CENTRAL UNION HIGH SCHOOL DISTRICT 351 ROSS AVENUE EL CENTRO, CA FOR ARCHITECTURAL SERVICES

Similar documents
AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES FOR

AGREEMENT FOR PROFESSIONAL CONSULTANT SERVICES CITY OF SAN MATEO PUBLIC WORKS DEPARTMENT

CITY OF EL PASO DE ROBLES

NOW, THEREFORE, THE BOARD OF TRUSTEES OF THE TWIN RIVERS UNIFIED SCHOOL DISTRICT DOES HEREBY RESOLVE, DETERMINE, AND ORDER AS FOLLOWS:

ANNEX A Standard Special Conditions For The Salvation Army

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES

SHORT FORM STANDARD SUBCONTRACT. This Agreement is made this day of, 20, between

SHORT FORM OF AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES

ARCHITECT OF RECORD & DSA CLOSEOUT CERTIFICATION SERVICES RFQ# 029

AIA Document B141 TM 1997 Part

NATOMAS UNIFIED SCHOOL DISTRICT CONTRACT FOR ARCHITECTURAL SERVICES FOR ( )

AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER

City of Beverly Hills Beverly Hills, CA

STORM DRAIN ENGINEERING DESIGN SERVICES

CONSULTING AGREEMENT STANDARD TERMS AND CONDITIONS

AGREEMENT FOR CONSTRUCTION PROJECT MANAGEMENT SERVICES

CONTRACT FOR SERVICES RECITALS

INDEPENDENT CONTRACTOR AGREEMENT

Solano Community College District REQUEST FOR QUALIFICATIONS (RFQ #14-008) CIVIL ENGINEERING SERVICES CAPITAL IMPROVEMENT PROGRAM

PROFESSIONAL SERVICES AGREEMENT. For On-Call Services WITNESSETH:

CONSULTANT SERVICES AGREEMENT (Hazardous Material Assessment/ Abatement Consulting Services)

EXHIBIT C PROFESSIONAL SERVICES CONTRACT TEMPLATE

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT

Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project

FIRM FIXED PRICE TERMS AND CONDITIONS AES-1 Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE

AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER

AIA Document B101 TM 2007

Request for Bid/Proposal

REQUEST FOR QUALIFICATIONS (RFQ) FOR DSA INSPECTOR OF RECORD (IOR) SERVICES

April 27, 2017 REQUEST FOR PROPOSALS (RFP) FOR PROFESSIONAL LAND SURVEYING SERVICES

CLOVIS UNIFIED SCHOOL DISTRICT Herndon Avenue Clovis, CA RFQ 2747 Request for Qualifications For Construction Management Services

BOARD OF EDUCATION PASADENA UNIFIED SCHOOL DISTRICT PASADENA, CALIFORNIA

MASTER AGREEMENT FOR CONSTRUCTION/ PROJECT MANAGEMENT SERVICES

SKLYINE BOULEVARD PAVEMENT REPAIR PROJECT

Document B105 TM. Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project

CONTRACT AGREEMENT FOR PARKING AREA CONSTRUCTION. THIS AGREEMENT, made this day of, 2018,

ATTACHMENT A AIA DOCUMENT B EDITION STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT

OREGON STATE UNIVERSITY CM/GC CONTRACT. (Construction Manager/General Contractor)

BROKER AND BROKER S AGENT COMMISSION AGREEMENT

Document B101 TM. Standard Form of Agreement Between Owner and Architect

CITY OF EL PASO DE ROBLES The Pass of the Oaks

CONSULTANT SERVICES AGREEMENT

Standard Form of Agreement Between Contractor and Subcontractor

DRY SWEEPING SERVICES AGREEMENT

STANDARD FORM OF CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES INCLUDING CONSTRUCTION FOR A GUARANTEED MAXIMUM PRICE BETWEEN

EXHIBIT A: SECTION INSTRUCTIONS TO BIDDERS

CITY OF SALINAS REQUEST FOR QUALIFICATIONS HISTORIC ARCHITECT SERVICES

SAN DIEGO CONVENTION CENTER CORPORATION

Standard Form of Agreement Between Owner and Architect without a Predefined

Document A133 TM. AGREEMENT made as of the day of in the year 20 (In words, indicate day, month and year.)

COUNTY OF MARIN PROFESSIONAL SERVICES CONTRACT Edition 1

SUBCONTRACT CONSTRUCTION AGREEMENT

SECTION IV CONTRACT BID NUMBER

Document A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition

REQUEST FOR PROPOSAL LOOMIS PARK MASTER PLAN GENERAL INFORMATION LOOMIS PARK MASTER PLAN

SARPY COUNTY AND SARPY CITIES WASTEWATER AGENCY

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager as Owner s Agent

REQUEST FOR QUALIFICATIONS (RFQ) FOR DSA INSPECTOR OF RECORD (IOR) SERVICES. April 18, 2006

CONTRACT FOR CONSULTING SERVICES BETWEEN THE CITY OF LONG BEACH AND NAME STREET AND P.O. BOX ADDRESS CITY, STATE, ZIP TELEPHONE NO. FAX NO.

