I Public Disclosure Authorized. Supplemental Letter No. 2 REPUBLIC OF ARMENIA. Public Disclosure Authorized

Similar documents
Financial Standing of the Power Sector in Armenia

Document of The World Bank FOR OFFICIAL USE ONLY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROGRAM APPRAISAL DOCUMENT ON A

OFFICIAL - DOCUMENTS L4

Financing Agreement OFFICIM. DOCUMENTS1 CREDIT NUMBER 5283-IN. (Low Income Housing Finance Project) between INDIA. and

Public Disclosure Authorized OFFICIAL /r DOCUMENTS. Supplemental Letter No. 2. ARMENIAN SOCIAL INVESTMENT FUND April 8, 2015

Financing Agreement. (Energy Community of South East Europe APL 3 Montenegro Project) between THE REPUBLIC OF MONTENEGRO. and

OFFICIAL DOCUMENTS. Loan Agreement LOAN NUMBER 8873-ID

ARAB REPUBLIC OF EGYPT

THE BOARD OF THE CENTRAL BANK OF THE REPUBLIC OF ARMENIA. ORDINANCE No 158-N On approving Regulation 20/02

Loan Agreement. (Alma Electricity Transmission Project) between JOINT STOCK COMPANY KAZAKHSTAN ELECTRICITY GRID OPERATING COMPANY.

Republic of Senegal: Advance Agreement for the Preparation of the Proposed Casamance Development Pole Project Project Preparation Advance No.

THE CENTRAL BANK OF THE REPUBLIC OF ARMENIA BOARD RESOLUTION No. 39

Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Energy Community of South East Europe Program- FYR Macedonia Component-AD MEPSO Project (Loan No MK) Amendment of the Loan Agreement

I OFFICItAL ct 3, DOGIJNMTS

FOR OFFICIAL USE ONLY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN

National Electric Power Regulatory Authority

OFFICIAL. Letter No. CD-I 85/WB/INIS/XI/2017 November 7, 2017

Appendix H: Green-e Logo Use Guidelines (available at

OFFICIAL DOCUMENTS ZW4

Financing Agreement. (Additional Financing for Village Communities Support Program (Phase I)) between REPUBLIC OF GUINEA. and

Loan Assumption Agreement

Development Credit Agreement

Loan Agreement. Public Disclosure Authorized LOAN NUMBER 3771 BUL. Public Disclosure Authorized. (Agricultural Development Project)

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11)

Global Environment Facility Trust Fund Grant Agreement

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11)

LOAN AGREEMENT. (Zhejiang Power Development Project) between PEOPLE S REPUBLIC OF CHINA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Assumption Agreement

1) Boosting export enablers and firm competitiveness, 3) Sustainably managing environmental and natural resources.

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Multi-Donor Health Results Innovation Trust Fund Grant Agreement

ARMENIA: THIRD PUBLIC SECTOR MODERNIZATION PROJECT

Program Implementation Document. Project Number: November PAK: Access to Clean Energy Investment Program

NOW THEREFORE, the Parties hereto agree as follows: 1. Trustee Allocation and Commitment of Funds

Loan Agreement LOAN NUMBER 8577-IQ

Tamil Nadu Project Agreement

ARMENIA: DISEASE PREVENTION AND CONTROL PROJECT

CONFORMED COPY LOAN NUMBER 3770 LE

Public Disclosure Authorized COPY CONFORMED NUMBER 1238 BO. Public Disclosure Authorized. (Fourth Power Project) Public Disclosure Authorized between

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ELECTRICITY SECTOR EFFICIENCY ENHANCEMENT PROJECT CR SE. April 25, 2005 TO THE

Loan Agreement. Public Disclosure Authorized CONFORNED COPY LOAN NUMBER 2214 IND. Public Disclosure Authorized. (Twelfth Power Project)

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

OFFICIAL DOCUMENTS. Project Agreement LOAN NUMBER 8655-YF. (Additional Financing for Corridor X Highway Project) between

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Financing Agreement OFFICIAL OCUMENTS. Public Disclosure Authorized CREDIT NUMBER 5152-UZ. Public Disclosure Authorized

DECISION OF THE EUROPEAN CENTRAL BANK of 29 July 2014 on measures relating to targeted longer-term refinancing operations (ECB/2014/34) (2014/541/EU)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008

