Electricity Supply to Africa and Developing Economies Challenges and Opportunities. Renewable energy integration

Similar documents
THE SOUTH AFRICAN RENEWABLE ENERGY IPP PROCUREMENT PROGRAMME

CONTRACT RULES: ELECTRICITY CONTRACTS

EPC CONTRACTS FOR WIND ENERGY PROJECTS - SOUTH AFRICAN RE IPP PROGRAMME - LESSONS LEARNED FROM PHASES 1 AND 2 (OCTOBER 2012)

The South African Grid Code. Transmission Tariff Code. Version 9.0

REGULATIONS FOR INVESTMENTS IN ELECTRICITY NETWORKS IN NIGERIA 2015

IFC Transaction Advisory Services Creating opportunity where it s needed most. From Concept Design to Project Execution

IPP TRANSACTION ADVISOR TERMS OF REFERENCE

83C Questions and Answers

Key lessons from South Africa s Renewable Energy IPP Programme

RISK MANAGEMENT FOR INFRASTRUCTURE PROJECTS & TERMSHEET DEVELOPMENT

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS

Prototype Wind PPA Term Sheet

Appendix B-2. Term Sheet for Tolling Agreements. for For

Guideline Scope of Services and Tariff of Fees for Persons Registered in terms of the Engineering Profession Act, 2000, (Act No.

2.5 On 20 June 2006 the Customer's Agent requested a detailed breakdown of the noncontestable

GENERAL TERMS AND CONDITIONS OF PURCHASE OF CADCON HOLDING GMBH

MYPD Methodology Eskom Response to Consultation Paper

WALK-THROUGH THE LEGAL STRUCTURE OF PPA S عرض الهيكل القانوني التفاقيا شراء الطاق

General terms of business Obad Beschriftungen GesmbH Amended terms for selling hard- and software products (DISIPOS)

CONTRACT RULES: ICE FUTURES UK NATURAL GAS FUTURES CONTRACT

SPECIAL CONDITIONS OF TENDER

Standard forms of partnering contracts The ultimate contractual commitment? Part 4

DRAFT STCP 18-1 Issue 004 Connection and Modification Application

Chapter 19 EQUITY SECURITIES OVERSEAS ISSUERS. Preliminary

Close: 3 July 2017 STATE OF CITY FINANCES 2018 DANGA MUGHOGHO 20 JUNE Danga Mughogho State of City Finances

INSTRUCTIONS TO BIDDERS

Nutreco General Purchase Terms and Conditions

REQUEST FOR PROPOSAL

The New NZS 3910:2013

GUIDELINES FOR ASPIRING NEW GENERATION APPLICANTS

Peter Wright. Renewable Energy Projects in Africa Comparing Procurement Models for Renewable Generation Capacity. Simmons & Simmons March 2015

(CALL FOR PROPOSALS) FAST TRACK FEASIBILITY STUDIES

EU Capacity Regulations Capacity Allocation Mechanisms with Congestion Management Procedures

Request for Proposal. Fabrication and Installation of Municipal Way-finding Signage Town of Orangeville. June 15, 2015

Request for Tender The Owners Corporation of Units Plan 2413 Landmark Strata and Building Management Services

4.2 Definitions In this Clause 4 and Schedule E the following terms shall have the meanings ascribed to them below:-

Request for Quotation

REQUEST FOR TENDERS ANALYSIS OF IMPLICATIONS OF THE PROPOSED ESTABLISHMENT OF A TRIPARTITE FTA BETWEEN COMESA, SADC AND THE EAC ON SACU

18 April 2016 Draft for consultation

Request for Proposal;

Nigeria Power Series - Part 2: Unlocking Financing for Developing Independent Power Projects in Nigeria

Introduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal

Overview of the framework

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF PROGRAM MANAGER 1. BASIC SERVICES A-1 2. GENERAL PROGRAM SERVICES A-6

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY SMART PROVISION

83D Questions and Answers

Case study: Delivering the first phase of two new universities for the South African government. Dr Ron Watermeyer Spencer Hodgson

SUBCONTRACT FOR LABOUR ONLY ENGINEERING AND CONSTRUCTION WORKS (September 2005) (Second Edition of CIDB document 1016)

