CAPITAL IMPROVEMENT PLAN GUIDELINES AND PROCEDURES

Similar documents
CAPITAL IMPROVEMENT PLAN

Public Works and Development Services

CAPITAL IMPROVEMENT BUDGET FY

CAPITAL IMPROVEMENTS PROGRAM MANUAL

INTRODUCTION. Why a CIP? What is a Capital Improvement?

POLICY ON CAPITAL ASSETS & CAPITAL IMPROVEMENT PLAN (CIP)

This page intentionally blank. Capital Facilities Chapter Relationship to Vision. Capital Facilities Chapter Concepts

FORM B CAPITAL PROJECT REQUEST. (Excluding equipment) 1. Project Title 2. Purpose of Project Request Form (Check One)

CITY OF SACRAMENTO CALIFORNIA. April 27, 2012

Kelly Howsley Glover, Long Range Planner Wasco County Planning Commission. Wasco County Planning Department

INSTRUCTIONS FOR COMPLETING CAPITAL IMPROVEMENTS PROGRAM (CIP) REQUESTS

County of Gloucester, Virginia. Capital Improvement Plan Manual. Fiscal Years 2020 through 2024

PALM BEACH COUNTY CAPITAL IMPROVEMENT PROGRAM

ADMINISTRATIVE ANALYST (Class Code 1590) TASK LIST

Capital Improvement Program

GENERAL FUND REVENUES BY SOURCE

Office for Capital Facilities

SECTION C - RESERVE FOR CAPITAL EXPENDITURE (RCE) PROJECTS

THE CITY OF LAWTON, OKLAHOMA ANNUAL FINANCIAL STATEMENTS AND INDEPENDENT AUDITOR S REPORTS

CAPITAL IMPROVEMENTS ELEMENT

CITY OF WAUSAU. Capital Improvement Program Planning 2016

ARLINGTON COUNTY, VIRGINIA

GUIDE TO THE OPERATING BUDGET

TOWN OF CUMBERLAND, RHODE ISLAND ANNUAL FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2016

City of North Lauderdale, Florida

CITY OF PARIS Paris, Kentucky. FINANCIAL STATEMENTS June 30, 2011

PUBLIC WORKS ADMINISTRATION / ENGINEERING

TOWN OF CUMBERLAND, RHODE ISLAND ANNUAL FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2017

CITY OF NIAGARA FALLS, NEW YORK. Financial Statements as of December 31, 2010 Together with Independent Auditors Report

Citizens Guide to the Budget

Capital Program Considerations in CHALLENGING TIMES

Memorandum City of Lawrence City Manager s Office

INTRODUCTORY SECTION

REQUEST FOR PROPOSALS FOR AUDIT SERVICES (BID NUMBER) TOWN OF TYRONE TOWN COUNCIL TOWN OF TYRONE, GEORGIA

RESOLUTION NO. 14R-2434

BUSINESS PLAN. Adopted: March 26, Business Plan 1

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager At-Risk

CITY OF NORCROSS, GEORGIA. Annual Financial Report. For the year ended December 31, 2009

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: SEPTEMBER 19, 2001 CMR:354:01

Professional Standards and Recognition Committee BUDGET REVIEWER S GUIDE Fiscal Year 2012/13

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form

FISCAL YEAR 2017 BUDGET PREPARATION MANUAL

COUNTY OF OTTAWA, MICHIGAN FINANCIAL STATEMENTS YEAR ENDED DECEMBER 31, 2017

How Much Is Enough? Determining Appropriate Levels of Capital Investment

City of Marianna Marianna, Florida

State Revolving Fund (SRF) Clean Water Program Application Instructions for Municipal Borrowers

1/9/2018. Capital Improvement Program

CITY OF JAMESTOWN, NEW YORK TABLE OF CONTENTS. Independent Report of Auditor 1. Management s Discussion and Analysis 3. Statement of Net Assets 12

CAPITAL BUDGET AND MULTI-YEAR CAPITAL PLAN SECTION 1 INTRODUCTION INTRODUCTION. Purpose of the Capital Improvement Plan

Policy CIE The following are the minimum acceptable LOS standards to be utilized in planning for capital improvement needs:

City of Bonney Lake. Financial Statements and Federal Single Audit Report. Pierce County. For the period January 1, 2013 through December 31, 2013

CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT

THE COMMISSIONERS OF LEONARDTOWN LEONARDTOWN, MARYLAND FINANCIAL STATEMENTS AND INDEPENDENT AUDITORS REPORT. For the Year Ended June 30, 2018