The World Bank IN Swachh Bharat Mission Support Operation (P153251)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN

The World Bank. May 16, 2016

OFFICIAL DOCUMENTS. THE WORLD BANK IBRD -IDA I womawgwmiou. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

PUBLIC SERVICES REGULATORY COMMISSION OF ARMENIA (PSRC)

PEOPLE S REPUBLIC OF CHINA

OFFICIAL Lw-::.xiti..-1~

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

COMMODITY FUTURES TRADING COMMISSION. Commission Merchants and Derivatives Clearing Organizations; Correction

Number 6 of 2012 EURO AREA LOAN FACILITY (AMENDMENT) ACT 2012 ARRANGEMENT OF SECTIONS

Loan Agreement OFFIAL DOCUMENTS LOAN NUMBER 8229-AM. (Lifeline Road Network Improvement Project) between REPUBLIC OF ARMENIA. and

OFFMCAL. olrakdocuments,

Amendment to Administration Agreement

Public Disclosure Copy. Implementation Status & Results Report Dominican Republic DRM Development Policy Loan with a Cat DDO (P159351)

390 United Nations Treaty Series 1964

ACBA CREDIT-AGRICOLE BANK CJSC OPERATIONAL TARIFFS (LENDING OPERATIONS)

OFFICIAL DOCUMENTS. Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

2010 SELECTIVE CAPITAL INCREASE

Development Financing Agreement

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

(Real Estate Cadastre and Registration Project Additional Financing) between. FORMER YUGOSLAV REPUBLIC OF MACEDONIA (the Borrower) and

Development Credit Agreement

KOSOVO ENERGY CORPORATION J.S.C. Generation Division, TPP Kosova B

Loan Agreement. (South East Europe and Caucasus Catastrophe Risk Insurance Facility Project) between REPUBLIC OF SERBIA. and

Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

OFFICIAL DOCUMENTS. Loan Agreement LOAN NUMBER 8688-IQ

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Project Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY

REPUBLIC OF INDONESIA

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

September 1, Southern California Edison Company/ Docket No. ER

Loans, Credits, and Grants Assumption and Amendment Agreement

Project Agreement. Public Disclosure Authorized. LOAN NUMBER 1412-T-SE jcumems J LOAN NUMBER 1413-SE. Public Disclosure Authorized

(Electric Power Sector Project) between THE ARGENTINE REPUBLIC. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. Dated November 18, 1988

The offices responsible for coordination of all matters related to the implementation of this arrangement are:

ON THE STATE REGISTRATION OF LEGAL ENTITIES

Financing Agreement CONFORMED COPY IDA CREDIT NUMBER 4825-KG IDA GRANT NUMBER H618-KG. (Emergency Recovery Project) between KYRGYZ REPUBLIC.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

APPENDIX 3A DETAILED TARIFF CALCULATIONS FOR YEAR 2015 FOR THE SALE OF ELECTRICITY TO THE MAIN GRID IN TANZANIA UNDER

Loan Assumption Agreement

OFFICIAL DOCUMENTS. H. E. Jean Gustave Sanon Minister of Economy and Finance Ministry of Economy and Finance Ouagadougou Burkina Faso.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Financing Agreement OFFICIAL- DOCUMENTS GRANT NUMBER H868-0-HT REPUBLIC OF HAITI INTERNATIONAL DEVELOPMENT ASSOCIATION. Public Disclosure Authorized

Re: IDA Financing No VN (Enhancing Teacher Education Program), Additional Instructions: Disbursement

DETAILED REGULATIONS OF THE REGULATIONS ON FINANCIAL INVESTMENT BUSINESS

Development Credit Agreement

Grant for Strengthening Institutional Capacity to Support Indonesian Women Migrant Workers IDF Grant No

Loan Agreement. (Additional Financing for Laguna de Bay Institutional Strengthening and Community Participation Project) between

The World Bank Indonesia Power Transmission Development Project (P117323)

Loan Agreement. (Shandong Ecological Afforestation Project) between PEOPLE S REPUBLIC OF CHINA. and

Transcription:

