Senex and QGC JV asset swap

Similar documents
Western Surat Gas Project major agreements executed with GLNG. Ian Davies, Managing Director and CEO 24 September 2015

RIU Good Oil Conference

DRIVING GROWTH WITH GAS

FY18 half year results. Ian Davies, Managing Director and CEO Graham Yerbury, Chief Financial Officer 22 February 2018

Senex Energy Limited Investor Briefing Ian Davies, Managing Director September 2011

FY17 full year results and FY18 outlook. Ian Davies, Managing Director and CEO Graham Yerbury, Chief Financial Officer 22 August 2017

Senex Energy Limited An emerging unconventional gas leader. Ian Davies, Managing Director Shale Gas World, Adelaide 23 August 2011

Senex Energy agreed friendly merger with Stuart Petroleum. Ian Davies, Managing Director 21 February 2011

FY18 FULL YEAR RESULTS. Ian Davies, Managing Director and CEO Gary Mallett, Chief Financial Officer 21 August 2018

VICTORIA PETROLEUM N.L. A.B.N

FY19 Half year results

Comet Ridge Noosa Mining Conference

Important Notice Disclaimer

Good Oil Conference 2017

Santos increases 2P reserves to 1,406 million barrels 180% 2P reserves replacement GLNG dedicated 2P reserves up 12% to 6,721 PJ

For personal use only. Noosa Mining Conference 19 th July 2018

Sole-3 flow-back. Presentation to Good Oil Conference David Maxwell, Managing Director 13 September 2018

VICTORIA PETROLEUM N.L. Time to Grow. Ian Davies, Managing Director RIU Good Oil Conference, 7 th September 2010

For the period ended 30 September 2018

For personal use only Investor update

CEO S PRESENTATION. WestSide 2012 Annual General Meeting 22 November 2012

AUSTRALIA, HERE WE COME

Presentation to Euroz Securities Rottnest Island Institutional Conference 2019

Cooper Energy, growing with gas David Maxwell Presentation to QUPEX 13 June 2017

Positioned for Growth APPEA 2016 Conference and Exhibition June 2016

Energy for south-east Australia

Half-Year FY2018 Results & Guidance

Quarterly Report. Q3 FY18 March 2018 HIGHLIGHTS

Bungaloo-1, Otway Basin. Gas business & oil production Presentation to Exchange SA investment conference Adelaide 23 June 2016

Arrow Energy recommends acquisition by Shell / PetroChina Joint Venture following planned demerger

Galilee Basin in Focus

For personal use only. Drillsearch Energy. Takeover offer for Acer Energy. 4 October 2012

2016 the year of Answers. David Casey, Managing Director

EGM Presentation September J. Michael Yeager Chairman and Chief Executive Officer

AUSTRALIA FOCUSED EXPLORATION & PRODUCTION COMPANY

The information in this presentation: Qualified petroleum reserves and resources evaluator. Rounding

FY13 Annual Results FY14 Outlook. 29 August 2013

Central Petroleum Limited (ASX: CTP).

CORPORATE PRESENTATION NOVEMBER

19 NOVEMBER 2015 AGM PRESENTATION ASX: GLL

Skandi Acergy installing control umbilical to Sole gas field February, Investor pack March 2019

Galilee Energy: investor presentation

COALBANK LIMITED (ASX: CBQ)

Bungaloo-1, Otway Basin

Annual General Meeting 9 November 2018

Q3 FY17 Quarterly Report for 3 months to 31 March 2017

Early entry advantage in the Indian unconventional energy market

For personal use only. six months to 31 December 2013

TRI-STAR PETROLEUM COMPANY

STRIKE ENERGY LIMITED Non Renounceable Rights. 11 November 2016

Freedom Oil & Gas Investor Presentation

Beach Energy Limited. The emergence of Cooper Basin shale gas. ASX Small to Mid Caps Conference New York, 4 March 2010.

Gas project development Oil production Exploration

Icon continues to monitor the discovery wells drilled within the permit, which currently remain suspended.

For personal use only. Presentation to Taylor Collison Gas Day 5 April 2018

For personal use only

SUBSTANTIAL LEVERAGE TO THE UNCONVENTIONAL OIL & GAS SECTOR EUROPE & NORTH AMERICA INVESTOR ROADSHOW MARCH 2012

ASX Announcement 2015 Year End Reserves Review

For personal use only

Expanding Scale and Opportunities

TERRAMIN AUSTRALIA LIMITED. Annual General Meeting

2015 Annual General Meeting 25 November 2015

For personal use only. Investor Update. David Casey, Managing Director

Investor pack update. 13 June 2017

September 2018 Quarterly Report & Appendix 5B

Delivering on Strategy

Kilmain Project Collaborative opportunities in Queensland for exploration, resource development and investment with JOGMEC Presentation Colin

AWE LIMITED. INVESTOR PRESENTATION APPEA CONFERENCE - 16 May 2017

Macquarie Securities Australian Conference Reg Nelson Managing Director, Beach Petroleum

