Public Policy Issues and Sustainability in Southern California. Financing Infrastructure Development

Similar documents
Western Riverside Council of Governments Transportation Uniform Mitigation Fee Program Five-Year Expenditure Report (FY2008/09 to FY2014/15)

OTHER GOVERNMENTAL FUNDS - SPECIAL REVENUE

CHAPTER 5 INVESTMENT PLAN

Analysis of the Alameda County Transportation Expenditure Plan Prepared by Alameda County Transportation Commission

TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012)

Policy Statement No: 304 Adopted: June 2011 Category: Financial Management. Subject: Reporting Unrestricted Fund Balance in the General Fund Financial

Georgetown Planning Department Plan Annual Update: Background

FINDINGS. The Board of Supervisors finds that: Resolution No declaring its intention to form Community Facilities District No.

University Link LRT Extension

Georgetown Planning Department Plan Annual Update: Background

Transportation Uniform Mitigation Fee ADMINISTRATIVE PLAN

Public Works and Development Services

Measure I Strategic Plan, April 1, 2009 Glossary Administrative Committee Advance Expenditure Agreement (AEA) Advance Expenditure Process

This page intentionally blank. Capital Facilities Chapter Relationship to Vision. Capital Facilities Chapter Concepts

Chapter VIII. General Plan Implementation A. INTRODUCTION B. SUBMITTAL AND APPROVAL OF SUBSEQUENT PROJECTS C. SPHERE OF INFLUENCE

UNOFFICIAL COPY OF HOUSE BILL Read and Examined by Proofreaders:

CAPITAL IMPROVEMENTS ELEMENT

CITY OF PALM DESERT COMPREHENSIVE GENERAL PLAN

OVERVIEW OF THE SAN DIEGO REGION Current Conditions and Future Trends

City of Stockton Page 1

Description of Fund Types and Funds

1. I N T R O D U C T I O N

CAPITAL IMPROVEMENT PROGRAM SUMMARY

ECONOMIC ISSUES AND OPPORTUNITIES PAPER

Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda

Chapter 3: Regional Transportation Finance

Proposition 1B and the Strategic Growth Plan

Georgia Funders Forum June 20, Impact Fees. Georgia s Most Ignored State Law? Bill Ross ROSS+associates

Appendix. G RTP Revenue Assumptions REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY

Annual Operations and Capitol Improvement Budget Fiscal Year

Policy CIE The following are the minimum acceptable LOS standards to be utilized in planning for capital improvement needs:

Chapter 5. REMAINING REVIEW FACTORS

Executive Summary. Fiscal Year ($ millions) Total Department Uses by Major Service Area 2, ,

Re: Lanterns Fiscal Impact Analysis. Background. Analysis Process. June 7, Mr. Scott Carlson Carlson Land PO Box 247 East Lake CO 80614

Published on e-li ( February 10, 2018 Capital Funding Sources and Debt Financing

Appendix O. Transportation Financial Background

TAX POLICY BACKGROUND

The Board of Supervisors of the County of Riverside ordains as follows:

FISCAL IMPACT ANALYSIS Local Policy Primer

City Services Appendix

CRANE CROSSING SPECIFIC PLAN OAKDALE, CALIFORNIA

Queen Creek Annual Budget Organizational Structure

OTHER GOVERNMENTAL FUNDS - SPECIAL REVENUE

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 H 1 HOUSE BILL 861. Short Title: Local Option Tax Menu. (Public)

1. identifies the required capacity of capital improvements to serve existing and future development based on level-of-service (LOS) standards;

MANAGEMENT S DISCUSSION & ANALYSIS

TUMF TRANSPORTATION UNIFORM MITIGATION FEE NEXUS REPORT

CITY FUNDS & FUND ACCOUNTING TAB 19

CAPITAL IMPROVEMENT PROGRAM K-1

2019 Budget KEY FINANCIAL HIGHLIGHTS

HERCULES STRATEGIC PLAN 2017

Minimum Elements of a Local Comprehensive Plan

Budget. Quick. Reference. Guide

Gerald K. Geist, Executive Director Service and Representation for Town Governments of New York. January 28, 2013

MEASURE M DRAFT GUIDELINES

SERVICE DELIVERY & GOVERNMENTAL TRANSPARENCY Infrastructure & Operational Enhancements

Community Budget Priorities FY

CHAPTER 4 FINANCIAL STRATEGIES: PAYING OUR WAY

Public Act No

Mobility Plans and Fees: The Future of Transportation Funding

Report to the City Council

Wake County. People love to be connected. In our cyberspace. transit plan CONNECTING PEOPLE, CONNECTING THE COUNTY

