Discussion paper on National Gramin Awaas Mission (GRAM)

Similar documents
Pradhan Mantri Awaas Yojana - Gramin (PMAY-G) Ministry of Rural Development Government of India

1,07,758 cr GoI allocations for Ministry of Rural Development (MoRD) in FY

Indira Awaas Yojana. Financial assistance provided under IAY during the years is mentioned below:

`6,244 cr GOI allocations for Ministry of Drinking Water and Sanitation(MoDWS) in FY

GOVERNMENT OF INDIA MINISTRY OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT LOK SABHA STARRED QUESTION NO. 280 TO BE ANSWERED ON

A STUDY ON DISTRICT RURAL DEVELOPMENT AGENCY WITH SPECIAL REFERENCE TO MADURAI DISTRICT P. NAGARAJAN

Rural Road Connectivity in India

Centrally Sponsored Schemes

BASELINE SURVEY OF MINORITY CONCENTRATION DISTRICT. Executive Summary of Leh District (Jammu and Kashmir)

Second Presentation State Plan of Action for Rural Development Programmes

EXECUTIVE SUMMARY OF THE DEVELOPMENT GAPS AND PRIORITIES FOR THE MULTI-SECTOR PLAN

District Rural Development Agency (DRDA)

Impact of Multi Sector Development Plan on Muslims: A Case Study of Moradabad District

JEEViKA Bihar Rural Livelihoods Promotion Society State Rural Livelihoods Mission (SRLM), Govt. of Bihar

National Rural Employment Guarantee Act (NREGA)

TEMPLATE For furnishing ANNUAL IMPLEMENTATION PLAN (AIP) FOR

Report No. 216 Evaluation Study of Indira Awaas Yojana Programme Evaluation Organisatio 2013

Gram Panchayat Development Plan(GPDP) Ministry of Panchayati Raj

Total Sanitation Campaign GOI,

PROGRAMMES AND POLICIES FOR POVERTY ALLEVIATION

Executive summary Siddharth Nagar

People s Plan Campaign for Gram Panchayat Development Plan (GPDP) Sabki Yojana Sabka Vikas

A Multi Sectoral Approach To Health (UNDP Aided) Project Management Unit (SWAJAL) Deptt. Of Rural Development, Govt.

Chapter V Financial Resource Mobilization of PRIs in Karnataka

BLOSSOM INDUSTRIES LIMITED

Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010

PUDHU VAAZHVU The World Bank funded Project

CONTENTS SL. NO. PARTICULARS PAGE NOS. 1 Preamble 3. 2 CSR Mission 3. 3 Objectives 3. 4 Focus Areas 4. 5 Approach to Implementation 5.

Pratidhwani the Echo ISSN: (Online) (Print) Impact Factor: 6.28

India s model of inclusive growth: Measures taken, experience gained and lessons learnt

NOW, THEREFORE, IT IS HEREBY AGREED between the Parties as follows: Obligations of the Ministry of Environment and Forests (through the NTCA)

9,000cr GOI allocation for SBM in FY

FUNCTIONS AND STRUCTURE OF THE PLANNING COMMISSION ( IN BRIEF )

Rajiv Rinn Yojana (RRY)

GOVERNMENT OF INDIA OUTCOME BUDGET

POLICY FOR CORPORATE SOCIAL RESPONSIBILITY

A BRIEF NOTE ON THE IMPLEMENTATION OF NATIONAL RURAL EMPLOYMENT GUARANTEE SCHEME IN HIMACHAL PRADESH

34. RURAL / URBAN DEVELOPMENT AGENCY

Swachh Bharat Mission

Social Security Provisioning in Bihar: A Case for Universal Old Age Pension

ORIGIN AND PERFORMANCE OF MGNREGA IN INDIA A SPECIAL REFERENCE TO KARNATAKA

HIL Limited. Corporate Social Responsibility Policy

GOVERNMENT OF MEGHALAYA COMMUNITY AND RURAL DEVELOPMENT DEPARTMENT. NOTIFICATION (No. CDD.122/2006/3 Dated Shillong, the 28 th July 2006)

THE UNORGANISED WORKERS SOCIAL SECURITY ACT, 2008 ARRANGEMENT OF SECTIONS

CSR (CORPORATE SOCIAL RESPONSIBILITY)

Draft Concept Note on the Social Audit Mechanism to be followed in Karnataka.

