UNIFIED DEVELOPMENT ORDINANCE TABLE OF CONTENTS. Chapter 1 General Provisions Article 1.1 Introduction

Similar documents
TABLE OF CONTENTS CHAPTER 80: AREA ZONING CODE

BUTTE COUNTY ZONING ORDINANCE CONTENTS

CITY OF MOUNTLAKE TERRACE RESOLUTION NO.

INSPECTION SERVICES DIVISION FEE SCHEDULE

PLANNING DEPARTMENT ADMINISTRATION

IC Chapter 14. Redevelopment of Areas Needing Redevelopment Generally; Redevelopment Commissions

CHAPTER 15: FLOODPLAIN OVERLAY DISTRICT "FP"

FLOODPLAIN DEVELOPMENT VARIANCE APPLICATION PACKET

TOWN OF WOODWAY FEE SCHEDULE PAGE 1 EFFECTIVE APRIL 18, 2017

Manor Township, Lancaster County, PA Zoning Permit Application ( section 702) App. number App. date

ORDINANCE LIST AND DISPOSITION TABLE

Ponderosa Townhome Association

ARTICLE IV. NON-CONFORMING USES, BUILDINGS, AND STRUCTURES

PLANNING AND ZONING COMMISSION COMMUNICATION

PLANNING DEPARTMENT. Town Goals. Goal: Ensure that infrastructure exists for current and future needs identified in the comprehensive plan.

Village Plan Commission Ordinances

City of Hanover 2018 Fee Schedule

Elevating Historic Properties

Chapter 113 FLOODPLAIN MANAGEMENT ARTICLE I. IN GENERAL

Chapter 1040 General Floodplain Ordinance TABLE OF CONTENTS PAGE

CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES. Goal 1: [CI] (EFF. 7/16/90)

City of Garland. Fee List (2015) Zoning Change or Specific Use Provision Applications

Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan.

STORMWATER MANAGEMENT FUND Department of Environmental Services

Residential Permit Fee Schedule

HACKBERRY HIDDEN COVE PUBLIC IMPROVEMENT DISTRICT NO. 2 SERVICE AND ASSESSMENT PLAN (UTILITY IMPROVEMENTS)

CHAPTER 5: FEES, FINES & FRANCHISE GRANTS

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 H 1 HOUSE BILL 861. Short Title: Local Option Tax Menu. (Public)

Article 32 Special Events

City of Hanover 2019 Fee Schedule

Article 19 NON-CONFORMING DEVELOPMENT. ADOPTED: January 2002 CASE NUMBER: TA ORDINANCE NO.

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

Oregon Theodore R. KujDiigjslii Governor

Kansas Underground Utility Damage Prevention Act. With Changes Mandated by HB 2637

Article 23-6 FLOODPLAIN DISTRICT

SUMMARY OF SERVICES BY STRATEGIC PRIORITY

NOTICE OF SPECIAL MEETING

Stormwater System Development Charges

City of New Smyrna Beach Permit Fee Schedule

MUNICIPAL BONDED INDEBTEDNESS LIMITS AND EXCEPTIONS TO THOSE LIMITS

SUMMARY OF SERVICES BY STRATEGIC PRIORITY

OWNER S INFORMATION SHEET

Community Rating System. National Flood Insurance Program

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach

Pre-Development Floodplain Application

APPENDIX B EVALUATION OF EXISTING PROGRAMS AND POLICIES. Hillsborough County Local Mitigation Strategy Appendix B-1

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

CITY OF PLANTATION ENGINEERING DEPARTMENT INTEROFFICE MEMORANDUM NO

A Flood Mitigation Plan for the Non-Tidal N.J. Section of the Delaware River Basin. Warren County Planning Workshop (2 nd Meeting) March 7, 2007

Floodplain Development Permit Application

Fee Schedule. Effective January 1, Administrative Services/All Departments: COPYING OF RECORDS

CITY OF MILAN OFFICAL FEE SCHEDULE

Ordinance Number 1 % New Munich Floodplain Management Ordinance. September 10,2007

BOARD OF ZONING APPEALS OCTOBER 23, 2013 AGENDA

UNOFFICIAL COPY OF HOUSE BILL Read and Examined by Proofreaders:

Honorable Mayor and Members of the City Council. Elizabeth Corpuz, Director of Planning and Building Services Jason P. Clarke, Senior Planner

