SUPPORTING EVIDENCE FOR ENTRIES INTO NUCLEAR ACCOUNTS

Similar documents
REFURBISHMENT AND NEW GENERATION NUCLEAR

OVERVIEW OF DEFERRAL AND VARIANCE ACCOUNTS

COMPARISON OF NUCLEAR OUTAGE OM&A

CLEARANCE OF DEFERRAL AND VARIANCE ACCOUNTS

DEPRECIATION AND AMORTIZATION

Deferral and Variance Accounts and Darlington CWIP in Rate Base

No. Account Reductions 2 Balance Transactions Amortization 4 Interest 5 Transfers 2013 (a) (b) (c) (d) (e) (f) (g) (h)

NUCLEAR WASTE MANAGEMENT AND DECOMMISSIONING BACKGROUND INFORMATION

OVERVIEW OF DEFERRAL AND VARIANCE ACCOUNTS

ONTARIO ENERGY BOARD

OVERVIEW OF DEFERRAL AND VARIANCE ACCOUNTS

CONTINUATION OF DEFERRAL AND VARIANCE ACCOUNTS

OTHER OPERATING COST ITEMS

SECOND IMPACT STATEMENT

EB OEB Application. for. Payment Amounts for OPG s Prescribed Facilities. Argument-in-Chief. Ontario Power Generation Inc.

CLEARANCE OF DEFERRAL AND VARIANCE ACCOUNTS

CAPITAL BUDGET NUCLEAR

Ontario Power Generation 2017 Investor Call. March 9, 2018

RE: EB-2017-XXXX AN APPLICATION FOR AN ACCOUNTING ORDER ESTABLISHING A DEFERRAL ACCOUNT TO CAPTURE THE REVENUE REQUIREMENT IMPACT

Electricity Power System Planning

CAPITAL EXPENDITURES NUCLEAR OPERATIONS

May 19 Topic Presenter. 10:55-11:30 Rate Base, Depreciation, Nuclear Liabilities, Pension/OPEB, Deferral and Variance Accounts

NUCLEAR WASTE MANAGEMENT AND DECOMMISSIONING REVENUE REQUIREMENT IMPACT OF NUCLEAR LIABILITIES

Ontario Power Generation Inc. Application for payment amounts for the period from January 1, 2017 to December 31, 2021

ONTARIO POWER GENERATION REPORTS 2013 FIRST QUARTER FINANCIAL RESULTS

SUMMARY OF APPLICATION

Ontario Power Generation Second Quarter 2018 Investor Call

Consultation Session on OPG s Next Application

Appendix G: Deferral and Variance Accounts

UPDATE FOR AUDITED ACTUAL BALANCES FOR DEFERRAL AND VARIANCE ACCOUNTS

ONTARIO POWER GENERATION REPORTS 2013 FINANCIAL RESULTS

DARLINGTON REFURBISHMENT CONSTRUCTION WORK IN PROGRESS IN RATE BASE

BRUCE GENERATING STATIONS - REVENUES AND COSTS

CAPITALIZATION, RETURN ON EQUITY AND COST OF CAPITAL

ONTARIO POWER GENERATION INC. ANNUAL INFORMATION FORM FOR THE YEAR ENDED DECEMBER 31, 2015

ONTARIO POWER GENERATION REPORTS 2013 THIRD QUARTER FINANCIAL RESULTS

Largest nuclear site in North America Facilities spread over 2,300 acres connected by 56 kms (35 miles) of roadway

FIRST QUARTER REPORT. YEAR-TO-DATE RESULTS For the period ended June 30, 2017

Filing Guidelines for Ontario Power Generation Inc.

ONTARIO POWER GENERATION REPORTS 2008 FIRST QUARTER FINANCIAL RESULTS

TAXES. Filed: EB Exhibit F4 Tab 2 Schedule 1 Page 1 of 16

Line Principal Component Cost Rate Cost of No. Capitalization Note ($M) (%) (%) Capital ($M) (a) (b) (c) (d)

PROJECT AND PORTFOLIO MANAGEMENT - NUCLEAR

Filing Guidelines for Ontario Power Generation Inc.