CLIMATE REPORT 2017 PRIVATE SECTOR AND CLIMATE FINANCE IN THE G20 COUNTRIES

PPA & REFIT. by Andile Gxasheka, RE Specialist. NERSA South Africa

UNIQUE ATTRIBUTES OF RENEWABLE POWER PURCHASE AGREEMENTS

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities

Minister Jeff Radebe: Independent Power Producer Programmes. Senior officials from all stakeholders behind this outcome

MINISTRY OF FINANCE AND ECONOMIC AFFAIRS

Renville County Purchasing Procedures (Procurement Policy)

2. Polka will be entitled to engage third parties for certain activities.

1. Risk of regularizing illegal connections

UGANDA ELECTRICITY TRANSMISSION COMPANY LIMITED - AND - GENCO... POWER PURCHASE AGREEMENT RELATING TO

Chapter 19 EQUITY SECURITIES OVERSEAS ISSUERS. Preliminary

ESKOM S CONNECTION CHARGES METHODOLOGY

CONTRACT RULES: ICE FUTURES TTF NATURAL GAS FUTURES CONTRACT

TENDER NUMBER: PH. NO

Capital Project Approval Request

TRANSMISSION CHARGING STATEMENT

AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND SPAWGLASS CONSTRUCTION CORP., CONSTRUCTION MANAGER-AT-RISK

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

M_o_R (2011) Foundation EN exam prep questions

RENEWABLE ENERGY AUCTIONS IN SUB-SAHARAN AFRICA:

IPP s Project Risk Classification

STAFF REPORT ACTION REQUIRED

1.1 These regulations shall extend to whole of the State of Punjab.

POST-CABINET MEDIA BRIEFING

Electricity supply contract (deemed)

Safety Inspector (Railway Safety Inspector) SECTION 2: OCCUPATIONAL PROFILE

Enabling Renewable Energy in South Africa Assessing the Renewable Energy IPP Procurement Programme

General notes: All percentages apply to net effective exposure and apply at all times. The benchmarks indicated are defaults and are not prescribed.

RIIO-ED1 BUSINESS PLAN SA-02 Supplementary Annex - Incentives. June 2013 (updated April 2014)

Basics of PPA Negotiations. Eng. David M. Mwangi, Individual Energy Consultant Nairobi, Kenya

Heads of Terms of the Design Agreement for the Moscow Kazan Section of the Moscow Kazan Ekaterinburg High-Speed Railway Line

POLICY ON PURCHASING Overview

NIGERIAN POWER SECTOR REFORMS AND PRIVATISATION. By Bolanle Onagoruwa Director General, Bureau of Public Enterprises

STCP 19-2 Issue 005 Construction Process & Scheme Closure

GENERAL PURCHASING CONDITIONS OF ALLES KOMT GOED B.V. Registered in the commercial register of the Chamber of Commerce under number

Client or the buyer who enters into an Agreement with Autarco for the sale of Product:

TERMS OF SALE. or, if no date is specified, 14 Working Days after the date of the written quotation (unless extended by NZ Steel in writing).

SPECIAL TENDER CONDITIONS FOR THE

LICENCE CONDITIONS FOR TRADING IN GAS BY NGV GAS (PTY) LTD

DIRECTORATE OF ESTATES AND FACILITIES

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46))

UNIFIED CARRIER LICENCE TELECOMMUNICATIONS ORDINANCE (Chapter 106)

Landscape Construction. For Hard & Soft Landscaping. Standard Terms and Conditions of Contract. Artisan Hardscape Solutions Ltd

LOCAL GOVERNMENT FINANCE 2

Construction Project Manager TERMS OF REFERENCE

2011 All Source RFP Exhibit I

REQUEST FOR QUOTATION (RFQ)

Direct Purchasing and PPAs 101

PFMA. Briefing to the Portfolio Committee: Home Affairs Audit outcomes of the portfolio for the financial year

REQUEST FOR PROPOSAL FOR THE PROVISION OF EXTERNAL AUDIT SERVICES FOR THE THREE YEARS

Sheila Belayutham CHAPTER 6 CONTROL

How to get connected to our natural gas transmission system. LNG terminals and underground storage facilities