City of Jeffersontown. Request for Qualifications ON-CALL. Electrical Services

QUOTATION ONLY -- NOT AN ORDER

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER. Pre-Construction and Construction Phase Services

NOW THEREFORE, the Owner and the Architect, for the considerations hereinafter set forth, agree as follows:

SAMPLE CONTRACT BETWEEN THE BOARD OF COMMISSIONERS OF THE PORT OF NEW ORLEANS AND CONTRACTOR NAME FOR SERVICES

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

CITY OF MONTEREY REQUEST FOR PROPOSALS FINANCIAL ADVISORY SERVICES. City of Monterey Finance Department 735 Pacific Street, Suite A Monterey, CA 93940

STATE OF VERMONT STANDARD FORM. GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017)

DOUKPSC04 Rev Feb 2013

Document A133 TM. AGREEMENT made as of the day of in the year Two Thousand and Sixteen. BETWEEN the Owner:

NOTICE TO BIDDERS CUSTODIAL SUPPLIES

Supplementary General Conditions to Contract General Conditions for Design-Bid-Build Minor Projects TYPE Contract MIN RENUMBER

REQUEST FOR QUALIFICATIONS/ PROPOSALS LEASE-LEASEBACK CONTRACTOR FOR

INDEPENDENT CONTRACTOR AGREEMENT AND SERVICE PROVIDER TERMS OF SERVICE

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE

VILLAGE OF ORLAND PARK (Contract for Small Construction or Installation Project) This Contract is made this day of, 20 by and between the Village

CONSULTING AGREEMENT

General Conditions for Consultancy Services Agreements

{Company.Name} {ToContact.DisplayAddress} {Projects.Name}

REQUEST FOR PROPOSALS TELEPHONE SYSTEM

Instructions / Face Sheet for INDEPENDENT CONSULTANT AGREEMENT FOR PROFESSIONAL SERVICES (CONSTRUCTION-RELATED)

Town of Highlands Board Approved as of May 17, 2012

STANDARD FORM AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER FOR PROFESSIONAL SERVICES. THIS AGREEMENT is made this day of, 20,

SECTION III: SAMPLE CONTRACT AGREEMENT FOR SERVICES

CITY OF MONTEREY REQUEST FOR PROPOSALS TO PROVIDE ON-CALL REALTOR SERVICES FOR AFFORDABLE HOUSING

PADRE DAM MUNICIPAL WATER DISTRICT PROFESSIONAL SERVICES AGREEMENT

SILVER FALLS SCHOOL DISTRICT 4J REQUEST FOR PROPOSALS REAL ESTATE SALES SERVICES

PROPOSAL January 11, 2019

INDEPENDENT CONTRACTOR AGREEMENT

ON-CALL CIVIL ENGINEERING CONSULTING SERVICES AGREEMENT BETWEEN THE CITY OF PITTSBURG AND [NAME OF CONSULTANT]

AGREEMENT FOR PRELIMINARY CONSTRUCTION SERVICES FOR THE DEVELOPMENT OF (INSERT PROJECT NAME HERE)

REQUEST FOR PROPOSALS For: Youth Sports Officials and Scorekeepers

REQUEST FOR PROPOSALS FOR DESIGN OF THE GRAPE DAY PARK RESTROOM PROJECT

AIA Document A201 TM 1997

the SERVICES in accordance with the time set forth as agreed upon by the CITY and CONTRACTOR. 7. EXTENSIONS, CHANGES, AND AMENDMENTS This Agreement sh

WATER QUALITY MAINTENANCE-SPARKS MARINA CANAL CITY OF SPARKS, NEVADA

SAFETY FIRST GRANT CONTRACT

ATTACHMENT C STANDARD TERMS AND CONDITIONS CONTRACT FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF LONG BEACH AND NAME STREET AND P.O.

CLAIMS ADMINISTRATION SERVICES AGREEMENT

Document C132 TM. Standard Form of Agreement Between Owner and Construction Manager as Adviser

Transcription:

CENTRAL UNION HIGH SCHOOL DISTRICT 351 ROSS AVENUE EL CENTRO, CA 92243 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL SERVICES JANUARY 28, 2016

2 REQUEST FOR QUALIFICATIONS (RFQ) SELECTION OF ARCHITECT(S) TO PROVIDE ARCHITECTURAL/ENGINEERING SERVICES FOR THE CENTRAL UNION HIGH SCHOOL DISTRICT The (the District or CUHSD) is seeking Statement of Qualifications (SOQ) from qualified architectural firms to provide architectural and engineering services related to the development, planning, and construction of facilities for the District. It is the intent of the District to approve an architect that will be used to complete new construction, modernization and other facility projects including, but not limited to, future bond projects. Qualified firms are invited to submit an original plus three (3) copies of said proposal that meet the requirements described herein no later than 2:00 p.m. on Friday, February 12, 2016, to the following address: Mr. Arnold Preciado Assistant Superintendent, Business & Support Services 351 Ross Avenue El Centro, CA 92243 This Request for Qualifications does not commit the to award a contract or pay any costs incurred in the preparation of a proposal responsive to this request. The District reserves the right to accept all or part of any SOQ or to cancel, in part or in its entirety, this Request for Qualifications. The District further reserves the right to accept the proposal(s) that it considers to be in the best interest of the District. Thank you for your interest in working with our District. RFQ Architectural Services Arnold Preciado Assistant Superintendent, Business & Support Services CENTRAL UNION HIGH SCHOOL DISTRICT 351 Ross Avenue, El Centro, CA 92243 (760) 336-4921 arnold@cuhsd.net