Chapter 1 Introduction

THE UNORGANISED WORKERS' SOCIAL SECURITY ACT, 2008

CORPORATE SOCIAL RESPONSIBILITY POLICY

AN EVALUATION OF INDIRA AWAS YOJANA IN CHALLAKERE TALUK OF CHITRADURGA DISTRICT, KARNATAKA

CHAPTER VIII INSTITUTIONAL, INFRASTRUCTURE AND DEVELOPMENT PROFILE OF THE HILL SUB-SAMPLE

Chapter 3. Implementation Mechanism of MGNREGA

Corporate Social Responsibility and Sustainability Policy of Indian Railway Finance Corporation Ltd (IRFC)

Performance of Mahatma Gandhi National Rural Employment Guarantee Act (MGNREGA): An Overview

THE UNORGANISED WORKERS SOCIAL SECURITY BILL, 2008

STATUS OF PANCHAYATI RAJ STATE PROFILE CHHATTISGARH STATE

Survey on MGNREGA. (July 2009 June 2011) Report 2. (Preliminary Report based on Visits 1, 2 and 3)

Segment -1 (Background)

PAISA FOR PANCHAYATS POLICY BRIEF 2016

Rural Administration

CSR Policy of Lupin Group of Companies. CSR policy in compliance with the Section 135 of the Companies Act, Lupin Limited.

ENERGY LIMITED (CIN: U29224GJ1987PLC010044)

Corporate Social Responsibility (CSR) Policy

(CORPORATE SOCIAL RESPONSIBIITY)

Introduction. Poverty

Corporate Social Responsibility (CSR) Policy

About Swadesh Darshan Scheme:

MEMORANDUM OF UNDERSTANDING. (Place) on the day of 2009 BETWEEN the Ministry of Rural Development

ASK INVESTMENT MANAGERS LIMITED. Corporate Social Responsibility Policy. 1 P a g e

Odisha State Action Plan on Climate Change (A Review with Special focus on women and children)

TOTAL SANITATION CAMPAIGN (TSC) Budgeting for Change Series, 2011

PRADHAN MANTRI ADARSH GRAM YOJANA (PMAGY) MINISTRY OF SOCIAL JUSTICE AND EMPOWERMENT

THIRD PARTY INSPECTION AND MONITORING

ANDHRA PRADESH RURAL WATER SUPPLY AND SANITATION PROJECT (APRWSSP) FINANCIAL MANAGEMENT MANUAL FOR DEPARTMENT OF RWSS, SWSM AND DWSM FINAL REPORT

Aarhat Multidisciplinary International Education Research Journal (AMIERJ) ISSN

IMPACT OF NREGA ON AGRICULTURAL LABOUR FORCE IN THOOTHUKUDI DISTRICT INTERVIEW SCHEDULE. 1. Name of Beneficiary: Contact: 2. Village Name Village Code

Financial Inclusion and Millennium Development Goals

ORISSA PUBLIC PRIVATE PARTNERSHIP POLICY-2007

Ministry of Housing and Urban Poverty Alleviation Government of India

By Kiran Moghe InfoChange India News & Features development news India Phoca PDF

CORPORATE SOCIAL RESPONSIBILITY POLICY

MITSUBISHI ELEVATOR INDIA PRIVATE LIMITED CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY

Rural Development, GOI

Resource Gap Analysis of National Social Assistance Programme

CHAPTER-IV REFORMS IN THE CSS

Government s Agricultural economic initiatives and challenges ahead

SONATA FINANCE PVT LTD.- CSR POLICY. (As approved in CSR Committee meeting dated../../...) Page 1 of 8

