The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner

Similar documents
Support mechanisms for RES-e

Undertaking Successful PPPs in Kazakhstan

Financing Renewable Energy Projects in Kazakhstan: Key Legal Challenges

ADAPTING THE TARGET MODEL TO VALUE FLEXIBILITY

Key Elements of a Wind / Solar PPP. Cathy Oxby Commercial Director Mob:

Feed in Tariff Guidelines

The Spread of Feed-in Tariffs: Lessons Learned

Renewable Energy Guidance

Wind Project Financing. Targets, Barriers & Challenges, Elements of Financing, Recommendations for Financing

Electricity Market Reform

Brazilian Power Sector: Lessons from the Past, Challenges Going Forward

Solar PV Business Models & Investment

UK ELECTRIC MARKET REFORM APPLICATION TO TEXAS POWER MARKET. Ingmar Sterzing CEIC Seminar April 10, 2013

Enabling Renewables at Scale: Key Needs and Opportunities for Grid-Connected Solar & Wind in Asia

WG5/6 Sub-Working. EU Emissions Trading Scheme - Auctioning Proceeds

Investing in Renewable Assets in Emerging Markets

Ireland in the wider European energy market

INVESTMENT OPPORTUNITIES in Central Asia Power Sector

Leveraging Private Investment for Climate-Related Activities. CCXG Global Forum, OECD

Is 2016 a game changer for renewable investment?

The South African Grid Code. Transmission Tariff Code. Version 9.0

How multi-technology PPA structures could help companies reduce risk

STATEMENT ON SSE S APPROACH TO HEDGING 14 November 2018

The barriers to renewable energy project investment in Wales

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI

PROJECT FINANCE GLOSSARY

Nigeria Power Series - Part 2: Unlocking Financing for Developing Independent Power Projects in Nigeria

ADB CTF Private Sector Geothermal Program: Indonesia & Philippines) ADB response to the CTF Trust Fund Committee with regard to questions from:

Energy utility obligations and auctions

One new bright spot in the PPA market has been the emergence in the US of non-utility offtakers of renewable energy ENERGY AND PRIVATE EQUITY

Retail Bond Offer Investor Presentation

3 rd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

CLIMATE REPORT 2017 PRIVATE SECTOR AND CLIMATE FINANCE IN THE G20 COUNTRIES

IFC Transaction Advisory Services Creating opportunity where it s needed most. From Concept Design to Project Execution

ELECTRICITY MARKET REFORM Comparing Contracts for Difference to the Renewables Obligation

Spurring Growth of Renewable Energies in MENA through Private Sector Investment

Regional Power Market Challenges and Opportunities from Nepalese perspective

How to make PPP work in Russia

Opportunities & Challenges by. Nadeem Babar Orient Power Company Ltd. November 2015

FEED IN TARIFF A NEW TYPE OF INVESTMENT INCENTIVES IN ENVIRONMENTAL PROTECTION IN SERBIA

Corporate Renewable Energy Procurement

Packaging PPP Waste to Energy Projects - ADB s Experience

Reforming Power Markets: Lessons from Five Developing Countries presented at: World Forum on Energy Regulation Rome, 6 October 2003

Investor Conference Call FY March 2018»

Regional Liquidity Support Facility Mitigating risks for private investments in Renewable Energy in Sub-Sahara Africa.

Competitive Selection and Support for Renewable Energy

Implementation of Gas Release Programmes for European Gas Market Development

ECONOMIC CONSULTING ASSOCIATES LIMITED 41 Lonsdale Road London NW6 6RA UK tel +44 (0) / fax +44 (0)

UK Solar Investment. 8% return per annum. Defined exit strategy at the end of year 3 with option to extend. Pension Compatible.