RESOLUTION NO A RESOLUTION ESTABLISHING PLAN REVIEW, PERMIT, AND INSPECTION FEES; RESCINDING RESOLUTION NO

Gordon County Permit Fees Effective August 1, 2012

Floodplain Development Permits A Technical Guidance Document

FEE SCHEDULES. Class "B" Fermented Malt $ per year

2019 Budget Presentation Planning and Community Development. Craig Dossey, Executive Director October 18, 2018

COMMUNITY SUMMARY LINN COUNTY MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN CITY OF LISBON

OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY

DEPARTMENT OF DEVELOPMENT SERVICES

Bucks County, PA Flood Risk Review Meeting. November 2014

Session of HOUSE BILL No By Committee on Judiciary 2-7

TOWN OF KENT, CT PLANNING AND ZONING COMMISSION

GENERAL FUND REVENUES BY SOURCE

CITY OF SOLVANG FEES, CHARGES, AND FINES

THE LOCAL DEVELOPMENT FINANCING ACT Act 281 of The People of the State of Michigan enact:

EFFECTIVE JANUARY 1, 2016 THE CITY OF WINNIPEG BY-LAW NO. 107/2015

This page intentionally blank. Capital Facilities Chapter Relationship to Vision. Capital Facilities Chapter Concepts

Floodplain Development Permit Application

North Carolina Department of Public Safety Emergency Management Risk Management

LEE COUNTY, FLORIDA DEPARTMENT OF COMMUNITY DEVELOPMENT ZONING DIVISION STAFF REPORT

STORMWATER MANAGEMENT FUND Department of Environmental Services

GENERAL ADMINISTRATION AND CORPORATE SERVICES (Administration/Corporate/Finance Departments)

ORDINANCE NO. CID-3193

RESOLUTION NO A RESOLUTION OF THE CITY OF NEWPORT REVOKING ALL PRIOR FEE RESOLUTIONS AND ADOPTING A NEW FEE SCHEDULE.

CAPITAL RECOVERY POLICY TABLE OF CONTENTS

Municipal Gas Utility of the City of Cedar Falls, Iowa Service Policy September 2016 Table of Contents

PROJECT EVALUATION FORM

ETOWAH UTILITIES SCHEDULE OF RULES AND REGULATIONS

CHAPTER 35 REIMBURSEMENT DISTRICTS FOR PUBLIC ROAD IMPROVEMENTS

Direction Zoning Use Land Use Plan Jurisdiction

CITY OF PALM DESERT COMPREHENSIVE GENERAL PLAN

Plan Implementation AICP Exam Review

2017 WATER AND WASTEWATER IMPACT FEE STUDY CITY OF AZLE, TEXAS

THE PEOPLE OF THE STATE OF MICHIGAN ENACT:

AMENDMENT TO SUBDIVISION AGREEMENT

Chapter 6 - Floodplains

F l o o d Ha z a r d Mi t i g at i o n

Village of Batavia Proposed Resolution Establishing Community Reinvestment Area

Village of Glenview Plan Commission

City of Ocean City Permit and Application Process Quality Improvement

Planning Commission Meeting. March 2, 2016

Project Plan for the Creation of Tax Incremental District No. 10

HENRY COUNTY, OHIO SPECIAL PURPOSE FLOOD DAMAGE PREVENTION REGULATIONS TABLE OF CONTENTS

Floodplain Management 101. Mississippi Emergency Management Agency Floodplain Management Bureau

Reasonable Modification from the Planning Code

Transcription:

Genoa City Code Title 11 UNIFIED DEVELOPMENT ORDINANCE TABLE OF CONTENTS Chapter 1 General Provisions Article 1.1 Introduction HISTORY AND REGIONAL SETTING... 1.1.1 THE NEED FOR THIS ORDINANCE... 1.1.2 GENERAL DEVELOPMENT OBJECTIVES... 1.1.3 ORGANIZATION OF THIS DOCUMENT... 1.1.4 Article 1.2 Purpose and Applicability TITLE AND JURISDICTION... 1.2.1 PURPOSE AND INTENT... 1.2.2 SEPARABILITY... 1.2.3 REPEAL OF CONFLICTING ORDINANCES... 1.2.4 PUBLICATION AND EFFECTIVE DATE... 1.2.5 ILLUSTRATIONS... 1.2.6 ZONING MAP... 1.2.7 ANNEXED LAND... 1.2.8 BOUNDARY LINES... 1.2.9 INTERPRETATION... 1.2.10 PLATTED BUILDING AND SETBACK LINES... 1.2.11 INCORPORATION BY REFERENCE... 1.2.12 DISCLOSURE BY TRUSTEE OF LAND TRUST... 1.2.13 SUCCESSOR TO RULE OR STANDARD MAKING AGENCIES... 1.2.14 PRIVATE AGREEMENTS... 1.2.15 COMPREHENSIVE PLAN... 1.2.16 Article 1.3 Definitions USE OF DEFINTIONS... 1.3.1 RULES... 1.3.2 DEFINITIONS... 1.3.3 Chapter 2 Decision Making, Administration And Enforcement Responsibilities Article 2.1 General Provisions GENERAL PROVISIONS... 2.1.1 Article 2.2 The Office of the Development Administrator