OPG REPORTS 2015 THIRD QUARTER FINANCIAL RESULTS

EB OEB Application. for. Payment Amounts for OPG s Prescribed Facilities. Argument-in-Chief. Ontario Power Generation Inc.

Canadian Environmental Assessment Agency Canadian Nuclear Safety Commission: Joint Review Panels

Filing Guidelines for Ontario Power Generation Inc.

OPG REPORTS 2016 SECOND QUARTER FINANCIAL RESULTS

COMPENSATION AND BENEFITS

OPG REPORTS 2017 FIRST QUARTER FINANCIAL RESULTS. Company completes major projects on time and within budget

CAPITAL STRUCTURE AND RETURN ON EQUITY

OPG REPORTS 2018 FIRST QUARTER FINANCIAL RESULTS

OPG REPORTS 2017 THIRD QUARTER FINANCIAL RESULTS. Darlington Refurbishment Project Remains on Time and on Budget at One-Year Mark

Financial Guarantees for Decommissioning of Canadian NPPs

OPG REPORTS 2018 SECOND QUARTER FINANCIAL RESULTS

ONTARIO POWER GENERATION REPORTS 2007 THIRD QUARTER FINANCIAL RESULTS

SUMMARY OF APPLICATION

SUMMARY OF LEGISLATIVE FRAMEWORK

OPG REPORTS 2016 FINANCIAL RESULTS. Solid operating and financial results position the Company for success with major generation projects

OPG REPORTS 2015 FINANCIAL RESULTS. Strong operating and financial results position OPG well for the refurbishment of the Darlington station

Filed: EB Exhibit Al Tab 2 Schedule 1 Page 1 of 6 1 ONTARIO ENERGY BOARD

CONTINGENCY. Filed: EB Exhibit D2 Tab 2 Schedule 7 Page 1 of 10

OPG REPORTS 2017 FINANCIAL RESULTS. OPG records increase in net income for third consecutive year

STANDING COMMITTEE ON PUBLIC ACCOUNTS

CENTRALLY HELD COSTS

COST OF LONG-TERM DEBT

Canadian Nuclear Safety Commission Quarterly Financial Report for the Quarter Ended December 31, 2017

R EPORT PICKERING A REVIEW PANEL. of the. Copie à des fins d archivage. Veuillez consulter l éditeur original pour la version actuelle.

Canadian Nuclear Safety Commission Quarterly Financial Report for the Quarter Ended June 30, 2017

ONTARIO POWER GENERATION REPORTS 2002 EARNINGS

PROGRAM EXECUTION 1.0 OVERVIEW

OPG REPORTS 2018 FIRST QUARTER FINANCIAL RESULTS

REGULATORY ASSETS. The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Assets.

Issue Number: 1.1 Issue: Has OPG responded appropriately to all relevant OEB directions from previous proceedings?

ONTARIO POWER GENERATION REPORTS 2013 THIRD QUARTER FINANCIAL RESULTS

CASH WORKING CAPITAL

Canadian Nuclear Safety Commission Quarterly Financial Report for the Quarter Ended December 31, 2016

Canadian Nuclear Safety Commission Quarterly Financial Report for the Quarter Ended September 30, 2017

OPG REPORTS STRONG 2015 SECOND QUARTER FINANCIAL RESULTS

CAPITAL STRUCTURE AND RETURN ON EQUITY

HYDROELECTRIC INCENTIVE MECHANISM

PENSION AND OPEB COST VARIANCE ACCOUNT

Request for Acceptance of OPG s Financial Guarantee

REGULATORY ACCOUNTS. The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Accounts.

Canadian Nuclear Safety Commission

OPG REPORTS Q3 NET INCOME ATTRIBUTABLE TO THE SHAREHOLDER OF $118 MILLION BEFORE EXTRAORDINARY GAIN

Oral Presentation. Exposé oral. Submission from the Power Workers Union. Mémoire du Syndicat des travailleurs et travailleuses du secteur énergétique

Second Quarter Financial Report

Canadian Nuclear Safety Commission Quarterly Financial Report For the Quarter Ended June 30, 2015

CAPITAL BUDGET SUPPORT SERVICES

EB Hydro One Networks Inc. s 2019 Transmission Revenue Requirement Application and Evidence Filing