Public Disclosure Authorized Supplemental Letter No. 2 REPUBLIC OF ARMENIA Public Disclosure Authorized International Bank for Reconstruction and Development 1818 H Street, N.W. Washington, D.C. 20433 United States of America I 2016 Public Disclosure Authorized Re: Dear Sirs and Mesdames: Loan No. 8615-AM (Power Sector Financial Recovery Program) Performance Monitoring Indicators This refers to the provisions of paragraph I of Section HI.A of Schedule 2 to the Loan Agreement of this date between the Republic of Armenia (the Borrower) and the International Bank for Reconstruction and Development (the Bank) for the above-captioned Project. The Borrower hereby confirms to the Bank that the indicators set forth in the attachment to this letter shall serve as a basis for the Borrower to monitor and evaluate the progress of the Project and the achievement of the objectives thereof. Public Disclosure Authorized Very truly yours, REPUBLIC OF ARMENIA By Authorized reprg ntative Attachment

Attachment to Supplemental Letter No. 2 Project Name: Power Sector Financial Recovery Program (P157571) Annex 1: Disbursement Linked Indicators, Disbursement Arrangements and Verification Protocols Disbursement-Linked Indicator Matrix Results Area 1: Elimination of cash outflows of state-owned power companies for non-core business related reasons DLI 1: Decision by the Shareholder Meeting of ANPP and YTPC, prohibiting the non-core No Decision business related expenditures, lending and decision is made borrowing by the above companies Time frame for achievement of DLI Total financing allocated % of total DLI to DLI financing baseline 1S 2016 2S 2016 1S 2017 2S 2017 2018 2019 2020 Amount allocated (US$ million) 3.00 10% 3.00 - Decision on Liquid liquidation is ation is made and Revalua registe Exists as Exists as liquidation tion of red by DLI 2: Liquidation of Haigasard legal legal plan is - - assets is the entity entity approved by complet authori the ed zed Shareholder' state s Meeting agency Amount allocated (US$ million) 2.00 7% 0.00 1.00 - - 0.50-0.50 ANPP incurs non-core business - - Yes - Yes Yes Yes DLI 3: No new non-core business related related expenditures, borrowing and lending incurred by expenditu ANPP res Amount allocated (US$ million) 2.50 8% 1.90-0.20 0.20 0.20

-3- DLI 4: No new non-core business related expenditures, borrowing and lending incurred by YTPC YTPC incurs non-core business - - Yes - Yes Yes Yes related expenditu res Amount allocated (US$ million) 2.50 8% - - 1.90 0.00 0.20 0.20 0.2 Results Area 2 : Reduction of the outstanding principal amounts of YTPC' and ANPP's commercial loans DLI 5: Reduction of the principal amount of outstanding commercial loans of ANPP to be refinanced under the Program Amount allocated (US$ million) 6.56 22% 2.00 2.80 1.76 - DLI 6: Reduction of the principal amount of outstanding commercial loans of YTPC to be refinanced under the Program Amount allocated (US$ million) 4.96 17% 1.40 2.60 0.96 - - Results Area 3: End-user tariffs reflecting changes of electricity supply costs DLI 7: ENA's margin for each new tariff period fully reflects the loss (revenue) accrued due to difference between the forecast and actual cost of electricity purchased by ENA during the No No Yes - Yes Yes Yes Yes preceding tariff period plus the associated interest expense (revenue). Amount allocated (US$ million) 2.00 7% - 1.00-0.40 0.20 0.20 0.20 DLI 8: Tariffs for YTPC and Hrazdan TPP for each new tariff period fully reflect the loss (revenue) resulting from difference between No No Yes - Yes Yes Yes Yes forecast and actual cost of purchased natural gas due to fluctuation of AMD/US$ exchange rate during the preceding period Amount allocated (US$ million) 2.00 7% - 1.00-0.40 0.20 0.20 0.20 Results Area 4: Maintaining the generation capacity of the gas turbine at YTPC's CCGT plant

