All CE TSOs proposal for additional properties of FCR in accordance with Article 154(2) of the Commission Regulation (EU) 2017/1485 of 2

Similar documents
16 July 2018 DRAFT VERSION for public consultation

ELIA LFC Block Operational Agreement

7 April ENTSO-E AISBL Avenue de Cortenbergh Brussels Belgium Tel Fax www. entsoe.

Proposal of the Transmission System Operators of the Baltic. Capacity Calculation Region for the regional design of longterm

Capacity Calculation Region Nordics regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU)

Allegato A. Summary WHEREAS... 3 GENERAL PROVISIONS Article 1 Subject matter and scope Article 2 Definitions... 4

Explanatory document for the Nordic synchronous area proposal for limits for the exchange of FCR between the TSOs in accordance with Article 163(2)

18 April 2016 Draft for consultation

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12

ANCILLARY SERVICES TO BE DELIVERED IN DENMARK TENDER CONDITIONS

Energinet.dk s proposal for Arrangements concerning more than one NEMO in one bidding zone in accordance with Article 45 and 57 of the Commission

(a) maximises market participants opportunities for adjusting their balances by

All Baltic CCR TSOs Common Proposal for Regional Design of Long-Term Transmission Rights in Accordance with Article 31 of the Commission Regulation

Intraday cross-zonal gate opening and gate. in accordance with Article 59 of Commission Regulation (EU) 2015/1222 of 24

ELECTRICITY BALANCING IN EUROPE

GB TSOs Intraday proposal for arrangements concerning more than one Nominated Electricity Market Operator (NEMO) in the GB Bidding Zone in accordance

ACER. Congestion income distribution methodology. in accordance with Article 73 of the Commission Regulation

DS3 System Services Protocol Interim Arrangements

SPP Reserve Sharing Group Operating Process

Table of Contents List of Figures...3 List of Tables...3 Definitions and Abbreviations...4 Introduction...7

ENTSO-E Network Code on Electricity Balancing

ENTSO-E recommendations for Market Design Trilogue negotiations

Application instruction for the maintenance of frequency controlled reserves

APX Power NL Market Instrument Specifications

Terms and Conditions related to Balancing

Allocation Rules for Forward Capacity Allocation

FREQUENCY SUPPORT MARKETS WITH WIND POWER PARTICIPATION

LFCR code update for JESG, May 2013

Contents Introduction Chapter 1 - Security Policy... 6

Ancillary & Other Services Volume Methodology Statement

1/12/2018. Allegato A

The Model of Implicit Capacity Allocation in the Baltic States

Grid Code Workgroup Consultation Response Proforma


CID Methodology Explanatory note

EXCERPTS from the SAMS-SPCS SPS Technical Reference

COMMISSION REGULATION (EU) NO. 543/2013. Article 17.1.a: Rules on Balancing

13 th February th February 2017 Page 1 of 7

ACTIVATION PURPOSES BSG. 7 March 2017

DS3 System Services Protocol Regulated Arrangements

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for

STANDARD MT5 ACCOUNT TERMS OF BUSINESS

4.2 Definitions In this Clause 4 and Schedule E the following terms shall have the meanings ascribed to them below:-

Maintenance Policy. Error means any verifiable and reproducible failure of the Software to materially conform to the Documentation.

UNITED COOPERATIVE SERVICES. Distributed Generation Procedures & Guidelines Manual for Members

Contract notice in 2014/S of 31/10/2014

ReliabilityFirst Regional Criteria 1. Operating Reserves

C2-102 COMMON NORDIC BALANCE MANAGEMENT. K.LINDSTRÖM FINGRID (Finland)

DATED [ ] 200[ ] NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and [ ] (2) FAST RESERVE FRAMEWORK AGREEMENT

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Generating Unit Operating Requirements

We appreciate your feedback

SHARES ACCOUNT TERMS OF BUSINESS

SHADOW ALLOCATION RULES

RULES. For. Article 1

FINAL REPORT ON GUIDELINES ON UNIFORM DISCLOSURE OF IFRS 9 TRANSITIONAL ARRANGEMENTS EBA/GL/2018/01 12/01/2018. Final report

AUFLS information paper

COMPARISION OF OFFSHORE REQUIREMENTS

(7) This proposal is submitted for the approval of all National Regulatory Authorities (hereafter referred to as the NRAs ) of the CCR GRIT.