Influence of Administrative and Political Authorities Decisions on the Construction of Community Development Projects in India

CORPORATE SOCIAL RESPONSIBILTY POLICY/ PSP PROJECTS LIMITED. Corporate social responsibility Policy PSP PROJECTS LTD

BUDGET MCQ PART- I. Q.1 How much amount of Agricultural Credit to farmers has been proposed in the Union Budget ?

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN)

POLICY FOR CORPORATE SOCIAL RESPONSIBILITY

MADRAS FERTILIZERS LIMITED CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY

NABARD & microfinance

CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY OF KALYANI FORGE LIMITED

20 th Year of Publication. A monthly publication from South Indian Bank.

SBICAP Securities Ltd. (SSL)

CSR Policy of Delta Corp Limited. 1. Corporate Social Responsibility (CSR) Policy of Delta Corp Limited ( Company )

Modified Area Development Agency (MADA)

Urban Sanitation: Swachh Bharat Mission

Transcription:

Discussion paper on National Gramin Awaas Mission (GRAM) Indira Awaas Yojana was launched in June, 1985 as a sub-scheme of Rural Landless Employment Guarantee Programme and later became a component of Jawahar Rozgar Yojana. It became an independent scheme in 1996. Rs. 82,780.00 cr has been expended for the construction of 2.91 cr houses since then. The scheme was continued in the Twelfth five year plan with an outlay of Rs.59, 585 crore. The twelfth plan working group on rural housing recommended a target of 1.5 crore houses for the plan period based on a housing shortage estimate of 4 cr houses in rural areas. Against the annual target of 30 lakh houses, the budgetary outlay for the scheme enabled a target of 30.09 lakh and 24.85 lakh houses in 2012-13 and 2013-14 respectively. During the current financial year, a target of 25.19 lakh has been set against an outlay of Rs.16,000 crore. As per the Census 2011, 1.08 crore households live in dilapidated houses, which are showing signs of decay or breaking down and require major repairs or those houses decayed or ruined and are far from being in conditions that can be restored or repaired. However, if one takes roofing alone, about 4.41 crore houses have kutcha roofing. If material of wall is taken, 2.71 crore houses have grass, thatch, bamboo, plastic, etc. as wall and another 5.83 crore have mud or unburnt brick as the material. The SECC data indicates 4.01 crore house have one or two rooms with kutcha walls and kutcha roofs. All these figures reveal that the magnitude of the problem cannot be clearly defined with the existing data. There is a need for ground-truthing. Looking at the above numbers, a target of approximately four crore houses can be safely assumed to require urgent attention. Assuming that 20 per cent of households living in such houses can provide resources to build a house and the remaining 80 per cent of the families may not be able to provide for construction of a house from their resources. Then atleast 3.20 crore households would require assistance from the Government to house themselves. Eligibility for assistance would be decided based on the condition of the house and BPL families would be given priority. The deserving would be identified through a participatory process involving the Gram Sabha and PRIs. Page 1 of 6