FINANCIAL HIGHLIGHTS. Revenue & Operating Highlights. p Contracted Generation. p Regulated Hydroelectric p Regulated Nuclear. p Other

Pickering Whole-Site Risk

ONTARIOF Eil GENERATION. Brian Duncan Senior Vice President. Darlington Nuclear. OPG Proprietary. December 10, 2014 CD# NK38 CORR

EXECUTIVE SUMMARY OF APPLICATION

First Quarter Financial Report

COST OF LONG-TERM DEBT

The Economic Benefits of Refurbishing and Operating Canada s Nuclear Reactors

Green Bond Investor Presentation

Transcription:

Exhibit H Tab Page of 0 0 SUPPORTING EVIDENCE FOR ENTRIES INTO NUCLEAR ACCOUNTS.0 PURPOSE This evidence describes actual (0) and projected (0) expenditures used for the calculation of entries into the Nuclear Development Variance Account, the portion of the Capacity Refurbishment Variance Account related to nuclear facilities and the Nuclear Fuel Cost Variance Account..0 NUCLEAR DEVELOPMENT VARIANCE ACCOUNT The Nuclear Development Variance Account ( NDVA ) was established in accordance with section. () of O. Reg. /0. The purpose of this account is to ensure that OPG recovers the difference between actual non-capital costs incurred (including firm financial commitments made) for planning and preparation for the development of proposed new nuclear generation facilities and the amounts included in payment amounts for these activities. The projected 0 year-end balance in the NDVA is $.M as shown in Ex. H- -, Table. OPG did not include a forecast of non-capital costs or firm financial commitments for New Nuclear at Darlington ( NND ) in its EB-0-000 test period revenue requirement. OPG s EB-0-000 evidence stated that if costs for planning and preparation for new nuclear arose and no new cost recovery mechanism was developed by the Province, then OPG intended to recover these costs through the NDVA (EB-0-000, Ex. D--, page ). OPG incurred non-capital costs in 0 and 0 related to planning and preparation activities for the development of the proposed new nuclear facility. Actual 0 expenditures of $.M and projected 0 expenditures of $.M total $.M. These activities are part of continuing initiatives to ensure readiness to construct new units following selection of a preferred vendor consistent with the Minister s Letter to OPG dated March, 0 (Attachment ). The Province s intention to construct about,000 MW of new nuclear power at the Darlington site is contained in the Long-Term Energy Plan released by the Province in November 0 and reaffirmed in the Minister s letter.

Exhibit H Tab Page of The projected year-end 0 balance in the NDVA is $.M. The difference between this amount and the actual /projected expenditures of $.M reflects OPG s recovery of $.M of costs for new nuclear in payment amounts during the January-February 0 stub period and an interest credit of $.M (related to approved December, 0 credit balances) as shown in Chart below and in Ex. H--, Table. CHART Nuclear Development Variance Account 0 Key elements of the actual 0 and projected 0 planning and preparation work for NND include: Recovered in EB 00 00; EB 0 000 Payment Amounts 0 Actual & 0 Projected Expenditures Variance for recovery in NDVA Forecast expenditures in EB 0 000 Variance: 0 Actual & 0 Projected versus EB 0 000 Jan Feb Mar 0 Jan Feb Mar 0 0 Dec 0 Total 0 Dec 0 Total Dec 0 Total Dec 0 (a) (b) (c) (d) (e) (f) (c) (f) (g) (f) (g) Nuclear Development Variance Account. 0.0..... 0.0. Interest (.) Total. Preparation for and participation in a three-week Joint Review Panel public hearing in March 0 regarding the NND Environmental Assessment ( EA ) and application for Licence to Prepare Site. The Panel s report released on August, 0 concluded the project will not result in any significant adverse environmental effects, provided the mitigation measures proposed and commitments made by OPG during the review and the Panel s recommendations are implemented. In May 0 the Federal Government responded to the recommendations of the Joint Review Panel and approved the EA. Ongoing work to address compliance and monitoring of the EA commitments made by OPG and the License to Prepare the Site recommendations as set out in the Joint The OEB-approved payment amounts in EB-0-000 became effective on March, 0. The entries made to the NDVA for January and February of 0 have been calculated with reference to the payment amounts approved in EB-00-00, which included forecast expenditures for new nuclear, in accordance with methodologies approved in EB-00-0.