Transcription:

Electricity Supply to Africa and Developing Economies Challenges and Opportunities Renewable energy integration Costs Containment Considerations by Utilities during Implementation of IPP Projects DP Hadebe and JG Geeringh Eskom ESKOM SOUTH AFRICA Eskom Head Office, Megawatt Park 1 Maxwell Drive, Sunninghill, Johannesburg, 2000 Email: dudu.hadebe@eskom.co.za Abstract - The advent of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) in South Africa, as per the country s IRP (Integrated Resource Plan for Electricity 2010-2030) of 2010, has resulted in the establishment of PPAs between the Seller (each IPP) and the utility s Single Buyer Office (Off-taker/Buyer). This paper details the salient points from the PPA that would qualify the REIPPs to seek relief for a System Event claim in the form of a deemed energy payment from the utility whilst detailing possible preventive measures that should be observed by the utility to ensure the financial sustainability of its operations into the future. Keywords - renewable energy, compensation event, deemed energy, Power Purchase Agreement, system event, corporate objectives, environmental permits, project management, execution strategy, asset designs. 1

1. Introduction The PPA (power purchase agreement) between the IPP (independent power producer) and the utility could result in deemed energy payment (DEP) claims if the terms and obligations thereof are not fully met. This paper is based on the South African case study and it aims to highlight the preventive measures that could be taken by utilities, following an investigation done to assess any process alignment shortfalls that could have been experienced during the asset creation process to connect the committed IPP (Independent Power Producer) generation projects onto the national grid. The research methodology assumed an empirical approach to conduct the investigation whereby the authors relied on documented post event reports, prescribed process practices together with clarification interviews with relevant stakeholders, where necessary. The investigation findings are herein presented as Key Principles. The content of this paper also includes the main features of the IPP bidding process, as applicable for this paper, and the Eskom (South African utility) asset creation value chain as background information. The contributing factors in the calculation of the DEP costs are also presented. 2. Definitions 2.1 Compensation Event A Compensation Event [20] means any material breach by the Buyer of any of its obligations under this Agreement (save for any breach that constitutes a Government Default), including any failure to make any payments due and payable on the due date for payment, to the extent in each case that the breach is not caused or contributed to by the Seller or any Contractor or by Force Majeure, a System Event or Unforeseeable Conduct. 2.2 Deemed Energy Deemed Energy [20] means the energy output that would otherwise be available to the Buyer, but was restricted by either a System Event or a Compensation Event. 2.3 System Event [20] Means: (a) any delay in the connection of the Facility to the System, beyond the contracted date once the Budget Quote Conditions had been met; or (b) any constraint, unavailability, interruption, Curtailment, breakdown, inoperability or failure of or disconnection from, the whole or any part of the System, that is not caused by any natural force or event or an act or omission of the Seller or a Contractor or, for the avoidance of doubt, termination of the Distribution Agreement or Transmission Agreement by the Distributor or the NTC (National Transmission Company) (as the case may be) due to breach of either such agreement by the Seller; 3. Qualification Criteria For Deemed Energy Claims As per the PPA terms and obligations, IPPs qualify in two ways to claim for deemed energy payments from Eskom, i.e. due to a: Compensation Event System Event [20] as a result of, inter alia, a delay in connection of the Facility to the System as well as the unavailability of the System which unavailability exceeds the threshold of the allowed grid unavailability period in a 12 month cycle (18.25 days for Distribution and 7.3 days for Transmission systems respectively) and curtailment requests by the system operator. 4. Deemed Energy Payment Costs With regards to the DEP costs, Deemed Energy attracts the same value as the prevailing tariff of a specific Facility. Any DEP value is dependent on three factors, namely (i) the prevailing tariff structure, (ii) the duration of the event and (iii) the size of the Facility impacted. Depending on the abovementioned three factors the exposure in the case of a System Event may amount to millions of ZAR (rands). 5. Salient Features of the IPP Bidding Process The South African REIPPPP (Renewable Energy Independent Power Producer Procurement Programme) is a multistakeholder process comprising the IPP as the energy Seller, the DoE (Department of Energy) as the energy Procurer and Eskom (the local utility) as the Off-taker/ Buyer. The DoE s role, as mandated by the state 2

