Appendix B COMPARISON OF BUILDERS RISK INSURANCE REQUIREMENTS

Similar documents
AIA Document C196 TM 2008

SUPPLEMENTARY CONDITIONS

Document A141 TM Exhibit B. Insurance and Bonds. for the following PROJECT: (Name and location or address)

ADDENDUM TO STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR A RESIDENTIAL OR SMALL COMMERCIAL PROJECT AIA DOCUMENT A

APPENDIX B WASHINGTON SUBURBAN SANITARY COMMISSION PROCUREMENT OFFICE INSURANCE AND BONDING CONTRACT NO.

Builders Risk. Builders Risk and Installation Floater: Insuring the Building Project. Personal use only. Not for reproduction.

AIA Document A101 TM 2017 Exhibit A

CITY AND COUNTY OF SAN FRANCISCO Port of San Francisco. Contract No Pier 23 Roof Repair. ADDENDUM No. 1 Issued: December 16, 2016

Table of Contents. The Builders Risk Book

FORM OF AGREEMENT 1-S THE PENNSYLVANIA STATE UNIVERSITY OWNER AND PROFESSIONAL CONTRACT SAMPLE

OREGON STATE UNIVERSITY

Document A Exhibit A Insurance and Bonds

AIA Document A101 TM 2017 Exhibit A


INSURANCE AND INDEMNIFICATION MANUAL. Supplement to Policy 560 i

SCHEDULE "B" - INSURANCE REQUIREMENTS

ICSC CENTERBUILD CONFERENCE DECEMBER 2-5, 1998 ARIZONA BILTMORE PHOENIX, ARIZONA

I SIGNED THAT? SCARY STORIES & SOLUTIONS

The Interplay of Builders Risk and Commercial General Liability Coverage

COLORADO ROOFING ASSOCIATION

SECTION SUPPLEMENTARY CONDITIONS

2010 INSURANCE MANUAL

AIA Document A101 TM 2007

SUPPLEMENTARY AND SPECIAL TERMS AND CONDITIONS FOR MINOR PROJECTS

CITY OF ST. LOUIS LAMBERT-ST. LOUIS INTERNATIONAL AIRPORT

INSURANCE EXHIBIT TO CONSTRUCTION AGREEMENT Insurance Requirements Owner Controlled Insurance Program

EXHIBIT B-8 (revised) INSURANCE REQUIREMENTS FOR AIRCRAFT / AIRPORT OPERATION CONTRACTS

STANDARD FORM OF GENERAL CONDITIONS OF CONTRACT BETWEEN OWNER AND DESIGN-BUILDER

5.0 TERREBONNE PARISH CONSOLIDATED GOVERNMENT, DEFINED.

TERREBONNE PARISH CONSOLIDATED GOVERNMENT INSURANCE REQUIREMENTS CONTRACTORS

Installation Manual. Patent Pend

ADM.21 INSURANCE AND INDEMNITY REQUIREMENTS FOR CONTRACTS

The Homeowners Coverage Guide: Interpretation and Analysis

AIA Document A105 TM 2007

Table of Contents Chapter 1: An Overview Chapter 2: What s Covered

INSURANCE REQUIREMENTS FOR CONSTRUCTION PROJECTS Effective Date: April 23, 2018

Mobile homes are eligible if they are permanently located, but may only be covered by the Basic Form. Coverage may not include an attached carport.

AIA Document A105 TM 2007

CITY OF TACOMA Water Supply

Premises Coverages 3. Additional Coverages 4. Limits Of Insurance 6. Waiting Period 6. Loss Determination 6. Loss Payment Limitations 7

Service Line Coverage

INSURANCE CHECKLIST FRANCHISE HOTELS

EXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR

EDUCATION AND ADVANCED EDUCATION (PUBLIC SCHOOL DISTRICTS AND PUBLIC POST SECONDARY INSTITUTIONS) OWNER INSURED CONSTRUCTION PROJECTS

Construction Builder's Risk and CGL Insurance: Scope of Coverage, Covered Losses, Exclusions, AI Endorsements

Document A105 TM. Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project

Personal Property Forms & Endorsements

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project

Commercial Property. Commercial Package Policy (CPP) The CPP is made up of:

STANDARD SHORT FORM AGREEMENT BETWEEN OWNER AND CONSTRUCTOR (Lump Sum Price) Formatted: Font: Not Bold Formatted: Centered

SECOND AMENDMENT TO AIA A AGREEMENT BETWEEN OWNER AND CONTRACTOR. Multnomah County Health Headquarters Building County Contract No.