APPOINTMENT... 2.2.1 DUTIES OF THE DEVELOPMENT ADMINISTRATOR... 2.2.2 Article 2.3 The Office of the Director of Public Works APPOINTMENT... 2.3.1 DUTIES OF THE DIRECTOR OF PUBLIC WORKS... 2.3.2 Article 2.4 The Hearing Officer ESTABLISHMENT... 2.4.1 APPOINTMENT AND TERM OF OFFICE... 2.4.2 DUTIES OF THE HEARING OFFICER... 2.4.3 MEETINGS AND RULES... 2.4.4 Article 2.5 The Plan Commission CREATION... 2.5.1 APPOINTMENT AND TERMS... 2.5.2 OFFICERS... 2.5.3 VACANCIES... 2.5.4 JURISDICTION... 2.5.5 MEETINGS AND RULES... 2.5.6 QUORUM... 2.5.7 Article 2.6 The Mayor and City Council AUTHORITY... 2.6.1 Article 2.7 Enforcement COMPLAINTS REGARDING VIOLATIONS... 2.7.1 PERSONS LIABLE... 2.7.2 PROCEDURES UPON DISCOVERY OF VIOLATIONS... 2.7.3 PENALTIES AND REMEDIES FOR VIOLATIONS... 2.7.4 Chapter 3 Non-Conforming Lots, Buildings, Structures and Uses Article 3.1 Purpose PURPOSE... 3.1.1 Article 3.2 General Provisions AUTHORITY TO CONTINUE NON CONFORMING BUILDINGS, LOTS, STRUCTURES AND USES... 3.2.1 ENLARGEMENTAND EXPANSION OF NON-CONFORMING BUILDINGS, LOTS, STRUCTURES AND USES... 3.2.2 MAINTENANCE AND REPAIR OF NON-CONFORMING BUILDINGS, LOTS, STRUCTURES AND USES.. 3.2.3 ACCESSORY USES... 3.2.4 PREVIOUS NON-CONFORMING BUILDINGS, LOTS, STRUCTURES AND USES... 3.2.5 Article 3.3 Additional Regulations, Standards and Criteria NON-CONFORMING LOTS... 3.3.1

NON-CONFOMRING BUILDINGS AND STRUCTURES... 3.3.2 NON-CONFORMING USES... 3.3.3 Article 3.4 Exempt Buildings, Structures, Uses and Lots EXEMPT BUILDINGS, STRUCTURES, USES AND LOTS... 3.4.1 Article 3.5 Eliminating Non-Conforming Buildings, Structures and Uses PROCEDURES... 3.5.1 ELIMINATION OF NON-CONFORMING BUILDINGS AND STRUCTURES... 3.5.2 ELIMINATION OF NON-CONFORMING USES OF LAND... 3.5.3 Chapter 4 Development Review Procedures Article 4.1 General Provisions PURPOSE... 4.1.1 FEES... 4.1.2 REIMBURSEMENT FOR STAFF REVIEW TIME... 4.1.3 ZONING CERTIFICATES... 4.1.4 Article 4.2 Site Plan Review SITE PLAN REVIEW... 4.2.1 APPLICATION REQUIREMENTS FOR SITE PLAN REVIEW... 4.2.2 SITE PLAN REVIEW PROCEDURES... 4.2.3 STANDARDS FOR SITE PLAN REVIEW... 4.2.4 STANDARDS FOR APPEARANCE REVIEW... 4.2.5 APPEARANCE REVIEW CRITERIA... 4.2.6 Article 4.3 Special Uses PURPOSE... 4.3.1 AUTHORIZED SPECIAL USES... 4.3.2 STANDARDS... 4.3.3 ADDITIONAL STANDARDS AND CRITERIA... 4.3.4 CONDITIONS... 4.3.5 PROCEDURES... 4.3.6 EFFECT OF DINIAL OF A SPECIAL USE... 4.3.7 TERMINATION OF SPECIAL USE PERMIT... 4.3.8 DISCONTINUATION OF A SPECIAL USE... 4.3.9 Article 4.4 Planned Developments PURPOSE... 4.4.1 OBJECTIVES... 4.4.2 MODIFICATION OF DISTRICT REGULATIONS... 4.4.3 GENERAL STANDARDS AND CRITERIA FOR PLANNED DEVELOPMENTS... 4.4.4 APPLICATION PROCEDURES... 4.4.5 ADMINISTRATION OF PLANNED DEVELOPMENTS... 4.4.6