IFRS accounting outline for POWER. Purchase

Preparing Renewable Energy Power Purchase Agreements in the Middle East and North Africa: Questions to Ask

Clean Technology Fund (CTF) Proposal for CTF 2.0

CMA Report and Summer Budget Implications for the UK energy sector July 2015

New York State Initiatives and Futures

Transactional Energy Market Information Exchange (TeMIX)

Addressing financial risks in RE investment in East Africa. Focus on Ethiopia and Kenya

EUROPEAN COMMISSION Background and objectives of the notified project

Public Private Partnerships (PPP)- The Financial Perspective October 2014

Discussion Area CURRENT MARKET REGIME. FIT CFD s PPA. COMPARISON OF FIT CFD v ROC BACK STOP PPA S

REGULATORY TOOLS TO SUPPORT COMPETITIVENESS OF RENEWABLE ENERGY SOURCES

LEGAL & GENERAL, SYSTEMIQ AND MODERN ENERGY INVEST IN UPSIDE ENERGY

Cost of Equity (USD)

Fortum in Russia. Tapio Kuula. Senior Vice President Fortum Corporation. Capital Markets Day

CHAPTER 17. BE IT ENACTED by the Senate and General Assembly of the State of New Jersey:

Issues Paper on Proposed Revisions to the Western Power Network Access Arrangement (2017/18 to 2021/22 - AA4)

Perspective on Financing Wind Energy Projects. June 16, 2016

CLIMATE INVESTMENT READINESS INDEX (CIRI) - A Tool to Assess Investment Climate for Climate Investments

[Third Reprint] ASSEMBLY, No STATE OF NEW JERSEY. 213th LEGISLATURE INTRODUCED DECEMBER 8, 2008

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION

ARE MARKETS DEAD? ARE WE HEADING FOR A REGULATED FUTURE? DOES COMPETITION STILL STAND A CHANCE?

Reform of the Russian Gas Sector

Fact sheet: Financing climate change action Investment and financial flows for a strengthened response to climate change

One small reminder please remember to switch off your mobile phones.

Brexit: potential impacts on energy markets and regulation

Ross Garnaut The University of Melbourne 8 April The Centre for Contemporary Chinese Studies

Solar PV where the sun doesn t shine: Estimating the economic impacts of support schemes for residential PV with detailed net demand profiling

What is an accounting view of our financial performance for 2013 and how we stood at the end of the year?

Financial Report Axpo Holding AG

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Transactional Energy Market Information Exchange (TeMIX)

GHG EMISSIONS TRADING SYSTEMS RATIONALE AND DESIGN ELEMENTS GRZEGORZ PESZKO, LEAD ECONOMIST, WORLD BANK

Power Trading in the Coupled European Markets

SALES AND HIGHLIGHTS 2018 THIRD QUARTER

The basics of energy trading. Edgar Wilton

Electricity Industry Bill

Electricity trading and risk management in liberalised market

What next for UK auctions of renewable Contracts for Difference?

Armstrong South East Asia Clean Energy Fund LP

Stormy Weathers in the European Wind Power sector how to keep the pace?

Revenue for power and utilities companies

The Economics and Financing of Distributed Generation Investment. Budapest, Hungary November 17, 2016

Tariffs and Tariff Design Promoting Access to the Poor

Vision 2050: Estimating the order of magnitude of sustainability-related business opportunities in key sectors

Consolidated Segmental Statement (CSS) For the year ended 31 March 2015

PEPANZ Submission: New Zealand Emissions Trading Scheme Review 2015/16

Ensuring Resource Adequacy in California: An Alternative to Centralized Capacity Markets

Wholesale power market challenges:

Notes Statkraft AS Group

Fiscal Policy and Financial Support Schemes for Clean Energy Mini Grids (CEMG)

Long Term FTR Market Education

Transcription:

The policy and regulatory aspects of a bankable solar power project Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner

Contents 1. The restriction of subsidies and policy priorities. 2. The ingredients of a bankable offtake agreement. 3. The use of an auction process 4. The challenges faced in Uzbekistan. 5. The feed-in tariff compared with investment based subsidies. 6. The challenge of the intermittency of renewable power. 7. The opportunity the transformation of power systems. 2

The contradictions of evolving regulation In many jurisdictions the necessity of providing incentives for solar power generation is being questioned. The capabilities of suppliers of PV manufacturing equipment to incorporate new PV technologies in production and assembly lines, combined with a worldwide appetite of governments to build domestic PV manufacturing capabilities, have contributed to PV manufacturing growth, innovation and costs declines. Such incentives remain critical, however, as although solar costs have declined dramatically over the past ten years the cost to generate electricity with large - scale solar remains well above local power prices and other fuel sources for power generation in most markets. Their continued provision therefore is very much a question of both policy priorities within a particular country, and its ambition to minimise carbon emissions. 3

