ACTIVITY COMPLETION SUMMARY (ACS)

Similar documents
Public Disclosure Copy

Validation of Zambia Validation Report Adam Smith International Independent Validator 10 August 2017

Board decision on the Validation of Burkina Faso

ACTIVITY COMPLETION SUMMARY (ACS) Libya - Supporting Electricity Sector Reform (ID: P154606) Libya (MIDDLE EAST AND NORTH AFRICA)

Validation Report Sustainable Development Strategies Group (SDSG), Independent Validator 20 January 2017

The World Bank NEITI Reporting Compliance (P162344)

Validation of Burkina Faso Draft Validation Report Adam Smith International Independent Validator December 11 th 2017

Re: EITIMDTF Grant No. TF Extractive Industries Transparency Initiative in Indonesia - Phase 2

TOR FOR A TARGETED EFFORT ON TRANSPARECY IN COMMODITY TRADING

Mongolia: Development of State Audit Capacity

Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda.

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. Energy and Extractive Industries Transparency and Accountability

EITI Board 11 January Board decision on the Validation of Nigeria. Decision reference: /BC-224

BEST PRACTICES IN IMPLEMENTING EITI

Project Information Document/ Identification/Concept Stage (PID)

Joint Venture on Managing for Development Results

Public financial management is an essential part of the development process.

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

Board decision on the Validation of Côte d Ivoire

Liberia Reconstruction Trust Fund Implementation Manual

Validation of Tanzania Draft Validation Report Adam Smith International Independent Validator 27 July 2017

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase

Green Bond Working Group Terms of Reference Updated 16 February 2018

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

Zambia EITI Beneficial Ownership Roadmap

The World Bank MW: Mining Governance and Growth Support Project (P120825)

GIFT Work Plan for 2017 Lead Stewards Meeting, January 17, 2017 Second version - January 31, 2017

WSSCC, Global Sanitation Fund (GSF)

SERBIA. Support to participation in EU Programmes. Action Summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

75 working days spread over 4 months with possibility of extension 1. BACKGROUND

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

Statement on Climate Change

Self-Reliance through Mutual Accountability Framework (SMAF)

Seq No: 5 ARCHIVED on 29-May-2018 ISR31357 Created by: Laila Ashraf AbdelKader Ahmed on 23-Jan-2018 Modified by: Laurent Gonnet on 21- May-2018

Terms of Reference (ToR)

Government Payment Guidelines - International Advisory Group for Government Payments

State Owned Financial Institutions Reform Project (P156837)

EITI - THE NORWEGIAN ANNUAL ACTIVITY REPORT 2014

THE WORLD BANK TERMS OF REFERENCE Impact of carbon pricing instruments on national economy and contribution to NDC

Extractive Industries Transparency Initiative (EITI) Improving EI: Emerging Lessons and Results from EITI implementation in the GAC context

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010

GUYANA FORESTRY COMMISSION

Annex A. Country Partnership Framework Template. Document of The World Bank Group FOR OFFICIAL USE ONLY

AN INTEGRATED ASSESSMENT MODEL FOR TAX ADMINISTRATION

SURVEY GUIDANCE CONTENTS Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness

SERBIA. Support to participation in Union Programmes INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen

Evaluation Approach Paper Project Performance Evaluation Report: Economic Recovery Program in the Maldives (Loans 2597/2598-MLD) August 2017

Public Financial Management

DOCU MENTS FOFFRCIAL71?

Validation of Mali Extractive Industries Transparency Initiative

BRAZIL MRP IMPLEMENTATION STATUS REPORT (ISR)

2 SCOPE OF WORK, RESPONSIBILITIES AND DESCRIPTION OF THE PROPOSED ANALYTICAL WORK

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF Dec ,580,000.00

Contents. I. General Assessment of Year s Performance... 1 A. Summary of Activities... B. Developing The Fourth and Fifth EITI Report...

The World Bank Building a Modern Fiscal System Technical Assistance (P154694)

PARTNERSHIP FOR MARKET READINESS (PMR) PRESENTATION OF THE PMR FY17 EXPENSES AND PROPOSAL FOR THE PMR FY18 BUDGET

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2

September Preparing a Government Debt Management Reform Plan

Page 1 of 5. APPROVED e-requisition

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

Annex D. Completion and Learning Review Template Document of The World Bank FOR OFFICIAL USE ONLY

The World Bank Kenya Infrastructure Finance/PPP project (P121019)

Fund for Gender Equality Monitoring and Evaluation Framework Executive Summary

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

World Bank HIV/AIDS Program

Prior to submitting the BO roadmaps, Honduras and Trinidad and Tobago have started approaching BO disclosures in practice.

