Georgia Department of Community Affairs Office of Affordable Housing MONTHLY DRAW PROCESS

Similar documents
Lackland ISD Accounts Payable Procedures

Connecticut Housing Finance Authority. Advance Preparation Guidelines 2019

Fairfield ISD Accounts Payable Procedures

Tax Credit Assistance Program (TCAP)

DIVISION 1 - GENERAL REQUIREMENTS SECTION APPLICATIONS FOR PAYMENT

Document A Exhibit A

5. All expenditures must be ones that are accounted for by the Applicant on its financial records under Generally Accepted Accounting Principles.

Standard Form of Agreement Between Design-Builder and Contractor. The Design-Builder has entered into a Design-Build Contract with the Owner dated:

APPLICATION FOR PAYMENT PROCEDURE SUBCONTRACT EXHIBIT F

Calleguas Municipal Water District Procurement Policy

AIA Document A103 TM 2007

STUDENT COOPERATIVE ASSOCIATION, INC.

Texas Neighborhood Stabilization Program Construction and Rehabilitation Draws January 19, 2011

Office of Community Development Capital Programs Manual. Section: 6.0 CONSTRUCTION PROCESSING REQUIREMENTS Sub Section 6.

Accounts Payable Policies and Procedures

Rockdale ISD Accounts Payable Procedures

Community Partnerships Program Eligible Costing Rules and Financial Management Guidelines

ACCOUNTING POLICIES AND PROCEDURES MANUAL

IMPERIAL CONSTRUCTION, INC. 400 Interstate 20 West, Suite 200 Weatherford, Texas Telephone: (817) Facsimile: (817)

Fiscal Guidelines For CSC Funded Programs FY 2016/2017

New Jersey LFN Packet Check List

TDHCA Tutorial Davis Bacon Compliance: DBRA Certified Payroll Form (WH 347)

2009 Gap Funding Round Application Guide

Schedule A (Attached to Bill of Sale) (Contract Value includes all taxes, Description of Material, Description of Location)

Low down payment option; qualify with as little as 3.5% down

POLICY & PROCEDURE DOCUMENT NUMBER: DIVISION: Finance & Administration. TITLE: Moving Expense Reimbursement Policy. DATE: July 1, 2003

REQUEST FOR BID PROPOSALS

Section 1602 Program Program Description. July 2, 2009

Delaware State Housing Authority Cost Certification and Draw Guide

PRO CONTRACTOR EXPENSE REPORT GUIDE

SOUTH CAROLINA STATE FIREFIGHTERS ASSOCIATION. AGREED UPON PROCEDURES-Periods ending December 30, 2015 SUMMARY OF FINDINGS

UNITED STATES MASTERS SWIMMING, INC. Financial Operating Guidelines (As amended through ) TABLE OF CONTENTS

EMPLOYEE MANUAL FOR POLK COUNTY ELECTED OFFICIALS

REQUEST FOR PROPOSALS

Computer Equipment or Software between $1,000 and $9,999 between $10,000 and $99, Furniture between $1,000 and $9,999

APPENDIX C: LPA INVOICE-VOUCHER State Form (5-06)

! " # $ " % made as of the 24 day of May in the year 2006 (In words, indicate day, month and year) the Owner: (Name, address and other information)

SAMPLE POLICIES FOR LRC TO DEVELOP WITH FINANCE DIRECTOR/ACCOUNTANT FOR CONTRIOLS. CLRC Staff Expense Authorization Approval Levels

COMMERCIAL FACADE IMPROVEMENT PROGRAM GUIDELINES AND APPLICATION

ADDENDUM NO. 01 REQUEST FOR PROPOSALS NO CONSTRUCTION MANAGER AT RISK (CMAR)- CNG FUELING INFRASTRUCTURE UPGRADES

Important Messages - Grants

CDKN Expenses Policy

Construction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures.

