Version June 2015

Risk and Audit Committee charter

CHARTER OF THE NOMINATING AND CORPORATE GOVERNANCE COMMITTEE OF THE BOARD OF DIRECTORS OF PLURALSIGHT, INC. Adopted May 3, 2018

Transcription:

PROJECT: CONSTRUCTION ADMINISTRATION/CONSTRUCTION MANAGEMENT (CA/CM) SERVICES INCLUDING RESIDENT PROJECT REPRESENTATIVE (RPR)/ CONSTRUCTION INSPECTION SERVICES DATE: JANUARY 22, 2018 SUBJECT: ADDENDUM NO. 1 An infrmatinal meeting was held at the Piedmnt Triad Internatinal Airprt at 11:00 AM n January 19, 2018 fr the abve referenced prject. A summary f the meeting is belw. A. INTRODUCTIONS Alex Rsser, P.E. Deputy Executive Directr, PTAA Lisa Elmre Prject Manager, PTAA Lrin Akins Prject Manager, PTAA Chris Bishp Deputy Directr f Airfield Operatins, PTAA Kimberly Hdges Executive Assistant, PTAA (Sign-In Sheet Attached) PTAA has numerus prjects that will be ging n in the next few years. The RW 5R-23L Rehabilitatin prject and the Suth Aprn Rehabilitatin prject that have recently bid are part f this RFQ. B. RFQ INFORMATION Deadline fr questins is Thursday, January 25, 2018 at 5:00 P.M. EST. N questins will be answered after this deadline date. Submit any questins in writing t Alex Rsser at rssera@gsair.rg. Questins relating t this RFQ shuld nt be cnducted with any PTAA staff member ther than as described previusly. Pre-Prpsal Infrmatinal Meeting will be included in Addendum N. 1. Interested firms shuld submit six (6) cpies f their Statements f Qualificatins n r befre 1:00 P.M. EST, Friday, February 2, 2018 t PTAA, c/ Mr. Alex Rsser, P.E., Deputy Executive Directr, 1000A Ted Jhnsn Parkway, Greensbr, NC 27409. PTAA may require a presentatin by shrtlisted firms prir t the selectin f a cnsultant. PIEDMONT TRIAD INTERNATIONAL AIRPORT ADDENDUM NO. 1 CA/CM ON-CALL SERVICES RFQ PAGE 1 OF 7

Infrmatin related t this RFQ and addenda will be psted t the Piedmnt Triad Internatinal Airprt website under Airprt Operatins http://flyfrmpti.cm. C. PROJECT DESCRIPTION PTAA is sliciting Statements f Qualificatins t engage the services f a qualified firm t prvide prfessinal Cnstructin Administratin Services including Resident Prject Representative (RPR)/Cnstructin Inspectin Services n an as-needed basis fr varius prjects at the Piedmnt Triad Internatinal Airprt (GSO). Prjects may include, but are nt limited t: Runway 5R-23L Rehabilitatin, Suth Aprn Rehabilitatin, and ther varius airfield prjects. PTAA plans t cntract fr these services fr a perid f up t three (3) years (with the pssibility f tw (2) ne (1) year extensins) frm the time f the cntract signing and retains the right t add t r delete frm the prjects listed abve. Firms shuld nt feel that they are in a less cmpetitive psitin if they have nt been actively marketing their services t the Authrity. The Suth Aprn Rehabilitatin prject is the Old Terminal Aprn. A prtin f the aprn was dne in 2012 with a 2 mill and verlay. The first phase f the prject is anticipated t start cnstructin March 2018. The prtin that was cmpleted in 2012 will be the next phase. The prject cnsists f milling the asphalt, sme reclamatin, paving and sme grade adjustments. The selected firm will be wrking with the design firm, Michael Baker Internatinal. The Runway 5R-23L Rehabilitatin prject will be brken up int tw r pssibly three years depending n funding. The first stage f the rehab prject will include almst half f the runway. The runway was last verlaid in 1999. The first phase f the prject is scheduled t begin April 2018 and runs until Nvember 2018. The first phase f the prject will displace the threshld 3,000 ft. s that the runway will be 7,000 ft. The end f the runway will be raised 6 inches s the ALSF will have t be adjusted as part f that prject. After the first phase has been cmpleted, the runway will be shut dwn fr a perid f time while the cntractr will begin wrk at the 2,000 ft. mark up t 4,700 ft. prvided the Bard apprves the three alternates which will add 600 ft. t the prject. The base bid included 4,100 ft. and the three alternates fr an additinal 200 ft. Phase 2 f the prject is anticipated t start in April 2019. Taxiway A & M was cmpleted in the summer f 2017. The selected firm will be wrking with the design firm, Michael Baker Internatinal. PIEDMONT TRIAD INTERNATIONAL AIRPORT ADDENDUM NO. 1 CA/CM ON-CALL SERVICES RFQ PAGE 2 OF 7