Presently unit assistance is Rs. 70,000 (Rs. 75,000 in difficult areas. The unit size is fixed at a minimum of 20 sq.mt which is too small for a household and needs to be increased to atleast 30 sq.mts to provide enough space for the household and livelihood activities. Toilet is provided under NBA implemented at the ground level by a different agency. Cost of construction has increased with increase in prices of material and wages for skilled labour. The lack of access to institutional credit to the poor for the purpose of housing remains distant with banking institutions remaining indifferent to the needs of the sector in rural areas. The country loses 15 lakh houses to disaster every year and the need to incorporate resilient design and construction features gains importance. Above all the house should be able to withstand wear and tear and weather factors for atleast a period of 30 years and should not slip back into disrepair within a few years. In the above scenario the unit assistance is found to be insufficient. Unit assistance needs to be increased to Rs. 1.5 lakh or so in plain areas or a little higher in difficult/hilly areas with the toilet becoming an integral part of the house. This would have significant cost implications but is inevitable if the problem of housing in rural areas is to be addressed. The construction of 20 lakh houses during the current year, at an unit cost of Rs.1.5 lakh would require funds of Rs.21,840 crore (Rs. 6,940 cr over and above the existing outlay of Rs.16,000 crore in B.E 2014-15). The construction of 25 lakh houses would require funds of Rs.27,300 crore (Rs. 13,200 crore over and above the existing outlay). A target of 3.20 crore houses can be covered, in a period of nine years with an annual target of 25 lakh houses and fund requirements of Rs.27,300 crore. A National Gramin Awaas Mission (GRAM) becomes imperative since the Government has sought to achieve the goal of 'pucca houses for all' by 75 years of the Nations independence, a time of just eight years to 2022. It would help focus attention on 'improving living conditions rather than just offering shelter, with sufficient thought to interrelated considerations of basic amenities. Fixed end goal in terms of time and numbers (quantities) can be achieved, with planned cost reduction measures, increased efficiency in fund flow and utilisation. Effective decision making becomes possible if the agency is empowered and there exists a robust mechanism for regular monitoring. Open defecation has remained persistent despite efforts through the Total Sanitation Campaign and Nirmal Bharat Abhiyan. Census 2011 reveals that 11.62 crore rural Page 2 of 6

households (69.30 %) do not have a latrine within their premises. The baseline survey conducted by MoDWS in 2012 covering 90% of rural areas revealed that 59.65% of houses in rural areas do not have a toilet. With effect from 1.4.2013 construction of toilet has been made mandatory along with construction of IAY unit by the beneficiary. Reports reveal that not all houses sanctioned have been provided with toilets. Only 2.18 lakh of the 15.62 lakh houses completed have reported construction of a toilet. Interactions with State Governments have revealed that irregular fund flow and administration of the programme by different agencies at three levels has made coordination difficult. Pooling of resources has not been possible at the implementation level. Two different beneficiary lists have led to patchy coverage. Making a sanitary toilet alongwith bathing space integral to the house would ensure that all new houses constructed would have a toilet with bathing space and the beneficiary would not have to approach two different agencies. Funds for construction of the house and toilet with bathing space have to flow from a single source in order to ensure construction. Provision of household level biological waste treatment facility with appropriate technologies like Bio-digesters would also be incorporated. Also suitable technologies would be adopted for treatment of waste water at the habitat level. The 69 th round survey of the National Sample Survey Organisation (NSSO), during July 2012 to December 2012 shows that 53.9 per cent of rural households did not have drinking water facilities within premises. The basic amenities like water and electricity are provided by different entities which work in silos. There has been no integrated planning in terms of time or geography. New habitations that are developed can overcome this lacuna only through coordinated efforts from the various departments at the ground level right from the stage of planning. Use of scientific basis for planning like the use of Disaster Risk Atlas of India given by the National Disaster Management Authority (NDMA) would help maximise results. This requires a projectised mode of working and focussed supervision to ensure coordination between these entities and a critical role played by the State governments. There is a clear need for developing and popularising appropriate technology through a network of institutions, which could result in low-cost, environment- friendly and disasterresistant houses as per local cultural preferences. Rural Building Centres/ Technology Page 3 of 6