Ballot Measures-T Section

Management Letter. City of Montgomery Montgomery, Minnesota. For the Year Ended December 31, 2016

NORTH CAROLINA DEPARTMENT OF TRANSPORTATION

Office of Budget and Financial Planning BUDGET MANUAL 2018

CITY OF ST. PAUL PARK FINANCIAL STATEMENTS FOR THE FISCAL YEAR ENDED DECEMBER 31, 2014

CLINTON CITY BASIC FINANCIAL STATEMENTS AND REQUIRED SUPPLEMENTARY INFORMATION WITH INDEPENDENT AUDITOR'S REPORTS YEAR ENDED JUNE 30, 2018

CITY OF LAKE ELMO, MINNESOTA COMPREHENSIVE ANNUAL FINANCIAL REPORT FOR THE FISCAL YEAR ENDED DECEMBER 31, 2017

Policy 3-205: Remodeling and Construction Policy

ACTION STRATEGIES. Aurora Places is the guidebook

City of San Luis Obispo. Citywide User Fee and Rate Study. Final Report. March 30, 2017

Operating Budget Overview 2019

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 20, 2015

THE CORPORATION OF THE CITY OF SAULT STE. MARIE

Special Revenue Funds

CITY OF YREKA, CALIFORNIA FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2015

LEAVENWORTH CITY COUNCIL Study Session Agenda City Hall - Council Chambers July 10, :00 a.m.

Management Letter. City of New Richland New Richland, Minnesota. For the Year Ended December 31, 2017

Celebrating 25 Years of Excellence

TOWNSHIP OF UPPER ST. CLAIR LONG-TERM PLAN

APPLICATION FOR FUNDING 2018/2019 PROGRAM YEAR (JULY 1, 2018 TO JUNE 30, 2019)

Mecklenburg County Fire Protection Service Districts Report

Taxes: This 2019 Budget holds property and income taxes for city services at their current rates.

CITY OF LAGUNA BEACH, CALIFORNIA. Comprehensive Annual Financial Report. For the Fiscal Year Ended June 30, 2015

Community Development Block Grant Disaster Recovery (CDBG-DR): Housing Rehabilitation Policies and Procedures

TOWN OF NEW SHOREHAM, RHODE ISLAND FINANCIAL STATEMENTS YEAR ENDED JUNE 30, 2015

Studies. Presented to: Merger Advisory Committee

CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES. Goal 1: [CI] (EFF. 7/16/90)

CITY OF EASTLAKE LAKE COUNTY REGULAR AUDIT

CAPITAL IMPROVEMENTS. City of St. Augustine Comprehensive Plan EAR-Based Amendments

FY17/18 Cost Allocation Plan. 04/27/2017 Heather J. Corder, Finance Director

EXHIBIT N SUNNYDALE OPEN SPACE AND RECREATIONAL ASSETS

SALEM CITY CORPORATION FINANCIAL STATEMENTS

ORDINANCE NO

Financial Summaries. Long Range Financial Plan Multi-Year Budget

SALEM CITY CORPORATION FINANCIAL STATEMENTS

AGENDA REPORT. DATE: November 27, City Commission. Kim D. Leinbach, Interim City Manager

DRAFT. Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects

REQUEST FOR PROPOSAL

REQUEST FOR QUALIFICATIONS (RFQ) Central Valley Opportunity Center Winton Vocational Training Center Project Proposals Due: February 21, 2014

TOWN OF NEW SHOREHAM, RHODE ISLAND FINANCIAL STATEMENTS YEAR ENDED JUNE 30, 2016

OTHER GOVERNMENTAL FUNDS CAPITAL PROJECTS

Capital Improvements

Municipal Budget Process

WATER USER RATES & FEE STUDY

Submitted herewith is the adopted operating budget for fiscal year

CDBG-DR, BW-12, CRS and Dauphin County, PA: What do they have in common? 2015 ASFPM Annual Conference

Local ballot measure: B. Redding School District Bond Measure

Transcription:

2009-2014 CAPITAL IMPROVEMENT PLAN GUIDELINES AND PROCEDURES

2009-2014 Capital Improvement Plan Guidelines and Procedures 1 TABLE OF CONTENTS I. Introduction...2 II. Capital Improvement Plan Development Process...2 III. Guidelines and Procedures...3 IV. APPENDIX A. Capital Improvement Plan Calendar...6 B. Capital Project Summary List and Project Request Form...7 C. Criteria and Scoring Matrix...9