D. SCOPE OF WORK The scpe f wrk fr the selected firm will generally include, but will nt be limited t the fllwing: Cnstructin Administratin/Cnstructin Management Services: Mnitr and versee the crdinatin f cnstructin wrk with PTAA, designer, affected agencies and utilities, any ther cnstructin cntractrs and ther parties as necessary. Develp a written, prject-specific quality assurance plan detailing the specific gals t be achieved in cnstructin. Assist PTAA in btaining any necessary permits, excluding permits fr inspectin r temprary facilities required t be btained directly by the varius cntractrs. Assist PTAA in btaining apprvals frm the authrities having jurisdictin. Mnitr cntractrs cnfrmance t permit requirements. Cnduct prject related meetings including pre-cnstructin cnferences and cnstructin prgress meetings. Prepare and distribute meeting minutes in cllabratin with PTAA and the design firm. Review the prgress schedule, shp drawing submittals, field reprts, testing reprts, etc. prepared by cntractr and/r subcnsultants and cnsult with PTAA cncerning acceptability. Maintain rderly files fr any prject crrespndence, shp drawings and samples, reprductins f riginal cntract dcuments including all wrk directive changes, addenda, change rders, field rders, and additinal drawings. Review and prcess applicatins fr payments fr cmpliance including any necessary supprting dcuments in cllabratin with RPR and frward with recmmendatins t PTAA. Review existing airfield cnstructin security prcedures and ensure adherence frm RPR and cnstructin cntractrs persnnel. Review and prcess change rder requests in cllabratin with PTAA and the design firm. Cnsult with PTAA in advance f scheduled majr tests, inspectins, r start f imprtant phases f the wrk. Mnitr cntract clseuts t ensure receipt f all deliverables, cmpletin f all cntract mdificatins and ascertain final quantities necessary t invice PIEDMONT TRIAD INTERNATIONAL AIRPORT ADDENDUM NO. 1 CA/CM ON-CALL SERVICES RFQ PAGE 3 OF 7

remaining payments. Prepare and prcess certificates f final inspectin/acceptance certificates f cmpletin where required, and final payment releases. Ensure the cmpleteness f as-built plans frm the recrd drawings, fr PTAA acceptance and apprval. Refer t RFQ fr additinal CA/CM Services requirements. Resident Prject Representative Services: Cnduct n-site bservatins f the wrk in prgress t assist Authrity and CA/CM in determining if the wrk is, in general, prceeding in accrdance with the cntract dcuments. Ability t prvide services fr nighttime and/r daytime cntractr/prject wrk shifts as required. Review prgress schedules, shp drawing submittals, and applicatins fr payment quantities prepared by cntractr in cnjunctin with CA/CM review. Reprt t CA/CM and PTAA whenever RPR believes that any wrk is unsatisfactry r des nt cnfrm t the cntract dcuments, r des nt meet the requirements f any inspectins, test, r apprval required. Maintain rderly files in the field fr any prject crrespndence, shp drawings and samples, reprductins f riginal cntract dcuments including all wrk directive changes, addenda, change rders, field rders, additinal drawings issued subsequent t the executin f the cntract, PTAA s clarificatins and interpretatins f the cntract dcuments, prgress reprts, and ther prjectrelated dcuments in cnjunctin with CA/CM. Prepare required daily field reprts including phts f prject wrk and ther dcuments in Wrd r Excel frmat. Daily reprts are extremely imprtant. The RPR needs t knw hw t cmplete a detailed reprt in a timely manner. Realtime reprting is expected that the selected firm(s) will cmply with. Attend meetings with CA/CM and cntractr, such as pre-cnstructin cnferences, prgress meetings, and ther prject related meetings. During the curse f the prject, verify that certificates, maintenance and peratin manuals, and ther data required t be furnished by cntractr are applicable t the items actually installed and in accrdance with the cntract dcuments. PIEDMONT TRIAD INTERNATIONAL AIRPORT ADDENDUM NO. 1 CA/CM ON-CALL SERVICES RFQ PAGE 4 OF 7

