TAMIL NADU GENERATION AND DISTRIBUTION COPRORATION LIMITED (ABSTRACT)

Similar documents
TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED (ABSTRACT)

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED (ABSTRACT) (SECRETARIAT BRANCH)

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED

Officers Revision of Wages With Effect From

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED (ABSTRACT) Read:

TAMILNADU ELECTRICITY BOARD (ABSTRACT) (SECRETARIAT BRANCH)

2. Receipt of this letter together with its enclosures may be acknowledged.

TNEB ENGINEERS' SANGAM

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED (ABSTRACT)

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED (ABSTRACT)

Workmen Revision of Wages With Effect From

TAMIL NADU GENERATION & DISTRIBUTION CORPORATION LIMITED ACCOUNTS BRANCH

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED (ABSTRACT)

BUDGETING PROCESS. Procedures in Tamil Nadu Generation and Distribution Corporation Ltd

Tender Schedule. 10 th, 11 th & 16 th August 2017 Time am to pm. August 2017 Time am to pm

TENDER DOCUMENT FOR APPOINTING CREDIT RATING AGENCIES FOR PRIVATE PLACEMENT OF BONDS

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED (ACCOUNTS BRANCH) 144, Anna Salai, (2 copies each for Accounts and

Through Proper Channel

Through & Hard Copy TANGEDCO ACCOUNTS BRANCH 144, ANNA SALAI, CHENNAI Circular.Memo.No.CFC/FC/REV/AS.3/D.325 /17, dated

Fv E ºÄ J uzvà "G Íõ±ì ö

KARNATAKA STATE ROAD TRANSPORT CORPORATION CENTRAL OFFICES : BANGALORE. No. KST:CO:RCT:RULES: 58 :78-79 Date:

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION (DRAFT)

FORM - 7 PART - I FORM FOR ASSESSING PENSION AND GRATUITY

Procedure for. Sharing of Inter-State Transmission System Losses. In compliance of

THE TAMIL NADU TAX ON ENTRY OF MOTOR VEHICLES INTO LOCAL AREAS RULES, 1990 (G.O. P. No. 95, dated the 20 th February, 1990)

FINANCE (PENSION) DEPARTMENT

SOUTHERN REGIONAL POWER COMMITTEE BENGALURU. Record Notes of the Meeting regarding issues pertaining to Tamil Nadu

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 22 ND MEETING OF COMMERCIAL SUB-COMMITTEE OF SRPC HELD AT BANGALORE ON

SECURITIES AND EXCHANGE BOARD OF INDIA

Bhopal: Dated 5 th May 2006

COMPREHENSIVE PERFORMANCE AWARD SCHEME FOR THERMAL POWER STATIONS

FINANCE [Pay Cell] DEPARTMENT. (Heyvilambi, Puratasi-25, Thiruvalluvar Aandu 2048) ABSTRACT

FOLLOWING RECOMMENDATIONS OF THE OFFICIAL COMMITTEE WILL BE IMPLEMENTED

TAMIL NADU FINANCIAL CODE FORM:12 CHAPTER X ARTICLE 230

UCO BANK (OFFICERS ) SERVICE REGULATIONS, 1979 (Updated upto )

TAMIL NADU GOVERNMENT GAZETTE

ABSTRACT. RULES - Tamil Nadu Value Added Tax Rules, Notified. Commercial Taxes and Registration [B1] Department. G.O.Ms. No.

TAMIL NADU GOVERNMENT GAZETTE

Sharing of ISTS Losses

LEAVE RULES FOR WORKERS

THE TAMILNADU INDUSTRIAL INVESTMENT CORPORATION LIMITED CITIZENS CHARTER

Annexure - II. Benefits available to Tamil Nadu government employees. Revised pay scales with grade pay

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION

Draft Consultative Paper on. Captive Generating Plants

TAMIL NADU ELECTRICITY BOARD LEAVE REGULATIONS

FINANCE (PENSION) DEPARTMENT

FINANCE [Salaries] DEPARTMENT

FINANCE [Pay Cell] DEPARTMENT

Application for no objection certificate from the Government of Tamil Nadu for

FINANCE [Pension] DEPARTMENT G.O.No.205

Uttar Pradesh Electricity Regulatory Commission

PAY FIXATION RULES. These rules may be called POWERGRID Pay Fixation Rules.

