SUBCONTRACTOR MANAGEMENT PLAN

Similar documents
Safety & Health Manual

SAFETY POLICY. Office Address 5195 W. 58 th Ave. Unit F Arvada, CO

Contractor s Environmental Health & Safety Disclosure

1.3 All employees are equally responsible for complying with the Ontario Occupational Health & Safety Act and its Regulations.

ST. JOHN THE BAPTIST PARISH HOMER BOOGIE JOSEPH COMMUNITY CENTER FACILITY USE AGREEMENT

LONG ISLAND UNIVERSITY STANDARD TERMS AND CONDITIONS

Contractor Guidelines

HULCHER CONTRACTOR SAFETY MANAGEMENT PROCESS

Electric Transmission Texas, LLC Supplemental Safety Terms and Conditions

SUBCONTRACTOR Pre-Qualification Form

POWER CONSTRUCTION COMPANY CCIP PROGRAM SAFETY REQUIREMENTS

2016 CDM Smith All Rights Reserved July 2016 SECTION SAFETY, HEALTH, AND EMERGENCY RESPONSE

ATTACHMENT "I" SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS)

PRODIGY. CONTRACTING GROUP INC. CommerCial residential industrial

Accident Prevention Plans (APP) Appendix A EM (15 SEPTEMBER 2008 edition)

Contractor Safety Policy

Carson, CA Inland Star Distribution Centers, Inc. PSM/CalARP

Contractors Induction Booklet. Contractor s Name:

Habitat for Humanity of Greater Memphis RULES OF ALL PROJECTS

Roger Williams University Contractor Protocols

RULES OF ALL PROJECTS

HOUSING CONSTRUCTION CONTRACT (Projects up to $10,000)

Power Construction Company CCIP Program Safety Requirements

Diversified Engineering & Plastics General Safety & Environmental Process for Contractors

SUPPLEMENTARY TERMS AND CONDITIONS FOR PURCHASE ORDERS ISSUED FOR CONSTRUCTION, INSTALLATION OR REPAIR WORK TO BE PERFORMED ON OUR PREMISES

Prime Contractor Requirements Revised: April 2015

KENNECOTT UTAH COPPER SITE SPECIFIC TERMS For purposes of these Site Specific Terms, (a) the term Company means Kennecott Utah Copper LLC; (b) the

San Antonio Water System PROJECT CONSTRUCTION PROGRAM HEALTH AND SAFETY PROGRAM

2. Attachments a) Design Drawings Drawing(s) Revision Revision Date Specifications (T1.1-T2.8) N/A N/A A /06/17 A1.1 N/A N/A A2.

I. Identification of Partners

ACCIDENT PREVENTION POLICY Signature Page Assign, Sign, & Return this page only to DiFiore Construction

WORKING WITH CONTRACTORS POLICY AND PROCEDURE

00810 Vendor Diversity

ATTACHMENT C-1 CONTRACTOR QUALIFICATIONS FOR CONSTRUCTION OF ELECTRIC AND NATURAL GAS FACILITIES

Contractor shall provide new thermal fused plastic laminate doors for each interior opening as scheduled. All openings are to receive new hardware.

CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS

QUALITY POLICY. All Company employees are responsible for implementing the Company s Quality Policy.

MINIMUM BASIC OUTLINE FOR ACCIDENT PREVENTION PLAN

~!'BCdBulldor. A partnering program between the. Associated Builders and Contractors of Minnesota. and the. Occupational Safety and Health Division

San Antonio Water System Standard Specifications for Construction

CZOT-MGS LLC SUBCONTRACT AGREEMENT JOB # DAL010 SUBCONTRACT: 001 COST CODE: 00000

CONTRACTOR SAFETY AGREEMENT

CONSTRUCTION AGREEMENT/CONTRACT

Denver Public Schools. Bond Construction. Construction Safety Standards West Seventh Avenue Denver, CO 80204

SUBCONTRACTOR AGREEMENT

Contractor Pre-qualification Questionnaire

Cooperation with the University s representatives, addressing specific safety issues at the Project.