Facilitation Centres are envisaged to play the role of a single window solution for guidance on these concerns. The beneficiary has to build the house herself with handholding support from the Rural Building Centre. Implementation Structure I. National level A National Gramin Awaas Mission (GRAM) may be set up in the form of an autonomous registered Society to implement and monitor the scheme at the National level, and be housed in the Department of Rural Development. The governing structures of the Mission would have representatives at a senior level from other participating Ministries implementing JNNURM/NRDWP and RGGVY and agencies like NDMA, NEERI to provide technical inputs. If required, there could be sub-missions and Department of Expenditure could also be associated with this. These could be entrusted with the task of approving State level projects, releasing funds, capacity building, providing technical assistance and monitoring performance. High end coordination at the Centre could be ensured through a Cabinet Committee on Housing. Provision for concurrent and impact evaluation of the scheme would be made. II. State level Implementation at the State level would be by a State Mission housed in the Rural Development Department /agency as decided by the State Government. The Mission would be headed by Secretary/Principal Secretary who is in charge of IAY. It would be monitored by an Empowered Project Approval and Management Committee under an officer of the rank of Chief Secretary. Senior representatives of Panchayati Raj, Drinking Water, Sanitation, Power, Renewable Energy, Health, Social Welfare and any other departments whose schemes are planned for convergence would be a part of it. Mission is mandated to finalise thrust areas and district targets for the year, decide on implementation to cover habitations and individual households through an Annual Action Plan. Preparing projects for holistic development of habitations with convergence to provide drinking water, power and any other service/benefit as decided by the State Government for approval by the Empowered Project Approval and Management Committee and MoRD would be its core function. The Mission would involve reputed organisations, educational institutions, domain experts and eminent Page 4 of 6

NGOs to provide technical guidance during project preparation and implementation. They would be involved in facilitation for choice of design and technology options for construction of houses and toilets. The Mission would meet atleast once every quarter to review progress. III. District level At the district level the Additional Collector/ CEO Zilla Parishad incharge of IAY would head the Mission. Representatives from all participating line departments would be part of the Mission. District Mission would be mandated to monitor and report progress of work. Involvement of Panchayati Raj Institutions in beneficiary selection and hand holding would be encouraged. Mechanism to carry out Social Audits and a Grievance Redressal System would be implemented at the district and block levels. Implementation approach Two streams of work would be carried under the scheme o Upgradation/Construction of Individual Houses in existing habitats for beneficiaries selected on the basis of a participatory process o Upgradation/Construction through a Habitat approach including mandatory convergence for water and power as projects. Entire fund flow for the scheme would be electronically managed. Funds would flow to a State Fund and from there to the project area as per need assessed by the State government. Payment to Beneficiary and progress to be tracked through the use of Temporary Identification Number from the Socio-Economic Caste Census. Monitoring would be on a GIS enabled online Management Information System. Construction would be done by the beneficiary himself/herself and no contractors would be involved The site identified for construction would be photographed and latitude/longitude coordinates recorded along with the photograph. Photographs would be geo-tagged and time stamped. Photos would be captured at various stages of construction to show progress and release of instalments would be linked to stage of construction. Page 5 of 6

Development of a menu of architectural designs using local building construction technologies to enable the beneficiary to make an informed choice. Design and technology should be in conformity to measures recommended by N.D.M.A. Facilitation for use of locally appropriate disaster resilient designs and construction technologies. Facilitation and handholding during construction would be done by the District Mission, along with Rural Building Centers, Technical Institutes, Technology Facilitation Centres, SHG's, NGOs, Voluntary Organisations and practitioners in the field of rural housing. Cascading training for masons States to facilitate price concession by material producers especially for cement, steel and brick. Key role for Gram Panchayats External and independent quality monitors drawn from reputed academic institutions would conduct field checks. Resource mobilisation Additional resources would have to come from the budgetary provisions or from institutional credit. Institutional finance could be leveraged through existing institutions like HUDCO and NHB. Options for bilateral/multilateral funding could also be explored. Extra budgetary resources from and voluntary organisations could also be explored. The Mission being a separate entity it should be possible to mobilize substantial resources upfront to be repaid on an annuity model using the future stream of allocation for rural housing/iay houses. Page 6 of 6