University of Maine System Supplementary Conditions to AIA A General Conditions of the Contract for Construction

Required Insurance Language for PRF Construction Contracts

ITHACA COLLEGE EQUIPMENT LEASE MASTER AGREEMENT. 1. TERM: This Agreement is effective from (insert dates for a three year period).

For purposes of this Chapter the following words, phrases, and terms shall be defined and construed as follows:

SHORT FORM STANDARD SUBCONTRACT. This Agreement is made this day of, 20, between

representatives, successors or permitted assigns.

Rail Owner Controlled Insurance Program Manual

2013 Uniform General Conditions for University of Texas System Building Construction Contracts. Table of Contents

ProNetwork News. Risk Management Tools for the Design Professional. Insurance coverage on construction projects. December 2017 Vol. VII No.

Clarification: The bid due date has been adjusted to 3/19 at 10:00 a.m. at Oliver House (1450 Commerce Drive, Decatur, GA 30030).

ARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES

LaCrosse Back-flow Services 2005

GENERAL CONDITIONS OF THE CONTRACT FOR NON-CONSTRUCTION

TERMS AND CONDITIONS OF SALE AND/OR HIRE OF PRODUCTS

Where Builders Risk Meets Personal Lines

ABA Film Services Ltd. Terms and Conditions of Hire

ANDRA JEWELS LIMITED TERMS & CONDITIONS OF SUPPLY

AIA Document A107 TM 1997

FACILITY USE AGREEMENT FOR UNIVERSITY OF CINCINNATI S NOVEL DEVICES LABORATORY

Special Districts Insurance Services Property Coverage Document. Effective: January 1, 2016

TENANT/LESSEE INSURANCE GUIDE THE PORTMAN ESTATE MARCH 2018

TERMS AND CONDITIONS OF SALE. 1.1 the following words and expressions shall have the following meanings unless the context otherwise requires:

Insurance Handbook for VHFA-financed rental housing contains the following: 1) Insurance coverages and limits that are required by VHFA;

HOUSING AUTHORITIES RISK RETENTION POOL

Document A Exhibit A Determination of the Cost of the Work

MAJOR SERVICES PROCUREMENT EXHIBIT. This document modifies the Terms and Conditions for Services and Related Materials as follows:

EQUIPMENT BREAKDOWN ENHANCEMENT ENDORSEMENT

TRENTON AGRI PRODUCTS LLC INSURANCE & INDEMNIFICATION TERMS & CONDITIONS

3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents.

AN INSURANCE PRESENTATION YOU CAN USE: HOW TO WRITE INSURANCE SPECIFICATIONS FOR A SHOPPING CENTER LEASE

EQUIPMENT BREAKDOWN ENDORSEMENT FOR COMMERCIAL PROPERTY ***************************************************************************

APPENDIX 3 FAYAIR (STANSTED) LIMITED STANDARD TERMS OF BUSINESS. Aircraft means any aircraft in respect of which the Customer has requested Services;

BUILDING AND RENOVATION POLICY

STANDARD SUBCONTRACT AGREEMENT FOR BUILDING CONSTRUCTION

BINDER BILL-EOC ALL TERMS, PROVISIONS, CLAUSES AND EXCLUSIONS OF THE POLICY NOTED ABOVE ARE AS EXPIRING UNLESS OTHERWISE INDICATED.

WHEN RECORDED RETURN TO: Los Gatos Union School District Roberts Road Los Gatos, California Attention: Martin Fregoso WITH A COPY TO:

SECTION SUPPLEMENTARY CONDITIONS A. APPLICATION

ADDENDUM #1 TO THE REQUEST FOR QUALIFICATIONS

Builder's Risk Insurance for Construction Projects: Legal Issues Evaluating Scope of Coverage and Resolving Coverage Disputes

NEW JERSEY COUNTIES EXCESS JOINT INSURANCE FUND 9 Campus Drive, Suite 216 Parsippany, NJ Telephone (201) BULLETIN NJCE 19-06

ConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR

PENTAXIA LIMITED TERMS AND CONDITIONS OF BUSINESS. 1.1 Definitions. In these Conditions, the following definitions apply:

Emergency Financial Preparedness. Training

BUILDER S RISK CONTRACT PROVISIONS AND COVERAGE: WHAT EVERY CONTRACTOR S ATTORNEY SHOULD KNOW

responsibility of Tenant and/or Construction Contractors or Construction Subcontractors to pay.