RISK CONTROL SOLUTIONS

Sample Safety Program for Mississippi Employers

Transnet Freight Rail E.4E Transnet (August 2006) A Division of Transnet Ltd. TRANSNET LIMITED (Registration no. 1990/000900/06) PRIEVIEW COPY ONLY

MAINE COMMUNITY COLLEGE SYSTEM

Exhibit. Owner Controlled Insurance Program. Insurance Requirements

CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]

Tower Contractor Questionnaire

Subcontract Agreement

OKLAHOMA CITY COMMUNITY COLLEGE HAZARD COMMUNICATION PROGRAM. Environmental Health and Safety

SUBJECT: REQUEST FOR QUOTES (RFQ): PROVIDE, INSTALL AND REPAIR VARIOUS VERTICAL BLINDS AND WINDOW COVERINGS

REQUEST FOR PROPOSALS FOR ACCOUNTING SERVICES

Subcontractor Contract and Scope of Work MECHANICAL Social Security Administration Auburn, AL Ross Clark Circle Dothan, Alabama 36301

Introduction to OSHA and OSHA Inspections. Jim Shelton, CAS, Houston North

CONTRACTOR PRE-QUALIFICATION QUESTIONNAIRE

CN Course Exercise. c. Ensure all employees have received the required training for their work.

APPLICATION for SPECIAL USE

BIDDER QUALIFICATION FORM

CONTRACTOR PRE QUALIFICATION QUESTIONNAIRE

Mold Remediation and Clean Up of Central High School

Work Health and Safety Conditions

WRITTEN AGREEMENT FOR OCCUPATIONAL HEALTH AND SAFETY

Goodman Sports Complex

CONTRACT AGREEMENT between Tow Company ) Contract No.: 06-FSP-01 Street Address ) City, State ZIP Code ) ) (hereinafter "Contractor") ) ) ) ) ) and )

Security, Safety, and Environmental Guidelines for Contractor Employees EXHIBIT S-1

AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC)

Labor Law Regulation Part 60 Pursuant to Section 134 of the Workers. Compensation Law as amended by Chapter 6 of the Laws of 2007

Subcontractor Requirements

Rising Sun-Ohio County Park Board Facility Rental Application and Agreement (812)

Workplace Safety and Loss Prevention Incentive Program (Safety, Drug and Alcohol Prevention, and Return to Work Incentive Programs)

SECTION C CONTRACT GENERAL TERMS AND CONDITIONS

Works Appointment: We, on behalf of the Employer, would like to inform you that your quotation, Reference Number

Contractor Safety Management Element November 2018

Introduction to OSHA. This presentation is designed to assist in conducting OSHA 10-hour General Industry outreach training for workers.

SUBCONTRACT AGREEMENT

Independent Contractor policy (Fremdfirmenordnung)

Activity Hazard Analysis (AHA) Overall Risk Assessment Code (RAC) (Use highest code) SIGNATURES Activity # AHA #

TOOLS FOR SAFETY ENFORCEMENT ON CONSTRUCTION AND CONTRACT PROGRAM MANAGEMENT PROCEDURES THAT APPLY TO CONSTRUCTION ALTERATION & REPAIR PROJECTS

Request for Quote RFQ CF Window Cleaning at Boise State University Stueckle Sky Center

THIS CONSTRUCTION CONTRACT ( Contract ) dated as of ( Owner ) and ( Contractor ) having a principal place of business at.

Contractor Information

Subject: Invitatioii for Bid No. 230 Emergency Response for Environmental Clean-up and Disposal of Hazardous and Noii-Hazardous Waste Addendum No.

CONTRACTOR/SUPPLIER QUALIFICATION STATEMENT

CONTRACT AGREEMENT FOR PARKING AREA CONSTRUCTION. THIS AGREEMENT, made this day of, 2018,

Hazard Assessment, Analysis and Control

DATA ITEM DESCRIPTION

Request for Proposal Public Warning Siren System April 8, 2014

ADDENDUM TO INSURANCE MANUAL. Safety Standards. Owner Controlled Insurance Program (OCIP)

THE PIKE COMPANY, INC

STANDARD SUBCONTRACT AGREEMENT FOR BUILDING CONSTRUCTION

EXHIBIT A SCOPE OF WORK AND RELATED INFORMATION PORTABLE FIRE EXTINGUSHER SERVICES

APPLICATION FOR ALTERATIONS OR ADDITIONS

Subcontractor Partner Prequalification Form. Company Name: DBA (if applicable):

Transcription:

SUBCONTRACTOR MANAGEMENT PLAN Steingass Mechanical Contracting, Inc. 754 Progress Drive Medina, Ohio 44256 (330) 725-6090 0