(government), is to control and manage the bidding process to determine the preferred bidders in accordance to the Ministerial Determinations as stipulated in the country s IRP (Integrated Resource Plan). The tariff is also determined as an outcome of the DoE process. Eskom is responsible for network capacity analysis studies for each applicant, provision of the associated connection solution (quote), conclusion of a PPA with each of the successful bidders as well as entering into the Use of System Agreement with the IPP, either a Transmission or Distribution agreement, as applicable. Eskom s model is non-discriminatory for each of the applicants and assumes that a certain IPP will be the only one to connect onto a specific node, either a substation or a powerline. Since Eskom plays an indirect role in the adjudication process to establish the preferred bidders, this can have a negative impact on Eskom s project delivery to connect a successful IPP. Project delays could be experienced due to upstream infrastructure required to connect an IPP at a specific node or as a result of network congestion caused by generation allocations, as decided by DoE, in excess of the available capacity at a specific node. 6. Asset Creation Value Chain The South African utility case study follows the PLCM (Project Life Cycle Model) [6] process for the planning, development and execution of projects. The PLCM is made up of six phases; namely Pre-Project Planning, the Concept Phase, the Definition Phase, the Execution Phase, the Finalisation Phase and the Post Project Phase. The key activities and milestones within each phase are herein briefly explained. 6.1 Pre-Project Planning Phase The Pre-Project Planning Phase involves preconcept project activities such as desktop network planning studies and project costing using standard costs. No site work is carried out. The output is a non-binding Eskom quote, namely the CEL (Cost Estimate Letter) issued to the IPP. At end of this phase, a CRA (Concept Release Approval) submission is prepared which is a milestone that signifies project readiness to enter the next phase, the Concept Phase. 6.2 Concept Phase On acceptance of the CEL, the applicable quotation fee is invoiced, and site activities are initiated to develop design alternatives, produce a high level schedule, preliminary cost estimate and risks for each alternative. Environmental assessment is also initiated for each alternative. Comparison of design alternatives is then performed to select the preferred design alternative. Thereafter the concept design is produced, the scope of work is confirmed, the environmental assessment report is concluded and the site or servitude, as applicable, is selected. The Project Management Plan is then developed, which contains the itemised equipment, the WBS (work breakdown structure) and the schedule thereof ( project schedule ), cost estimates and project resourcing, amongst others. Conditional ordering of long-lead items is performed at the end of this phase, for example in cases where there is upstream network strengthening required in order to connect a customer project. This is however not done for IPP customer projects since at this stage it is unknown whether that specific IPP will be a preferred bidder or not, and is done during the Definition Phase. The milestones for the Concept Phase are the issuing of the BQ (Budget Quote) to the IPP, which has an 85% confidence level, and the compilation of the DRA (Design Release Approval) documentation, after obtaining internal design governance approval. The PPA is also released to the IPP at the end of the Concept Phase. 6.3 Definition Phase Acceptance of the BQ (an element of fulfilling BQ effective date conditions for IPP projects) triggers the Definition Phase to develop the solution. Detailed designs are produced, the required legal and regulatory approvals are obtained as well as purchasing or leasing of the selected site or servitude. Various project related plans are also concluded such as the Detailed Contracting and Procurement Strategy and Plan, Health and Safety Plan, Quality Plan, the Environmental Management Programme and the Risk Management Plan. Long-lead items are also ordered early on during the Definition Phase while the balance 3