ANNEX A Standard Special Conditions For The Salvation Army

RENOVATION CONTRACT. Borrower Name(s): Phone #: Phone #:

Accounts, deeds, currency, plans, mechanical drawings and other records and documents, data processing equipment;

CONDITIONS OF SALE. Customer means the person, firm or company who purchases the Goods from the Supplier.

Transcription:

Appendix B Comparison of Builders Risk Insurance Requirements Appendix B COMPARISON OF BUILDERS RISK INSURANCE REQUIREMENTS Builders Risk Contract Requirements AIA A201 (2007) Section 11.3 ConsensusDOCS 300 (2007) Section 21.4 EJCDC C700 (2007) Section 5.06-10 DBIA 535 (2009) Section 5.3 A. General Responsibilities of Owner 1. Insurance procurement 11.3.1 21.4.1 5.06.A 5.3.1 2. Payment of premiums 11.3.1 (1) 21.4.1 (1) 5.06.A (1) 5.3.1 (1) 3. Payment of deductibles 11.3.1.3 21.4.1 (2) 5.06.D. Paid by contracter/ subs suffering loss 5.3.1 4. Adjust/settle claims with insurer(s) 11.3.8, 11.3.10 No provision 5.08 5.3.4 (with Design Builder) 5. Provide claims proceeds to others as per their respective interests 11.3.8 No provision 5.08 5.3.4 (with Design Builder) 6. Provide a bond following a loss (upon request) 11.3.9 No provision 5.08.B No provision 7. Provide a copy of the required property policy to Contractor 11.3.6 21.4.1 B. Builders Risk Insurance Requirements 1. Policy Form 5.03.B Certificate of Insurance only 5.3.3 Certificate of Insurance and Endorsements Builders risk or equivalent form 11.3.1, 11.3.1.1 21.4.1 5.06.A.2 (3) 5.3.1 property insurance Covers physical loss or damage 11.3.1.1 21.4.1 5.06.A.2 5.3.1 continued 207

THE BUILDERS RISK BOOK Builders Risk Contract Requirements AIA A201 (2007) Section 11.3 ConsensusDOCS 300 (2007) Section 21.4 EJCDC C700 (2007) Section 5.06-10 DBIA 535 (2009) Section 5.3 2. Required Insured Perils/ Causes of Loss All risk including: 11.3.1.1 21.4.1 5.06.A.2 5.3.1 broadest coverage commercially available including: Fire 11.3.1.1 21.4.1 5.06.A.2 5.3.1 Extended coverage 11.3.1.1 (4) 5.06.A.2 5.3.1 Lightning (5) 21.4.1 5.06.A.2 No provision Explosion 11.3.1.1 (6) 21.4.1 5.06.A.2 (6) 5.3.1 (6) Windstorm 11.3.1.1 21.4.1 5.06.A.2 (6) 5.3.1 (6) Hail 11.3.1.1 (6) 21.4.1 5.06.A.2 (6) 5.3.1 (6) Smoke 11.3.1.1 (6) 21.4.1 5.06.A.2 (6) 5.3.1 (6) Aircraft 11.3.1.1 (6) 21.4.1 (7) 5.06.A.2 (6) 5.3.1 (6) Vehicles 11.3.1.1 (6) 21.4.1 5.06.A.2 (6) 5.3.1 (6) Riot 11.3.1.1 (6) 21.4.1 5.06.A.2 (6) 5.3.1 (6) Civil commotion 11.3.1.1 (6) 21.4.1 5.06.A.2 (6) 5.3.1 (6) Theft 11.3.1.1 21.4.1 5.06.A.2 5.3.1 Vandalism 11.3.1.1 21.4.1 5.06.A.2 5.3.1 Malicious mischief 11.3.1.1 21.4.1 5.06.A.2 5.3.1 Debris removal 11.3.1.1 21.4.1 5.06.A.2 5.3.1 Collapse 11.3.1.1 21.4.1 (however caused) 5.06.A.2 5.3.1 Earthquake 11.3.1.1 21.4.1 5.06.A.2 5.3.1 Earth movement No provision 21.4.1 No provision No provision Flood 11.3.1.1 21.4.1 No provision 5.3.1 Water damage No provision 21.4.1 5.06.A.2 No provision Wind 11.3.1.1 (6) 21.4.1 5.06.A.2 (6) 5.3.1 (6) continued 208