Exhibit H Tab Page of 0 0 Review Panel s report. In particular, the Joint Review Panel recommended that OPG undertake a formal quantitative cost-benefit analysis for condenser cooling water options, applying the principle of Best Available Technology Economically Achievable ( BATEA ). OPG has retained an external engineering company to perform the BATEA evaluation. Site readiness activities to ensure the NND initiative is well positioned to support site turnover to the vendor. OPG s objective is to avoid delay by having the project site ready to turn over to a vendor in 0, should the procurement process be completed. The site readiness activities include archeological investigations that were included in the commitments made by OPG as part of the application for the Licence to Prepare the Site and the termination of services (e.g., water, power) plus relocation of certain Darlington facilities from the proposed site to minimize the future impact on the ongoing operations at the existing Darlington station as well as the need for future OPG access into the vendor-controlled site. Providing support as required for the Province s vendor procurement process. In June 0, OPG signed Services Agreements with each of Westinghouse and SNC Lavalin/Candu Energy Inc. to prepare detailed construction plans schedules and cost estimates for two potential nuclear reactors at Darlington. Maintaining community and stakeholder involvement, which includes the stakeholder consultation program required as part of the BATEA evaluation..0 CAPACITY REFURBISHMENT VARIANCE ACCOUNT The Capacity Refurbishment Variance Account ( CRVA ) was established pursuant to O. Reg./0, section () to record variances between the actual capital and non-capital costs, and firm financial commitments incurred to increase the output of, refurbish or add operating capacity to a prescribed generation facility and the amounts for these purposes included in the approved payment amounts. The projected year-end 0 balance for recovery in this account related to the nuclear facilities is $.M as shown in Ex. H--, Table. Entries in this account for recovery include: Expenditures for Pickering B Refurbishment undertaken pursuant to a directive that OPG received from the Province on June, 00.

Exhibit H Tab Page of Expenditures for the Pickering Continued Operations program, which increase the output of the station. Expenditures for Darlington Refurbishment Project, which was undertaken pursuant to a directive that OPG received from the Province on June, 00. Expenditures for the Fuel Channel Life Cycle Management Project in support of Pickering Continued Operations and the Darlington Refurbishment Project. Chart below compares actual 0 and projected 0 expenditures against EB-0-000 forecast expenditures for all four subcategories and reconciles against the amounts proposed to be recovered in the CRVA, as derived in Ex. H--, Table. CHART Capacity Refurbishment Variance Account 0 Variance for recovery in CRVA Forecast expenditures in EB 0 000 Variance: 0 Actual & 0 Projected versus EB 0 000 Forecast Recovered in EB 00 00; EB 0 000 Payment 0 Actual & 0 Amounts Projected Expenditures Jan Feb Mar 0 Jan Feb Mar 0 0 Dec 0 Total 0 Dec 0 Total Dec 0 Total Dec 0 (a) (b) ( c ) (d) (e) (f) (c) (f) (g) (f) (g) Capacity Refurbishment Variance Account Pickering B Refurbishment 0. 0.0 0. 0.0 0.0 0.0 (0.) 0.0 0.0 Pickering Continued Operations 0.0.0.0. 0.0...0 (0.) Darlington Refurbishment Non Capital... 0...0 (.). (.) Fuel Channel Life Management 0.0.. 0...... Subtotal....0...0.. Interest 0. Total.. Pickering B Refurbishment Pickering B Refurbishment represents a credit to ratepayers of $0.M in the CRVA account. There are no expenditures on Pickering B refurbishment during the 0-0 period as OPG is not pursuing this option. The ($0.M) credit is for the period up to February, 0 and represents the amount OPG received for Pickering B refurbishment through the EB- 00-00 payment amounts. The entries have been calculated with reference to these payment amounts in accordance with methodologies approved in EB-00-0.