Fiscal Management Policies and Procedures

DIVISION 1 GENERAL REQUIREMENTS SECTION MODIFICATION PROCEDURES AND PRICING OF CHANGED WORK

Appendix C. UNITED STATES MASTERS SWIMMING, INC. Financial Operating Guidelines (As amended through ) TABLE OF CONTENTS

Chapter 2: Designer Agreements and Payments

Training Guide. Division of Business and Finance. Procurement and Materials Management, Accounts Payable, Central Motor Pool, and Travel

Work Change Directive No.

AIA Document A102 TM 2007

BUDGET MANAGER BUDGET MANAGEMENT

WUPRPM. Regulations and Procedures. Effective Date: January 25, 2008 Q. Moving Expenses Revision Date: January 12, 2017.

1 Exam Prep Florida Contractor s Reference Manual Practice Test 3

This Webcast Will Begin Shortly

COUNTY OF MARIN PROFESSIONAL SERVICES CONTRACT Edition 1

Construction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures.

FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5)

Standard Form of Agreement Between Owner and Architect without a Predefined

ALPINE SCHOOL DISTRICT 490 North State Street, Lindon, Utah Office (801) Fax Number (801)

Business Income Tax Return Engagement Letter

Conference and Travel Procedures

Theta Phi Alpha Travel and Expense Policy

Waiver & Releases for Subcontractors / Second Tier Subcontractors & Suppliers

SUPPLEMENTARY AND SPECIAL TERMS AND CONDITIONS FOR MINOR PROJECTS

Gang Reduction & Youth Development (GRYD) FISCAL POLICY MANUAL

ADVERTISEMENT: REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE HOUSING AUTHORITY OF THE CITY OF MCKINNEY, TEXAS

Domestic Mobility FAQs

06/28/2018 By: Lydia Ludwig, Controller Next Review: 04/01/ months from last review Crossreferences:

CITY & COUNTY OF SAN FRANCISCO CONTRACT MONITORING DIVISION CMD ATTACHMENT 3

Fundamentals of Advance Payments and Cost Reimbursement

Board Policy No

Community Development Block Grant (CDBG) Disaster Mitigation for Public Housing Authorities. Our Staff

GEORGIA HOUSING AND FINANCE AUTHORITY THROUGH ITS ADMINISTRATOR THE GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS TAX CREDIT ASSISTANCE PROGRAM DESCRIPTION

Alameda County Transportation Commission SAMPLE PROGRAM COMPLIANCE LANGUAGE: CONSTRUCTION

Managing Construction Risks

City of Mukilteo Cyrus Way, Mukilteo, WA Procurement Policies & Procedures

Financial Report Instruction Manual

GENERAL: WITNESSETH: That the said Contractor and the said District, for consideration hereinafter named agree as follows: DESCRIPTION OF WORK:

Cash Disbursement Policy

FISCAL POLICY MANUAL SUMMER 2018

Sample Fiscal Policies & Procedures Manual

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

BUSINESS POLICY AND PROCEDURE MANUAL

Eligible Costing Rules and Financial Management Guidelines

SOX Policy Evaluation Checklist

West Virginia Personal Options Intellectual/Developmental Disabilities Waiver Program Goods and Services Packet

St. Charles City County Library District Invitation for bid HVAC Replacement at Winghaven Branch

Rahman Safi International Consulting

Audit certificate template for Horizon2020 projects funded by SERI

WISCONSIN HOUSING AND ECONOMIC DEVELOPMENT AUTHORITY Low Income Housing Tax Credit (LIHTC) Program COST CERTIFICATION AUDIT GUIDE

Payment Provisions National Contracts AIA A-201 and G702/703

AIA Document A101 TM 2007

GUIDELINES FOR FINANCIAL CONTROL AND ADMINISTRATION OF JOINT VENTURE OPERATIONS

Chapter 2: Designer Agreements and Payments

This procedure applies to the Facilities & Safety Business Office (FSBO) and Facilities Planning & Construction (FP&C).

