Total Budget Year 1 - FY Estimated Project Specific Funding. External Deliver Project Contrib Cost Contrib Balance Cost

Similar documents
FIVE YEAR CIP SUMMARY

RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT AGENDA

RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT AGENDA

GENERAL PLAN AMENDMENT # FLOOD HAZARDS

STORMWATER MANAGEMENT FUND Department of Environmental Services

RESOLUTION - APPROVING FINAL FISCAL YEAR BUDGET

An Overview of the New Development Impact Fee (DIF) Nexus Study. Riverside County Executive Office Staff Report February 11, 2014

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

July 1, Tier Percent of Allocation Cost per ccf $0.91 $1.27 $2.86 $4.80 $ % % % % 201+%

RECOMMENDATION: Staff recommends the Board adopt Resolution No approving SAFCA s Fiscal Year Final Budget.

APPENDIX K Drainage Study

King County Flood Control District Flood Risk Reduction Work Program and Accomplishments

Water Resources Engineering Division Public Works City of Colorado Springs

SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR JANUARY 19, 2017 WATER INFRASTRUCTURE IMPROVEMENTS FOR THE NATION (WIIN) ACT

FINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012

STATUS. Total Maximum Daily Load Progress Report

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

The costs incurred by the Permittees in implementing the Santa Ana Regional DAMP fall into two broad categories:

2004/05 Long Range Finance Plan

AGENDA DATE: June 21, 2017 ITEM NO: 13. Zone 7 adopted its first two-year budget for fiscal years FY in June of 2016.

NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter

East Hartford. Challenges

Western Riverside Council of Governments Transportation Uniform Mitigation Fee Program Five-Year Expenditure Report (FY2008/09 to FY2014/15)

Stormwater Utility Fund Delivery of Services

Volusia County Floodplain Management Plan 2012

This survey is expected to take approximately 20 minutes and must be completed in one session.

This survey is expected to take approximately 20 minutes and must be completed in one session.

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C

STORMWATER MANAGEMENT FUND Department of Environmental Services

Role of Disaster Insurance in Improving Resilience: An Expert Meeting The Resilient America Roundtable

Delaware River Basin Commission s Role in Flood Loss Reduction Efforts

LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A

Attachment A 09 Final Budget Adjustments Summary-All Depts ( )

Infrastructure Asset Management. Southwest Chula Vista Civic Association April 26, 2007

MUNICIPAL LAND USE STRATEGIES for Improving Flood Resilience

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

DRAFT. Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects

CITY OF PALM DESERT COMPREHENSIVE GENERAL PLAN

Request for Proposals/Qualifications (RFP/Q) San Jacinto River, Stage 3 Master Drainage Plan

Public Meeting Impact of Hurricane Irma on Central Beach

Chapter 6 - Floodplains

POLICY/CONSENT (per Exec. Office) COST $ $ $ $ 0 Consent Policy NET COUNTY COST $ 0 $ 0 $ 0 $ 0 SOURCE OF FUNDS: N/A

Item No. 1 Town of Atherton

Chapter 5 Floodplain Management

FLOODPLAIN MANAGEMENT PLAN 2015 ANNUAL PROGRESS REPORT

Attachment B. King County Flood Control Zone District Work Program

Flood Plain Management Annual Progress Report September 2014

UPDATE ON DALLAS FLOODWAY

City Council Report 915 I Street, 1 st Floor Sacramento, CA

Nassau County 2030 Comprehensive Plan. Capital Improvements Element (CI) Goals, Objectives and Policies. Goal

Sewer Rate Study July 2016

CITY OF SAN JACINTO Capital Improvement Program Project Details

IMPLEMENTATION A. INTRODUCTION C H A P T E R

STORMWATER MANAGEMENT FUND Department of Environmental Services

Request for Proposals (RFP) For Services as General Counsel San Gabriel River Discovery Center Authority

REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES

MVMCC CAPITAL IMPROVEMENT PROGRAM (CIP) UPDATE AND ADOPTING A RESOLUTION APPROVING A MVMCC CAPITAL BUDGET ALLOCATION AMENDMENT

The City of Sierra Madre

Floodplain Management Plan

GENERAL FUND FINANCIAL FORECAST

COUNTY ADMINISTRATOR PUBLIC WORKS

LAFCo 509 W. WEBER AVENUE SUITE 420 STOCKTON, CA 95203

Stormwater Utilities 101: Getting Started on Financing your Stormwater Management Plan