E. GENERAL Cnduct peridic safety reviews f jb site(s) and advise cntractr, CA/CM and PTAA f any deficiencies. Observe quality cntrl testing perfrmance by the cntractr and maintain testing recrds, including crrective actins taken regarding failed tests. Upn substantial cmpletin f the cntractrs wrk, prepare a list f incmplete r unsatisfactry items and a schedule fr their cmpletin. Cnduct inspectins in cnjunctin with CA/CM and PTAA t determine if the wrk is substantially cmplete. Assist CA/CM in cllecting and prcessing all necessary prject clseut requirements. Refer t RFQ fr additinal RPR Services requirements. T be cnsidered fr this assignment, cnsidered fr this assignment, firms must specifically demnstrate recent experience in cnstructin management f large-scale prjects including but nt limited t runway/taxiway rehabilitatins, aprn rehabilitatins, taxiway cnstructin, utility infrastructure imprvements, and miscellaneus airfield prjects f similar scpe ver the last ten (10) years with a cnstructin value f nt less than $1,000,000; Cnstructin management persnnel (Prject Manager, Cnstructin Manager, Resident Prject Representative, etc.) shuld pssess a minimum f five (5) years f cnstructin experience n cntracts cmparable in scpe and size t thse described in the abve paragraph; and Firms must be licensed and have the authrity t transact business in the State f Nrth Carlina. Fr further infrmatin, please reference Nrth Carlina General Statutes fr exact requirements t practice Prfessinal Engineering in the State f Nrth Carlina. The firm will be expected t participate in meeting PTAA s DBE participatin gals. These gals will be defined at a later date. Favrable cnsideratin will be given t firms that have recent experience with the FAA Suthern Regin and Memphis ADO; NCDOT Divisin f Aviatin; and varius additinal resurce agencies which crdinatin might be required. This prject may be funded in part by the Federal Aviatin Administratin AIP prgram and/r the Nrth Carlina Department f Transprtatin Divisin f Aviatin. PIEDMONT TRIAD INTERNATIONAL AIRPORT ADDENDUM NO. 1 CA/CM ON-CALL SERVICES RFQ PAGE 5 OF 7

The firm(s) must have the financial ability t undertake the wrk and assume the liability. The selected firm will be required t furnish prf f Prfessinal Liability insurance. Teaming is allwable and is limited nly t cmpanies and persnnel with experience in Airprt Cnstructin Management/Administratin and Testing Services. Only experience in the last ten (10) years will be cnsidered, and such experience must be at cmmercial service airprts. Experience at airprts similar in size and functin t PTIA is preferred. F. SUBMITTAL REQUIREMENTS All Statements f Qualificatins are limited t ten (10) pages exclusive f cver sheet and shall be typed, 8½ x 11 sheets, single-spaced, single sided with fnt f 11 pint Times New Rman. Nte that supprting dcumentatin such as an rganizatinal chart, cver, appendix, ther graphics, etc. d nt need t be 11 pint Time New Rman fnt. The intrductry letter shuld be addressed t Alex Rsser, P.E., Deputy Executive Directr and limited t ne (1) page. The evaluatin criteria are limited t nine (9) pages and each prpsal will be evaluated t determine verall respnsiveness and qualificatins under the RFQ and will be based n the fllwing cnsideratins and their respective weights: 30% - Qualificatins and Experience f Staff Assigned t this Prject 30% - Firm Qualificatins and Experience Related t the Scpe f this Prject 20% - Prject Apprach 20% - Histry/Aviatin Experience f the Firm Up t five (5) single page resumes fr key staff that will be assigned t this effrt may be included in an appendix. Please refer t RFQ fr cmplete submittal requirements. G. QUESTIONS 1. Q: Will this be a single r multiple firm selectin? A: That is still t be determined. PIEDMONT TRIAD INTERNATIONAL AIRPORT ADDENDUM NO. 1 CA/CM ON-CALL SERVICES RFQ PAGE 6 OF 7