RESTORE Program Frequently Asked Questions (FAQ) Sheet Housing Trust Fund Corporation Revised February 2017

MEMORANDUM OF AGREEMENT SUMMARY

Treasurer s Guide. Chapter Leadership Training. NMA...THE Leadership Development Organization

Money! That $ What I Want!

Contractor s Name: Contractor s Address: Contractor s Point of Contact and Phone #: Contract Number: Contract Date: Amendment Number: Amendment Date:

Transcription:

Submit electronic draw requests to: ARRA.incoming.files@dca.ga.gov Georgia Department of Community Affairs Please do not email draw requests to individuals within DCA. There is a 10 MB limit on this email address. Starting September 1, 2010, all draw requests will have a deadline for submission which is the close of business on the 14 th of the month with the exception of closing draws. DCA reserves the right to hold all draw requests received after the 14 th of each month until the next month. If the 14 th of the month falls on a Saturday or Sunday, draw requests are due the preceding Friday. At closing for all projects with ARRA and/or NSP funds, the Borrower must provide a flow of funds to demonstrate for which budget items DCA funds are anticipated to be requested. See program specific guidelines below. DCA s goal for disbursement of funds is 10-15 business days from receipt of a complete draw package. TCAP Reminders 1. No swimming pool costs are allowed for TCAP funding (such costs can be funded with equity or other financing source). 2. TCAP funds may only be used for capital investments (eligible basis items plus cost of land). If the borrower requests more TCAP funds than are included in the underwritten eligible basis, that amount will show in the DCA template as 'ineligible overruns'. 3. The remaining balance column of the disbursement template will show the total project balance, not necessarily the eligible basis balance, so the eligible basis balance should be noted in the comments column. 4. Lender Retainage: DCA will withhold TCAP funds in an amount equal to 5% of the original hard cost contract sum until all of the requirements for the final construction draw request have been met including the contractor cost certification. Exchange Reminders: 1. Exchange funds may be used for most cost items; however, it is strongly encouraged that 2009 round funded projects use these funds for hard costs. 2. Lender Retainage: a. If there are no other types of DCA funding in the project, DCA will withhold Exchange funds in an amount equal to 5% of the original hard cost contract sum until all of the requirements for the final construction draw request have been met including the contractor cost certification. b. If Exchange funds are combined with HOME funds, DCA will withhold HOME funds in an amount equal to 5% of the original hard cost contract sum until all of the requirements for the final construction draw request have been met including the contractor cost certification. Exchange funds may be 100% exhausted at any point of choosing by the owner.

NSP Reminders: 1. NSP funds may be used for most cost items; however, it is strongly encouraged that 2009 round funded projects use these funds for hard costs or the purchase of property or land. 2. Lender Retainage: a. If there are no other types of DCA funding in the project, DCA will withhold NSP funds in an amount equal to 5% of the original hard cost contract sum until all of the requirements for the final construction draw request have been met including the contractor cost certification. b. If Exchange funds are combined with NSP funds, DCA will withhold NSP funds in an amount equal to 5% of the original hard cost contract sum until all of the requirements for the final construction draw request have been met including the contractor cost certification. HOME reminders 1. HOME funds may only be used for hard construction costs. 2. Lender Retainage: a. If there are no other types of DCA funding in the project, DCA will withhold HOME funds in an amount equal to 5% of the original hard cost contract sum until all of the requirements for the final construction draw request have been met including the contractor cost certification. b. If any other DCA funds are combined with HOME funds, DCA will withhold HOME funds in an amount equal to 5% of the original hard cost contract sum until all of the requirements for the final construction draw request have been met including the contractor cost certification. 2008 funding round projects (and 2009-507, 2009-001, 2009-502) All draws, including closing draws, and all costs, both hard costs and soft costs, will be reviewed by DCA on a monthly basis regardless of the funding source. Proof of payment will be required for all costs. See below. 2009 funding round project (except 2009-507, 2009-001, 2009-502) All draws, including closing draws, and all costs, both hard costs and soft costs must be submitted to DCA on a monthly basis regardless of the funding source. DCA will review 20% of the submitted draw requests funded by sources outside DCA each month. DCA will review 100% of the submitted draw requests for DCA sources each month. Proof of payment will be required for all DCA funded costs. Process: 3. On or about the 22 nd of each month, the borrower will receive the DCA Disbursement Template and DCA Invoice Summary Sheet via email from the underwriter assigned to the project. The borrower completes the appropriate Requested columns on the template for each draw request. The template tracks the project budget, eligible basis, and the borrower s