2009-2014 Capital Improvement Plan Guidelines and Procedures 2 Introduction To keep pace with the growth of Lawrence and to provide for many of the community s needs identified in the City s Comprehensive Plan requires public investments to be made annually in capital improvements. If needed improvements are not made annually, the condition of the City s infrastructure will deteriorate and eventually will not be able to be ignored. At that point, the cost will be much greater due to the size and scope of the needed improvements as well as the increase in construction costs. In addition to growth, there are also older sections of the City that were developed without adequate facilities such as storm sewers and paved streets. Capital improvements are needed to address these inadequacies, benefiting not only the neighborhoods where they are located but the entire community. Because the cost of addressing all of the City s capital needs in one budget year is too great, it is necessary to create a multi-year plan based on priority of need and the anticipated resources available each year. That plan is called the Capital Improvement Plan or CIP. There are many benefits of having a Capital Improvement Plan. It provides an overall perspective as the development pattern of the city, and thus enables the citizens as well as the City Commission and City staff to take a long-range view of the their future activities and responsibilities. It calls attention to the deficiencies of the city and stimulates action to correct them. It promotes coordination of projects across city departments and across overlapping governmental jurisdictions. It can also allow city staff to more effectively budget operating expenditures each year necessary to maintain new projects and stabilize personnel demands. The Capital Improvement Plan is not to be confused with the Capital Improvement Budget. The Capital Improvement Budget is prepared each year in conjunction with the annual Operating Budget. It generally includes only those projects from the first year of the Capital Improvement Plan that will be funded that year. Capital Project Defined A capital project is defined as a project with a minimum total cost of $50,000 resulting in 1) creation of a new fixed asset; or 2) enhancement to an existing fixed asset with a life expectancy of at least 20 years. Examples include construction or expansion of public buildings, new storm and sanitary sewers, water line upgrades and extensions, the acquisition of land for public use, planning and engineering costs, and street construction. Vehicle replacements less than $35,000 or projects considered as operational, recurring, or maintenance are not considered capital projects and are typically funded through the City's Operating Budget. Capital Improvement Plan Development Process Early each year, capital project request forms are submitted by various City departments, agencies, and the public. Forms are to be submitted for all needed improvements that should be

2009-2014 Capital Improvement Plan Guidelines and Procedures 3 constructed or started during the next six fiscal years. The request forms include a description of the scope and justification for a project as well as a budget for anticipated costs and expected funding sources. The departments also suggest a year for the project based on priorities and needs. If appropriate, Master Plans are used. The projects are reviewed by the Capital Improvement Administrative Review Committee made up of representatives from several departments, as well as a City Commissioner and a member of the Planning Commission. The Committee uses a set of scoring criteria and scoring matrix to determine a score for every project submitted. The scores are translated into priority rankings and are used to develop a draft Capital Improvement Plan. The projects in the draft CIP are submitted to the Planning Commission, for review to ensure they are all consistent with the City's Comprehensive Plan, Horizon 2020. The draft Capital Improvement Plan is then submitted to the City Commission for review, and if appropriate, approval. Once approved, projects from the first year of the Capital Improvement Plan are used to develop the City Manager s recommended Capital Improvement Budget. The Capital Improvement Budget is adopted along with the annual Operating Budget and contains projects from the first year of the CIP. It provides an estimate of the cost of the project as well as a breakdown of the funding sources that will be used to pay for the project. Guidelines and Procedures There are guidelines and procedures that should be followed in order to develop the Capital Improvement Plan. Submittals are to be made electronically using forms available on the City s website at http://www.lawrenceks.org/cmo/capital_improvement_program. City Departments should save all forms in the Capital Improvement Planning folder on Citydata and should include the department name in the file name. Members of the public should email all materials to Bobbie J. Walthall at bjwalthall@ci.lawrence.ks.us. Capital Project Summary List / Scoring Sheet A list summarizing all projects submitted by the department should be completed. It should list projects by year and in priority order, with the project considered by the department to have the highest priority listed first. Guidelines for the completion of each section of the Summary List / Scoring Sheet are provided below. NA or RE+ - This column indicates if the project is acquisition of a new asset (NA) or is a repair to an existing asset (RE). If RE is used, the next column should indicate what assest is being repaired (ST = streets; BD = building).