REQUIRED DOCUMENT FROM HIRING UNIT

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT. International Public Financial Management Specialist

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

JORDAN. Terms of Reference

B.29[17d] Medium-term planning in government departments: Four-year plans

TRANSPARENCY FUND Inter-American..Development..Bank

1. Preamble. 2. Principles and objectives

Second Public Financial Management Capacity Strengthening Project (P151492)

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA

From Reports to Reforms: Formulating Country Strategies for Implementing Recommendations from EITI Reports

Annex 1. Action Fiche for Solomon Islands

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

Multi-country European Integration Facility

with Caribbean Community Climate Change Centre (5Cs) for Belize 14 December 2016 NDA Strengthening & Country Programming

TRACKING GOVERNMENT EXPENDITURE ON NUTRITION IN SIERRA LEONE

Technical Assistance Report

Jordan Country Brief 2011

OFFICIAL -1 L(-L DOCUMENTS. Between. and

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

INTRODUCTION INTRODUCTORY COMMENTS

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT. Regional Public Financial Management Expert

Acronyms List. AIDS CCM GFATM/GF HIV HR HSS IP M&E MDG MoH NGO PLHIV/PLH PR SR TA UN UNAIDS UNDP UNESCO UNFPA UNICEF WG WHO NSP NPA MEC

Arrangements for the revision of the terms of reference for the Peacebuilding Fund

Economic and Social Council

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment

III. modus operandi of Tier 2

Science and Information Resources Division

SCOPE OF WORK AND APPLICATION GUIDELINES

PUNTLAND GOVERNMENT OF SOMALIA MINISTRY OF HEALTH. Health Financing Strategic Plan - DRAFT

Transcription:

Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized ACTIVITY COMPLETION SUMMARY (ACS) Azerbaijan: Mainstreaming EITI Implementation (ID: P162544) Azerbaijan (EUROPE AND CENTRAL ASIA) Public Disclosure Authorized Aug 01, 2017 Page 1 of 16

BASIC INFORMATION Activity Information Project ID P162544 Short Name Azerbaijan: Mainstreaming EITI Project Status Product Line Advisory Services & Analytics Full Name Azerbaijan: Mainstreaming EITI Implementation Completion Fiscal Year Closed 2018 Processing Is this a Reimbursable Advisory Service (RAS)? No What kind of task description is needed? Concept Note with a Review (Track 2, including Programmatic) Is this a Programmatic activity? No Is this a joint Bank-IFC activity? No Accountability Region EUROPE AND CENTRAL ASIA Requesting Unit ECCSC(7000) Country, Regional or World Azerbaijan Team Leader Bakhtiyar Karimov Responsible Unit GEEX1(9266) Practice Area (Lead) Contributing Practice Areas Aug 01, 2017 Page 2 of 16