Appendix B Comparison of Builders Risk Insurance Requirements Builders Risk Contract Requirements AIA A201 (2007) Section 11.3 ConsensusDOCS 300 (2007) Section 21.4 EJCDC C700 (2007) Section 5.06-10 DBIA 535 (2009) Section 5.3 Testing and startup 11.3.1.1 21.4.1 (if applicable) 5.06.A.6 No provision Terrorism No provision 21.4.1 No provision No provision Defective design (resulting damage) No provision 21.4.1 No provision No provision Defective workmanship (resulting damage) No provision 21.4.1 No provision No provision Defective material (resulting damage) No provision 21.4.1 No provision No provision 3. Required Subjects of Insurance No provision No provision No provision No provision Work on site 11.3.1 21.4.1 5.06.A2 5.3.1. Falsework 11.3.1.1 21.4.1 (8) 5.06.A2 5.3.1 (8) Temporary buildings 11.3.1.1 21.4.1 (8) 5.06.A2 5.3.1 (8) Work stored off the 5.06.A.4 project site 11.3.1.4 21.4.1 (8) (if owner agrees) 5.3.1 (if owner agrees) Work while in transit 11.3.1.4 21.4.1 (8) 5.06.A.2 5.3.1 Costs of removing debris 11.3.1.1 21.4.1 5.06.A.2 5.3.1 Costs of demolition due to enforcement of legal requirements 11.3.1.1 No provision 5.06.A.2 No provision Costs of reasonable architects' and contractors' fees and expenses due to insured loss 11.3.1.1 No provision 5.06.A.3 5.3.1 (9) 4. Required Insured Amounts Contract sum 11.3.1 21.4.1 5.06.A. 5.3.1. Change orders 11.3.1 21.4.1 5.06.A. 5.3.1. Materials supplied/ installed by others 11.3.1 21.4.1 (if part of Project) 5.06.A. (if part of the Work) 5.3.1. (if part of the Project) continued 209

THE BUILDERS RISK BOOK Builders Risk Contract Requirements AIA A201 (2007) Section 11.3 ConsensusDOCS 300 (2007) Section 21.4 EJCDC C700 (2007) Section 5.06-10 DBIA 535 (2009) Section 5.3 Total value of the project at the site 11.3.1 21.4.1 No provision 5.3.1. Off site strorage Silent Silent Silent Silent Off site in transit Silent Silent Silent Silent Replacement cost valuation 11.3.1 21.4.1 (at time of loss) 5.06.A. 5.3.1 (full insurable value) 5. Required Insurance Duration Before exposure to a loss can occur 11.3.6 No provision No provision No provision Before start of the work 21.4.1 No provision 5.3.3 Until final payment has been made 11.3.1 (10) 21.4.1 (11) 5.06.A.7 5.3.3 Until no person/entity other than the owner has an insurable interest in the property 11.3.1 (10) 21.4.1 (11) No provision No provision 6. Required Protected Parties Interests in As Additional the Project As Named Insureds As Loss Payees (12) Insureds Owner 11.3.1 21.4.1 5.06.A.1 5.3.1 Contractor 11.3.1 21.4.1 5.06.A.1 5.3.1 (13) Subcontractor 11.3.1 21.4.1 5.06.A.1 5.3.1 Sub-subcontractors 11.3.1 21.4.1 5.06.A.1 5.3.1 Materials suppliers No provision 21.4.1 No provision No provision Designers No provision 21.4.1 (14) No provision 5.3.1 (15) Engineers No provision 21.4.1 (14) 5.06.A.1 5.3.1 (15) Directors, officers, members, employees, partners, agents, consultants and subcontractors of foregoing No provision 21.4.1 (14) 5.06.A.1 No provision continued 210