2009-2014 Capital Improvement Plan Guidelines and Procedures 4 Department The name of the department submitting the project should be provided here. Members of the public should use public. Total Cost The total cost provided should be in 2006 dollars and should include costs to be paid by other government agencies, or by special assessments, benefit districts, etc. City Share Should include cost to be paid by City. City share of benefit districts should be provided here. Criteria Each of the criteria used by the Administrative Review Committee to score projects is provided. A score should be provided for each of the criteria for all projects submitted. Explanations of each of the criteria, as well as each score, can be found on page 9 of this document. Project Request Form Project Request Forms are used to compile the Capital Improvement Plan. They explain and justify each project to city staff, elected officials, and the public. A separate Project Request Form should be completed for each project; however, multiple forms should be saved in one Excel workbook. Guidelines for each section of the Project Request Form are provided below. Project Title A name should be designated for the purpose of reference. It should be brief but should provide enough information to allow readers to distinguish between other similar projects. For instance, 6 th and Wakarusa Traffic Signal would be better than Traffic Signal Improvement. Department Responsibility The department and division submitting the request should be provided. Map City departments should insert a small map showing the location of the project here. Contact Information Systems for assistance with this feature. Description The description should provide sufficient detail to permit a full understanding of the nature and scope of the project by someone with little to no knowledge of the project. If the project is construction of a facility, the square footage and/or number of stories should be provided. A more detailed description of the location of the project and its relation to existing facilities or other proposed projects should also be provided. Justification Detailed reasons and rationale for the project should be provided. Statements of inadequacy must be supported by comparison with accepted standard practice. For instance, construction of fire station at this location will

2009-2014 Capital Improvement Plan Guidelines and Procedures 5 increase area of City reachable within IAFF standard response time of 6 minutes or less. Compliant with the Comprehensive Plan and/or other Master Plan A check should be placed in the appropriate check box. Expenditure Schedule The various components of project implementation have been listed as well as the total cost, expenditure this year (if any), each year in the plan, and the cost beyond the last year of the plan. Estimate as closely as possible all costs necessary to complete the project. Estimates are to be on the basis of present costs and should be reassessed each year. Planning costs include research or planning/feasibility studies needs for the project. Preliminary and final design and engineering plans for the project should be listed in the design component. Construction costs include all landscaping and inspections. Equipment costs reflect all miscellaneous equipment/furnishings to initially equip and furnish the facility. Operational Impact An attempt should be made to identify and quantify any net impact of the project on the operating budget for the year of the project and years following completion of the project. Funding Schedule Fill in appropriate blanks. List the proposed expenditures for each source of funds according to year. If a particular project is anticipated to have more than one funding source (i.e. local funds and federal aid), indicated all sources in the appropriate year blank. Comments Reference to surveys, engineering reports, Comprehensive Plan, etc. should be provided here. Also, any relationship to other projects should be noted here. Project Score This section will be completed by the Administrative Review Committee and will be the total score the project receives.

2009-2014 Capital Improvement Plan Guidelines and Procedures 6 2009-2014 Capital Improvement Plan Calendar January 15, 2008 February 29, 2008 March 19, 2008 March 26, 2008 April 1-4, 2008 April 2 9:00-12:00 April 3 2:00 5:00 April 4 9:00 12:00 Capital Improvement Plan forms and instructions posted on the City s website and distributed to City Departments, agencies and the public Project Request forms and department scoring sheet due Preliminary list of projects, scoring criteria, and score sheet distributed to Administrative Review Committee Planning Commission - Public Input on CIP Administrative Review Committee meetings to review projects and develop consensus scores 2009 Projects 2010-2011 Projects 2012-2014 Projects April 14, 2008 Administrative Review Committee s Consensus Project Score Sheet Finalized April 21, 2008 May 21, 2008 May 27, 2008 June 10, 2008 Projects in Capital Improvement Plan distributed to Planning Commission for their review to ensure projects are in conformity with the Comprehensive Plan Planning Commission meeting review and, if appropriate, approve projects as being in conformity with the comprehensive plan City Commission review and, if appropriate, approve the Capital Improvement Plan City Commission Study Session 2008 Capital Budget Funding Options based on priorities and funding available

2009-2014 Capital Improvement Plan Guidelines and Procedures 7 Example of the Capital Projects Summary List / Scoring Sheet Capital Projects Summary List / Score Sheet 2009-2014 NA or RE+ Department Project title 2009 consistency with community goals and plans public health and safety Mandates or other legal requirements maintains or improves standard of service extent of benefit to community related to other projects public perception of need efficiency of service Total supports economic development environmental quality feasibility of project opportunity cost operational budget impact 2010 2011 2012 2013 2014