of the items of plant is ordered after obtaining internal approval of the Detailed Contracting and Procurement Strategy and Plan, as per the project schedule. The latter activity (ordering of the balance items) and the production of construction designs finalize the solution. The compilation of the ERA (Execution Release Approval) signifies the completion of the Definition Phase. 6.4 Execution Phase On-site project execution commences during the Execution Phase. This follows the site preparation for implementation and the delivery of equipment orders on site. The as built assets are constructed as per the applicable execution strategy, either purely Eskom build or Customer Self-build or a combination of the two. The project manager plays a key role of managing project delivery, the resources involved and the co-ordination thereof, conducting quality inspections, and the management of contracts. Asset testing for operational readiness is conducted followed by commissioning (also known as energisation). The FRA (Finalisation Release Approval) documentation is compiled as a milestone to complete the Execution Phase. 6.5 Finalisation Phase The built assets are handed over to the asset owner, the applicable regional Transmission or Distribution O&M (Operations and Maintenance) personnel. The as built network diagrams and operating drawings are also submitted to the O&M personnel. Any defects identified at asset handover are corrected, activities to rehabilitate the site or servitude are carried out and costs are reconciled. The Lessons Learnt exercise is also done to evaluate project performance. Finally, the project team is disbanded at project close-out. 6.6 Post Project Phase There are three main activities within the Post Project Review Phase. Firstly, the asset owner operates and maintains the new assets, measures the required benefits and records the findings in the Maintenance and Operational Plan. Secondly, the network planning manager conducts the business solution review to confirm that the correct solution, based on Need Statement and Benefits Identified, was selected and implemented. Lastly, the benefits realisation manager measures and reports on the product or solution performance. 7. Key Principles 7.1 Supportive Corporate Objectives The utility s senior management shall ensure that strategic corporate objectives such as the Design-To-Cost paradigm do not hamper the development of contracted for IPP related connection projects. This would avoid a negative ripple effect onto the asset design, procurement and environmental processes, which when not fully followed (in the interest of the utility s business) could raise a legal event for the utility. 7.2 Timely Environmental Permits for the Utility s Portion of the Scope of Work The full suite of the environmental assessment studies, namely the Geotechnical study, EIA (Environmental Impact Assessment) and EMPr (Environmental Management Programme), WULA (Water Use Licence Application), heritage approvals and the vegetation removal permit, as well as Servitude Acquisition for the Line and Substation Site, is critical to the success of a project. Permits are regulated by various government departments. For example, the EIA is regulated by the Department of Environmental Affairs, WULA by the Department of Water and Sanitation; Heritage is regulated by the South African Heritage Resource Agency and the Department of Environmental Affairs, while Vegetation Removal is regulated by the Department of Agriculture, Forestry and Fisheries. A senior environmental adviser co-ordinates the permits activities while the senior adviser land acquisition co-ordinates activities for site and servitude acquisition as well as statutory approvals for road, rail, telecommunications and pipeline crossings over wayleaves of other service providers. The lodging of the application with the applicable government s authorities for the entire project scope of work, namely utility s portion as well as the customer s dedicated portion, shall be the accountability of the IPP. Accordingly, the utility does not have to initiate the application after BQ acceptance, which may not allow sufficient time for the construction of the grid connection solution to meet the customer s need date. 4