Policy priorities and political ambition With regards to policy priorities in both developed and developing countries budgetary constraints have impacted on the development of policy, the level of support offered to renewable energy, and the willingness of governments to cross subsidise varying between jurisdictions and over time. As examples from within the region: In Kazakhstan the Ministry of Energy has been concerned that the increased deployment and subsidisation of renewable power generation will result in price inflation, power currently produced at low cost by depreciated coal fired stations (the reason for its opposition to the indexation of the feed in tariff to the foreign exchange rate). In Ukraine the very existence of a low cost power supply, from nuclear power stations, has justified the promotion of what are comparatively high feed in tariffs. Discussion, however, has already been initiated with regards to how such subsidies may be maintained and renewable goals met in the context of a growing need to replace existing base-load power generation. 4

The key ingredients of a bankable offtake arrangement Many countries have supported solar generation via feed-in tariffs, which entitle favoured generators to be compensated by an electricity supplier, government counterparty or other regulated entity, for electricity delivered to the grid at a predetermined, above market rate, for a fixed period of time. As will be seen sequencing is also critical to a project's ability to access financing. In particular, the technical and financial conditions for grid connection need to be confirmed before construction financing is issued. 5

The feed-in tariff and credit risk The provision of such a feed-in tariff involves the conclusion by the power generator of a long-term power purchase agreement (PPA) with an offtaker with an adequate credit rating before the commencement of construction (and subject to an ongoing credit rating test). Project sponsors and financers will typically require a guarantee or other type of credit enhancement dependent on the credit grade of the offtaker and their perception of project risk in general (more often than not a PPA is only viewed as being bankable if the payment of the feedin tariff is treasury guaranteed). Many commercial banks require political risk insurance before financing, which may be provided by MIGA, development banks, or export credit agencies. 6

The feed-in tariff and currency risk Access to financing significantly improves if the feed-in tariff offered is in hard currency. If the feed-in tariff is to be paid in the local currency the sponsor will have to hedge the currency risk through swap or future agreements, the cost of which can reduce a project IRR significantly. The contrasting experiences of the ability to raise financing in a country in which the feed-in tariff is denominated in local currency, and a country in which the feed in tariff is denominated in EUR, illustrates that the currency risk associated with devaluation will restrict access to financing. Where local currency is used governments have struggled to mitigate such perceived currency risk, the indexation of feed-in tariff payments to both inflation and exchange rate fluctuations complicated and controversial. 7

Grid connection and other issues A bankable offtake arrangement has a number of other ingredients: the issuance of binding technical conditions for grid connection before the commencement of construction; non prohibitive grid connection costs; a clear procedure for land allocation (with security of tenure for the lifetime of the project and the necessary rights to export the electricity to the grid); land use rights, along with clear definition ownership rights for the connection line; and, a clear procedure for the energisation / final acceptance of the project. 8

The use of an auction process In many countries an auction process for PPAs is utilised to ensure competitive pressure on pricing, and credit support requirements (either the PPA itself may be the subject of the auction, or the project in its entirety, i.e. the PPA, a prepared site, and the grid connection). If implemented effectively such a process will allow an operator to present a realistic project cost and secure a reasonable rate of return, with an incentive to improve that rate of return during project execution. The value of an auction process, however, may be distorted by the participation of a state owned utility company: an auction process only works if there is competitive tension and a price cap. Furthermore, foreign investors tend to favour negotiated deals since auctions tend to create a price floor which either distorts competition or results in the tabling of non-commercial bids (cf. auctions for capacity which tend to create a price ceiling). 9

The use of an auction process (cont.) In countries in which auctions have been utilised effectively the price tendered has typically decreased as the transmission, distribution and other infrastructure in a country is developed, the PPAs offered are increasingly viewed as being bankable, and contractors and sub contractors are prepared to offer lower premiums / prices as their perceived level of project and country risk reduces. Auctions significantly decrease the interest of financial investors as their assumption is that there will be a limited return on equity, i.e. a successful bid will be made on a cost plus basis as opposed to a price that takes into account the future cash generation capacity of a project. 10