3 INSTRUCTIONS FOR SUBMITTAL OF SOQ S I. GENERAL INSTRUCTIONS A. Submittal of Statement of Qualifications (SOQ s) SOQ s should be reviewed for accuracy before submission to the District since said document may not be adjusted after submission to the District. The District will not be responsible for errors or omissions in any SOQ. The District reserves the right to reject any and all SOQ s, or to waive any irregularities, or informalities in the SOQ s. B. Signatures All SOQ s must include a signature of an authorized officer of the firm submitting the SOQ. A signature form has been included with this document. C. Disqualified SOQ s Any SOQ received after 2:00 p.m. on Friday, February 12, 2016, shall be refused and returned to the firm unopened. D. Questions/Addenda Any questions regarding this SOQ should be submitted in writing via e-mail or hand delivered to the contact person listed below no later than 5:00 p.m. on Tuesday, February 9, 2016 E. Withdrawal of SOQ s Firms may withdraw their SOQ, either personally or by written request, at any time prior to 2:00 p.m. on Friday, February 12, 2016. Any request to withdraw a SOQ is effective only if received by the District before 2:00 p.m. on Friday, February 12, 2016, at the following location: Office of the Assistant Superintendent, Business & Support Services 351 Ross Avenue El Centro, CA 92243 F. Copies of SOQ s Each firm submitting a SOQ must include the original plus three (3) copies of the original. RFQ Architectural Services Arnold Preciado Assistant Superintendent, Business & Support Services CENTRAL UNION HIGH SCHOOL DISTRICT 351 Ross Avenue, El Centro, CA 92243 (760) 336-4921 arnold@cuhsd.net

4 G. Contacts In order to control information disseminated regarding this RFQ, firms interested in submitting SOQ s are directed not to make personal contact with members of the Board of Trustees and District Administration with the exception of the individual listed below: Mr. Arnold Preciado, Assistant Superintendent Business & Support Services 351 Ross Avenue El Centro, CA 92243 H. Rights of the District The District reserves the right to incorporate terms and conditions it determines to be proper or necessary into any contract negotiated as a result of an SOQ submitted in response to this RFQ. RFQ Architectural Services Arnold Preciado Assistant Superintendent, Business & Support Services CENTRAL UNION HIGH SCHOOL DISTRICT 351 Ross Avenue, El Centro, CA 92243 (760) 336-4921 arnold@cuhsd.net

11 II. PURPOSE OF REQUEST FOR QUALIFICATIONS A. Selection of Architectural Firms It is the intent of the administration to recommend to the Board of Trustees an architectural firm that will provide architectural and engineering services related to the development, planning, and construction of facilities for the District. III. DESCRIPTION OF PROJECTS The District will make the assignment of an architect for new construction, modernization and other facility projects including, but not limited to, future bond projects. The selected firm will be expected to develop, plan, design, and administer construction. The method of construction will be determined jointly between the District and Architectural Firm. The Architect will be expected to work with the District s Project Manager during both the design and construction phases of the project. Any firms selected will be expected to assist the District in obtaining available State funds through the OPSC/SAB, if available. IV. CONTENTS OF STATEMENTS OF QUALIFICATIONS A. General In order for SOQ s to be considered, said SOQ must be clear, concise, complete, well organized, and demonstrate both respondent s qualifications and its ability to follow instructions. The quality of answers, not length of responses or visual exhibits, is what is important in the SOQ. Respondents shall submit one (1) unbound original plus three (3) copies of the SOQ in 12-point font and, with the exception of the unbound original, all copies shall be spiral bound into books of approximately 8 ½ x 11 format, not to exceed twenty (20) pages. All respondents shall follow the order and format specified below. Each section of the SOQ shall be tabbed to correspond to the numbers/headers shown below: B. Submittal Letter The cover letter shall be brief (one page maximum). Include the SOQ s title and submittal due date, the name, address, fax number and telephone number of the responding firm (or firms if there is a joint venture or association). If the firm is proposing to co-respond with another principal firm, the cover letter must specify the type of services to be provided by each firm and the proposed percentage allocated to that phase or function for the co-respondent. C. Table of Contents Include complete and clear listings of headings and pages to allow easy reference to key information. RFQ Architectural Services Arnold Preciado Assistant Superintendent, Business & Support Services CENTRAL UNION HIGH SCHOOL DISTRICT 351 Ross Avenue, El Centro, CA 92243 (760) 336-4921 arnold@cuhsd.net

D. DVBE Requirements 12 Describe the firm s DVBE contract capabilities and your ability to meet any State requirement related to DVBE. E. Description of Firm List the dollar value of school projects done by the firm in the past calendar year (January, 2015 to December, 2015). Please list new school and modernization projects done over the past two years. What is the overall scope of work anticipated by your firm in the next year? In the next two years? F. Project Team Please list the Architect(s) in your firm that would be involved in the design, bidding or construction phases of either new or renovation projects at existing school and district operation sites. Please list the consultants and engineers used by the firm in the following areas: a. Structural b. Mechanical c. Civil d. Electrical e. Technology f. Low Voltage g. Landscaping h. Commercial Development G. Knowledge of State Funding for School Construction The SOQ shall include the background, experience, and the success of your firm in terms of obtaining State School Facility funding. H. Experience in Working with State and City Agencies Describe the experience of key personnel who will be assigned to District projects in working with and receiving approval from State Agencies including but not limited to the California Department of Education, the Division of State Architect and the Department of Toxic Substance Control; and City planning, redevelopment, and zoning. I. Experience with Education Specification Development The SOQ shall include a description of the experience of key personnel in working with District staff in the development of educational specifications especially on construction projects. RFQ Architectural Services Arnold Preciado Assistant Superintendent, Business & Support Services CENTRAL UNION HIGH SCHOOL DISTRICT 351 Ross Avenue, El Centro, CA 92243 (760) 336-4921 arnold@cuhsd.net