Appendix B Comparison of Builders Risk Insurance Requirements Builders Risk Contract Requirements AIA A201 (2007) Section 11.3 ConsensusDOCS 300 (2007) Section 21.4 EJCDC C700 (2007) Section 5.06-10 DBIA 535 (2009) Section 5.3 7. Other Requirements Partial occupancy may not commence until insurers have consented 11.3.1.5 21.4.1 5.06.A.5, 5.10.A 5.3.3 Insurer must be authorized in the jurisdiction where the project is located 11.3.1 No provision 5.02.A 5.3.1 The waiver of subrogation provision must be recognized by the insurance policy 11.3.5, 11.3.7 21.4.1 5.07.A No provision 30 days advance written notice of intended cancellation, non-renewal or limits reduction 11.3.6 No provision 5.06.C (16) 5.3.3 8. Penalties for Failure to Procure Required Insurance If Contractor is damaged the Owner shall bear all reasonable costs attributed thereto 11.3.1.2 (17) 21.4.2 5.09.A (18) No provision C.Other Insurance Requirements 1. Boiler and Machinery If required by the contract documents or law 11.3.2 No provision 5.06.B 5.3.2 Coverage is to apply to objects during installation and until final acceptance by Owner 11.3.2 No provision No provision 5.3.2, 5.3.3 (until final payment) Must include interests of owner, contractor, subcontractors and subsubcontractors 11.3.2 No provision 5.06.B (incl. "Engineer") 5.3.2 (19) continued 211

THE BUILDERS RISK BOOK Builders Risk Contract Requirements AIA A201 (2007) Section 11.3 ConsensusDOCS 300 (2007) Section 21.4 EJCDC C700 (2007) Section 5.06-10 DBIA 535 (2009) Section 5.3 Must include directors, officers, members, employees, partners, agents, consultants and subs of foregoing No provision No provision 5.06.B No provision Must include owner and contractor as named insureds 11.3.2 No provision No provision No provision D.Waiver of Subrogation 1. General Provisions Mutual type agreement 11.3.7 21.4.3 5.07.A 5.3.5 Applicable to the extent covered by required builders risk insurance 11.3.7 21.4.3 5.07.A 5.3.5 Applicable to the extent covered by other property insurance applying to the work 11.3.7 No provision 5.07.A 5.3.5 (only boiler policy) Applicable to separate owner's loss of use insurance (if purchased) 11.3.3 No provision 5.07.B.1, (20) 5.07.C. No provision Applicable to separate owner's insurance covering adjacent buildings/contents 11.3.5 21.4.4 (21) 5.07.B.2 No provision Applicable to insurance which replaces the required builders risk insurance after final completion of the project. 11.3.5 No provision 5.07.B.2 (22) No provision 212

Appendix B Comparison of Builders Risk Insurance Requirements Footnotes: (13)Design Builder (1) Since owner must secure the policy it is inferred the owner must pay the premium. (2) Including coinsurance penalties (3) A builders risk policy is required. There is no provision allowing an equivalent policy. (4) Extended Coverage is not required by name. However, the perils set forth by an extended coverage endorsement are specifically required. (5) This peril is generally considered to be part of the required all risk policy, but is not technically required to be insured by 11.3.1.1. (6) These perils are considered to be part of the required Extended Coverage. (7) But no coverage is required for damage to the project caused by aircraft/helicopters operated by or on behalf of contractor. (8) Coverage is required on the entire Project as defined in the contract documents. (9) Coverage is required for professional fees, overtime premiums and all other expenses incurred to replace or repair the Project. (10)Until the later of final payment or no person/entiy other than owner has an insurable interest. (11)Until the sooner of final payment or no person/ entiy other than owner has an insurable interest. (12)Also see 5.07.A. (14) Designer means the architect, designer or engineer identified in Article 1 and its representative and consultants. (15)Design Consultants are to be additional insureds. (16)To owner, contractor and each loss payee to whom a certificate has been issued. (17)To contractor. (18)If owner or contractor has any objection to the coverage afforded on the basis of non-conformance with the requirments, the objecting party must notify the other party in writng within 10 days of receiving the certificates of insurance or other documentation. If the non-conformance is not corrected, and without prejudice to any other remedy, the objecting party may secure additional insurance at the expense of the other party. (19)Including Design Builder and Consultants. (20)The waiver of subrogation applies regardless if owner purchases insurance or not. (21)To the extent of stated general liability limits or otherwise agreed limits in the Contract Documents, Contractor indemnifies and holds owner harmless from claims from damage to owner's adjacent property, caused by negligent acts of constructor, subcontractors or anyone they are responsible for. (22)Also applies during partial utilization, after substantial completion and after payment. 213

214 THE BUILDERS RISK BOOK

Appendix B Comparison of Builders Risk Insurance Requirements 215

216 THE BUILDERS RISK BOOK

Appendix B Comparison of Builders Risk Insurance Requirements 217

218 THE BUILDERS RISK BOOK