STCP19-5 Issue 002 Offshore Transmission System Compliance Process & Testing

CHAPTER II INTERCONNECTION AGREEMENTS

EUROPEAN STANDARD OF ACTUARIAL PRACTICE 2 (ESAP 2) ACTUARIAL FUNCTION REPORT UNDER DIRECTIVE 2009/138/EC

UNC 0680: UNC Changes as a Consequence of no deal United Kingdom Exit from the European Union. UNC Modification

Report on Proposed principles for Common Balance Management

System Operating Policies on Compensation between Elia and Nemo Link

COMPANIES REGULATIONS

Pre Energisation Data Information Note

Short Term Operating Reserve (STOR)

Joint European Standing Group (JESG) Requirements for Generators Tech Sub Group Issues

TRADING REGULATIONS FOR THE SHARES OF GROWTH COMPANIES AND SPANISH REAL ESTATE INVESTMENT TRUSTS (SOCIMIs) THROUGH THE ALTERNATIVE EQUITY MARKET (MAB)

NPCC Regional Reliability Reference Directory # 5 Reserve

Terms of Business for FXTM Standard FIXED Account

Proposal for Multiple NEMO Arrangements (MNA) for the Belgian bidding zone in accordance with Article 45 and Article 57 of the Commission Regulation

Background Information:

Questions and answers

ATTACHMENT H: Large Generator Interconnection Agreement (LGIA) STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT

Proposed Smart Solutions in the Clean Energy package Proposed smart solutions in the Clean Energy package

Twelfth Revised Sheet No FLORIDA POWER & LIGHT COMPANY Cancels Eleventh Revised Sheet No INDEX OF CONTRACTS AND AGREEMENTS

Response to ENTSOE public consultation. Network Code on Capacity Allocation and Congestion Management for. Electricity

Comments on CEPA s draft conclusions in relation to European transmission tariffs

Violation Risk Factor and Violation Severity Level Justifications Project Modifications to BAL

BC Hydro Open Access Transmission Tariff Effective: 09 December 2010 OATT Attachment M-1 Appendix 5 Page 1

APPLICATION FOR STANDARD CONTRACT BY A QUALIFYING COGENERATOR OR SMALL POWER PRODUCER

Applicable Balancing Services Volume Data Methodology Statement

SURPLUS ENERGY PURCHASE AGREEMENT PARALLEL CUSTOMER GENERATION CGS 8 WISCONSIN AGGREGATE RENEWABLE CAPACITY OF 20 KILOWATTS OR LESS

EIOPA Final Report on Public Consultations No. 13/011 on the Proposal for Guidelines on the Pre!application for Internal Models

EU Harmonisation of Maintenance Publications at Interconnections Points

Milestone Forex - Terms of Business

Unlocking grid flexibility:

Anders Plejdrup Houmøller 10 May Wholesale market models and the role of exchanges and traders. Prepared by Anders Plejdrup Houmøller

CENT ACCOUNT TERMS OF BUSINESS V.4

The North Seas Countries Offshore Grid Initiative

FIRM FAST RESERVE EXPLANATION AND TENDER GUIDANCE DOCUMENT

cc. Robert O Rourke Jo Aston Paul Bell Denis Kelly Robbie Ahern Michael Beggs Tony Hearne 1st April 2015 Dear Sir and Madam,

UGANDA ELECTRICITY TRANSMISSION COMPANY LIMITED - AND - GENCO... POWER PURCHASE AGREEMENT RELATING TO

Intraday Cross-Zonal Gate Opening and Gate Closure Times. Consultation document. PC_2018_E_01 9 January 2018

EUROPEAN STANDARD OF ACTUARIAL PRACTICE 2 (ESAP 2) ACTUARIAL FUNCTION REPORT UNDER DIRECTIVE 2009/138/EC

Jefferson Energy Cooperative Policy 124 DISTRIBUTED GENERATION POLICY

Intraday Implicit Cross- Border allocation on BE-FR border. Description of the allocation mechanism

BANDERA ELECTRIC COOPERATIVE, INC. Tariff for Electric Service. Sheet No. Section III 1.0

Transcription:

All CE TSOs proposal for additional properties of FCR in accordance with Article 154(2) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation Date 13/03/2018 DISCLAIMER This document is released on behalf of all CE transmission system operators ( TSOs ) only for the purposes of the public consultation on the TSOs proposal for additional properties of FCR ( FCR additional properties ) in accordance with Article 154(2) of the Commission Regulation (EU) No 2017/1485 of 2 August 2017 ( SO GL ). This version of the proposal for additional properties of FCR does not in any case represent a firm, binding or definitive TSOs position on the content.