J. Management of Workload 13 Describe the ability of your firm to complete projects assigned to your firm taking into consideration your current workload. Further, identify the size and number of capital projects your firm would be capable of handling simultaneously without the District experiencing any delays in the completion of project plans and specifications. K. Architect s Agreement and Fees Attached is the Agreement for Architectural Services. The submittal is to include the proposed Architectural Fee Schedule. Should the District request change orders at its discretion and not because of errors or omissions, the District will pay Architect on an hourly basis. Please include an hourly fee schedule for any architectural services related to change orders that may be made at the District s discretion. L. Design Process Please describe the design process proposed by your firm: How would the architect coordinate the work by the various consulting engineers/consultants? How would your firm go about securing the various agency approvals? How would your firm provide quality assurance in the plans and specifications? Describe your firm s experience in working with a construction/project manager in the design and pre-construction phases of a project. M. Construction and Occupancy Please describe the desired working relationship in the field with a construction/project manager or general contractor during construction. What is your experience in working with multi-prime contractors? Describe how change orders can be minimized during construction. N. References and Description of Experience This section shall identify similar projects that the firm has completed as outlined in section III, Description of Projects. Indicate the areas of expertise you have previously provided and how the firm's expertise will enable the District to benefit from that expertise. Include the names and sizes of the districts with the names and contact numbers of individuals familiar with your work that can be contacted by District staff. O. High Performance Incentive Grants (HPIG) Please describe the process you will use to determine HPIG grant possibilities in a modernization or new construction project. RFQ Architectural Services Arnold Preciado Assistant Superintendent, Business & Support Services CENTRAL UNION HIGH SCHOOL DISTRICT 351 Ross Avenue, El Centro, CA 92243 (760) 336-4921 arnold@cuhsd.net

14 V. SELECTION PROCESS The process that will be used by the District in selecting architectural firms to perform services as outlined in this Request for Proposals will be as follows: A. Selection Committee The Selection Committee shall be comprised of the Board s Facility Subcommittee composed of the following membership: 1. Two (2) Board Members 2. Superintendent 3. Assistant Superintendent, Business & Support Services B. Initial Screening The Selection Committee will review proposals submitted by architectural firms and select those firms that will be invited to participate in oral interviews. Target Date: February 17, 2016 C. Oral Interviews The Selection Committee will interview each of the architectural firms recommended from the initial screening. The final architectural firm selected by the Committee will be recommended to the Board of Trustees. D. Board of Trustees The Board of Trustees will make the final selection of an Architectural firm on March 8, 2016. District Administration will be authorized to enter into an agreement with the selected Architectural firm. RFQ Architectural Services Arnold Preciado Assistant Superintendent, Business & Support Services CENTRAL UNION HIGH SCHOOL DISTRICT 351 Ross Avenue, El Centro, CA 92243 (760) 336-4921 arnold@cuhsd.net

15 VI. SELECTION CRITERIA Architectural firms submitting proposals are advised that all proposals will be evaluated to determine the best firms that will be able to meet the needs of the District. The selection criteria will include, but not be limited to, the items listed below: a) Ability to communicate with District personnel regarding the design of facilities to support the District s programs. (10 points) b) Experience and expertise of the firm and its consulting engineers/consultants, especially related to modernization and new construction projects. (15 points) c) Capable personnel to manage the project in the office and supervise construction in the field. (15 points) d) Past record of meeting time schedules and budgets for comparable projects, accuracy of plans and minimum amount for change orders. (10 points) e) Completeness and quality of the proposal. (10 points) f) Recommendations and/or visits to completed projects. (10 points) g) A local office for the firm with the ability to fully staff the project without travel costs or delays. (5 points) h) Oral interview. (15 points) i) Proposed hourly fee schedule for change orders or additional services as required and described above. (5 points) j) Implementation of District s Architectural Services Agreement. (5 points) PROPOSAL FORM The will select the successful Architectural firm and said firm shall be expected to enter into the District s Architectural Services Agreement within a specified period following notification of being approved by the Board. Written proposals will be received in the Office of the Assistant Superintendent, Business & Support Services,, 351 Ross Avenue, El Centro, California 92243, by no later than 2:00 p.m. on Friday, February 12, 2016. RFQ Architectural Services Arnold Preciado Assistant Superintendent, Business & Support Services CENTRAL UNION HIGH SCHOOL DISTRICT 351 Ross Avenue, El Centro, CA 92243 (760) 336-4921 arnold@cuhsd.net

16 OFFER TO ENTER INTO AGREEMENT The undersigned hereby proposes to enter into an agreement with the Central Union High School District and furnish services as outlined in the request for qualifications subject to the terms and conditions contained herein. Name and Address of Firm Signature of Authorized Officer or Employee of Firm Name Signature Address Title City and State Date Telephone Number Fax Number Email Address URL RFQ Architectural Services Arnold Preciado Assistant Superintendent, Business & Support Services CENTRAL UNION HIGH SCHOOL DISTRICT 351 Ross Avenue, El Centro, CA 92243 (760) 336-4921 arnold@cuhsd.net

CENTRAL UNION HIGH SCHOOL DISTRICT AGREEMENT FOR ARCHITECTURAL SERVICES 1. Parties and Date This Agreement is made and entered into this day of, 2016, by and between the CENTRAL UNION HIGH SCHOOL DISTRICT, a public school district organized under the laws of the State of California with its principal place of business at 351 Ross Avenue, El Centro, CA 92243 (the District ) and [INSERT NAME OF ARCHITECT], [INSERT ADDRESS OF ARCHITECT] ( Architect ). District and Architect are sometimes individually referred to as a Party and collectively as Parties in this Agreement. 2. Recitals 2.1 The District is a public agency school district organized under the laws of the State of California, with power to contract for the services provided for herein. 2.2 The District intends to construct, reconstruct, modernize, structurally repair and mitigate hazards at school facilities in the District which are known here as The Project. The Project shall be the construction of certain modernizations, upgrades and expansions e.g. classroom facilities located at various school sites throughout the District. 2.3 The District requires the services of a duly qualified and licensed architect to perform the services required by this Agreement. Architect represents that it is aware of the District s plans with respect to the Project. 2.4 Architect warrants that it is fully licensed, qualified, and willing to perform the services required by this Agreement; provided, however, that if Architect is a corporation or other organization, the Project Architect designated pursuant to Section 3.2 herein, and not the Architect itself, shall be fully licensed to practice as an architect in the State of California. 2.5 The District desires to engage Architect to render the services for the Project as provided hereunder. 3. Terms 3.1 Employment of Architect. Architect promises and agrees to furnish to District all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the professional architectural and related services necessary for the full and adequate completion of the Project consistent with the provisions of this Agreement (hereinafter referred to as the Services ). The Services are more particularly described throughout this Agreement, including Exhibit A attached hereto and incorporated herein by reference. All Services shall be subject to, and performed in accordance with, this Agreement, any exhibits attached hereto and incorporated herein by reference, and all applicable local, state and - 1 - Agreement for Architectural Services