SECTION 2 CHART OF ACCOUNTS

2019 PRELIMINARY OPERATING AND CAPITAL BUDGETS

2013 Proposed General Government Operating Budget GLOSSARY. Glossary - 1

Edmonton City Centre Airport Demonstration Plan

TRANSIT ORIENTED DEVELOPMENT IN THE PORTLAND METRO REGION

Astrong and productive economy

Infrastructure Financing Programs. January 2016

ACTION STRATEGIES. Aurora Places is the guidebook

CAPITAL IMPROVEMENT PROGRAM K-1

Mountain House Debt. A Synopsis of How Mountain House Is Financed

CITY OF BOISE FINANCIAL SYSTEM OVERVIEW

CITY OF BURBANK FINANCIAL SERVICES DEPARTMENT STAFF REPORT

Fiscal Year Budget In Brief. City of Deerfield Beach, Florida. Bold Innovation for a Better Future

THE TAX INCREMENT FINANCE AUTHORITY ACT Act 450 of The People of the State of Michigan enact:

MICHIGAN RENAISSANCE ZONE ACT Act 376 of 1996

City of Manassas, Virginia Planning Commission Meeting AGENDA. Work Session

REQUEST FOR QUALIFICATIONS/PROPOSAL

Finances (Adopted 1969, updated 1975, redone 1976, 1977, 1981 and 1995.)

Budget of the Village of Emerald Lake Village Form Due Date: 20 Days after the Meeting

Community Planning & Development

FIVE-YEAR REVENUE AND COST PROJECTIONS FOR MAJOR OPERATING FUNDS

TRANSPORTATION. DISTRIBUTION OF EXISTING MOTOR VEHICLE SALES AND USE TAX.

CITY OF MORENO VALLEY, CALIFORNIA MEASURE A LOCAL STREETS AND ROADS PROGRAM. Independent Accountant s Report on Applying Agreed-Upon Procedures

TAUSSIG. & Associates, Inc. CITY OF ANAHEIM COMMUNITY FACILITIES DISTRICT NO (PLATINUM TRIANGLE) DAVID

INTRODUCTION TO CAPITAL IMPROVEMENTS PROGRAMMING

Subject: City of St. Louis Park Beltline Boulevard Station Redevelopment Area Comprehensive Plan Amendment, Review File No.

INTRODUCTION INTRODUCTION 1

The Federal Perspective: Project Finance, TIFIA and Public Private Partnerships

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS SPECIAL REVENUE FUNDS

DEFINITION OF REVENUE SOURCES GENERAL FUND

APPENDIX I REVENUE PROJECTION AND ASSUMPTIONS

CITY OF MORENO VALLEY Neighborhood Budget Meeting. May 2013

City of San Mateo San Mateo, California

Chapter 10 Equity and Environmental Justice

Glossary of Terms. Anchorage Municipal Employee Association, Inc. A change to a budget that is made after the budget has been proposed.

City of Starkville, Mississippi. Audit Report. September 30, 2017

THE TAX INCREMENT FINANCE AUTHORITY ACT Act 450 of The People of the State of Michigan enact:

Executive Summary 1/3/2018

Transcription:

Public Policy Issues and Sustainability in Southern California Financing Infrastructure Development University of California Riverside March 3, 2010

Outline What is Infrastructure?; Infrastructure Need; Different Funding Options for Public Infrastructure; Challenges facing Public Infrastructure Financing; Suburbs Reaching Limits; Managing Population Growth; Paradigm Shift in Infrastructure Needs; and TUMF.

What is Infrastructure? Security Service - Police, Fire, Military; Public Health Hospitals, Ambulances, Clinics; Transportation Systems Railway Network, Airports, harbors, roads, fuel supply; Electricity - Transmission and distribution; Water Supply - Drinking water, waste water/sewage; Agriculture - Food production and distribution; Education Schools, community colleges, universities; Etc..

How Do Pay for New Public Infrastructure? Fees, Bonds, Financial Districts, taxes, etc Current economic slowdown and turmoil in the housing and credit markets threaten to further constrain state and local infrastructure spending; However: The housing correction and consumer slowdown are creating a budgetary crisis for many state and local governments; Infrastructure deficit will actually get worse unless we change the way we finance infrastructure investment; and Local governments will need to get creative in the way public infrastructure if financed in the current economic environment.