Contents Whereas... 3 Article 1 Subject matter and scope...4 Article 2 Definitions and interpretation...4 Article 3 ADDITIONAL PROPERTIES OF FREQUENCY CONTAINMENT RESERVES ACCORDING TO ARTICLE 154(2) SO GL...4 Article 4 Publication and implementation of the Proposal for additional properties of FCR...5 Article 5 Language...6 2

All TSOs, taking into account the following, Whereas (1) This document is a common proposal developed by all transmission system operators from synchronous area of Continental Europe (hereafter referred to as TSOs ) regarding the development of the additional properties of frequency containment reserves (hereafter referred to as FCR additional properties ) in accordance with Article 154(2) of Commission Regulation (EU) 2017/1485 (hereafter referred to as SO GL ). This proposal is hereafter referred to as FCR additional properties proposal. (2) The FCR additional properties proposal takes into account the general principles and goals set in the COMMISSION REGULATION (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation. The goal of the COMMISSION REGULATION (EU) 2017/1485 is to ensure the operational security of the interconnected transmission system. It sets for this purpose requirements for approval of terms and conditions or methodologies of TSOs, in particular concerning additional properties of the FCR in accordance with Article 154(2). (3) With respect to Article 154 of SO GL which determines only FCR technical minimum requirements, all TSOs of a synchronous area have the right to specify, in the synchronous area operational agreement, common additional properties of the FCR required to ensure operational security in the synchronous area, by means of a set of technical parameters and within the ranges in Article 15(2)(d) of COMMISSION REGULATION (EU) 2016/631 of 14 April 2016 establishing a network code on requirements for grid connection of generators and Articles 27 and 28 of COMMISSION REGULATION (EU) 2016/1388 of 17 August 2016 establishing a Network Code on demand connection. To reflect the individual needs of the SA CE the TSOs of SA CE propose respective additional properties described below. (4) The proposal specifies conditions for FCR providing units and/or FCR providing groups: with respect to activation of FCR and in particular with respect to FCR availability also in stressed system status with a view also to new technologies. (5) Article 6(2)(d)(iii) of the SO GL requires all TSOs to develop methodologies, conditions and values included in the synchronous area operational agreements in Article 118 concerning the additional properties of the FCR in accordance with Article 154(2). (6) According to Article 6 of SO GL the proposal for additional properties of FCR is expected to reduce the risk of not appropriate activation of FCR and of non-availability of FCR in stressed system state. With this in mind the proposed additional properties presented below will contribute to system stability and therefore to the achievement of the objectives of Article 4 of the SO GL. (7) Specification of activation of FCR has the goal to ensure fast response and therefore help to stabilize the system. Specifications for FCR providing units and/or FCR providing groups with limited energy reservoir aim at ensuring sufficient availability also in stressed system status. Specifications for frequency measurement aim at ensuring availability of independent functionality of FCR providing units and/or FCR providing groups in particular in case of system split or communication problems. The transition period is defined to avoid too abrupt change of requirements for already existing FCR providing units and/or FCR providing groups. 3

(8) In conclusion, the proposal for additional properties of FCR contributes to the general objectives of the COMMISSION REGULATION (EU) 2017 to the benefit of all market participants and electricity end consumers. SUBMIT THE FOLLOWING PROPOSAL FOR ADDITIONAL PROPERTIES OF FCR TO ALL REGULATORY AUTHORITIES: Article 1 Subject matter and scope The additional properties of FCR as determined in this proposal shall be considered as the common proposal of all TSOs in accordance with Article 154 (2) of SO GL and shall cover the requirements in addition to Article 154 for FCR providing units and/or FCR providing groups. Article 2 Definitions and interpretation 1. For the purposes of the proposal for additional properties of FCR, terms used in this document shall have the meaning of the definitions included in Article 3 of the SO GL, of Regulation (EC) 714/2009, Directive 2009/72/EC, Commission Regulation (EU) 543/2013 and COMMISSION REGULATION (EU) 2016/631. 2. In this proposal for additional properties of FCR, unless the context requires otherwise: a. the singular indicates the plural and vice versa; b. the table of contents and headings are inserted for convenience only and do not affect the interpretation of this proposal for additional properties of FCR; and c. any reference to legislation, regulations, directive, order, instrument, code or any other enactment shall include any modification, extension or re-enactment of it then in force. Article 3 ADDITIONAL PROPERTIES OF FREQUENCY CONTAINMENT RESERVES ACCORDING TO ARTICLE 154(2) SO GL 1. Each TSO shall ensure that either each FCR providing unit and FCR providing group or in case a TSO utilizes combined responses to fulfil its FCR delivery the activation of all FCR providing units and FCR providing groups are not artificially delayed, begin as soon as possible but no later than 2 s after a frequency deviation, and the activation shall rise linearly or quicker. If the delay in initial activation of active power frequency response is greater than two seconds, the power generating facility owner shall provide technical evidence demonstrating why a longer time is needed. These requirements should be checked during prequalification according to Article 155 in the SO GL. 2. Each TSO shall ensure that each FCR providing unit stays connected to the grid within the frequency ranges specified in Article 13(1) of Commission Regulation (EU) 2016/631 as long as possible and at least according to the minimum time periods of operation according to same regulation and has to take into account possible under frequency load shedding actions of the relevant system operators which might include also FCR providing units. 3. FCR providing units or FCR providing groups are deemed to have limited energy reservoirs in case a full activation for the time frame contracted by the TSO might, without active state-of-charge (SOC) management, lead to a full exhaustion of the energy reservoir taking into account the effective SOC available at the beginning of that time frame. For prequalification the TSOs shall require that FCR providing units or FCR providing groups to respect the following: 4