MAHARASHTRA CIVIL SERVICES

FINANCE [SALARIES] DEPARTMENT

G.O.MS.No. 111 Dated: Read the following:-

TENDER NOTICE: 01 /

FINANCE (ADMN.DI&IF) DEPARTMENT. G.O.Ms.No.36 Dated: Read the following:-

CANARA BANK (OFFICERS ) SERVICE REGULATIONS, 1979

Pay fixation : I) Appointment Initial pay Minimum of the time scale of pay. II) Promotion fixation:

Draft Tamil Nadu Value Added Tax Rules, 2006

BEFORE THE COMMISSIONER, H.R. & C.E.ADMN.DEPARTMENT, CHENNAI-34. Tuesday the 25 th day of September, Two thousand and Eighteen.

Letter No.55473/PGC/2013, dated:

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Tariff Order No 1 of 2010 dated

CENTRAL ELECTRICITY REGULATORY COMMISSION New Delhi NOTIFICATION

Government of Gujarat Finance Department, Sachivalaya, Gandhinagar Dated the 1 st, 2006


LEAVE POLICY. To define the procedure, entitlements & guidelines for officers to avail leave.

JAMMU AND KASHMIR STATE ELECTRICITY REGULATORY COMMISSION

TEXPROCIL. (A) Exports under Bond/ LUT or under Refund of IGST

TENDER NOTICE. AG(A&E)/OM./IV/ / Dt. 13/6/2018. Sub: Annual Rate Contract for Computer Stationery for the year

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman

No. F. 15 (5) FD (Rules) / 98 Jaipur, dated June 11,1998. Revision of pension of pre-1988 pensioners / family pensioners etc.

Schedule 19 POWER PURCHASES FROM COGENERATION AND SMALL POWER PRODUCTION QUALIFYING FACILITIES

COMBINED APPLICATION FORM FOR GENERAL PROVIDENT FUND FINAL CLOSURE AND PENSION

Policy Manual POWERGRID EMPLOYEES (HBA) GROUP INSURANCE SCHEME 1.0 INTRODUCTION

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED

Government of West Bengal Finance Department Audit Branch. No. : F(P) Kolkata, the 25 th November, 2009 MEMORANDUM

Institute of Human Resources Development Prajoe Towers, Vazhuthacaud, Thiruvananthapuram

GOVERNMENT OF HIMACHAL PRADESH DEPARTMENT OF HIGHER EDUCATION --- No.Shiksha-II-Chha(10)-2/2009 Dated Shimla rd Sept.

REGIONAL OFFICER. Page 1 of 11

BALMER LAWRIE & CO. LTD ASSOCIATE SERVICES, 32, SATTANGADU VILLAGE MANALI, CHENNAI PHONE: / 542 FAX:

Determination of Tariff for Generation and Distribution

MAHARASHTRA CIVIL SERVICES (COMMUTATION OF PENSION) RULES 1984

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE MINUTES OF THE 19 TH MEETING OF TECHNICAL COORDINATION COMMITTEE OF SRPC HELD AT HYDERABAD ON

TAMIL NADU ELECTRICITY BOARD ENGINEERS SANGAM Regd. No.124/MDS (Recognised) H.Q.: CHENNAI. DATE: CIRCULAR NO.2

OFFICE MEMORANDUM. 2.2 Separate orders will be issued by the Ministry of Defence in regard to Armed Forces pensioners/family pensioners.

2. Updating of notional emoluments for revision of pension / family pension of pre retirees / family pensioners and consolidation of pension.

PJM & MISO Assumptions and Criteria for Testing of New Resources

Power Purchase Obligation (Compliance by purchase of Renewable Energy/Renewable Energy Certificates) Regulations, 2012 (Regulation No. 1 of 2012).