federal laws, rules and regulations. All Services performed by Architect shall be subject to the sole and discretionary approval of the District, which approval shall not be unreasonably withheld. 3.2 Project Architect; Key Personnel. 3.2.1 Project Architect. Architect shall name a specific individual to act as Project Architect, subject to the approval of District. Architect hereby designates [INSERT NAME OF INDIVIDUAL ARCHITECT], (License No. [INSERT INDIVIDUAL S LICENSE NUMBER]) to act as the Project Architect for the Project. The Project Architect shall: (1) maintain oversight of the Architect s activities and performance pertaining to the Project at all times; (2) have full authority to represent and act on behalf of the Architect for all purposes under this Agreement; (3) supervise and direct the Services using his or her best skill and attention; (4) be responsible for the means, methods, techniques, sequences and procedures used for the Services; (5) adequately coordinate all portions of the Services; and (6) act as principal contact with District and all contractors, consultants, engineers and inspectors on the Project. Any change in the Project Architect shall be subject to the District s prior written approval, which approval shall not be unreasonably withheld. The new Project Architect shall be of at least equal competence as the prior Project Architect. In the event that District and Architect cannot agree as to the substitution of a new Project Architect, District shall be entitled to terminate this Agreement for cause. 3.2.2 Key Personnel. In addition to the Project Architect, Architect has represented to the District that certain additional key personnel, engineers and consultants will perform the Services under this Agreement. Should one or more of such personnel, engineers or consultants become unavailable, Architect may substitute others of at least equal competence upon written approval of the District. In the event that District and Architect cannot agree as to the substitution of key personnel, engineers or consultants, District shall be entitled to terminate this Agreement for cause. As discussed below, any personnel, engineers or consultants who fail or refuse to perform the Services in a manner acceptable to the District, or who are determined by the District to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project or a threat to the safety of persons or property, shall be promptly removed from the Project by the Architect at the request of the District. The key additional personnel, engineers and consultants for performance of this Agreement are as follows: [INSERT NAMES AND TITLES OF KEY PERSONNEL]. 3.3 Hiring of Consultants and Personnel. 3.3.1 Right to Hire or Employ. Architect shall have the option, unless District objects in writing after notice, to employ at its expense architects, engineers, experts or other consultants qualified and licensed to render services in connection with the planning and/or administration of the Project, and to delegate to them such duties as Architect may delegate without relieving Architect from administrative or other responsibility under this Agreement. Architect shall be responsible for the coordination and cooperation of Architect s architects, engineers, experts or other consultants. All consultants, including changes in consultants, shall be subject to approval by District in its sole and reasonable discretion. Architect shall notify District of the identity of all consultants at least fourteen (14) days prior to their commencement of work in order - 2 - Agreement for Architectural Services

to allow District time to review their qualifications and approve their participation on the Project in its sole and reasonable discretion. 3.3.2 Qualification and License. All architects, engineers, experts and other consultants retained by Architect in performance of this Agreement shall be qualified to perform the Services assigned to them, and shall be licensed to practice in their respective professions, where required by law. 3.3.3 Standards and Insurance. All architects, engineers, experts and other consultants hired by Architect shall be required to meet all of the same standards and insurance requirements set forth in this Agreement, unless other standards or requirements are approved by the District in writing. Unless changes are approved in writing by the District, Architect s agreements with its consultants shall contain a provision making them subject to all provisions stipulated in this Agreement. 3.3.4 Assignments or Staff Changes. Architect shall promptly obtain written District approval of any assignment, reassignment or replacement of such architects, engineers, experts and consultants, or of other staff changes of key personnel working on the Project. As provided in the Agreement, any changes in Architect s consultants and key personnel shall be subject to approval by District. 3.3.5 Draftsman and Clerical Support. Draftsmen and clerical personnel shall be retained by Architect at Architect s sole expense. 3.4 Standard of Care; Performance of Employees. 3.4.1 Standard of Care. Architect shall perform all Services under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals qualified to perform the Services in the same discipline in the State of California, and shall be responsible to District for damages sustained by the District and delays to the Project as specified in the indemnification provision of this Agreement to the extent caused by the Architect. Architect represents and maintains that it is skilled in the professional calling necessary to perform the Services. Architect represents that all of its employees, architects, engineers, experts and other consultants shall have sufficient skill and experience to perform the Services assigned to them. Finally, Architect represents that it, its employees, architects, engineers, experts and other consultants have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services assigned to or rendered by them, and that such licenses and approvals shall be maintained throughout the term of this Agreement. As provided for in the indemnification provisions of this Agreement, Architect shall perform, at its own cost and expense and without reimbursement from the District, any services necessary to correct errors or omissions which are caused by the Architect s failure to comply with the standard of care provided for herein. 3.4.2 Performance of Employees. Any employee or consultant who is determined by the District to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee or consultant who fails or refuses to perform the Services in a manner acceptable to the District, shall - 3 - Agreement for Architectural Services