request for funds from each funding source on a line item basis. The borrower also completes the DCA Invoice Summary sheet to detail all invoices, including hard costs, for which funds from all funding sources are requested. 4. Once received, soft costs are reviewed by underwriters; hard costs are reviewed by the Construction Manager; Section 3 documentation and relocation costs are reviewed by the Federal Compliance Officer; proof of previous payments is reviewed by the draw request coordinator. 5. Davis-Bacon payroll reports (where applicable) are submitted separately and on a weekly basis directly to the Federal Compliance Officer. 6. Once the draw is approved, has been forwarded to accounting, and a tentative funding date has been set, the borrower will receive an email regarding the anticipated funding date. Additionally, the email will contain the completed DCA Disbursement Template for the draw indicating the amounts approved for disbursement and an updated DCA Invoice Summary Sheet that summarizes invoices received and proof of payments received to date. 7. DCA s target for disbursement of funds is 10-15 business days from receipt of a complete draw package. Guidelines-Soft Costs 1. Underwriters are directed not to approve anything that they would not feel comfortable seeing their tax dollars pay. If there is any doubt at all, it will not be approved. 2. If an item does not have appropriate backup, it will be removed from the approved draw amount approved and the remainder of the draw will be processed. The disallowed amount can be submitted with the next draw provided sufficient documentation is provided. 3. Only project specific expenses will be paid. 4. Marketing expenses are incurred to assist in lease up. Newspaper ads, brochures etc are examples of marketing expenses. Grand opening costs are not marketing expenses. 5. DCA will not pay marketing expenses such as web site design at the beginning of the project. Costs must be clearly associated with the property and be timely. 6. Under no circumstances will DCA pay or reimburse costs such as food, coffee, catering, entertainment, holiday gifts (to employees or non-employees), ground breaking or grand opening expenses. 7. DCA does not pay developer operating costs or administration fees. Examples would be blackberry, mileage reimbursements, cell phones etc. These are costs that are paid with developer fee. An example of an eligible administration cost might be the cost of preparing the bid specification, having it copied and publishing. 8. DCA will not pay invoices that are generated by the borrower or an affiliate to the (same) borrower for reimbursement. Reimbursements are made by including a copy of the actual third party invoice and a copy of the cancelled check or other evidence of payment by the borrower. All invoices must clearly specify the project, the services and the date performed. 9. Third party invoices must be project specific, have the date the service was provided and a description of the service. If the invoice is being paid under a contract, the invoice should reference the total contract amount and the amount paid to date. 10. Consultant fees will generally be part of the developer fee and not payable through the draw process. This would include application consultants and development consultants.