Aug 01, 2017 Page 3 of 16

BRIEF ACTIVITY DESCRIPTION Sector Overview: Azerbaijan, a resource-rich country, has been developing its natural gas sector rapidly over the past decades. Proven natural gas reserves are of the order of 1,000 bcm with the Shah Deniz field making up the largest share of these reserves. Azerbaijan produced about 18.8 bcm in 2014, primarily from Shah Deniz and Azeri-Chirag-Guneshli fields. Azerbaijan joined EITI in 2004 at the outset of this initiative and was the first country to be validated as fully EITI-compliant in 2009. Subsequently, with enforcement of changes to legislation on registration and processing of grants/funds received by local NGOs from international donors, many local civil society organizations faced difficulties in regard to their operations. Following deep concern for the ability of civil society to engage critically in the EITI process in Azerbaijan, at the EITI Board meeting (October 2014), the EITI Board decided to require Azerbaijan to undergo a compliance check earlier than planned, and the country was downgraded to candidate status at the EITI Board meeting on April 14th, 2015 following an early Validation report. At the EITI Board meeting on 26th October, 2016, Azerbaijan was found to have made meaningful progress, but more was needed to be done, especially on civil society engagement. The Board had agreed that Azerbaijan was to be assessed in a third Validation commencing on 26 July 2017. Therefore, the Government s objectives were to: (a) regain its EITI compliant status; (b) mainstream transparency reporting across the government institutions; and (c) embed data collection and transparent reporting for the oil and gas sector into existing government systems. Moreover, the proposed mainstreaming of EITI in Azerbaijan occurred in the context of the construction of the Trans- Anatolian Gas Pipeline ( TANAP ) project, which when constructed and operational, will carry natural gas from Azerbaijan to Turkey, and further to Europe. TANAP is to be supported for a period of 4 years through future IBRD-based lending, with USD 400 million each to be committed to the Governments of Azerbaijan and Turkey respectively. The large cashflows that were to arise once TANAP commences operation made mainstreaming of EITI of great importance to the Government of Azerbaijan, which had assured the World Bank of its support to the process.the Government of Azerbaijan was thus expected to make funding available to follow-up on the next steps subsequent to the completion of this ASA. Rationale for the activity: The Ministry of Finance, Government of Azerbaijan, through letter dated 13th July, 2016, to the World Bank, had asked for support towards EITI implementation, thereby evidencing a demand for this activity. In response to the abovementioned letter from the Government of Azerbaijan to the World Bank, the Regional Vice President, Europe and Central Asia, responded by specifically confirming the World Bank's support to a proposed activity at mainstreaming EITI in Azerbaijan. This ASA was also aligned with the Country Partnership Strategy for Azerbaijan FY'16-'20("CPS"). In fact, the CPS in paragraph 27 specifically cited the following as a development challenge..strengthen governance via participation in the Extractive Industries Transparency Initiative (EITI) and Open Government Partnerships (OGP). This ASA, by mainstreaming EITI implementation in Azerbaijan and embedding transparency into the country s governance systems, also resonated with Pillar I of the objectives of the EGPS (Extractives Global Programmatic Support) trust fund, i.e. EITI and Transparency - supporting implementation of the EITI and broader reforms on sector transparency and good governance. Previous World Bank Group Support to EITI Implementation in Azerbaijan: No previous grant had been made to Azerbaijan from the World Bank Group for the direct implementation of EITI, as the initiative was self-funded by the government of Azerbaijan. However, there had in the past been a single grant for assistance towards CSOs engaged in EITI in Azerbaijan titled Azerbaijan EITI Civil Society Support (P150813). The Aug 01, 2017 Page 4 of 16

development objective of the grant was to enhance the capacity of local civil society organizations and increase public awareness for effective implementation of EITI new standards in Azerbaijan. The project concluded in June, 2015. DEVELOPMENT OBJECTIVE The objective of this activity is to support the government of Azerbaijan s efforts to mainstream EITI into governmental and company reporting systems. DELIVERABLES Group By: Pillar DELIVERABLESWITHOUTSUBTASK Name Lead Type Completion Date Processing Type Modification Since last Milestone Status Aug 01, 2017 Page 5 of 16

Terms of Reference for conducting the feasibility study for mainstreaming EITI in Azerbaijan Assisting in the preparation of a work program for mainstreaming EITI Assisting in the conducting of the feasibility study in an advisory capacity to the National EITI Secretariat Assistance in the development of an application by Azerbaijan to the EITI Board for mainstreamed disclosures in accordance with requirement 4.9.c. of the EITI Standard Bakhtiyar Karimov Bakhtiyar Karimov Bakhtiyar Karimov Bakhtiyar Karimov Advisory 15-Mar-2016(A) DR Required Delivered 30-Nov-2017(P) 30-Nov-2017(P) 30-Nov-2017(P) DR Not Required DR Not Required DR Not Required Planned, then Planned, then Planned, then Comments The objective of this ASA was to support the government of Azerbaijan s (GoAZ) efforts to mainstream EITI into Aug 01, 2017 Page 6 of 16