be promptly removed from the Project by the Architect and shall not be re-employed to perform any of the Services or to work on the Project. 3.5 Laws and Regulations. 3.5.1 Knowledge and Compliance. Architect shall keep itself fully informed of and in compliance with all applicable local, state and federal laws, rules and regulations in any manner affecting the performance of the Services or the Project, and shall give all notices required of the Architect by law. Architect shall be liable, pursuant to the standard of care and indemnification provisions of this Agreement, for all violations of such laws and regulations related to the performance of its Services to the extent that such violation causes damage to the District. If the Architect performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the District, Architect shall be solely responsible for all costs arising therefrom. Architect shall defend, indemnify and hold District, its officials, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations. 3.5.2 Drawings and Specifications. Architect shall cause all drawings and specifications to conform to any applicable requirements of federal, state and local laws, rules and regulations, including, but not limited to, the California Building Code, the California Education Code, Titles 19, 21 and 24 of the California Code of Regulations, and any requirements of the Division of State Architect (including structural safety, fire/life safety and access compliance section), the State Department of Education and the California Department of General Services, in effect as of the time the drawings and specifications are prepared or revised for the submission of approvals of governmental authorities having jurisdiction over the Project. Any significant revisions made necessary by changes in such laws, rules and regulations after this time, which were not known or reasonably should not have been known, by Architect, may be compensated as Additional Services. Architect shall cause the necessary copies of such drawings and specifications to be filed with any governmental bodies with approval jurisdiction over the Project, in accordance with the Services described in Exhibit A attached hereto. For the preparation of all such drawings and specifications, the Architect shall use Computer Aided Design Drafting ( CADD ) (e.g., AutoCAD) or other technology acceptable to the Architect and District. 3.5.3 Americans with Disabilities Act. Architect will use its best professional efforts to interpret all applicable federal, state and local laws, rules and regulations with respect to access, including those of the Americans with Disabilities Act ( ADA ). Architect shall inform District of the existence of inconsistencies of which it is aware or reasonably should be aware between federal and state accessibility laws, rules and regulations, as well as any other issues which are subject to conflicting interpretations of the law, and shall provide District with its interpretation of such inconsistencies and conflicting interpretations. Unless Architect brings such inconsistencies and conflicting interpretations to the attention of the District and requests District s direction on how to proceed, the Architect s interpretation of such inconsistencies and conflicting interpretations shall be the sole responsibility and liability of Architect, and the Architect shall correct all plans, specifications and other documents prepared for the Project at no additional cost if its interpretations are shown to be incorrect. In the event that the Architect seeks direction from the District regarding how to proceed with respect to any inconsistent and/or conflicting - 4 - Agreement for Architectural Services

interpretation, the Architect shall be entitled to proceed in accordance with the District s direction. Architect shall at all times adhere to the standard of care provided for in this Agreement and will use its reasonable professional efforts and judgment in making its interpretations. 3.5.4 Permits, Approvals and Authorizations. Architect shall provide District with a list of all permits, approvals or other authorizations required for the Project from all federal, state or local governmental bodies with approval jurisdiction over the Project. Architect shall then assist the District in obtaining all such permits, approvals and other authorizations. The costs of such permits, approvals and other authorizations shall be paid by the District. 3.6 Independent Contractor. District retains Architect on an independent contractor basis and Architect is not an employee of District. Architect is not an employee for state tax, federal tax or any other purpose, and is not entitled to the rights or benefits afforded to District s employees. Any additional personnel performing the Services under this Agreement on behalf of Architect shall also not be employees of District, and shall at all times be under Architect s exclusive direction and control. Architect shall pay all wages, salaries, and other amounts due such personnel in connection with their performance of Services under this Agreement and as required by law. Architect shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers compensation insurance. 3.7 Schedule of Services. 3.7.1 Timely Performance Standard. Architect shall perform all Services hereunder as expeditiously as is consistent with professional skill and care, as well as the orderly progress of any Project work so as not to be the cause, in whole or in part, of delays in the completion of the Project or in the achievement of any Project milestones, as provided herein. Specifically, Architect shall perform its Services so as to allow for the full and adequate completion of the Project within the time required by the District and within any completion schedules adopted for the Project. Architect agrees to coordinate with District s staff, contractors and consultants in the performance of the Services, and shall be available to District s staff, contractors and consultants at all reasonable times. 3.7.2 Performance Schedule. Architect shall prepare an estimated time schedule for the performance of Architect s Services, to be adjusted as the Project proceeds. Such schedule shall be subject to the District s review and approval, which approval shall not be unreasonably withheld, and shall include allowances for periods of time required for District s review and approval of submissions, and for approvals of authorities having jurisdiction over Project approval and funding. If District and Architect cannot mutually agree on a performance schedule, District shall have the authority to immediately terminate this Agreement. The schedule shall not be exceeded by Architect, without the prior written approval of District. If, due to the fault of the Architect, the Services are not completed within the time provided by the agreed upon performance schedule, or any milestones established therein, it is understood, acknowledged and agreed that the District will suffer damages, for which the Architect will be responsible pursuant to the indemnification provision of this Agreement. - 5 - Agreement for Architectural Services