Exhibit H Tab Page of 0 0. Pickering Continued Operations Pickering Continued Operations represents $.M to be recovered in the CRVA account. As described in evidence in EB-0-000, the objective of Pickering Continued Operations is to achieve a short-term extension to the operating life of Pickering Units - for a further four calendar years beyond their originally-assumed end of life. In its decision in EB-0-000, the OEB approved $.M in costs during the 0/0 test period and determined that variances between budgeted and actual expenditures should be tracked through the Capacity Refurbishment Variance Account. Actual Pickering Continued Operations expenditures (exclusive of amounts allocated from the Fuel Channel Lifecycle Management Project described below) in 0 amounted to $0.M, compared with the OEB-approved amount of $.M. For 0, actual/projected expenditures are $.M compared to the OEB-approved amount of $.M. The combined variance is a credit of $0.M. The lower actual 0 expenditures compared to OEB-approved expenditures reflects cost savings mainly associated with fuel channel inspections, deferral of some work, for example, Unit stator clean, and a reduction in scope of certain programs, for example Unit enhanced water lancing. For 0, the increase of $.M in projected expenditures compared to OEB-approved amount is attributable to increased base and outage work for Pickering Continued Operations including some deferred work from 0. As shown in Chart above, OPG is seeking to recover $.M from ratepayers in the CRVA for Pickering Continued Operations, while having experienced only a slight credit variance of ($0.M) between actual/projected 0-0 Pickering Continued Operations expenditures and the forecast in EB-0-000. The reason that the amount sought for recovery is greater than the variance in expenditures is that expenditures for Pickering Continued Operations were forecast in EB-0-000 over a -month period, but the approved payment amounts

Exhibit H Tab Page of 0 0 became effective on March, 0 and thus only reflect expenditures for of those months. The entries made to the CRVA for January and February of 0 have been calculated with reference to the payment amounts approved in EB-00-00 in accordance with methodologies approved in EB-00-0. These payment amounts did not include any expenditures for Continued Operations, which had not yet been identified as the go-forward option in EB-00-00. Consequently, OPG is receiving $.0M ($.0M x /) through the EB-0-000 payment amounts, rather than the full $.0M budgeted in EB-0-000. This $.0 M shortfall, as reduced by the ($0.M) variance, is the $.M entry in the CRVA for 0/0.. Darlington Refurbishment Project The entries for the Darlington Refurbishment Project ( DRP ) - Non Capital represents a credit to ratepayers of $.M in the CRVA account. The project is primarily capitalized but there are some OM&A expenditures equalling $.0M ($.M actual in 0 and $.M projected in 0) related to provision of training as well as some OM&A costs related to various facilities and infrastructure projects. The variance between actual/projected 0-0 DRP Non Capital expenditures and the amounts forecast in EB-0-000 is ($.M) as shown in Chart above. The reasons for this variance in 0 and 0 are provided in the paragraphs that follow. The variance for 0 is $.M below the approved OEB amount of $.M. This is primarily due to the graduate engineer-in-training program ending earlier than expected as trainees moved into regular full-time engineering positions, as well as lower demolition and removal costs incurred during the year related to facility improvements required for Darlington Refurbishment. As trainees move into their regular full-time engineering positions, their costs are attributable to the work that they are performing; i.e., capitalized work for Darlington Refurbishment planning.

Exhibit H Tab Page of 0 0 The projected variance for 0 is $0.M above the approved OEB amount of $.M. This is primarily due to higher training costs than budgeted for additional nuclear operators (e.g., authorized nuclear officers-in-training) required to support Darlington Refurbishment because during the execution phase, there will be a need for additional nuclear operators beyond normal station requirements. As shown in Chart above, OPG is proposing to credit ratepayers $.M in the CRVA for the Darlington Refurbishment Project - Non Capital, while having experienced only a credit variance of $.M between actual/projected 0-0 Darlington Refurbishment Project - Non Capital expenditures and the forecast in EB-0-00. The reason that the amount sought to be credited is greater than the credit variance in expenditures is that expenditures were forecast in EB-0-000 over a -month period, but the approved payment amounts became effective on March, 0 and thus only reflect expenditures for of those months. The entries made to the CRVA for January and February of 0 have been calculated with reference to the amounts underpinning the payment amounts received by OPG approved in EB-00-00 in accordance with methodologies approved in EB-00-0. These payment amounts included expenditures for Darlington Refurbishment Project - Non Capital that were higher than those included in the approved EB-0-000 forecast amounts. Consequently, over the full month period of 0-0 OPG received $.M in payment amounts, rather than the $.M budgeted in EB-0-000. This ($. M) credit plus the ($.M) credit variance explained above, is the ($.M) credit entry in the CRVA shown in Chart above.. Fuel Channel Life Cycle Management Project The Fuel Channel Life Cycle Management ( FCLM ) project represents $.M be recovered in the CRVA account. The FCLM project supports both the Pickering Continued Operations and Darlington Refurbishment initiatives. This OPG-initiated industry effort is being coordinated through the CANDU Owners Group, and is aimed at gaining greater certainty around the remaining service lives of all CANDU units in Ontario. For Darlington, the work