AGM PRESENTATION 25 October 2017

Investors Presentation Reg Nelson Managing Director Hector Gordon Chief Operating Officer

Coal Exploration Projects. November 2014

ASX release. Investor presentation. 3 May 2018 Ref: #029/18

For personal use only

European Business Update On Track

Macquarie Securities Western Australia Forum. 15 October 2014

Investor Presentation September 2011

For personal use only

For personal use only

For personal use only. DART ENERGY: A Glocal Company? Simon Potter, CEO

Forsyth Barr conference

Euroz Securities Rottnest Island Institutional Conference Presentation. 14 March 2017

CARBON ENERGY LIMITED QUARTERLY REPORT SEPTEMBER 2014

Origin Energy. Investor Presentation - Update on Amended Loan Facilities and APLNG. Grant King, Managing Director

2018 Guidance & Grieve Update

June 2018 Quarterly Report & Appendix 5B

March 2018 Quarterly Report & Appendix 5B

TERRAMIN AUSTRALIA LIMITED. Annual General Meeting

Mines and Money Australia October Delivering Value From Queensland Coal

Significant Upgrade of Contingent Resources

Sundance Energy Australia Limited (ASX: SEA) Execute Deliver Grow

2017 First-half results

For personal use only

MANAGING DIRECTOR PRESENTATION 30 November 2016

Blue Energy Ltd (BUL)

For personal use only

Sole-4 subsea tree deployment

CENTRAL PETROLEUM. Annual Shareholder Roadshow. Gas Central to our Future. (Central Petroleum Shareholders Association) November 2014

Cooper Energy Limited

On 8 June 2017, Icon Energy lodged amended Evaluation Program s for each of the eight PCAs with DNRM, covering the entire area of ATP 855.

Transcription:

Senex and QGC JV asset swap Julie Whitcombe, EGM Strategic Planning Craig Stallan, Chief Operating Officer 10 September 2014

Asset swap consolidates Senex s Qld gas position QGC asset swap: monetising a minority JV position into a 100% held growth project Asset swap PL171 (Senex 20%) ATP 574P (Senex 30%) Senex Western Surat Gas Project Before After 2

QGC JV asset swap Transaction details Asset swap agreed with QGC, CNOOC and Tokyo Gas secures Senex a material 100% owned Surat Basin gas project Senex will exchange its minority interests in QGC operated eastern Surat Basin gas permits PL 171 and ATP 574P 1,2 for a 100% interest in, and operatorship of, three QGC JV western Surat Basin permits ATP 767, ATP 795, and ATP 889 2 On completion of the transaction, Senex will hold net 2P gas reserves of 488 PJ (83 mmboe) independently assessed by NSAI and MHA 3 No cash consideration payable by either party in relation to the transfer of the permits Transaction conditional on FIRB, Queensland Government, and other regulatory approvals Senex Western Surat Gas Project 3 (1) Senex interests in PL 171 and ATP 574P are 20% and 30% respectively. Senex holds a 45% operated interest in the existing Don Juan permits (ATP 593P and ATP 771P) (2) Including Potential Commercial Area (PCAs), PCA Applications and Petroleum Lease Applications (PLAs) (3) Total Surat Basin. Refer to Appendix

Senex is Western a major player Surat Gas in the Project Cooper Basin A material 100% owned Surat Basin gas project, adjacent to existing operated acreage 4

A material gas project Tripling the size of our Surat Basin gas business - operated by Senex Net 2P Reserves Land area (Senex share) 3.1x 2P Reserves 488 PJ (83 mmboe) 3.2x Land area 1,697 km 2 2,204 km 2 157 PJ (27 mmboe) 520 km 2 Before transaction After transaction Before transaction 1 2 1 After transaction Total Project Area Material opportunity with meaningful running room Adjoins Senex s existing Don Juan acreage with potential for co-development in the future as part of the Western Surat Gas Project Running room of over 2,000 km 2, creating efficiencies in appraisal and development, with existing pilot wells available to bring forward appraisal Multiple commercialisation options Project area is traversed by pipelines servicing both the domestic and export markets Adjacent to GLNG s Roma gas field development and in close proximity to APLNG s Spring Gully project 5 (1) Senex interests in PL 171 and ATP 574P are 20% and 30% respectively. Senex holds a 45% operated interest in the existing Don Juan permits (ATP 593P and ATP 771P) (2) Total Surat Basin. Refer to Appendix

Maturing our gas portfolio in line with strategy Moving our Surat Basin gas business along the maturity curve OIL GAS Cooper Basin Conventional Oil exploitation Cooper Basin Conventional Oil production MATURITY CURVE Cooper Basin Conventional Oil exploration portfolio Surat gas Western Surat Gas Project Cooper Basin Tight Oil Hornet Tight Gas project Combined 2P reserve base (mmboe) Gas 2 : 83.0 Oil: 13.3 Cooper Basin Conventional Gas Cooper Basin Unconventional Gas EXPLORATION APPRAISAL / DEVELOPMENT PRODUCTION (1) Bubble size indicates estimated resource / value opportunity (2) Following today s announcement 6