3.7.3 Excusable Delays. Any delays in Architect s work caused by the following shall be added to the time for completion of any obligations of Architect: (1) the actions of District or its employees; (2) the actions of those in direct contractual relationship with District; (3) the actions of any governmental agency having jurisdiction over the Project; (4) the actions of any parties not within the reasonable control of the Architect; and (5) any act of God or other unforeseen occurrence not due to any fault or negligence on the part of Architect. Neither the District nor the Architect shall be liable for damages, liquidated or otherwise, to the other on account of such excusable delays. 3.7.4 Request for Excusable Delay Credit. The Architect shall, within fifteen (15) calendar days of the beginning of any excusable delay, notify the District in writing of the causes of delay. District will then ascertain the facts and the extent of the delay, and grant an extension of time for completing the Services when, in its sole judgment, the findings of fact justify such an extension. The District s findings of fact thereon shall be final and conclusive on the parties. Extensions of time shall apply only to that portion of the Services affected by the delay and shall not apply to other portions of the Services not so affected. The sole remedy of Architect for extensions of time shall be an extension of the performance time at no cost to the District. If Additional Services are required as a result of an excusable delay, the parties shall mutually agree thereto pursuant to the Additional Services provision of this Agreement. Should Architect make an application for an extension of time, Architect shall submit evidence that the insurance policies required by this Agreement remain in effect during the requested additional period of time. 3.8 Architect Services. Architect shall fully and adequately complete the Services described in this Agreement and in Exhibit A attached hereto and incorporated herein by reference. 3.9 Additional Architect Services. At District s request, Architect may be asked to perform services not otherwise included in this Agreement, not included within the basic services listed in Exhibit A attached hereto, and/or not customarily furnished in accordance with generally accepted architectural practice. As used herein, Additional Services mean: (1) any work which is determined by District to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary for the Architect to perform at the execution of this Agreement; or (2) any work listed as Additional Services in Exhibit A attached hereto. Architect shall not perform, nor be compensated for, Additional Services without prior written authorization from District and without an agreement between the District and Architect as to the compensation to be paid for such services. District shall pay Architect for any approved Additional Services, pursuant to the compensation provisions herein, so long as such services are not made necessary through the fault of Architect pursuant to the indemnification provision of this Agreement. Such Additional Services shall not include any redesign or revisions to drawings, specifications or other documents when such revisions are necessary in order to bring such documents into compliance with applicable laws, rules, regulations or codes of which Architect was aware or should have been aware pursuant to the laws and regulations provision of this Agreement above. 3.10 District Responsibilities. District s responsibilities shall include the following: - 6 - Agreement for Architectural Services

3.10.1 Data and Information. District shall make available to Architect all necessary data and information concerning the purpose and requirements of each Project, including scheduling and budget limitations, objectives, constraints and criteria. As part of the budget limitation information, the District shall provide the Architect with a preliminary construction budget ( District s Preliminary Construction Budget ). As indicated in Exhibit B attached hereto, the District s Preliminary Construction Budget shall be used to estimate the Architect s Total Compensation for the Project(s), subject to change as provided in Exhibit B attached hereto. 3.10.2 Project Survey. If required pursuant to the scope of the Project and if requested by Architect, District shall furnish Architect with, or direct Architect to procure at District s expense, a survey of the Project site prepared by a registered surveyor or civil engineer, any other record documents which shall indicate existing structures, land features, improvements, sewer, water, gas, electrical and utility lines, topographical information and boundary dimensions of the site, and any other such pertinent information. 3.10.3 Inspector of Record. Appoint and pay, upon mutual agreement with Architect, an Inspector of Record as provided by state law. The Inspector of Record shall be qualified and approved by Architect and by the Division of State Architect, shall be under direction of the Architect, and shall be responsible to, and act in accordance with, the policies of District. The Inspector of Record shall be compensated by the District and shall be under direct contract with the District. The construction administration by Architect and its engineers or other consultants shall complement the continuous personal supervision of the Inspector of Record. 3.10.4 Bid Phase. Distribute Construction Documents to bidders and conduct the opening and review of bids for the Project. 3.10.5 Testing. Retain consultant(s) to conduct chemical, mechanical, soils, geological or other tests required for proper design of the Project(s), and furnish such surveys, borings, test pits, and other tests as may be necessary to reveal conditions of the site which must be known to determine soil condition or to ensure the proper development of the required drawings and specifications. 3.10.6 Required Inspections and Tests. Retain consultant(s) to conduct materials testing and inspection, as required by Title 21 of the California Code of Regulations, or to conduct any other environmental or hazardous materials testing and inspection pursuant to any other applicable laws, rules or regulations. 3.10.7 Fees of Reviewing or Licensing Agencies. Directly pay or reimburse the payment of all fees required by any reviewing or licensing agency, or other agency having approval jurisdiction over the Project. 3.10.8 District s Representative. Designate a person to act as its representative for the performance of this Agreement ( District s Representative ). The District s Representative shall be authorized to act as liaison between Architect and District in the administration of this Agreement and the Construction Documents, and shall have the power to act on behalf of the District for all purposes under this Agreement. Such person shall assist Architect in observing - 7 - Agreement for Architectural Services