governmental and company reporting systems. On March 9, 2017, the EITI Board decided on suspension of Azerbaijan s membership in EITI. The GoAZ disagreed with the Board s decision and on March 10, 2017 announced the withdrawal of the country s membership from EITI. Consequently, the project team had to discontinue further implementation of this ASA. The planned deliverables under this ASA were as follows: (i) Terms of Reference for conducting the feasibility study for mainstreaming EITI in Azerbaijan; (ii) assistance with the development of an application by Azerbaijan to the EITI Board for mainstreamed disclosures in accordance with requirement 4.9.c. of the EITI Standard; (iii) assistance with conducting the feasibility study in an advisory capacity to the National EITI Secretariat; and (iv) assistance with the preparation of work program for mainstreaming EITI. Due to Azerbaijan s exit from EITI, the project team completed only deliverable (i), which was developed following a consultation workshop. Along with this, an additional deliverable in the form of a power point presentation on the possible structure of a mainstreamed EITI process in Azerbaijan was also presented in a roundtable on 'Mainstreaming EITI in Azerbaijan'. In addition to these outputs delivered to the client, the project team also prepared for internal use and dissemination a document on the lessons learnt from the ASA and next steps for Azerbaijan, as well as a presentation on the activities and results of the ASA. DELIVERABLE DOCUMENTS Document Title Document Type Document Date Classification Deliverable: Terms of Reference for conducting the feasibility study for mainstreaming EITI in Azerbaijan ToR for feasibility study for mainstreaming EITI in Azerbaijan Report 06/29/2017 Official use only Presentation on Mainstreaming EITI in Azerbaijan Presentation 03/21/2017 Official use only Lessons Learnt and Next Steps for Azerbaijan Report 06/29/2017 Official use only Unofficial Translation of Presidential Decree Report 06/29/2017 Official use only Matrix of Comments and Team Responses Report 06/29/2017 Official use only Presentation on Mainstreaming EITI in Azerbaijan-Activities and Results Presentation 07/25/2017 Official use only AGE AND BUDGET Activity Age in Months (See Annex A for details) Aug 01, 2017 Page 7 of 16

At Concept Package Sign-off (Track 2) At Last Approved Progress Review Actual 8.4 0.0 Budget (See Annex B for details) Source of Fund At Concept Package Signoff (Track 2) At Last Approved Progress Review Actual Expenditure Bank Trust Fund 100,000 0 80,539 Bank Budget 0 0 869 Grand Total Direct Cost 100,000 0 81,408 Comments No comments have been entered RESULTS Do you want to track result indicators for this activity? Yes Outcome Indicators The scope of the feasibility study for mainstreaming EITI is clearly defined, and a work program to conduct mainstreaming activities is developed Unit of Measure: Yes/No Baseline Actual (Previous) Actual (Current) End Target Action Value No No Yes No Change Date 21-Nov-2016 30-Nov-2017 Intermediate Outcome Indicators No indicators have been added Aug 01, 2017 Page 8 of 16

Output Indicators Outputs are as follows: (i) Terms of Reference for conducting the feasibility study; (ii) assisting in the conducting of the feasibility study in an advisory capacity to the National EITI Secretariat Unit of Measure: Yes/No Outputs are as follows: (i) Terms of Reference for conducting the feasibility study; (ii) assisting in the conducting of the feasibility study in an advisory capacity to the National EITI Secretariat; (iii) Assistance in the development of an application by Azerbaijan to the EITI Board for mainstreamed disclosures in accordance with requirement 4.9.c. of the EITI Standard; and (iv) assistance in the development of a Work program based on the outcome of the feasibility study Value Actual (Previous) Actual (Current) End Target Action Yes No Change Date Overall Comments No comments have been entered 30-Nov-2017 ASSESSMENT Development Effectiveness Rating Satisfactory(5) Outcomes Work under this ASA had begun in late 2016 to support the Government of Azerbaijan is its plans to mainstream the Azerbaijan EITI (AZEITI) process by embedding transparency and disclosures required under the EITI standard into existing and new government and company reporting and statistical systems. The work completed to date includes (i) detailed discussions with Azerbaijan EITI leadership on strategies and desired outcomes for EITI mainstreaming; (ii) holding a consultative workshop of wider EITI stakeholders and representatives of key Azerbaijan government ministries and agencies to raise awareness of this ASA and understand priorities for EITI mainstreaming; and (iii) as a key deliverable, preparing a draft feasibility study Terms of Reference (ToR) to the former Azerbaijan EITI Multi Stakeholder Group for it to adopt and subsequently procure a specialist vendor to design the EITI mainstreaming blueprint. Additionally, to further build stakeholder consensus and discuss EITI mainstreaming proposals and Aug 01, 2017 Page 9 of 16