2. Q: When will the DBE participatin gals be determined? A: DBE gals will be prject specific and will be determined at time f cntract negtiatins. 3. Q: If the firm is n the NCDOT Apprved list fr DBE firms, is that sufficient? A: Yes, the DBE firm must be n the NCDOT apprved list. 4. Q: Sme participants had truble with hearing the audi n the WebEx. A: A recrding f the meeting will be prvided with Addendum N. 1. WebEx participants shuld email their cntact infrmatin t Alex Rsser (rssera@gsair.rg) and Kimberly Hdges (hdgesk@gsair.rg) t ensure that they are added t the distributin list and receive all RFQ related dcuments. 5. Q: On page 2 f the RFQ, what permits are being referred t? A: This was included as a general requirement in the event assistance with a miscellaneus permit is needed. 6. Q: When d yu intend t make yur firm(s) selectin? A: Submittals are due n February 2 nd, we hpe t d ur internal selectin prcess within 2 t 3 weeks and get a firm(s) n bard as sn as pssible. ATTACHMENTS: Sign-In Sheet Infrmatinal Meeting Presentatin Recrding f Infrmatinal Meeting (Please use link belw t access the recrding) https://www.drpbx.cm/sh/pn8psm5i8i8atc/aaatjizqadctdsw23lgpmcba?dl=0 END OF ADDENDUM NO. 1 PIEDMONT TRIAD INTERNATIONAL AIRPORT ADDENDUM NO. 1 CA/CM ON-CALL SERVICES RFQ PAGE 7 OF 7

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION ADMINISTRATION/CONSTRUCTION MANAGEMENT (CA/CM) SERVICES INCLUDING RESIDENT PROJECT REPRESENTATIVE (RPR)/ HEADLINE TO GO CONSTRUCTION INSPECTION SERVICES HERE INFORMATIONAL MEETING JANUARY 19, 2018

Intrductins Alex Rsser (Deputy Executive Directr) Lisa Elmre (Prject Manager) Lrin Akins (Prject Manager) Chris Bishp (Deputy Directr f Airfield Operatins) Kimberly Hdges (Executive Assistant) We ask that all questins be held until the questins prtin f this meeting.

RFQ Infrmatin Deadline fr questins is Thursday, January 25, 2018 at 5:00 P.M. EST. N questins will be answered after this deadline date. Submit any questins in writing t Alex Rsser at rssera@gsair.rg. Please put RFQ in the subject line n any questins emailed. Questins relating t this RFQ shuld nt be cnducted with any PTAA staff member ther than as described previusly. Pre-Prpsal Infrmatinal Meeting will be included in Addendum N. 1. Interested firms shuld submit six (6) cpies f their Statements f Qualificatins n r befre 1:00 P.M. EST, Friday, February 2, 2018 t PTAA, c/ Mr. Alex Rsser, P.E., Deputy Executive Directr, 1000A Ted Jhnsn Parkway, Greensbr, NC 27409. PTAA may require a presentatin by shrtlisted firms prir t the selectin f a cnsultant. Infrmatin related t this RFQ and addenda will be psted t the Piedmnt Triad Internatinal Airprt website under Airprt Operatins http://flyfrmpti.cm.

CA/CM ON-CALL SERVICES RFQ PROJECT DESCRIPTION PTAA is sliciting Statements f Qualificatins t engage the services f a qualified firm t prvide prfessinal Cnstructin Administratin Services including Resident Prject Representative (RPR)/Cnstructin Inspectin Services n an as-needed basis fr varius prjects at the Piedmnt Triad Internatinal Airprt (GSO). Prjects may include, but are nt limited t: Runway 5R-23L Rehabilitatin, Suth Aprn Rehabilitatin, and ther varius airfield prjects. PTAA plans t cntract fr these services fr a perid f up t three (3) years (with the pssibility f tw (2) ne (1) year extensins) frm the time f the cntract signing and retains the right t add t r delete frm the prjects listed abve. Firms shuld nt feel that they are in a less cmpetitive psitin if they have nt been actively marketing their services t the Authrity.