Exhibit H Tab Page of 0 0 will confirm that the refurbishment of Darlington can begin in 0 and will not need to be advanced. The work also supports the determination of high confidence that Pickering can maintain fitness for service to 00 end-of life. In December 0, a high confidence statement regarding the service lives of pressure tubes based on available research and development ( R&D ) results Pickering and Darlington will be presented to the OPG Board of Directors in order to make business decisions on the continued operations of Pickering and the refurbishment of Darlington. The 0 variance is $.M (actual 0 FCLM expenditures were $.M, compared with a Board-approved amount of $.M). The projected 0 variance is $.0M (projected expenditures are $.0M compared to a Board-approved amount of $.0M). The combined 0/0 variance is $.M as shown in Chart above. The primary activities that account for the increased 0 and 0 expenditures are as follows: R&D Integration: Following an internal review of the FCLM project in 0, additional costs were added to the FCLM project to increase oversight of the project to ensure its success, and therefore the success of Pickering Continued Operations and Darlington Refurbishment. Additional staff were deployed to develop and execute management strategies, enhance the risk management process and facilitate improved integration and alignment of the project within OPG and with the CNSC. Expanded R&D scope: In 0 OPG and Bruce Power consulted with the CNSC to qualify techniques for demonstrating the fitness-for-service of the pressure tubes related to OPG s initiatives to operate Pickering to 00 and Darlington refurbishment. A protocol agreement was formally documented and signed by the CNSC, Bruce Power and OPG. The protocol agreement and subsequent CNSC documentation established the technical deliverables required for submission to CNSC to establish pressure tube component fitness-for-service for regulatory compliance. As a result, OPG incurred increased costs in 0 and 0 directly related to work activities that reflected the expanded R&D scope and well as obtaining third party review of technical submissions to the CNSC.

Exhibit H Tab Page of 0 Additional work was also undertaken in 0 in the areas of pressure tube fracture toughness and annulus spacer material properties to validate assumptions and service life projections. The difference between the expenditure variance of $.M and the amount to be recovered in the CRVA of $.M exists for the same reasons explained above in Section. and Section. with respect to Pickering Continued Operations and Darlington Refurbishment..0 NUCLEAR FUEL COST VARIANCE ACCOUNT The projected 0 year-end balance in the Nuclear Fuel Cost Variance Account is $0.0M (Ex. H--, Table ). While there were transaction entries of $.M to the account in January and February 0 and $0.M of interest, the zero balance reflects the fact that the account is being terminated on December, 0. The remaining balance of $.0M is being transferred to the Nuclear Deferral and Variance Over/Under Recovery Variance Account as shown at Ex. H--, Table c, line. There is a minimal variance (less than $00K) between actual nuclear fuel costs and EB- 0-000 forecast nuclear fuel costs for the period January-February 0. However, as EB-0-000 payment amounts did not become effective until March 0, the $.M transaction entry in the account for the period January-February 0 reflects the calculation of a fuel cost rate variance as per EB-00-0 based on forecasts from EB-00-00 (see Ex. H--, Table ).

Filed: 0-0- Exhibit H Tab Page of Attachment : LIST OF ATTACHMENTS Minister s Letter from Brad Duguid, Minister of Energy to Honourable Jake Epp, OPG dated March, 0 Re: Long Term Energy Plan as it relates to OPG.

Ex. H-- Attachment Page of

Ex. H-- Attachment Page of