A material step towards our goals Complementing the growth potential of our strong SA Cooper Basin business +56 mmboe secured towards our aspirational reserves target 7

Funding included in FY15 guidance No change to FY15 guidance as a result of this transaction FY15 expenditure accounted for in corporate budgets and guidance Following completion, balance of FY15 work program focused on planning activities in advance of on ground works in Q4 FY15 / early FY16 Additional resourcing being sourced to ensure appropriate focus on the Queensland gas business without detracting from the Cooper Basin Up to $40 million investment over first three years to be funded from existing resources Production (mmboe) Capital expenditure ($ million) 1.25 1.38 1.4+ 130 152 0.6 No change 65 100 120 60 80 No change Oil and gas growth capex with return hurdles 40 Development capex FY12 FY13 FY14 FY15g FY12 FY13 FY14 FY15g FY15g 8 (1) Production guidance of 1.4 mmboe relates solely to oil production. Exploration and appraisal upside may include gas production.

Forward plan Achieving an investment decision on a commercial gas project in the Surat Basin FY15 FY16 FY17 FY18 FY19 FY20 + Assess Select Define Execute and operate Demonstrate feasibility and pilot production Select full-scale development concept Define selected concept Deliver 9 Up to $40 million to be invested over the next three years Initial focus on building project team and undertaking detailed planning Community and landowner engagement Environmental baseline studies Subsurface modelling Pilot program planning and ground work Pilot testing to inform larger scale investment decision

Questions

Important notice and disclaimer Important information This presentation has been prepared by Senex Energy Limited (Senex). It is current as at the date of this presentation. It contains information in a summary form and should be read in conjunction with Senex s other periodic and continuous disclosure announcements to the Australian Securities Exchange (ASX) available at: www.asx.com.au. Risk and assumptions An investment in Senex shares is subject to known and unknown risks, many of which are beyond the control of Senex. In considering an investment in Senex shares, investors should have regard to (amongst other things) the risks outlined in this presentation and in other disclosures and announcements made by Senex to the ASX. This presentation contains statements, opinions, projections, forecasts and other material, based on various assumptions. Those assumptions may or may not prove to be correct. No investment advice The information contained in this presentation does not take into account the investment objectives, financial situation or particular needs of any recipient and is not financial advice or financial product advice. Before making an investment decision, recipients of this presentation should consider their own needs and situation, satisfy themselves as to the accuracy of all information contained herein and, if necessary, seek independent professional advice. Disclaimer To the extent permitted by law, Senex, its directors, officers, employees, agents, advisers and any person named in this presentation: give no warranty, representation or guarantee as to the accuracy or likelihood of fulfilment of any assumptions upon which any part of this presentation is based or the accuracy, completeness or reliability of the information contained in this presentation; and accept no responsibility for any loss, claim, damages, costs or expenses arising out of, or in connection with, the information contained in this presentation. Reserve and resource estimates Please refer to the information in the Appendix for details of the qualified reserves and resources evaluator as well as the supporting information required by Chapter 5 of the ASX Listing Rules. 11

Supporting information for estimates Qualified reserves and resources evaluator statement: Information about Senex s reserves and resources estimates has been compiled in accordance with the definitions and guidelines in the 2007 SPE PRMS. The information is based on, and fairly represents, information and supporting documentation prepared by, or under the supervision of, Dr Steven Scott BSc (Hons), PhD, who is General Manager Coal Seam Gas, and has consented to the inclusion of this information in the form and context in which it appears. Dr Scott is a qualified petroleum reserves and resources evaluator, a member of the American Association of Petroleum Geologists, a certified petroleum geologist (P.G. 6218) and a full time employee of Senex. Dr Steven Scott has provided his prior written consent to the form and context in which the estimated petroleum reserves and the supporting documentation appear in this presentation. Aggregation method: The method of aggregation used in calculating estimated reserves was arithmetic summation by category of reserves. As a result of the arithmetic aggregation of the field totals, the aggregate 1P estimate may be very conservative and the aggregate 3P estimate very optimistic due to the portfolio effects of arithmetic summation. Conversion factor: In converting petajoules to mmboe, the following conversion factors have been applied: 1 mmboe = 5.880 PJ Evaluation date: 30 June 2014 for all reserves estimates in this presentation. External consultants: Senex engages the services of MHA Petroleum Consultants LLC and Netherland, Sewell and/or Associates, Inc. (all with qualified reserves and resources evaluators) to independently assess data and estimates of CSG reserves prior to Senex reporting estimates. Method: The deterministic method was used to prepare the estimates of reserves in this presentation. Ownership: All reserves estimates in this presentation are reported according to Senex s economic interest. Reference points: The Wallumbilla gas hub, approximately 45 kilometres south east of Roma, Queensland has been used as the reference point for for measuring and assessing the estimated reserves in this presentation. 12