CA/CM ON-CALL SERVICES RFQ FQ SCOPE OF WORK The scpe f wrk fr the selected firm will generally include, but will nt be limited t the fllwing: Cnstructin Administratin/Cnstructin Management Services: Mnitr and versee the crdinatin f cnstructin wrk with PTAA, designer, affected agencies and utilities, any ther cnstructin cntractrs and ther parties as necessary. Develp a written, prject-specific quality assurance plan detailing the specific gals t be achieved in cnstructin. Assist PTAA in btaining any necessary permits, excluding permits fr inspectin r temprary facilities required t be btained directly by the varius cntractrs. Assist PTAA in btaining apprvals frm the authrities having jurisdictin. Mnitr cntractrs cnfrmance t permit requirements. Cnduct prject related meetings including pre-cnstructin cnferences and cnstructin prgress meetings. Prepare and distribute meeting minutes in cllabratin with PTAA and the design firm.

CA/CM ON-CALL SERVICES RFQ SCOPE OF WORK Cnstructin Administratin/Cnstructin Management Services (cntinued): Review the prgress schedule, shp drawing submittals, field reprts, testing reprts, etc. prepared by cntractr and/r subcnsultants and cnsult with PTAA cncerning acceptability. Maintain rderly files fr any prject crrespndence, shp drawings and samples, reprductins f riginal cntract dcuments including all wrk directive changes, addenda, change rders, field rders, additinal drawings. Review and prcess applicatins fr payments fr cmpliance including any necessary supprting dcuments in cllabratin with RPR and frward with recmmendatins t PTAA. Review existing airfield cnstructin security prcedures and ensure adherence frm RPR and cnstructin cntractrs persnnel. Review and prcess change rder requests in cllabratin with PTAA and the design firm. Cnsult with PTAA in advance f scheduled majr tests, inspectins, r start f imprtant phases f the wrk.

CA/CM ON-CALL SERVICES RFQ SCOPE OF WORK Cnstructin Administratin/Cnstructin Management Services (cntinued): Mnitr cntract clseuts t ensure receipt f all deliverables, cmpletin f all cntract mdificatins and ascertain final quantities necessary t invice remaining payments. Prepare and prcess certificates f final inspectin/acceptance certificates f cmpletin where required, and final payment releases. Ensure the cmpleteness f as-built plans frm the recrd drawings, fr PTAA acceptance and apprval. Refer t RFQ fr additinal CA/CM Services requirements. Resident Prject Representative Services: Cnduct n-site bservatins f the wrk in prgress t assist Authrity and CA/CM in determining if the wrk is, in general, prceeding in accrdance with the cntract dcuments. Ability t prvide services fr nighttime and/r daytime cntractr/prject wrk shifts as required.

Resident Prject Representative Services (cntinued): CA/CM ON-CALL SERVICES RFQ SCOPE OF WORK Review prgress schedules, shp drawing submittals, and applicatins fr payment quantities prepared by cntractr in cnjunctin with CA/CM review. Reprt t CA/CM and PTAA whenever RPR believes that any wrk is unsatisfactry r des nt cnfrm t the cntract dcuments, r des nt meet the requirements f any inspectins, test, r apprval required. Maintain rderly files in the field fr any prject crrespndence, shp drawings and samples, reprductins f riginal cntract dcuments including all wrk directive changes, addenda, change rders, field rders, additinal drawings issued subsequent t the executin f the cntract, PTAA s clarificatins and interpretatins f the cntract dcuments, prgress reprts, and ther prject-related dcuments in cnjunctin with CA/CM. Prepare required daily field reprts including phts f prject wrk and ther dcuments in Wrd r Excel frmat. Attend meetings with CA/CM and cntractr, such as pre-cnstructin cnferences, prgress meetings, and ther prject related meetings.