11. DCA will not pay for travel, meals, lodging, or entertainment for any owner or development team member to visit the property. DCA will also not pay for mileage for developers, employees or consultants. 12. When a project is part of a multi-phased development, any common costs (such as masterplanning or infrastructure costs) must be allocated among the phases based on a reasonable allocating method. Such method must be clearly explained with the cost allocation supported with backup documentation. 13. Eligible Overruns: If the borrower requests more DCA funds than are included in the budget, only the amount in the budget will be approved. The excess will show in the DCA template as Eligible Overruns. There will be no negative balance in this case. 14. Overruns with Other Sources: If the borrower exceeds a budgeted line item with funds from other sources, the full amount will be deducted from the budget and leave a negative remaining balance. 15. Developer Fee Requests: (a) Exchange: The borrower is allowed to receive up to 25% of the developer fee (less the deferred portion) at the closing draw or during construction. The borrower is only eligible for an additional 25% of the developer fee (net of the deferred portion) at construction completion. See loan documents for further details. (b) TCAP: The calculation for allowed developer fee for TCAP is 25% (not net of deferred developer fee) at closing, 25% at construction completion, etc. See loan documents for further details. (c) HOME: Borrowers are allowed a flat 50% of developer fee before Conversion; this supersedes TCAP/Exchange rules if HOME funds are combined with TCAP/Exchange. 16. DCA will not sign off on a 1st draw request until all sources of funding have closed and/or property is purchased. 17. DCA related costs that have not been invoiced to the borrower will not be funded, with the exception of Allocation fees, waiver fees and Compliance Monitoring fees. These should be requested on a reimbursement basis only. Guidelines-Hard Costs 1. Change Orders & Construction Contingency Construction Contingency Regardless of how the contingency is funded, DCA must approve all change orders. It benefits the owner/developer to submit the change orders for approval to DCA via email or hard copy prior to inclusion in the draw request. DCA s goal for return comments on change orders is 5 business days. Developer/owners may rest assured that the scope of change orders of an immediate nature (e.g. unforseen circumstances such as subsurface conditions or hidden structural damage in rehabs) will be approved while pricing for these change orders may be worked out at a later date. Change orders that are not essential to the immediate progress of the project should be approved by DCA before any action is taken. DCA will not approve change orders that represent a substantial decrease in the scope of work or diminish the quality of the final product. All material changes to the contract bid documents must be documented through a change order process. DCA reserves the right to deny approval of any amenities or upgrades that

Georgia Department of Community Affairs DCA determines are excessive. Change orders may be submitted to cover the following issues: a. Unforeseen circumstances (hidden subsurface conditions, termite damage on rehabs, etc.) b. Amenities designed to enhance the quality of life c. Amenities that provide security such as lighting, fencing, smoke detectors etc. d. Product upgrades that increase durability and decrease maintenance costs e. Product upgrades or scope additions that increase energy efficiency and decrease operational costs Each change order must be submitted with an estimate that includes quantities and subcontractor, labor, materials, and equipment clearly listed and separated; invoices must be provided where available. All change orders and potential change orders must be documented on a change order log and tracked throughout the construction of the project. 2. Subcontractor administration General contractor and subcontractor lien waivers must be submitted. General contractors may use their own lien waiver forms, but they must include the following information, at minimum: legible subcontractor names scope of work/trade dollar amount subcontractor signatures applicable date A subcontractor/vendor log that details the name of each subcontractor or vendor over $5,000, the scope of the subcontractor s work, the amount of the contract, and any change orders issued to the contract must be updated and submitted each month with the draw. The subcontractor's log should include a line item indicating cumulative total amounts for the applicable columns. Lien waivers will be compared to the subcontractor log and the itemized contractor draw request to obtain a reasonable assurance that subcontractors are being paid in a timely manner for the work they perform. DCA will review 1 to 3 (at minimum) executed subcontracts for randomly selected scopes of work on each project. 3. General Contractor Retainage Please note that the standard DCA Loan Agreement includes the following provision: 4.01 (c) Retainage. Lender will withhold as retainage an amount equal to 10.0% of the amount approved under any Draw Request for hard costs until the Work is 50% complete, at which time Lender will withhold 5.0% of the approved amount.

In addition, the Contractor s Consent also includes the following language: This means that DCA will require that the AIA G702/703 reflects the following: If the project completion is between 0-50% of the general contractor s contract sum, the AIA G702/703 must show at least 10% retainage on the entire contract sum. No portion of the contract sum shall be exempt (Examples of items that are not exempt: stored materials, performance and payment bonds, insurance, general conditions). Adjustments will be made in the disbursement of DCA funds if the AIA G702/703s do not reflect 10% retainage. If the project completion is 50.1-100% of the general contractor s contract sum, the AIA G702/703 must show at least 5% retainage on the entire contract sum.