Steingass Mechanical Contracting, Inc. Subcontractor Management Plan Safety Pre-Qualification 1) Subcontractors will be pre-qualified by reviewing their safety programs, safety training documents, and safety statistics and any prior OSHA citations. 2) Subcontractor s safety programs must include the following safety metrics: A. Based upon the scope of their work subcontractors must have the written programs, policies and protocols necessary to comply at a minimum with 29 CFR 1926. B. Subcontractors must have necessary documents to demonstrate that employee training has been conducted upon initial assignment to the extent that employees are capable of recognizing existing and predicable hazards associated with their scope of work and/or mandated by 29 CFR 1926. C. Subcontractor s Incident Rating must be below the National Average in comparison to the BLS for the individual SIC Code. 3) Subcontractors shall be required to designate an onsite safety representative that has completed the OSHA 10 hour training. 1

4) Subcontractors must attend all pre-job meetings, kick-off meetings, safety orientations, and all safety meetings. 5) Subcontractors will be required to develop a project specific safety plan, conduct weekly safety meetings, conduct job safety analysis, hazard assessments and job safety inspections. 6) A post job safety performance review will be conducted on all subcontractors. 2

Steingass Mechanical Contracting, Inc. Subcontractor Management Plan Safety Qualifications Upon acceptance of contracted work for Steingass Mechanical Contracting, Inc. the following standards of professionalism and conduct must be met at all times. Violations of this set protocol will result in the permanent removal of the involved contractor from the work site. 1.) For the duration of the contract, all Contractors must be in full compliance with all applicable safety and health standards promulgated under the Occupational Safety and Health Act of 1970, and with any and all applicable state and local safety requirements, rules, and regulations thereunder. 2.) The Contractor will at all times indemnify and save Steingass Mechanical Contracting, Inc. harmless from and against every claim, demand, liability, loss, cost, charge, and counsel fee that results due to the Contractors failure to comply. 3.) Further, to any other remedy available to Steingass Mechanical Contracting, Inc. for the enforcement of the aforesaid indemnity obligation of the Contractor, Steingass Mechanical Contracting, Inc. may back charge contractor for any amount due from Contractor to Steingass Mechanical Contracting, Inc. under this contract. Before proceeding with operations specified in this contract or purchase order, the Contractor owner representative shall be responsible to insure that all supervisor s foremen, workers and delivery personnel are made aware of these regulations and requirements. The following Safety Qualifications must be met and submitted to Steingass Mechanical 3

Contracting, Inc. s office at 754 Progress Drive, Medina, Ohio 44256, with NO EXCEPTIONS. Date reviewed with personnel: 1) Horseplay, the use or possession of firearms, alcoholic beverages, illegal drugs on company property, including parking areas, is strictly forbidden. 2) During the progress of work, Contractors will maintain clean and safe working conditions. Work sites must be orderly and safe prior to leaving at the end of each shift. At the completion of the project, rubbish and debris occasioned by the work will be removed off site and the work area will be left broom clean. 3) Workers must be properly attired at all times. Shirts, trousers, and leather footwear are required. 4) Sufficient, approved, Personal Protective Equipment has been provided to personnel. 5) Personnel have been instructed in the proper use of PPE and in the ability to recognize any hazard they may encounter during their job assignment. 6) All incidents requiring medical attention shall be reported to Steingass Mechanical Contracting, Inc. at (330) 725-6090 WITHIN 24 HOURS. 7) All personnel entering the work site have been trained in Fall Protection and are capable of recognizing workplace fall hazards. and, in addition, understand that they must strictly adhere to it at all times. 8) Contractor personnel have been trained and understand the requirements of the Hazard Communication Standard, including 4

the maintenance of appropriate hazard information (Material Safety Data Sheet, MSDS) at the work site, establishing a central location for them at each job site and their responsibility to communicate this information to all affected employees. 9) Contractor personnel have been trained in the proper use of stairways and ladders. 10) When applicable, contractor will have competent person(s) as defined by the OSHA standard to inspect all scaffolding as required and to oversee the assembly and dismantling of all scaffolding. 11) When applicable, contractor will have competent person(s) as defined by the OSHA standard to inspect as required and to oversee all trenching operations. Contractor s Safety Representative Signature Date 5