FCR providing units or FCR providing groups with limited energy reservoirs can operate in standalone operation in case they have an active SOC management. Stand-alone operations means that operation is completely separated from operation of FCR providing units or FCR providing groups with unlimited energy reservoirs. The active SOC management shall ensure a continuous physical activation of automatic FCR. To enable the SOC management, such FCR providing units or FCR providing groups with limited energy reservoir in stand-alone operation shall have a ratio of rated power to prequalified power of at least 1.25:1 and a sufficient energy reservoir dimensioning of at least [1] MWh per 1 MW prequalified power to be sufficient to cover a Δf of 200 mhz for at least [30] minutes in positive and negative direction. In any way any lead time for the charging process needs to be considered for the energy management. The values in brackets given in this paragraph are depending on the minimum activation period to be ensured by FCR providers according art.156 (9, 10, 11) of the SO GL. In case FCR providing units or FCR providing groups with limited energy reservoirs are supplying FCR outside stand-alone operation as defined above, the FCR provider shall be able to compensate a possible lack of energy and hence a lack of FCR by shifting FCR activation to providing groups or providing units with unlimited energy reservoirs. In any case the shifting of FCR activation shall guarantee continuity of the FCR provision. The SOC management of FCR providing units and FCR providing group shall not rely on over fulfilment of activation. FCR providing units or FCR providing groups with limited energy reservoirs which are connected to the grid by means of inverters shall ensure that close to the limit of its energy reservoir the remaining capacity is sufficient for keeping its reactivity on short-term frequency deviations. Therefore, the unit shall switch from normal mode into reserve mode at t FAT (full activation time of afrr according to Art. 158 (1f) SO GL) before exhaustion of the energy reservoir due to maximum FCR provision in one direction. During the reserve mode the unit shall only react on short-term frequency deviations by following the zero-mean frequency: f zero mean (t) = f(t) 1 n(t t FAT ) n(t t FAT ) i=0 f (t-t i ) (reserve mode) For transition from normal mode into reserve mode a linear transition function T should be applied within the transition period of t exhaustion - t FAT to t exhaustion : f reaction (t) = f zero mean (t) T + (1 T) f(t) 4. Where centralized control of FCR providing units or FCR providing groups is applied each TSO shall ensure, that in case of regional disturbances, system split or communication problems separate frequency measurements for every geographical area behind a connection point to the voltage level of 110 kv and above are used and the autonomous activation of FCR is still possible. 5. Each TSO shall require that FCR providing units and FCR providing groups continue providing FCR and are not allowed to reduce activation in case of a frequency deviation outside the frequency range of +/- 200 mhz up to the frequency ranges as defined in Article 3.2. FCR providing units or groups which are able to further increase/decrease power output beyond the frequency range of +/- 200 mhz shall not limit their activation to the procured volume. Article 4 Publication and implementation of the Proposal for additional properties of FCR 1. The TSOs shall publish the proposal for additional properties of FCR without undue delay after all NRAs have approved the proposal or a decision has been taken by the Agency for the Cooperation of Energy Regulators in accordance with Article 8(1) and Article 11 of the SO GL. 5

2. The TSOs shall implement the proposal for additional properties of FCR provided one month after the regulatory authorities have approved the proposal in accordance with Article 6(3) SO GL or a decision has been taken by the Agency in accordance with Article 6(8) SO GL. The transitional period for the implementation of additional properties of FCR by the affected FCR providers shall be two years: one year for TSOs to adapt their Terms & Conditions and one additional year for FCR providers to implement the additional properties on FCR. Article 5 Language The reference language for this proposal for additional properties of FCR shall be English. For the avoidance of doubt, where TSOs need to translate this proposal for additional properties of FCR into their national language(s), in the event of inconsistencies between the English version published by TSOs in accordance with Article 8 of the SO GL Regulation and any version in another language, the relevant TSOs shall, in accordance with national legislation, provide the relevant national regulatory authorities with an updated translation of the proposal for additional properties of FCR. 6