Resident Prject Representative Services (cntinued): CA/CM ON-CALL SERVICES RFQ SCOPE OF WORK During the curse f the prject, verify that certificates, maintenance and peratin manuals, and ther data required t be furnished by cntractr are applicable t the items actually installed and in accrdance with the cntract dcuments,. Cnduct peridic safety reviews f jb site(s) and advise cntractr, CA/CM and PTAA f any deficiencies. Observe quality cntrl testing perfrmance by the cntractr and maintain testing recrds, including crrective actins taken regarding failed tests. Upn substantial cmpletin f the cntractrs wrk, prepare a list f incmplete r unsatisfactry items and a schedule fr their cmpletin. Cnduct inspectins in cnjunctin with CA/CM and PTAA t determine if the wrk is substantially cmplete. Assist CA/CM in cllecting and prcessing all necessary prject clseut requirements. Refer t RFQ fr additinal RPR Services requirements.

CA/CM ON-CALL SERVICES RFQ GENERAL T be cnsidered fr this assignment, firms must specifically demnstrate recent experience in cnstructin management f large-scale prjects including but nt limited t runway/taxiway rehabilitatins, aprn rehabilitatins, taxiway cnstructin, utility infrastructure imprvements, and miscellaneus airfield prjects f similar scpe ver the last ten (10) years with a cnstructin value f nt less than $1,000,000; Cnstructin management persnnel (Prject Manager, Cnstructin Manager, Resident Prject Representative, etc.) shuld pssess a minimum f five (5) years f cnstructin experience n cntracts cmparable in scpe and size t thse described in the abve paragraph; and Firms must be licensed and have the authrity t transact business in the State f Nrth Carlina. Fr further infrmatin, please reference Nrth Carlina General Statutes fr exact requirements t practice Prfessinal Engineering in the State f Nrth Carlina. The firm will be expected t participate in meeting PTAA s DBE participatin gals. These gals will be defined at a later date.

CA/CM ON-CALL SERVICES RFQ GENERAL (cntinued) Favrable cnsideratin will be given t firms that have recent experience with the FAA Suthern Regin and Memphis ADO; NCDOT Divisin f Aviatin; and varius additinal resurce agencies which crdinatin might be required. This prject may be funded in part by the Federal Aviatin Administratin AIP prgram and/r the Nrth Carlina Department f Transprtatin Divisin f Aviatin. The firm(s) must have the financial ability t undertake the wrk and assume the liability. The selected firm will be required t furnish prf f Prfessinal Liability insurance. Teaming is allwable and is limited nly t cmpanies and persnnel with experience in Airprt Cnstructin Management/Administratin and Testing Services. Only experience in the last ten (10) years will be cnsidered, and such experience must be at cmmercial service airprts. Experience at airprts similar in size and functin t PTIA is preferred.

CA/CM ON-CALL SERVICES RFQ SUBMITTAL REQUIREMENTS All Statements f Qualificatins are limited t ten (10) pages exclusive f cver sheet and shall be typed, 8½ x 11 sheets, single-spaced, single sided with fnt f 11 pint Times New Rman. Nte that supprting dcumentatin such as an rganizatinal chart, cver, appendix, ther graphics, etc. d nt need t be 11 pint Time New Rman fnt. The intrductry letter shuld be addressed t Mr. Alex Rsser, P.E., Deputy Executive Directr and is limited t ne (1) page. The evaluatin criteria are limited t nine (9) pages and each prpsal will be evaluated t determine verall respnsiveness and qualificatins under the RFQ and will be based n the fllwing cnsideratins and their respective weights: 1. Qualificatins and Experience f Staff Assigned t this Prject 30% 2. Firm Qualificatins and Experience Related t the Scpe f this Prject 30% 3. Prject Apprach 20% 4. Histry/Aviatin Experience f the Firm 20% Up t five (5) single page resumes fr key staff that will be assigned t this effrt may be included in an appendix. Please refer t RFQ fr cmplete submittal requirements.

Suth Aprn Rehabilitatin Base Bid 2012 Rehab Alt. Bid Nte: Aerial is nt exact and is prvided fr illustrative purpses nly.

Runway 5R-23L Rehabilitatin Phase 1 Displaced Threshld Nte: Aerial is nt exact and is prvided fr illustrative purpses nly.

Runway 5R-23L Rehabilitatin Phase 2 Displaced Threshld Phase 1 Nte: Aerial is nt exact and is prvided fr illustrative purpses nly.

QUESTIONS