Financing Options Development Impact Fee (DIF); Communities Facility District (CFD); Road & Bridge Benefit District (R&BBD); Mitigation Fees; Sales Tax Measure; Municipal Bonds; Build America Bonds (BABs); and State Transportation Improvement Program (STIP).

Infrastructure Need The Department of Finance estimates that California needs $500 billion worth of infrastructure over the next two decades; http://gov.ca.gov/issue/performance-based-infrastructure/ Our system for financing infrastructure has become increasingly inadequate with the passage of time and has not kept up with keeping a buck a buck ; and Schwarts, B. Redressing America s Public Infrastructure Deficit American Society of Civil Engineers assigned an overall D grade to the nation s infrastructure and estimated that it would take a $2.2 trillion investment from all levels of government over the next five years to bring it into a state of good repair. Cooper, M. U.S. Infrastructure in Dire Straits

Funding Options for Infrastructure Development Impact Fee (DIF) One time charge applied to new development; Goal is to raise revenue for the construction or expansion of capital facilities located outside the boundaries of the new development that benefit the contributing development; Dedicated principally for the provision of additional water and sewer systems, roads, schools, libraries and parks and recreation facilities made necessary by the presence of new residents in the area; These fees are usually implemented to help reduce the economic burden on local jurisdictions that are trying to deal with population growth within the area. The funds collected cannot be used for operation, maintenance, repair, alteration or replacement of capital facilities.

Funding Options for Infrastructure Communities Facility District (CFD) Local Agency Prop 13 limited the ability of local public agencies to increase property taxes; CFD was created to provide an alternative method of financing for needed improvements and services; Created by a sponsoring local agency, includes all properties that will benefit from the improvements to be constructed or the services to be provided; Annual charge determined by formula that takes into account property characteristics; Special taxes will be charged until the bonds are pain in full, thereafter the CFD will charge a reduced fee for maintenance.

Funding Options for Infrastructure Road & Bridge Benefit District (R&BBD) Local Agency Subdivision Map Act Provides for the establishment of a R&BBD. For bridges and major thoroughfares as identified by the circulation element to provide a network that connects with the state highway system. Funds will be expended solely for construction of the improvement serving the area from which the fees comprising the fund were collected. Established to defray the cost of road and bridge improvements to an established area of benefit. There are four (4) Road & Bridge Benefit Districts in Riverside County administered by the Transportation Department and they are: Southwest; Mira Loma; Menifee Valley; and Scott Road.

Funding Options for Infrastructure Mitigation Fees Used to offset specific impacts attributable to new growth to a variety of issues so that developments pay for their fair share of impacts; Focuses on the environmental effects of an area; Requires majority vote from Board/Council; Not a Tax; Funds can be used for: Improving or saving wetlands; Transportation infrastructure; Service infrastructure; Police and fire services; and Other impacts brought upon the public through increased development. WRCOG TUMF Established February 2003.

Funding Options for Infrastructure Sales Tax Measure Voter Approved requires 2/3 majority to pass Additional Sales tax measure is dedicated to a specific purpose; E.g.. Measure A Transportation funds in the County of Riverside $1 billion raised by Measure A from 1989 to 2009 Prop 13, has made sales tax measures a crucial funding source for public infrastructure financing.

Funding Options for Infrastructure Municipal Bonds A majority of infrastructure is funded through the municipal bond market as well as through state and local budgets; A fear of inability to pay back, social spending, balanced-budget requirements, debt limitations, and increased competition among states to keep taxes low have restrained state and local borrowing as well as spending. Bonds are issued by governmental agencies as a method of issuing debt through public investments; The issuer of bonds promises to repay the principal plus a fixed or variable amount of interest Allows government agencies to fund public interest projects for which they do not have immediate funds at their disposal.

Funding Options for Infrastructure Build America Bonds (BABs) Created under the American Recovery and Reinvestment Act; Designed to stabilize the bond market and help create jobs; Traditionally, tax-exempt bonds provided a critical source of capital for state and local governments, but the recession reduced their ability to finance new projects; Assists in financing capital projects at a lower cost; and Taxable bonds issued by state and local governments. Requirements To be used for NEW governmental capital expenditures.

Funding Options for Infrastructure State Transportation Improvement Program (STIP) Multi-year capital improvement program of transportation projects on and off the State Highway System; Funded with revenues from the Transportation Investment Fund; STIP programming generally occurs every two years; Local agencies work through their County Transportation Commission to nominate projects for inclusion in the STIP; Regional agencies prepare Regional Transportation Improvement Plans (RTIPs); STIP is adopted by the California Transportation Commission.