Procedure for Scheduling

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA

GRADATION, CATEGORISATION & FITMENT

DEPARTMENTAL EXAMINATION November 2013

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD. TIRUNELVELI REGION

TAMIL NADU GOVERNMENT GAZETTE

1.1 These regulations shall extend to whole of the State of Punjab.

THE NARRAGANSETT ELECTRIC COMPANY QUALIFYING FACILITIES POWER PURCHASE RATE

Transcription:

TAMIL NADU GENERATION AND DISTRIBUTION COPRORATION LIMITED (ABSTRACT) TANGEDCO - Mettur Thermal Power Station-II (1x600MW) Incentive Schemes Sanction of Monthly Thermal Allowance and Annual Thermal Incentive Bonus to the employees of Mettur Thermal Power Station-II Orders - Issued. (SECRETARIAT BRANCH) (Per.) FB TANGEDCO Proceedings No.6, Dated 15.04.2017 Chithirai 02. Thiruvalluvar Aandu 2048 Read: C(Per.)CMD TANGEDCO Proceedings No.100, (SB) Dated:27.10.94. PROCEEDINGS:- ***** In the Board s Proceedings cited, orders were issued for payment of Monthly Thermal Incentive Allowance and Annual Thermal Incentive Bonus to the employees of Mettur Thermal Power Station-I with effect from 1 st April 1992 with certain conditions for allowing the above incentives. 2. It was decided by TANGEDCO to construct another unit of 1X600 MW of Mettur Thermal Power Project-II and the above project was commenced during June 2008. The commercial operation of the Project was put into commission on 12.10.2013. At the time of project construction stage itself, the employees of the Mettur Thermal Power Project-II were allowed Monthly Thermal Incentive Allowance and Annual Thermal Incentive Bonus instead of Project Allowance and Project Special pay from 2008 onwards till 2013-14. 3. The Chief Engineer/Mettur Thermal Power Station-II has sent a proposal for sanction of Monthly Thermal Allowance and Annual Thermal Incentive Bonus for the years 2014-15 and 2015-16 to the employees of Mettur Thermal Power Station-II (Consequent on sanction of commissioning incentive)...2..

::2:: 4. After careful examination of the proposal, the TANGEDCO hereby order as follows: i) The Annual Thermal Incentive Bonus and Monthly Thermal Allowance paid in excess from 2008 to 2013-2014 shall be recovered from the employees of Mettur Thermal Power Station-II. ii) The Annual Thermal Incentive Bonus to the employees of Mettur Thermal Power Station-II for the year 2014-15 shall not be allowed due to non achievement of required slab of generation. iii) The Annual Thermal Incentive Bonus to the employees of Mettur Thermal Power Station-II (1x600 MW) for the year 2015-16 shall be granted as per the slab of generation achieved at the rates prescribed in (Per.) B.P. (Ch) No. 223 & 224 (SB) Dated: 21.11.2009. The Terms and Conditions for payment of Monthly Thermal Allowance and Annual Thermal Incentive Bonus is shown in Annexure. 5. The receipt of the Board's Proceedings shall be acknowledged. (BY ORDER OF BOARD) To R. BALAJI SECRETARY All Chief Engineers. The Chief Financial Controller/General and Revenue/Accounts Branch. All Superintending Engineers. All Deputy Secretaries/Secretariat Branch. The Chief Internal Audit Officer/Audit Branch. Copy to:- The Chairman cum Managing Director's Table. The Director General of Police/Vigilance. The Managing Director/TANTRANSCO. All Directors/TANGEDCO and TANTRANSCO. The Secretary/TANGEDCO/Chennai-2. The Legal Adviser. The Executive Assistant to Chairman cum Managing Director s office. The Industrial Relations Adviser/TANGEDCO. The Deputy Chief Engineer/Administrative Branch. All Senior Personnel Officers/Administrative Branch...3..

::3:: The Industrial Relations Officer/TANGEDCO. The Assistant Personnel Officer/Tamil Development for Publication in the TNEB Bulletin (2 copies). All Branches. Tamil Nadu Electricity Workers' Federation. Tamil Nadu Electricity Board Accounts & Executive Staff Union. Tamil Nadu Electricity Board Workers Progressive Union (LPF). Central Organisation of Tamil Nadu Electricity Employees (COTEE). Minsara Pirivu Anna Thozhir Sangam. Tamil Nadu Minvariya Janatha Thozhilalar Sangam. Tamil Nadu National Electricity Workers' Federation (2 Groups). Tamil Nadu Electricity Board Engineers' Sangam. Tamil Nadu Electricity Employees Congress. Tamil Nadu Electricity Board Thozhilalar Poriyalar Aykkiya Sangam. Tamil Nadu Electricity Board Engineers' Association. Tamil Nadu Electricity Board Finance & Accounts Officers Association. Bharathiya Electricity Employees Federation. Tamil Nadu Electricity Board Card Billing Staff Union. Tamil Nadu Electricity Board Dr.Ambedkar Employees Union. Tamil Nadu Electricity Board Engineers Union. :: TRUE COPY :: FORWARDED :: BY ORDER :: SECTION OFFICER