ASFPM Partnerships for Statewide Mitigation Actions. Alicia Williams GIS and HMP Section Manager, Amec Foster Wheeler June 2016

County of Yolo PLANNING AND PUBLIC WORKS DEPARTMENT. PLANNING COMMISSION STAFF REPORT April 14, 2011

CRISP COUNTY, GEORGIA AND INCORPORATED AREAS

CITY OF MORENO VALLEY $3,265,000 IMPROVEMENT AREA NO.1 COMMUNITY FACILITIES DISTRICT NO. 7 SPECIAL TAX BONDS, SERIES 2016

Truckee Railyard Draft Master Plan EIR. Draft Environmental Impact Report Appendices A-B SCH No

Section 19: Basin-Wide Mitigation Action Plans

King County Flood Control District 2015 Work Program

Passaic River Basin Flood Advisory Commission Report/Status of Recommendations. October 2014 Update

CITY OF LANCASTER FISCAL BUDGET REVENUE SOURCES

AGENDA ITEM ST. JOHNS COUNTY BOARD OF COUNTY COMMISSIONERS

CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: August 15, 2012

Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain management plans and flood forecast inundation maps

CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach

Technical Memorandum 3.4 E Avenue NW Watershed Drainage Study. Appendix E Floodplain Impacts and Implications Memo

Federal Emergency Management Agency

ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT, ZONE 7

SR-210 MIXED FLOW LANE ADDITION PROJECT EA NO. 0C7000 FROM HIGHLAND AVENUE TO SAN BERNARDINO AVENUE. Prepared for. December 2012.

The sub-totals by priority are: 5 Year Westside Master. * Based on a 5 year time period

Frequently Asked Questions Oxbow / Hickson / Bakke Ring Levee Option

moreno valley utility 2015/16 ANNUAL REPORT

Report Accompanying the Diamond Lake Urban Renewal Plan

Frequently Asked Questions (FAQs)

DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS /CITY ENGINEER WATER DISTRICT, COUNTY OF ORANGE, ORANGE COUNTY FLOOD

Dealing With Unnumbered A Zones in Maine Floodplain Management

Corte Madera Sales Tax Community Forum- Measure F

City Services Appendix

Chicopee River CSO Project Springfield Water & Sewer Commission. APWA Congress September 9, CSO Control Plan. CSO Control

Revenue Plan. August 12, Dennis Davies Deputy Director of Public Works 200 Civic Center Way El Cajon, CA 92020

BACKGROUND ANNUAL PROGRESS REPORT DEVELOPMENT ADOPTION OF THE H-GAC HAZARD MITIGATION PLAN/UPDATES MISSION STATEMENT

TIRZ 17 Redevelopment Authority Responses to Public Comment Period

STATE OF CALIFORNIA CALIFORNIA NATURAL RESOURCES AGENCY DEPARTMENT OF WATER RESOURCES

Capital Projects CAPITAL PROJECTS CAPITAL PROJECTS

SECTION 6: MITIGATION STRATEGIES

ADMINISTRATIVE APPEAL DECISION CLEAN WATER ACT Mendenhall PROPERTY Tenedor, LLC Utah County, Utah SACRAMENTO DISTRICT FILE NUMBER SPK

CITY OF LANCASTER FISCAL BUDGET REVENUE SOURCES

Transcription:

RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 4 FISCAL YEARS 2017-18 THROUGH 2021-22 Project Number Stg No. Project Title Total Budget Year 1 - FY 2017-18 CIP Years 2 through 5 - FY 2018-22 Total Total Remaining Project Specific Funding Estimated Project Specific Funding Post Unfunded Project Cost to Project CIP Project Appropriation External External Tax Revenue ADP Contrb Tax Revenue ADP Contrb Deliver Project Contrib Cost Contrib Balance Cost 4-8-00011 03 HEACOCK CH-SUNNYMEAD LINE B 18,721,998 $18,721,998 $17,721,998 $1,000,000 $0 $0 $0 $0 $0 $0-4-8-00020 03 SAN JACINTO RIVER 70,000,000 800,000 789,807 10,193 0 0 0 0 0 0 (69,200,000) 4-8-00020 04 SAN JACINTO RIVER 53,054,988 474,177 474,177 0 0 11,893,339 11,893,339 0 0 0 (40,687,472) 4-8-00030 50 BAUTISTA CRK CH (RCHRG BASIN EXPANSIO 1,628,172 1,628,172 1,118,172 0 510,000 0 0 0 0 0-4-8-00251 01 SAN JACINTO MDP LINE E-2 & E-2A 5,211,983 1,570,000 1,570,000 0 0 0 0 0 0 0 (3,641,983) 4-8-00330 00 GREEN ACRES DAM & OUTLET 12,289,231 208,617 208,617 0 0 1,045,076 1,045,076 0 0 11,035,538-4-8-00331 01 LAKEVIEW NUEVO MDP LATERAL D 6,583,687 117,924 112,978 4,946 0 6,465,763 6,465,763 0 0 0-4-8-00345 01 HOMELAND MDP LINE 1 STAGE 1 41,667 41,667 41,211 456 0 0 0 0 0 0-4-8-00400 01 MORENO MDP LINE F-2 & F-18 3,950,000 2,200,000 2,200,000 0 0 0 0 0 0 0 (1,750,000) 4-8-00431 01 ROMOLAND MDP, LINE A-3 STAGE 1 11,985,719 239,116 239,116 0 0 11,746,603 11,746,603 0 0 0-4-8-00614 02 SUNNYMEAD MDP LINE B-16A 1,819,967 251,150 95,106 156,044 0 1,568,817 1,568,817 0 0 0-4-8-00731 03 SUNNYMEAD MDP LINE H-1A (Hubbard Street S 1,501,122 1,501,122 1,501,122 0 0 0 0 0 0 0-4-8-00745 01 MORENO-ALESSANDRO INTRM FACILITY (DS 317,955 206,955 206,955 0 0 0 0 0 0 0 (111,000) 4-8-00746 01 MORENO COTTONWOOD INTERIM BASIN 105,819 105,819 105,819 0 0 0 0 0 0 0-4-8-00766 03 MORENO MDP LINE K-1 STG 3 2,581,500 500,000 $277,717 222,283 0 581,500 581,500 0 0 0 (1,500,000) 4-8-00993 99 SUNNYMEAD LINE M-11 EXTENSION (FLAMIN 326,545 61,928 $61,928 0 0 264,617 264,617 0 0 0-4-8-00010 02 PERRIS VALLEY CHANNEL 483,000 483,000 0 483,000 0 0-4-8-00265 02 LITTLE LAKE MDP LINE B STG 2 6,804,257 3,544,733 3,544,593 140 0 3,259,524-4-8-00410 01 MEAD VALLEY MDP LINE A 7,100,000 1,000,000 1,000,000 0 0 0 (6,100,000) 4-8-00766 01 MORENO MDP LINE K-1 STG 1/2 2,500,000 625,000 625,000 0 0 0 (1,875,000) 4-8-09061 00 PERRIS VALLEY MDP LINE E 8,395,598 2,950,000 0 2,950,000 0 0 (5,445,598) 4-8-09077 00 GOOD HOPE DRAINAGE IMPROVEMENTS 6,500,000 1,500,000 1,500,000 0 0 0 (5,000,000) ZONE 4 TOTALS $221,903,208 $28,628,645 $26,724,723 $1,393,922 $510,000 $43,668,448 $40,235,308 $3,433,140 $0 14,295,062 (135,311,053) FIVE YEAR CIP SUMMARY FUND BALANCE FORWARD - JULY 1, 2017: APPROPRIATIONS: Zone 4 Fund $41,517,305 D&C Capital Projects Expense $74,780,701 ADP Sub Fund 3,920,018 Capital Project Cost Inflation @ 2.8% 2,093,860 Total Fund Balance Forward $45,437,323 Uncategorized//Other Contributions 100,000 Operating Expenses 38,066,167 REVENUE: Contingencies 2,800,000 Taxes $89,557,000 Debt Service Payment - Promissory Note 14,433,500 Interest 1,517,000 Subtotal Appropriations $132,274,228 ADP Fees 100,000 Rental 8,000 Subtotal Revenue 91,182,000 ENDING FUND BALANCE - JUNE 30, 2022: External Contribution 510,000 Zone 4 Fund 4,531,263 Total Five Year Revenue $91,692,000 ADP Sub Fund 323,831 TOTAL FUNDS AVAILABLE $137,129,323 Total Ending Fund Balance 4,855,095 94

RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT OPERATIONS & MAINTENACE BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 4 FISCAL YEARS 2017-18 THROUGH 2021-22 Budget Year 1 - FY 2017-18 CIP Years 2 through 5 - FY 2018-22 Project Number Stg No. Project Title Appropriated Project Cost Project Specific Funding Tax Revenue Outside Revenue Estimated Project Cost Project Specific Funding Tax Revenue Outside Revenue O&M MAINTENANCE (NON-CAPITAL PROJ) BUDGET - FY 2017-18: 4-6-00000 00 ZONE 4 MAINTENANCE $4,451,726 $4,451,726 $0 $17,806,904 $17,806,904 $0 UNCATEGORIZED /OTHER CONTRIBUTIONS: 4-6-10020 00 HYDROGEOTECHNICAL ANALYSIS 100,000 100,000 0 0 0 0 MAINT (NON-CAPITAL PROJ) BUDGET SUBTOTALS $4,451,726 $4,451,726 $0 $17,806,904 $17,806,904 $0 UNCATEGORIZED /OTHER CONTRIBUTIONS 100,000 100,000 0 0 0 0 ZONE 4 TOTALS $4,551,726 $4,551,726 $0 $17,806,904 $17,806,904 $0 95

4-8-00010* 02 PERRIS VALLEY CHANNEL Open channel proposed in the adopted Perris Valley Channel MDP/ADP to provide flood protection to the city of Perris and also serve as the outlet for existing and proposed storm drains in the cities of Perris and Moreno Valley. The project has been included in the District's 5-year CIP to track Perris Valley ADP funds. Segments of the channel will be constructed when sufficient ADP funds become available. 4-8-00011 03 HEACOCK CHANNEL (aka SUNNYMEAD LINE B) Stages 3 and 4 project design is led by March Joint Powers Authority (MJPA) in collaboration with the City of Moreno Valley, March Air Reserve Base, and the District. Heacock Channel runs along Heacock Street and extends from Cactus Avenue to Perris Valley Channel Lateral A. The project will remove residential and commercial properties from the floodplain located east of the channel along Heacock Street between Delphinium Avenue and Krameria Avenue and will reduce flooding along Heacock Street. The project will collect water along Heacock Street and convey it in an open channel heading south and discharge into existing Perris Valley Channel Lateral A. PROJECT OUTSIDE FUNDING: - $7.6m from March Air Reserve Base for Stage4 construction - $1.8m in environmental mitigation costs funded by MJPA, City of Moreno Valley, and March Air Reserve Base 4-8-00020 03 SAN JACINTO RIVER District led project to develop a conceptual drainage improvement plan along the San Jacinto River from Ramona Expressway to Railroad Canyon. The goal of the plan is to provide flood protection to critical transportation facilities, alleviate drainage concerns in the city of Perris, advance implementation of the Western Riverside MSHCP, and accommodate certain land development activity within the floodplain fringe. Funding in the CIP is designated toward preparation of a master drainage plan and environmental analysis needed to comply with CEQA. 4-8-00020 04 SAN JACINTO RIVER This project, a joint venture with the City of San Jacinto, was conceived as a multi-year plan to construct the ultimate levee system (approximately 1,200-foot river bottom width) between the existing Corps of Engineers levee 9,500 feet upstream of State Street and a point 8,200 feet downstream of Sanderson Avenue. Project not fully funded in CIP. 96