implementation questions, this draft ToR was discussed in a second workshop in Baku attended by Azerbaijan EITI stakeholders and representatives of International EITI Secretariat, Oslo. In March 2017, Azerbaijan formally withdrew from the global EITI process. One consequence was that the remainder of this ASA, being an EITI-related activity, became redundant. The remaining steps, had this ASA continued in the context of Azerbaijan still being a member of EITI, were (i) to support Azerbaijan EITI authorities on knowledge-exchange with other EITI countries and (ii) to serve as an advisory resource to Azerbaijan EITI in advancing the proposed EITI mainstreaming goals. Lessons Learned Notwithstanding its withdrawal from global EITI, Azerbaijan has reiterated its commitment to transparency and reporting on extractives revenues and other disclosure requirements. The necessary legal decrees have been issued, setting out institutional responsibilities and key tasks directed towards ensuring transparency is maintained as it was under the former EITI process. Azerbaijan was an early member of global EITI process and has implemented EITI under the global EITI Standard for several years. Hence, the transition to a successor mechanism for sector and revenue transparency in oil gas and mining will need careful management and attention, inter alia in the following aspects: Sustained commitment by Government: Throughout the transition from EITI to a domestic system, Government s commitment to transparency and inclusion will need to be sustained and deepened: legal backing; clear institutional responsibility; resources and outreach; and participation by wider civic society will be essential. Ensuring credibility: For the accuracy, quality and completeness of sector and revenues information reported, and for the overarching governance mechanisms of these disclosures, reliability of the reported data and credibility of its underlying governance will be important. Building the requisite credibility and data reliability will take time and a sustained effort to make the transition, building consensus and engaging with citizens and civic society. Drawing on global knowledge: Drawing on global best practice and knowledge will also help boost transparency goals. In this respect, ongoing dialogue with WBG and other IFIs will open avenues for partnership. Momentum on mainstreaming plans: At the appropriate time, attention will have to re-focus on mainstreaming of transparency, such that sector and revenue transparency are embedded in institutional systems as an integral part of Azerbaijan s public finance systems. Key steps in this regards will be to reach agreement on (i) identifying the host agency for mainstreamed extractives transparency; and (ii) overarching systems design to integrate the various strands of reported Aug 01, 2017 Page 10 of 16

extractives data (from different Ministries and agencies) into an online reporting Portal. Further innovations: The mainstreaming ideas under discussion also offer, over time, the potential for creating other mainstreamed extractive data linkages such as (i) with E-government initiatives; (ii) more efficient inter-ministerial data linkages, by feeding quality-assured extractive data into central data portals for use across line ministries; and (iii) links to national budget systems such as mechanisms for budget consultation and outreach. Actively enabling civic debate: Promoting participation by citizens by boosting knowledge of the extractives sectors; how the extractives sector and revenues are managed and its contribution to Azerbaijan's economic position. ANNEX A. DETAILED SCHEDULE Name AIN Sign-off Management Approval of Concept Original Revised at the last milestone Latest Planned Actual 21-Nov-2016 01-Dec-2016 01-Dec-2016 07-Dec-2016 Completion Summary 30-Nov-2017 30-Nov-2017 01-Aug-2017 01-Aug-2017 ANNEX B. DETAILED BUDGET Budget Plan vs Actual (USD) Source of Fund Activity Plan Cumulative Budget Current FY (2018) Actual Expenditure to Date Actual vs Plan (%) Activity Plan WPA Plan Expenditure (YTD) WPA Burn Rate (%) Bank Trust Fund 100,000 80,539 81 40,000 0 0 0 Bank Budget 0 869 0 0 0 0 0 Budget Plan (USD) Costing Do you want to plan the budget by FY? Aug 01, 2017 Page 11 of 16

Budget Heading The World Bank Yes Do you want to plan your budget by Subtasks? Source of Fund 2018 (Current FY) Cumulative Budget Grand Total Grand Total Direct Cost 40,000 100,000 Bank Trust Fund 40,000 100,000 ANNEX C. DELIVERABLES DETAILS Not Categorized Deliverable Name Terms of Reference for conducting the feasibility study for mainstreaming EITI in Azerbaijan Status Decision Review Required? Yes Deliverable Creation Date Delivered Planned Delivery Date 15-Mar-2016 Lead Bakhtiyar Karimov 07-Dec-2016 Actual Delivery Date 29-Jun-2017 Type of deliverable Advisory Provide a brief description of the deliverable The Terms of Reference (ToR) produced as an output of this activity is for conducting a feasibility study for mainstreaming EITI, together with an indicative EITI mainstreaming work plan to achieve the following: 1. an electronic EITI reporting Portal in line with EITI Standard, 2016, embedded within Government of Azerbaijan systems and overseen by EITI MSG, with automated data gathering, and revenue/payments data matching; Aug 01, 2017 Page 12 of 16