The policy and regulatory framework for renewable power generation in Uzbekistan Only in 2015 did the government start actively promoting the generation of renewable energy. To date only two programmes have been adopted, both largely declarative. Resolution of the President dated 5 May 2015 On the programme of measures for reduction of energy consumption, introduction of energy saving technologies in the economic sectors and social sphere for years 2015-2019. Resolution of the President dated 26 May 2017 On the programme of measures for further development of renewable energy, increase of energy efficiency in economic sectors and social sphere for years 2017-2021 11

The lack of a legislative framework The lack of legislation and regulations supporting the development of alternative energy has hindered the implementation of projects, potential investors uncertain about the award, level, and guarantee of a feed in tariff payment. Further, investors face challenges in concluding public private partnership arrangements due to the lack of a law regulating such partnerships. The solar power projects discussed so far have been based on the bilateral investment agreement and power purchase arrangement models developed by the IFC. Potential investors have proposed the use of a profit sharing mechanism in the absence of a market price. 12

The challenges faced developing a renewable energy policy The two key challenges developing a renewable energy policy are: that the government has exaggerated expectations as to the level of feed - in tariff investors are prepared to accept due to the drastic drop in prices bid in auctions over the past couple of years elsewhere in the world, that of guaranteeing UzbekEnergo s obligations as either a co-investor in, or an offtaker of, a renewable power generation project. With regards to the first challenge, due to the cost of financing in Uzbekistan the government cannot expect investors to be prepared to finance projects at the feed - in tariff levels they accept in the Middle East or other established markets. Further, it needs to be recognised that new conventional power plants have a similar capital cost as solar power projects: the often quoted price per kwh of 2 EUR cents is a result of the continued operation of depreciated assets which incur only operating costs. 13

The challenges faced developing a renewable energy policy (cont.) With regards to the second challenge UzbekEnergo is the wrong counterparty for an investor concluding a bilateral investment agreement. Indeed, by asking UzbekEnergo to appear as the counterparty in such an agreement the government are forcing UzbekEnergo to create competitors to themselves. UzbekEnergo therefore have a number of reasons why not to comply with the key terms of such bilateral investment agreements. The World Bank has proposed that the State Committee for Investment act as counterparty to an investor with UzbekEnergo the offtaker. Further, The World Bank has recommended the establishment of an independent regulator, and, as part of that process, the need to unbundle generation activity from transmission and distribution. 14

The role of renewable energy in Uzbekistan s new energy policy The government is preparing its vision for the energy sector through to 2030 based on the expected energy needs of Uzbekistan. As part of that vision the government is developing a short - term plan for the next 3 to 5 years for the construction of new generating capacity based on what is justifiable. It has already been decided to cancel the construction of a new gas fired power plant due to the inability of UzbekNefteGaz to supply the feed gas to UzbekEnergo at a price that would justify its construction. A key question in the government s energy strategy is about the role of gas supply, i.e. whether UzbekNefteGaz should be expected to sell gas at subsidised prices for power generation. 15

The way forward: a preference for auctions The EBRD recommend that the government should first adopt PPP legislation and corresponding regulations. In contrast The World Bank maintain that this may be done in parallel to the development of projects which may be based on bilateral investment agreements. The World Bank has recommended that an auction system be introduced as only such an approach can identify a market feed - in tariff. They have proposed that the IFC prepare all the documents used in the auction based on those developed under the Scaling Solar project in Africa, The World Bank offering political risk insurance against an amendment of the feed - in tariff etc. 16

Conclusion: the pros and cons of a feed-in tariff A fixed output price as incentivising efficiency One of the important and desirable properties of a feed in tariff is that it preserves strong incentives for both investment efficiency and operating efficiency. With the price of output fixed every dollar of investment cost reduction translates into a dollar of profit, and every additional kwh produced adds to profit. From an investors' perspective, fixing the output price removes all risk associated with the supply and demand of electricity. The level of spending, however, understates the true subsidy involved as shifting risk from renewable generators to other market participants constitutes a subsidy. The failure of production to respond to the wholesale price Feed in tariff schemes generally guarantee the same revenue per kwh regardless of when that power is generated. The wholesale spot price of electricity often varies dramatically depending on weather, time of day, and other factors. Feed in tariffs that do not vary with the wholesale price therefore reduce the subsidy when electricity is most valuable, thus distorting incentives regarding the timing of production. 17