4-8-00030 50 BAUTISTA CREEK CHANNEL (RECHARGE BASIN EXPANSION) This project is a partnership between the District and Lake Hemet Municipal Water District (LHMWD) with both agencies contributing funding. This project will also receive funding from the Proposition 84 state grant administered by the California State Department of Water Resources. The goal of this project is to expand groundwater recharge within the area. There is currently an underutilized 17.5 acres of open space located adjacent to Bautista Creek Channel; the project will divide the open space land into six (6) subbasins. During wet weather, storm flows will be able to be diverted into these basins. During dry periods, surplus imported water will be piped into the new basins by LHMWD. Once constructed, LHMWD will be responsible for the ongoing operation and maintenance of the project. 4-8-00251 01 SAN JACINTO MDP LINES E-2 & E-2A City of San Jacinto designbuild project to provide flood protection to properties along State Street. The project consists of an underground storm drain ranging in pipe diameter from 30 to 72 inches that will collect 10-year storm runoff at Menlo Avenue and convey it north to the existing San Jacinto Line E improved channel. The District will contribute $1.6 million toward design and construction of the project, and the Cities of San Jacinto and Hemet will fund the remaining portion of the cost, currently estimated at $5.2 million. 4-8-00265* 02 LITTLE LAKE MDP LINE B District led project to provide flood protection to residences along Meridian Street in the unincorporated Little Lake area. The project consists of an underground storm drain along Meridian Street ranging in pipe diameter from 36 to 84 inches that will collect runoff at Whittier Avenue and convey it to the existing storm drain at Florida Avenue. The project has been partially funded by the District in the 5-year CIP. The remaining portion of the project cost will be funded by the District as additional funding becomes available. 4-8-00330 00 GREEN ACRES DAM AND OUTLET This project is led by the District. This project is located within the unincorporated portion of the County near the city of Hemet. The project will reduce flooding over areas located south of its location near the intersection of Cortrite Avenue and Los Limones Lane. Feasibility study has been completed and dam project footprint is established. Environmental reports, acquisition of right of way, and soliciting engineering consultants for detailed plans are currently underway. This project is funded by the District. 97

4-8-00331* 01 LAKEVIEW MDP LATERAL D The project is being led by the District. The goal of the project is to provide an outlet for Lakeview Dam which could allow the removal of a 100-year FEMA floodplain downstream of the dam. It may additionally allow reduction of portions of an Ordinance 457 floodplain that is currently affecting Water Avenue. The project collects flow from Lakeview Dam, conveys it to an underground pipe west down Water Avenue, and discharges into existing Nuevo Channel at Yucca Avenue and 11 th Street. This project is being funded by the District. Project not fully funded in CIP. 4-8-00345 01 HOMELAND MDP LINE 1 Project builds over two miles of Line 1 (along Briggs Road and Watson road) from the Briggs Road detention basin to Juniper Flats basin, and Juniper Flats basin. 4-8-00365 01 SUNNYMEAD LINE M-11 EXTENSION (FLAMING ARROW STORM DRAIN) This project will be a partnership between the District and the City of Moreno Valley. A cooperative agreement will establish the agency responsibilities. The budgeting premise is that the District will fund both design and construction. The goal of this project is to capture runoff that is flooding the properties along St. Christopher Lane. The project is a storm drain which will extend from Bay Street north and west to St. Christopher Lane. 4-8-00400 01 MORENO MDP LINE F-2 & F-18 In order to reduce street flooding and provide flood protection to adjacent homes, project will replace existing Line F-2 with an underground storm drain capable of conveying 100-year flows. Line F-18 will convey flows in Alessandro Boulevard from Merwin Street to Redlands Boulevard, then in Line F- 2 down Redlands Boulevard south to the existing Line F. City of Moreno Valley to administer design and construction of the project using FEMA grant funds and District funding per a cooperative agreement. 4-8-00410 01 MEAD VALLEY MDP LINE A District led project that proposes the construction of a master planned open channel from Brown Street to Alexander Street to provide flood protection and serve as the outlet for the proposed drainage system in the unincorporated community of Mead Valley. Funding allocated in the District s 5-year CIP is intended for the voluntary acquisition of properties along the facility alignment. 4-8-00431 01 ROMOLAND MDP, LINE A-3 This is a District led project that will help complete the backbone of the Romoland storm drainage system that will allow removal or significant reduction of the FEMA floodplains that are currently affecting property owners in the area. The 98