Article 4.5 Subdivision Plats and Procedures SUBDIVISION PLATS AND PROCEDURES... 4.5.1 SUBDIVISIONS... 4.5.2 THE CONCEPT PLAN... 4.5.3 THE PRELIMINARY SUBDIVISION PLAT OR DEVELOPMENT PLAN... 4.5.4 ENGINEERING APPROVAL... 4.5.5 THE FINAL SUBDIVISION PLAT OR DEVELOPMENT PLAN... 4.5.6 Article 4.6 Variations or Appeals VARIATIONS... 4.6.1 APPEALS... 4.6.2 Article 4.7 Changes and Amendments to This Title GENERAL REQUIREMENTS FOR CHANGES AND AMENDMENTS... 4.7.1 ADDITIONAL STANDARDS AND CRITERIA FOR AMENDING THE CITY COMPREHENSIVE PLAN... 4.7.2 ADDITIONAL STANDARDS AND CRITERIA FOR AMENDING THE ZONING ORDINANCE... 4.7.3 Chapter 5 Use Districts Article 5.1 Use Districts ESTABLISHMENT OF ZONES... 5.1.1 Article 5.2 Conditions of Use CONDITIONS OF USE... 5.2.1 Article 5.3 Permitted Uses TABLE OF PERMITTED USES... 5.3.1 Article 5.4 Performance Standards PURPOSE... 5.4.1 HAZARDOUS SUBSTANCES... 5.4.2 FIRE AND EXPLOSION HAZARDS... 5.4.3 SMOKE AND PARTICULATE MATTER... 5.4.4 ODORS... 5.4.5 RADIATION HAZARDS... 5.4.6 VIBRATION... 5.4.7 GLARE AND HEAT... 5.4.8 ELECTROMAGNETIC INTERFERENCE... 5.4.9 SOURCES OF ILLIMINATION... 5.4.10 INDUSTRIAL WASTEWATER DISPOSAL... 5.4.11 STORM WATER DISPOSAL... 5.4.12 NOISE... 5.4.13 CERTIFICATION OF COMPLIANCE... 5.4.14 ENFORCMENT... 5.4.15 VIOLATIONS... 5.4.16 Chapter 6 Land Use and Development Standards

Article 6.1 General Provisions NEW STRUCTURES... 6.1.1 NEW USES OF OLD STRUCTURES... 6.1.2 REMODELING... 6.1.3 USE OF OPEN LAND... 6.1.4 USES PERMITTED IN ALL DISTRICTS... 6.1.5 PUBLIC SEWER AND WATER FACILITIES REQUIRED... 6.1.6 PERMITTED USES... 6.1.7 SPECIAL USES... 6.1.8 LOT SIZE REQUIREMENTS... 6.1.9 BULK REGULATIONS... 6.1.10 OFF-STREET PARKING AND LOADING... 6.1.11 NUMBER OF STRUCTURES AND USES ON A ZONING LOT... 6.1.12 YARD REQUIREMENTS FOR OPEN LAND... 6.1.13 RESTRICTIONS ON ALLOCATION AND DISTRIBUTION OF REQUIRED YARDS AND OPEN SPACE... 6.1.14 USE LIMITATIONS... 6.1.15 Article 6.2 Accessory Structures or Uses ACCESSORY STRUCTORESOR USES... 6.2.1 Article 6.3 Temporary Structures and Uses TEMPORARY STRUCTORESOR USES... 6.3.1 Article 6.4 Home-Based Businesses PURPOSE... 6.4.1 PERFORMANCE STANDARDS... 6.4.2 PARTICULAR HOME-BASED BUSINESSES PROHIBTED... 6.4.3 Article 6.5 Site Development Standards PURPOSE... 6.5.1 LOT DEVELOPMENT... 6.5.2 Article 6.6 Landscaping and Tree Preservation PURPOSE... 6.6.1 TREE PRESERVATION AND REMOVAL REGULATIONS... 6.6.2 LANDSCAPING AND SCREENING REGULATIONS... 6.6.3 Article 6.7 Off-Street Parking and Loading PURPOSE... 6.7.1 SCOPE... 6.7.2 GENERAL OFF-STREET PARKING AND LOADING STANDARDS... 6.7.3 ADDITIONAL OFF-STREET PARKING STANDARDS AND REQUIREMENTS... 6.7.4 SCHEDULE OF REQUIRED PARKING... 6.7.5 LAND BANKED PARKING FACILITIES... 6.7.6