2009-2014 Capital Improvement Plan Guidelines and Procedures 8 Example of a Project Request Form PROJECT TITLE: DEPARTMENTAL RESPONSIBILITY: DESCRIPTION: [insert map here] JUSTIFICATION: COMPLIANT WITH COMPREHENSIVE PLAN AND/OR OTHER MASTER PLAN? YES NO EXPENDITURE SCHEDULE ($000s) PROJECT ELEMENT TOTAL THRU 2008 2009 2010 2011 2012 2013 2014 BEYOND 2014 PLANNING DESIGN LAND CONSTRUCTION EQUIPMENT 2% FOR ARTS OTHER TOTAL $ - 0 0 0 0 0 0 0 0 OPERATIONAL IMPACT ($000s) PROJECT ELEMENT TOTAL THRU 2008 2009 2010 2011 2012 2013 2014 BEYOND 2014 MAINTENANCE COSTS PERSONNEL COSTS TOTAL $ - 0 0 0 0 0 0 0 0 FUNDING SCHEDULE ($000s) SOURCE TOTAL THRU 2008 2009 2010 2011 2012 2013 2014 BEYOND 2014 G. O. BONDS SPECIAL ASSMT. REVENUE BONDS CURRENT REV. FEDERAL AID STATE AID EX. BONDS OTHER TOTAL $ - 0 0 0 0 0 0 0 0 COMMENTS: PROJECT SCORE (to be completed by Administrative Review Committee):

2009-2014 Capital Improvement Plan Guidelines and Procedures 9 Capital Improvement Plan Criteria List and Scoring Matrix Possible Scores Criteria 0 1 2 consistency with community goals and plans project is inconsistent with City's Comprehensive Plan or does nothing to advance the City Commission's strategic goals project is consistent the City's Comprehensive Plan but does little to advance the City Commission's strategic goals project are directly consistent with the City's Comprehensive Plan and advances the strategic goals of the City Commission public health and safety project would have no impact on existing public health and/or safety status project would increase public health and/or safety but is not an urgent, continual need or hazard project addresses an immediate, continual safety hazard or public health and/or safety need Mandates or other legal requirements maintains or improves standard of service project is not mandated or otherwise required by court order, judgment, or interlocal agreements project not related to maintaining an existing standard of service project would address anticipated mandates, other legal requirements, or interlocal agreements project would maintain existing standard of service project required by federal, state, or local mandates, grants, court orders and judgments; required as part of interlocal agreements project would address deficiencies or problems with existing services; would establish new service extent of benefit projects would benefit only a small percentage of citizens or particular neighborhood or area project would benefit a large percentage of citizens or many neighborhoods or areas project would benefit all of the citizens, neighborhoods, or areas related to other projects project is not related to other projects in the Capital Improvement Plan already underway project linked to other projects in the Capital Improvement Plan already underway but not essential to their completion project essential to the success of other projects identified in Capital Improvement Plan already underway public perception of need project has no public support or established voter appeal; is not identified by the citizenry as a need project has been identified by the citizenry as a need in the community but lacks strong support project has technical and strong political support, project was suggested by or even demanded by large number of citizens efficiency of service project would have no impact on the efficiency of service project would result in savings by eliminating obsolete or inefficient facilities project would result in significant savings by increasing the efficiency of the performance of a service or reducing the on-going cost of a service or facility supports economic development project would discourage or directly prevent capital investment, decrease the tax base, decrease valuation, or decrease job opportunities project would have no impact on capital investment, the tax base, valuation, or job opportunities project would directly result in capital investment, increased tax base, increased valuation, or improved job opportunities environmental quality project would have a negative effect on the environmental quality of the city project would not effect the environmental quality of the city project would improve the sustainability of the environment feasibility of project project is unable to proceed due to obstacles (land acquisition, easements, approval required) minor obstacles exist, project is not entirely ready to proceed project is entirely ready to proceed, no obstacles (land acquisition or easements, approvals required, etc.) exist opportunity cost if deferred, the increase in project costs would be less than the rate of inflation if deferred, the increase in project costs would be equal to inflation if deferred, the increase in project costs would be greater than the rate of inflation operational budget impact project would significantly increase debt service, installment payments, personnel or other operating costs or decrease revenues project would neither increase or decrease debt service, installment payment, personnel or other operating costs or revenues project would decrease debt service, installment payments, personnel or other operating costs or increase revenues