project is approximately two miles in length and will collect water along Valera Lane and convey it in an open channel heading west and then it will collect water along Palomar Road in an underground storm drain heading south and discharge into the existing downstream open channel Romoland MDP Line A. The project is 100% funded by the District. The project has an executed cooperative agreement with the City of Menifee. The project also requires major relocations of Eastern Municipal Water District and Southern California Edison facilities. District will fund for those relocations under separate funding agreements. 4-8-00614 02 SUNNYMEAD MDP LINE B-16A District lead project in the city of Moreno Valley to reduce flooding problems along Kitching Street and the surrounding community. Line B-16A will collect runoff from Kalmia Avenue and convey it south along Kitching Street in an underground storm drain which discharges to an existing storm drain at Ironwood Avenue. Implementation of the project may also reduce erosion and sediment accumulation along Kitching Street. The District will design and construction the project, and the City will take over the maintenance after construction. District is funding the design and construction of the storm drain, and additional coordination with the City regarding right of way acquisition and street improvements are ongoing. 4-8-00731* 03 SUNNYMEAD MDP LINE H-1A This project will provide 100-year flood protection and prevent flooding along Hubbard Street and adjacent streets (especially Wilson Place and Dunlavy Court). An underground storm drain will intercept flows along Hubbard Street and convey them south to an existing drain at Ironwood Avenue. City of Moreno Valley to administer design and construction using District funding via cooperative agreement. 4-8-00745 01 MORENO-ALESSANDRO INTERIM FACILITY The District is the lead of the interim facility that aims to minimize sediment accumulation in the parking lot of Discovery Church in Moreno Valley. The budget allows for the District to design the facility and provide construction funding. The City of Moreno Valley will construct, obtain the right of way necessary, and operate and maintain the project. 4-8-00746 01 MORENO COTTONWOOD INTERIM BASIN City of Moreno Valley led project designed and partially funded by the District. The project will capture sediment from an eroding wash and help prevent the flooding of a downstream neighborhood cul-de-sac on Cedar Court. The project consists of a sediment basin located north of Cottonwood 99

Avenue, just west of Martha Crawford Street. Flows will be collected from a wash to the north and discharged into an existing culvert within Cottonwood Avenue. The District has an agreement with the City to provide construction plans and to fund the project (not to exceed $100,000) while the City is responsible for the right of way, environmental permitting, construction, and maintenance of this facility. 4-8-00766 01 MORENO MDP LINE K-1 Project will convey 100-year flows in Stage 2 from Juniper Avenue down Pettit Street, then in Stage 1 west in Ironwood Avenue past Moreno Beach Drive to Line K. Project will reduce local flooding by conveying flows toward Nason Basin and provide an adequate outlet for future storm drains upstream. This project is being led by the City of Moreno Valley using funding from FEMA grants and $625,000 requested from the District. 4-8-00766 03 MORENO MDP LINE K-1 AND LINE K-4 In order to improve the floodplain and reduce flood risk to adjacent homes, this underground storm drain will convey 100-year flows in Line K-4 in Locust Avenue to Line K-1 south in Carrie Lane, west in Kalmia Avenue, then south in Pettit Street to an outlet just past Juniper Avenue. The City is lead for this project. In a 2014 cost share agreement between the District and the City of Moreno Valley, the District committed to contribute $500,000 for design and construction. Pursuant to the City request in 2016, additional funds have been budgeted for this project pending an updated cost share agreement. The District anticipates that portions of the project will be accepted for ownership, operation, and maintenance under a separate agreement in the future. 4-8-09061 00 PERRIS VALLEY MDP LINE E This project is anticipated to be led by the City of Perris and it involves the construction of an open channel on the north side of Ramona Expressway to provide alleviating the flooding at the intersection of Ramona Expressway and Perris Boulevard, and serve as an outlet for existing storm drains that have been constructed in the area. The project will collect runoff in the vicinity of Brennan Avenue and convey it eastward to Perris Valley Channel at Oleander Avenue. The District has partially funded $3 million toward the $8.4 million estimated to deliver the project. 4-8-09077 00 GOOD HOPE OLIVE STREET STORM DRAIN District led project to provide flood protection for the neighborhood south of Olive Street between Quail Drive and Theda Street in the unincorporated Good Hope community. The project consists of an underground storm drain that will collect storm flows along Olive Street and convey them to an 100

existing culvert at Highway 74 just east of Theda Street. Funding allocation programmed in the 5-year CIP is designated for further engineering scoping, analysis, and design along with a partial earmark for phased construction. * Projects with an asterisk following the Project Number are not included in the FY 2017-2018 budget (CIP Year One), but are included in Years Two through Five of the CIP. 101

OPERATIONS & MAINTENANCE (NON-CAPITAL PROJECTS) 4-6-00000 00 GENERAL ZONE 4 MAINTENANCE Annual maintenance of all Zone 4 projects, except major restoration or reconstruction. 102

UNCATEGORIZED/OTHER CONTRIBUTIONS 4-6-10020 00 HYDROGEOTECHNICAL ANALYSIS Resources allocated to hire geotechnical engineers to test existing District facilities for groundwater recharge potential. 103