Conclusion: the pros and cons of a feed-in tariff (cont.) A comparison with investment based subsidies On balance output subsidies and feed in tariffs are superior to subsidising investment via the tax system. Using tax credits rather than direct expenditures reduces transparency, incurs hidden costs, and reduces generation per unit of public expenditure. Subsidies for solar should reward generation, not investment, and should be structured to reward generation when it is more valuable. 18

Conclusion: the intermittency of renewable power and its challenge The increased role of renewable generated power, and its intermittent nature, will add to the challenge of managing peak energy demand, a task that is going to become increasingly complicated due to further electrification of our energy usage, i.e. automobiles and heating. Power generation will be less able to respond to demand changes if the proportion of renewable generated power increases as expected, thus increasing the need for flexibility. With regards to the setting of incentives, since the costs of renewable energy are uncertain, change over time, and vary from project to project, the quantitative response to any particular tariff level is uncertain. In recent years, regulatory regimes have limited the excessive response by either limiting total spending in any year or by reducing the tariff automatically when quantity milestones are passed. 19

Conclusion: delivering renewable energy's potential Global efforts to decarbonise, including raising generation capacity, will increasingly rely on the development of technology to help make the supply and use of energy more reliable, cost efficient and flexible. In particular, there will be a growing emphasis on demand side flexibility which uses technology and data to mange consumer demand, e.g. smart grids which incorporate this technology and data to manage supply and demand on a larger scale across a whole grid network. The utilisation of such technology would allow for the connection of greater levels of renewable resources to the network, and the better control of demand and real time pricing at both the wholesale and retail level. Consumers would be better able to increase, decrease or shift their energy use in response to signals, their decisions helping balance the power system and leading to an improvement in energy efficiency. 20

Conclusion: using information to increase coordination Whereas currently energy systems are dominated by large power generators, in the future we can expect to see energy flowing from smaller generators, such as solar and wind, to storage and from storage back to the grid. To facilitate this distribution systems will need to be more actively managed, their activity more closely co-ordinated with that of transmission systems. Distribution system operators will need to have a much greater role forecasting that they currently do, and need to monitor the increased amount of data on the network. Such active management can help to balance the national system as weather systems differ across a country affecting both the consumption of electricity, e.g. different heating requirements, and the production of electricity, and increased solar production from sunny states. 21

Contact Louis Skyner Partner M: +44 7815 005 813 Email: Louis.Skyner@dentons.com Louis Skyner, an English qualified solicitor, headed the Russia & CIS oil & gas practice of a large international law firm from July 2013 to April 2017. He joined Dentons as Partner on 1 May 2017. His practice has primarily been based on advising international oil & gas companies on their participation in upstream and downstream projects in Russia & the CIS, Russian oil companies on their activity outside Russia, and joint ventures / operators on a variety of regulatory and contractual issues. This work has involved the structuring and financing of projects being developed under concession, production sharing, and risk service agreements, and the structuring of the sales arrangements used by them. Aside from his legal practice Louis has authored numerous articles on Eurasian energy market regulation, economics and politics, from 2005 to 2011 as an associate fellow at Chatham House in London, from 2012 to 2014 as adjunct professor of the New Economic School in Moscow, from 2015 to 2016 as associate professor of the European University in St Petersburg, and from 2016 as an associate fellow of the Forum for Central Asian Studies at the University of Cambridge. Louis was awarded a doctorate by the University of Cambridge in 2002. In addition, over the past couple of years, he has advised the project sponsors of a number of renewable power generation projects in the CIS on their structuring and financing. Prior to July 2013 Louis worked as leading legal counsel at Statoil, based in Oslo, Dubai and then from 2010 in Moscow. In this position he supported Statoil's participation in oil, gas and LNG projects in both Russia and the Middle East. 22