ANNEXURE TERMS AND CONDITIONS (1). Monthly Thermal Incentive Allowance. (a) i) The employees of the Mettur Thermal Power Station-II and Mettur Thermal Power Project-II shall be granted a Monthly Thermal Incentive Allowance linked to production on the scale specified below at flat rates for various slabs of basic pay at the rates prescribed in (Per.) B.P. (Ch) No. 223 & 224 (SB) Dated: 21.11.2009. ii) In lieu of Project Special Pay and Project Allowance, the staff in the construction side of the Mettur Thermal Power Project-II will also be allowed the monthly Thermal Incentive Allowance as given to the staff of the Mettur Thermal Power Station-II. (b) Minimum out-put corresponding to the annual rate of 5000 KWH/KW of installed capacity for the calendar month should have been achieved for eligibility to the Monthly Thermal Incentive Allowance. (c) As the Monthly Thermal Incentive Allowance is granted only as an incentive for production, employees will not be eligible for this incentive allowance during the following periods:- i) during the periods of absence on leave other than casual leave or special casual leave or compensatory leave. ii) during suspension. iii) when the employee is charge-sheeted for any reason, in-eligibility of the allowance for a period of one month, the payment for the month being restored only if he is exonerated, subsequently. (2) Annual Thermal Incentive Bonus:- (a) i) Annual Thermal Incentive Bonus is for the Accounting year commencing from 1 st April of a year to the 31 st March of commencing from 1 st April of a year to the 31 st March of the succeeding year. The employees on the role of the Mettur Thermal Power Station-II who have been on actual duty (casual leave to be treated as actual duty) for 200 days in the accounting year from 1 st April to 31 st March of the succeeding year will be eligible to get the Annual Thermal Incentive Bonus. ii) A small construction side staff of Mettur Thermal Power Project-II will also be allowed the Annual Thermal Incentive Bonus in lieu of the Project Special Pay and Project Allowance as given to the staff of the Mettur Thermal Power Station-II.

::2:: (b) The rates of Annual Thermal Incentive Bonus when generation level reaches 5100 KWH.KW and the rate of Annual Thermal Incentive Bonus for the increase of every 100 KWH/KW over and above 5100 KWH.KW are as indicated in (Per.) B.P. (Ch) No. 223 & 224 (SB) Dated: 21.11.2009. (c) i) The minimum output for the eligibility of the monthly thermal allowance, and also the output(s) for the admissibility of annual bonus shall be calculated on the basis of morning and evening peak period generation during the following hours:- During Summer - April to September Morning Peak Hours Evening Peak Hours 05.00 to 09.00 18.00 to 22.00 During Winter October to March 06.00 to 10.00 17.00 to 21.00 ii) The peak hour generation data intimated by the power station to the Southern Regional Electricity Board, Bangalore would form the basis for incentive benefits. The daily energy generated during the peak period shall be computed in million units based on the half hourly generation in M.W. furnished to the Southern Regional Electricity Board, Bangalore and these will be summated for each month and multiplied by three for arriving at the monthly generation. The above monthly generation figures would be further summated over the year. iii) The Thermal Station should carry out the instructions of the Load Despatch Centres of the TANTRANSCO regarding load variations during off peak period. If any additional generation is pumped into the Grid during these off peak period in violation of the instructions of Load Despatch Centres of the TANTRANSCO, the generation of Power for that day computed as in (i) will be deducted out of the monthly generation of the station. (d) In Mettur Thermal Power Station-II /Mettur Thermal Power Project-II for extra hours approved and worked by the employees, a suitable reduction will be made from the total quantum of Annual Thermal Incentive Bonus, so that any over time paid is deducted from the total Annual Thermal Incentive Bonus Payable. //TRUE COPY// SECTION OFFICER