-4- At At least At least At 1400 At least 1400 GWh Ales140 1400 1400 les DLI 9: Electricity supplied by YTPC is GWh GWh GWh GWh 1400 maintained I GWh Amount allocated (US$ million) 4.48 15% - 1.65-1.63 0.4 0.4 0.4 Total disbursements 30.0 100% 6.40 10.05 6.52 2.43 1.70 1.20 1.70 DLI Verification Protocol Table DLI Definition/ Scalability of Protocol to evaluate achievement of the DLI and data/result verification Description of Disbursements Data source/agency Verification Entity Procedure achievement (Yes/No) DLI 1: Decision by the The target will be No Data source: Copies of the Independent Verification Review by IVA of the Shareholder's Meeting of considered achieved if decisions by the Agent (IVA), i.e. a law decision to determine ANPP and YTPC, prohibiting the Shareholder's Shareholder's Meeting of firm. whether those are legally the non-core business related Meeting of ANPP and ANPP and YTPC, binding upon the relevant expenditures, lending and YTPC makes a decision Agency: MENR entities. borrowing by the above prohibiting non-core companies. business related expenditures, lending and borrowing. DLI 2: Liquidation of Haigasard - Decision on The target will be No Data source: Copy of the IVA, i.e. a law firm. Review by IVA of the liquidation is made considered achieved if Shareholder's Meeting's Shareholder's Meeting's and liquidation plan the Shareholder's decision on liquidation decision to confirm it is is approved by the Meeting makes the and approval of the consistent with the Shareholder's decision on liquidation liquidation plan and a Armenian legislation and Meeting and approves the copy of the liquidation legally binding; and review liquidation plan. plan. of the liquidation plan and Agency: MENR the Shareholder's Meeting's approval to confirm whether the liquidation plan: (a) covers all key aspects and steps required for liquidation of entities under the applicable Armenian legislation; (b) does not contain provisions

-5- contradicting the Armenian legislation; and (c) contains a time-table for liquidation with clear indication of responsibilities of involved parties. - Revaluation of assets The target will be No Data source: Information IVA, i.e. a law firm. Review by IVA of the is completed. considered achieved if from MENR on all key report on revaluation of revaluation of assets is liquidation steps assets to confirm whether it completed. undertaken as per local was done in compliance legislation. with applicable standards Agency: MENR for this kind of activity as stipulated in the applicable legislation of the country. - Liquidation is The target will be No Data source Information IVA, i.e. a law firm. Review by IVA to confirm completed and considered achieved if from MENR on all key whether liquidation of registered by the the authorized liquidation steps Haigasard was registered by authorized state government body undertaken as per local the authorized state agency agency. registers the liquidation legislation. in compliance with relevant of Haigasard, which is Agency: MENR legislation of the country the final step in the and it constitutes the final liquidation process. step in liquidation process. DLI 3: No new non-core The target will be No Data source: Annual IVA, i.e. an audit firm, Review by IVA of the business related expenditures, considered achieved if financial statements and acceptable to the World annual financial statements borrowing and lending ANPP incurs no new other accounting records Bank. and other accounting and incurred by ANPP. non-core business related of ANPP. financial records, data and expenditures and do not Agency: MENR information of ANPP to provide and take any confirm absence of non-core new non-core business business related related loans. expenditures, borrowing and lending. DLI 4: No new non-core The target will be No Data source: Annual IVA, i.e. an audit firm, Review by IVA of the business related expenditures, considered achieved if financial statements and acceptable to the World annual financial statements borrowing and lending YTPC incurs no new other accounting records Bank. and other accounting and incurred by YTPC. non-core business related of YTPC. financial records, data and expenditures and do not Agency: MENR information of YTPC to provide and take any confirm absence of non-core new non-core business business related related loans. expenditures, borrowing and lending. DLI 5: Reduction of the The target will be Yes Data source: Financial IVA, i.e. an audit firm, Review by IVA of the principal amount of considered achieved if statements, accounting acceptable to the World financial statements, outstanding commercial loans ANPP reduces the Bank. accounting records and