Challenges facing Public Infrastructure Financing Options Depending political support for new funding mechanisms; Garnering public support; Misinformation; Special Interest Opposition; Keeping jurisdictions and private sector stakeholders on schedule and focused; Aging Population; Younger adults living at home longer; and Legal scrutiny and challenges.

Suburbs Reaching Limits People are beginning to come back to the central cities. ; Shaun Donovan, Secretary of Housing and Urban Development Infrastructure resources that was needed to support suburban growth will need to be refocused on Urban Growth as a number of people are moving back to more urban environments. Improved public transportation has encouraged people to give up their commute and live closer to work instead of work closer from home.

Managing Population Growth Local governments will need to find the financial wherewithal to furnish the services and public facilities needed to serve future population growth whether it be in the suburbs or central cities; County of Riverside is expected to grow by nearly 900,000 between now and 2035; and Population (2005-2035) 2,262,777 2,550,864 Vacant, developable land is growing more scarce, homes will increasingly be built on more compact sites in redevelopment areas and urban neighborhoods that are within walking distance of trolley stations, bus stops and shopping. 1,503,378 1,918,678 Source: Riverside County Center for Demographic Research. Projections adopted by WRCOG Dec. 6, 2006.

Paradigm Shift in Infrastructure Needs Transit Oriented Development (TOD); Designed to maximize access to public transport; Located within a radius of one-quarter to one-half mile (400 to 800 m) from a transit stop; and High-density development. Walkable Communities; Gives residents ability to walk to work or walk to the train; Demographic shifts point to younger people moving to downtown communities; and Will heal first from this crisis.

What is the purpose of the TUMF? To provide a supplemental revenue stream to augment the shortfall from traditional funding sources for regional transportation facilities; To mitigate the traffic impacts from new development on the regional system of highways and arterials; To ensure that new development pays its fair share towards providing the needed infrastructure improvements; Capital facilities costs only no operation and maintenance; and Complements Measure A revenues.

Why create a regional traffic fee? Local jurisdictions mitigate traffic impacts within their boundaries but have limited input and no control of their neighbors; Congestion from new growth transcends jurisdictional boundaries; Need to see the Big Picture of new growth on the transportation system as a whole; and Maintains level playing field. A uniform fee on all jurisdictions advantages / disadvantages equally.

Why did we end up with a fee program? Our choices: Benefit /Assessment Districts requires 2/3 vote Special Taxes (Mello-Roos) Community Facilities Districts requires 2/3 vote Sales Tax requires 2/3 currently in place Mitigation Impact Fee subject to AB 1600 Transfer Tax subject to County approval

What process did we use to establish the TUMF? Established a series of committees to guide the TUMF development (Public Works, Elected officials & City Managers); Developed the Regional System of Highways & Arterials (RSHA) with two tiers: backbone and Zonal ; Prepared the RSHA cost and used 20-year population and employment baseline forecast from SCAG; Prepared a Nexus Study; Held over 100 public meetings, press reports and workshops; Each jurisdiction adopted the TUMF Ordinance and Nexus Study and designated WRCOG as the Administrator.

Nuts and Bolts Simplified TUMF Formula Cost Assumptions x Network Improvements = TUMF Future Growth

The Program was designed to benefit local, regional and transit needs. For each TUMF dollar collected: 48.7% goes to the Backbone network and is programmed by the Riverside County Transportation Commission. 48.7% goes to the Zone in which it was collected for network improvements and is programmed by the jurisdictions in the Zone. 2.6% goes to regional transit and is programmed by Riverside Transit Agency. WRCOG and the Multi-Species Habitat Conservation Plan receive 1% and 1.38% respectively, off the top.

TUMF At Work Revenue Collected to Date - $518.7 million 143 projects programmed since inception; 31 projects completed; 13 projects under construction; 51 projects are in engineering and right-of-way acquisition; 41 projects are in planning and environmental; and The remaining balance is in preliminary design and planning phases.

Why Was Implementation Successful? Strong political leadership (local and subregional); Included the local jurisdiction technical and management staff throughout the process; Included some form of return to source ; OUTREACH, OUTREACH, OUTREACH; Include local builders, commercial builders, chambers, etc.; Kept it uniform; and Project identification and prioritization occurs by member jurisdictions and partner agencies; WRCOG only administers the Program.

Communicating with us is as easy as 1 2 3 4 www.wrcog.cog.ca.us