2. moving beyond required EITI disclosures and seeking possible linkages with wider national systems and initiatives; and 3. exploring a stronger role for EITI in identifying issues for sector reform, and on engagement with citizens on extractives issues and promoting public debate through mainstreamed EITI. Provide a brief summary of outputs before recommending decision review of the deliverable (if needed) or changing its status to Delivered. If applicable, include links to external documents and websites. Not Categorized Deliverable Name Assisting in the preparation of a work program for mainstreaming EITI Status Planned Delivery Date Decision Review Required? No Deliverable Creation Date 07-Dec-2016 30-Nov-2017 Lead Bakhtiyar Karimov Type of deliverable Provide a brief description of the deliverable Based on the feasibility study conducted per terms of the ToRs produced as the first deliverable under this ASA, assistance was to be provided in the development of a work program for implementing mainstreaming of EITI in Azerbaijan. The work program was supposed to contain detailed steps and timelines required to mainstream EITI in Azerbaijan. Provide a brief summary of outputs before recommending decision review of the deliverable (if needed) or changing its status to Delivered. If applicable, include links to external documents and websites. As a result of the withdrawal of Azerbaijan from EITI, the country did not proceed to undertake a feasibility study for mainstreaming EITI as was initially expected. The preparation of a work program for mainstreaming EITI also did not occur. Therefore, the task of 'assisting in the preparation of a work program for mainstreaming EITI' under this ASA stands cancelled. Not Categorized Aug 01, 2017 Page 13 of 16

Deliverable Name Assisting in the conducting of the feasibility study in an advisory capacity to the National EITI Secretariat Status Decision Review Required? No Deliverable Creation Date 07-Dec-2016 Planned Delivery Date 30-Nov-2017 Lead Type of deliverable Bakhtiyar Karimov Provide a brief description of the deliverable The consultant hired under this ASA was initially supposed to be available as a resource to the Azerbaijan EITI Secretariat in an advisory capacity during the implementation of the feasibility study. The feasibility study itself was to be performed by a consultancy firm to be financed and hired by the Government of Azerbaijan, and the World Bank Group was not expected to be financing it. Provide a brief summary of outputs before recommending decision review of the deliverable (if needed) or changing its status to Delivered. If applicable, include links to external documents and websites. As a result of the withdrawal of Azerbaijan from EITI, the country did not proceed to undertake the feasibility study for mainstreaming EITI as was initially expected. Therefore, this deliverable of 'assisting in the conducting of the feasibility study in an advisory capacity to the National EITI Secretariat' stands cancelled. Not Categorized Deliverable Name Assistance in the development of an application by Azerbaijan to the EITI Board for mainstreamed disclosures in accordance with requirement 4.9.c. of the EITI Standard Status Decision Review Required? No Deliverable Creation Date 07-Dec-2016 Aug 01, 2017 Page 14 of 16

Planned Delivery Date 30-Nov-2017 Lead Type of deliverable Bakhtiyar Karimov Provide a brief description of the deliverable Requirement 4.9.c of the EITI Standard requires countries to seek pre-approval from the EITI Board if they wish to mainstream financial data, i.e. deviate from the current requirement for reconciliation of financial data. Support was to be provided to the government and the Azerbaijan MSG for developing an application to the EITI Board for mainstreamed disclosures in accordance with requirement 4.9.c. Provide a brief summary of outputs before recommending decision review of the deliverable (if needed) or changing its status to Delivered. If applicable, include links to external documents and websites. As a result of the withdrawal of Azerbaijan from EITI, the country did not proceed to make an application for mainstreaming EITI for submission to the EITI Board in accordance with requirement 4.9.c. of the EITI Standard. Therefore, the deliverable of providing assistance in the development of an application by Azerbaijan to the EITI Board for mainstreamed disclosures stands cancelled. ANNEX D. CLIENTS Clients or Audience Does this activity have a client? Yes Organizations & Contacts Azerbaijan National EITI Secretariat Parastatal/Independent Government Institute, Activity Leadership/Oversight Azerbaijan Contacts Aug 01, 2017 Page 15 of 16

Farid Farzaliyev National Coordinator farid.farzaliyev@oilfund.az Survey Participation: Yes Aug 01, 2017 Page 16 of 16