-6- of ANPP to be refinanced outstanding commercial records and other financial other financial data of under the Program. debt. data of ANPP. ANPP and comparison with Agency: MENR the base-line level (established through independent audit) and target levels. DLI 6: Reduction of the The target will be Yes Data source: Financial IVA, i.e. an audit firm, Review by IVA of the principal amount of considered achieved if statements, accounting acceptable to the World financial statements, outstanding commercial loans YTPC reduces the records and other financial Bank. accounting records and of YTPC to be refinanced outstanding commercial data of YTPC. other financial data of under the Program. debt. Agency: MENR YTPC and comparison with the base-line level (established through independent audit) and target levels. DLI 7: ENA's margin for each The target will be No Data source: (a) tariff IVA, i.e. a law firm. Review by IVA of the ENA new tariff period fully reflects considered achieved if margin computation for margin approved by the the loss (profit) accrued due to ENA's margin is revised ENA for tariff period PSRC to confirm that it difference between the by PSRC at least once a subject to review with fully reflects the loss forecast and actual cost of year and for each new break-down by main line (revenue) accrued due to electricity purchased by ENA tariff period fully reflects item costs as published difference between the plus the associated interest the loss (revenue) and approved by PSRC; forecast and actual cost of expense (revenue). accrued due to difference (b) data from PSRC on electricity purchased by between the forecast and approved tariffs for all ENA actual cost of electricity large generating plants for purchased by ENA the period preceding the during the preceding tariff review period; and tariff period. (c) forecast generation numbers used by the PSRC, provided by EPSO, to compute the tariffs for the preceding period; and (d) actual generation numbers reported by the Settlement Centre. Agency: MENR DLI 8: Tariffs for YTPC and The target will be No Data source: (a) regulation IVA, i.e. a law firm. Review by IVA of tariffs for Hrazdan TPP for each new considered achieved if for adjustment of YTPC and Hrazdan TPP to tariff period fully reflect the the tariffs for YTPC and exchange rate fluctuation confirm they fully reflect loss (profit) resulting from Hrazdan TPP are revised driven fuel cost changes the changes in the cost of difference between forecast by PSRC at least once a for YTPC and Hrazdan natural gas due to changes and actual cost of purchased year and for each new TPP; (b) tariff in US$/AMD exchange rate. natural gas due to fluctuation tariff fully reflect the computation for YTPC I

-7- of AMDIUS$ exchange rate loss (revenue) accrued and Hrazdan TPP for tariff during the preceding period. due to difference period subject to review between forecast and with break-down by main actual cost of natural gas line item costs (including purchased during cost of natural gas) as preceding tariff period. published and approved by PSRC; (c) data from PSRC on gas tariffs effective for subject thermal power plants during the period for which compensation is computed; and (d) actual generation numbers of YTPC and Hrazdan TPP as reported by the Settlement Centre. Agency: MENR DLI 9: Electricity supplied by The target will be No Data source: Meters of Settlement Centre. Settlement Centre to report YTPC. considered achieved if YTPC at its substation the annual amount of YTPC supplies to the registering the amount of electricity supplied by power transmission electricity supplied to the YTPC to the power network the specified power transmission transmission network. amount of electricity in network. GWh. Agency: YTPC Bank Disbursement Table DLI Bank Of which Financing Deadline for DLI Minimum DLI Maximum DLI Determination of financing available for Achievement value to be achieved value(s) expected Financing allocated to Prior Advances to trigger to be achieved for Amount to be the DLI results (US$ (US$ disbursements of Bank disbursed against (million US$) million) million) Bank Financing disbursements achieved and purposes verified DLI value(s) DLI 1: Decision by the 3.00 0.00 0.00 June 30, 2016 The Shareholder's N/A 100% Shareholder's Meeting of Meeting of ANPP disbursement for ANPP and YTPC, prohibiting and YTPC makes a compliance the non-core business related decision, which expenditures, lending and prohibits the nonborrowing by the above core business related companies. _expenditures, lending

-8- and borrowing by those companies. DLI 2: Liquidation of Haigasard. - Decision on liquidation is 1.00 0.00 0.00 Dec. 31, 2016 The Shareholder's N/A 100% made and liquidation plan is Meeting approved disbursement for approved by the the liquidation plan compliance Shareholder's Meeting for Haigasard. - Revaluation of assets is 0.50 0.00 0.00 Dec. 31, 2018 Haigasard completed N/A 100% completed. revaluation of assets. disbursement for compliance - Liquidation is completed 0.50 0.00 0.00 Dec. 31, 2020 The State Register of N/A 100% and registered by the the Legal Entities of disbursement for authorized state agency. the Ministry of compliance Justice of Republic of Armenia registered the liquidation of Haigasard. DLI 3: No new non-core 2.50 0.00 0.00 No new non-core N/A 100% business related expenditures, fiscal year 2016: business related disbursement for borrowing and lending incurred June 30, 2017 expenditures, compliance by ANPP. borrowing and fiscal year 2017: lending by ANPP. June 30, 2018 fiscal year 2018: June 30, 2019 fiscal year 2019: June 30, 2020 fiscal year 2020: June 30, 2021 DLI 4: No new non-core 2.50 0.00 0.00 No new non-core N/A 100% business related expenditures, fiscal year 2016: business related disbursement for borrowing and lending incurred June 30, 2017 expenditures, compliance by YTPC borrowing and fiscal year 2017: lending YTPC June 30, 2018