Furthermore, the utility could strategically support the earlier initiation of the environmental application to enable adequate time for construction by collaborating with the DoE s IPP Office to establish a guarantee mechanism for the funding of pre-bq activities such as strategic EIAs. This is the responsibility of the Eskom task team working together with the DoE IPP Office. This is for consideration by the utility s task team working with the DoE s IPP Office personnel. 7.3 Astute Project Scheduling The utility s project manager shall ensure adequate resourcing from each of the affected disciplines and that each discipline s input into the project schedule, a subset of the Project Management Plan drawn up during the Concept Phase, accounts for seasonal conditions. Accordingly, adequate time allowance shall be made to limit execution during the rainy seasons of the year to a minimum. Furthermore, the utility s project schedule shall be signed off by the utility s representatives, namely the customer services representative and the project manager. The project manager is accountable for this. Prior to the Execution Phase, there shall be an exchange of the project schedules between the utility s project manager and the IPP s representative, with clear indication of at least the completion timelines of the interface milestones between the two parties. The utility s project manager shall furthermore liaise with the designated IPP representative to ensure that the IPP s contractors do not hamper the activities of the utility s contractors, vice versa. 7.4 Co-ordination of Multiple On-Site Contractors Working Simultaneously Having multiple contractors on site at the same time could negatively impact a project. As such, the utility s project manager shall be responsible for co-ordinating the activities of the various contractors to ensure seamless execution of the project scope of work. The utility s project manager shall furthermore liaise with the designated IPP representative to ensure that the IPP s contractors do not hamper the activities of the utility s contractors, vice versa. Compliance to Health and Safety regulations should be observed at all times to minimise safety related risks to personnel working close to a live chamber. Each contractor s management, namely the utility s project manager and the IPP s representative respectively, shall ensure that its personnel have undergone the applicable safety induction training such as ORHVS (Operating Regulations for High Voltage Systems) prior to working in a high or low voltage environment. 7.5 Conformity to the Contracted Execution Strategy The utility shall not deviate from the contracted execution strategy; either purely utility build, customer self-build or a combination of the two. Informal verbal agreements should be avoided into the future. The accountability for this lies with the utility s project manager, on behalf of all applicable disciplines involved in the project development and execution team. 7.6 Procurement Process Alignment The utility s procurement office should adhere to the prescribed procurement process, including the appointment of suitably qualified contractors based on their capacity to carry out the contracted works and are of acceptable financial standing. This would avoid the construction of stranded assets, which are both cost ineffective and time consuming, and the need to fast-track projects at ERA stage, thereby increasing the risk of inadequate (poor quality) and costly workmanship. The procurement office shall ensure that before a contract is concluded with a service provider, that the contract (NEC3 Engineering & Construction Contract or other kind) contains conditions to deal with pass through costs, deviations and non-conformances. Note that NEC means National Engineering Contract. 7.7 Designs Scope Sign-Off by the Utility where More Than One Utility Divisions are Impacted All asset designs allocated to an IPP shall be signed off for acceptance by the utility s project manager and the responsible utility s design engineer, for each of the impacted utility s divisions. This is so because the third party enters into a contract with one of the divisions and could lose sight of the full 5

interests of the other division(s), thereby adding to project costs and time overruns. 8. Discussion The South African investigative exercise on deemed energy payments claims provided an opportunity for assessment of the effectiveness of the current asset creation process. The findings indicate that challenges could be experienced during any of the project phases. Therefore, strict monitoring of compliance to the existing process as well as the adoption of the additional process improvement initiatives is recommended. Subsequent to this investigation, a practice note document has been developed and accepted for implementation across the utility s operations as a process improvement mechanism to ensure the utility s financial sustainability into the future. [15] National Forests Act, Act 84 of 1998 (as [16] National Heritage Resources Act, Act 25 of 1999 [17] National Veld and Forest Fire Act, Act 101 of 1998 [18] National Water Act, Act 36 of 1998 (as [19] Occupational Health and Safety Act, Act 85 of 1993 [20] REIPP Power Purchase Agreement between the IPP as the Seller and Eskom as the Buyer [21] Seller-Distributor/ NTC Self-Build Agreement [22] Seller-Eskom Budget Quotation [23] The South African Grid Code Preamble Version 9.0 (as amended from time to time) References [1] Environmental Impact Assessment Regulations of 2014 (as [2] Eskom Distribution Procedure for HV Self-Build Projects (unique identifier 240-43874056) [3] Eskom Group Customer Services Customer Quotation Process [4] Eskom Holdings Corporate Plan 2016/17-2020/21 Rev4.0 (unique identifier 240-56927206) [5] Eskom Procedure for Customer Self-Build Projects in Transmission (unique identifier 240-61713594) [6] Eskom Wires Project Life Cycle Model and Work Package Framework (unique identifier 240-76628703) [7] Grid Connection Code for Renewable Power Plants (RPPs) connected to the Electricity Transmission System (TS) or the Distribution System (DS) in South Africa (as amended and/or updated from time to time) [8] ISO 9001: 2008 Quality Management System [9] ISO 14001: 2015 Environmental Management System [10] J. P. Lewis, Fundamentals of Project Management, 3 rd ed., AMACOM, 2007. [11] L. Louw and N. Bhengu, Navigating Power Purchase Agreements for the African Continent, Africa Legal Brief Series, Nov. 2012. [12] National Environmental Management: Biodiversity Act, Act 10 of 2004 (as [13] National Environmental Management Act, NEMA, Act 107 of 1998 (as [14] National Environmental Management: Protected Areas Act, Act 57 of 2003 (as 6