ADDITIONAL OFF-STREET LOADING REGULATIONS... 6.7.7 SCHEDULE OF LOADING REGULATIONS... 6.7.8 Article 6.8 Signs PURPOSE... 6.8.1 SCOPE... 6.8.2 PROHIBITED SIGNS... 6.8.3 GENERAL PROVISIONS... 6.8.4 SIGNS EXEMPTED FROM THIS CHAPTER... 6.8.5 CLASSIFICATION OF SIGNS... 6.8.6 PERMITTED SIGNS... 6.8.7 TABLE OF SIGN REQUIREMENTS... 6.8.8 SPECIAL SIGNS... 6.8.9 SPECIAL USE... 6.8.10 SPECIAL AREAS OF CONTROL... 6.8.11 NON-CONFORMING SIGNS... 6.8.12 ZONING CERTIFICATE REQUIREMENTS... 6.8.13 Article 6.9 Public Open Space, School and Civic Contribution Requirements PUBLIC OPEN SPACE DESIGN STANDARDS AND REQUIREMENTS... 6.9.1 OPEN SPACE TYPES... 6.9.2 DEDICATION OF SCHOOL SITES OR FOR CASH CONTRIBUTIONS IN LIEU THEREOF... 6.9.3 SCHOOL CAPITAL DEVELOPMENT FEE... 6.9.4 FIRE PROTECTION, LIBRARY AND CITY CASH CONTRIBUTIONS... 6.9.5 Article 6.10 Flood Control Regulations PURPOSE... 6.10.1 DEFINITIONS... 6.10.2 BASE FLOOD ELEVATION... 6.10.3 DEVELOPMENT PERMIT... 6.10.4 PREVENTING INCREASED DAMAGES... 6.10.5 PROTECTING BUILDINGS... 6.10.6 OTHER DEVELOPMENT REQUIREMENTS... 6.10.7 VARIANCES... 6.10.8 ADMINISTRATION AND ENFORCEMENT... 6.10.9 DISCLAIMER OF LIABILITY... 6.10.10 VIOLATION AND PENALTIES... 6.10.11 Article 6.11 Streets and Alleys PURPOSE... 6.11.1 STANDARDS... 6.11.2 ALLEYS... 6.11.3 STANDARDS... 6.11.4

TABLE OF STREET STANDARDS... 6.11.5 Article 6.12 Sidewalks SIDEWALKS REQUIRED... 6.12.1 STANDARDS... 6.12.2 Article 6.13 Water Distribution System WATER MAINS REQUIRED... 6.13.1 WATER MAIN STANDARDS... 6.13.2 Article 6.14 Sanitary Sewer Collection System SANITARY SEWER COLLECTION SYSTEM REQUIRED... 6.14.1 SANITARY SEWER SYSTEM STANDARDS... 6.14.2 Article 6.15 Storm Water Management STORM WATER MANAGEMENT SYSTEMS, EROSION CONTROL, WETLAND PROTECTION, FLOODPLAIN PROTECTION AND PROTECTION OF RIPARIAN ENVIRONMENT... 6.15.1 THE WATERSHED PLANS... 6.15.2 DEFINITIONS... 6.15.3 STORMWATER MANAGEMENT SYSTEMS... 6.15.4 STORM SEWER DESIGN STANDARDS... 6.15.5 STORM SEWER, PIPE CULVERT AND STRUCTURE STANDARDS... 6.15.6 MINUMUM SIDED STORM SEWERS... 6.15.7 MINIMUM SIXED RESTRICTORS... 6.15.8 LOCATION OF STORM SEWER STRUCTURES... 6.15.9 STORMWATER DETENTION... 6.15.10 DETENTION BASIN CONSTRUCTION... 6.15.11 UNDERDRAINS... 6.15.12 Article 6.16 On-Site Public Improvements APPLICABILITY... 6.16.1 IMPROVEMENT PLANS... 6.16.2 AS-BUILT PLANS... 6.16.3 FEES... 6.16.4 Article 6.17 Off-Site Public Improvements APPLICABILITY... 6.17.1 IMPROVEMENT PLANS... 6.17.2 AS-BUILT PLANS... 6.17.3 FEES... 6.17.4