-9- fiscal year 2018: June 30, 2019 fiscal year 2019: June 30, 2020 fiscal year 2020: June 30, 2021 DLI 5: Reduction of the 6.56 0.00 4.50 For l" semester - $5.00 million $16.4 million Formulas: US$0.40 principal amount of outstanding 2016: June 30, reduction during reduction for each US$1 of commercial loans of ANPP to 2016 the period of Jan.1, reduction in be refinanced under the For 2 nd semester 2016 - June 30, outstanding Program 2016: Dec. 31, 2016 principal amount 2016 - $7.00 million of baseline For I" semester reduction during commercial debt, 2017: June 30, the period of Jul.1, but not more than 2017 2016 - Dec. 31, US$16.4 million 2016 - $4.40 million reduction during the period of Jan. 1, 2017 - June 30, 2017 DLI 6: Reduction of the 4.96 0.00 3.00 For 1" semester - $3.50 million $12.4 million Formulas: US$0.40 principal amount of outstanding 2016: June 30, reduction during reduction for each US$1 of commercial loans of YTPC to 2016 the period of Jan.1, reduction in be refinanced under the For 2 nd semester 2016 - June 30, outstanding Program 2016: Dec. 31, 2016 principal amount 2016 - $6.00 million of baseline For I" semester reduction during commercial debt, 2017: June 30, the period of Jul.1, but not more than 2017 2016 - Dec. 31, US$12.4 million 2016 - $2.40 million reduction during the period of Jan. 1, 2017 - June 30, 2017 DLI 7: ENA's margin for each 2.00 0.00 0.000 - For 2 nd semester ENA's margin for N/A 100% new tariff period fully reflects 2016: any time each new tariff disbursement for the loss (profit) accrued due to until December period fully reflects compliance difference between the forecast 31, 2016 the loss (revenue)

-10- and actual cost of electricity - For 2 nd semester accrued due to purchased by ENA during the 2017: any time difference between preceding tariff period plus the until December the forecast and associated interest expense 31, 2017 actual cost of (revenue). - For 2018: any electricity purchased time until by ENA during the December 31, preceding tariff 2018 period - For 2019: any time until December 3 1, 2019 - For 2020: any time until December 31, 2020 DLI 8: Tariffs for YTPC and 2.00 0.00 0.00 - For 2 nd semester Tariffs for YTPC and N/A 100% Hrazdan TPP for each new 2016: any time Hrazdan TPP for disbursement for tariff period fully reflect the until December each new tariff compliance loss (profit) resulting from 31, 2016 period fully reflect difference between forecast and - For 2 nd semester the loss (revenue) actual cost of purchased natural 2017: any time resulting from gas due to fluctuation of until December difference between AMD/US$ exchange rate 31, 2017 forecast and actual during the preceding period. - For 2018: any cost of purchased time until natural gas due to December 31, fluctuation of 2018 AMD/US$ exchange - For 2019: any rate during the time until preceding period December 31, 2019 - For 2020: any time until December 31, 2020 DLI 9: Electricity supplied by 4.48 0.00 0.00 - For 2016: Dec. - 1400 GWhlyear Annual electricity 100% YTPC. 31, 2016 supply in excess of disbursement for - For 2017: Dec. - 1400 GWh/year the specified compliance 31, 2017 minimum value is - For 2018: Dec. - 1400 GWhlyear acceptable. 31, 2018-1400 GWh/year

-11- For 2019: Dec. 31,2019-1400 GWhlyear - For 2020: Dec. 31, 2020