construction of the Project and participating in the preparation of the Punch List Items required by Exhibit A attached hereto. District may designate new and/or different individuals to act as District s Representative from time to time. The District s Representative shall render decisions in a timely manner so as to avoid unreasonable delay in the orderly and sequential progress of the Services, as provided in the excusable delay provisions of this Agreement above. 3.10.9 Review and Approved Documents. Review all documents submitted by Architect, including change orders and other matters requiring approval by the District s Governing Board or other officials. District shall advise Architect of decisions pertaining to such documents within a reasonable time after submission, so as not to cause unreasonable delay as provided in the excusable delay provisions of this Agreement above. 3.11 Compensation. 3.11.1 Architect s Compensation for Professional Services. Subject to adjustment under Exhibit B attached hereto, District shall pay to Architect, for the performance of all services rendered under this Agreement, per the Compensation Fee Schedule included under Exhibit B. This Compensation amount shall be based upon, and may be adjusted according to, the fee schedule and related terms and conditions attached hereto as Exhibit B and incorporated herein by reference. The Compensation, as may be adjusted upon mutual agreement pursuant to Exhibits A and B attached hereto, shall constitute complete and adequate payment for the Services provided under this Agreement. 3.11.2 Payment for Additional Services. Additional Services may be authorized pursuant to the applicable provisions of this Agreement. If authorized, such Additional Services will be compensated at the rates and in the manner set forth in Exhibit C attached hereto and incorporated herein by reference, unless a flat rate or some other form of compensation is mutually agreed upon by the parties. Architect shall be paid for Additional Services, as defined by this Agreement, so long as they have been approved in advance by the District. If District requires Architect to hire consultants to perform any Additional Services, Architect shall be compensated therefore at the rates and in the manner set forth in Exhibit C attached hereto and incorporated herein by reference, unless a flat rate or some other form of compensation is mutually agreed upon by the parties. District shall have the authority to review and approve the rates of any such consultants. In addition, Architect shall be reimbursed for any expenses incurred by such consultants pursuant to the terms and conditions of Section 3.11.3. 3.11.3 Reimbursable Expenses. Reimbursable expenses are in addition to compensation for the Services and Additional Services. Architect shall not be reimbursed for any expenses unless authorized in writing by District, which approval may be evidenced by inclusion in Exhibit C attached hereto. Such reimbursable expenses shall include only those expenses which are reasonably and necessarily incurred by Architect in the interest of the Project. Architect shall be required to acquire prior written consent in order to obtain reimbursement for the following: (1) extraordinary transportation expenses incurred in connection with the Project(s); (2) out-of-town travel expenses incurred in connection with the Project(s); (3) fees paid for securing approval of authorities having jurisdiction over the Project(s); (4) bid document duplication costs in excess of $100; and (5) other costs, fees and expenses in excess of $100. - 8 - Agreement for Architectural Services

3.11.4 Payment to Architect. Architect s compensation and reimbursable expenses shall be paid by District to Architect no more often than monthly. Such periodic payments shall be made based upon the percentage of work completed, and in accordance with the phasing and funding schedule provided in Exhibit B and the compensation rates indicated in Exhibit C attached hereto and incorporated herein by reference. In order to receive payment, Architect shall present to District an itemized statement which indicates Services performed, percentage of Services completed, method for computing the amount payable, and the amount to be paid. The statement shall describe the amount of Services provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement, as well as those expenses for which reimbursement is requested for that statement period. The amount paid to Architect shall never exceed the percentage amounts authorized by the phasing and funding schedule located in Exhibit B attached hereto. District shall, within thirty (30) days of receiving such statement, review the statement and pay all approved charges thereon pursuant to the provisions of Civil Code Section 3320. Disputed amounts shall be resolved by the parties in a mutually agreeable manner. Payments made for Additional Services shall be made in installments, not more often than monthly, proportionate to the degree of completion of such services or in such other manner as the parties shall specify when such services are agreed upon, and in accordance with any authorized fee or rate schedule. In order to receive payment, Architect shall present to District an itemized statement which indicates the Additional Services performed, percentage of Additional Services completed, method for computing the amount payable, and the amount to be paid. The statement shall describe the amount of Additional Services provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. District shall, within thirty (30) days of receiving such statement, review the statement and pay all approved charges thereon pursuant to the provisions of Civil Code Section 3320. Disputed amounts shall be resolved by the parties in a mutually agreeable manner. Upon cancellation or termination of this Agreement, Architect shall be compensated as set forth in the termination provision herein. 3.11.5 Withholding Payment to Architect. The District may withhold payment, in whole or in part, to the extent reasonably necessary to protect the District from claims, demands, causes of action, costs, expenses, liabilities, losses, damages, or injuries of any kind to the extent arising out of or caused by the negligence, recklessness, or willful misconduct protected under the indemnification provisions of this Agreement. Failure by District to deduct any sums from a progress payment shall not constitute a waiver of the District s right to such sums. The District may keep any moneys which would otherwise be payable at any time hereunder and apply the same, or so much as may be necessary therefor, to the payment of any expenses, losses, or damages as determined by the District, incurred by the District for which Architect is liable under the Agreement or state law. Payments to the Architect for compensation and reimbursable expenses due shall not be contingent on the construction, completion or ultimate success of the Project. Payment to the Architect shall not be withheld, postponed, or made contingent upon receipt by the District of offsetting reimbursement or credit from parties not within the Architect s reasonable control. - 9 - Agreement for Architectural Services

3.11.6 Prevailing Wages. Architect is aware of the requirements of California Labor Code Sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq. ( Prevailing Wage Laws ), which require the payment of prevailing wage rates and the performance of other requirements on certain public works and maintenance projects. Since the Services are being performed as part of an applicable public works or maintenance project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Architect agrees to fully comply with and to require its consultants to fully comply with such Prevailing Wage Laws. District shall provide Architect with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Architect shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Architect s principal place of business and at the Project site. Architect shall defend, indemnify and hold the District, its elected officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure of the Architect or its consultants to comply with the Prevailing Wage Laws. 3.11.7 DIR Registration. If any portion of the services provided by Architect are classified as public works under the Labor Code, then in addition to the foregoing, pursuant to Labor Code sections 1725.5 and 1771.1, the Architect and all applicable subcontractors/subconsultants must be registered with the Department of Industrial Relations ( DIR ). Architect and all such subcontractors/subconsultants shall maintain registration for the duration of the project and require the same of any other subcontractors. This project may also be subject to compliance monitoring and enforcement by the DIR. It shall be Architect s sole responsibility to comply with all applicable registration and labor compliance requirements, including the submission of certified payroll records directly to the DIR.. 3.12 Notice to Proceed. Architect shall not proceed with performance of any Services under this Agreement unless and until the District provides a written notice to proceed. 3.13 Termination, Suspension and Abandonment. 3.13.1 District s Termination for Convenience. District hereby reserves the right to suspend or abandon, at any time and for any reason, all or any portion of the Project and the construction work thereon, or to terminate this Agreement at any time with or without cause. Architect shall be provided with at least seven (7) days advanced written notice of such suspension, abandonment or termination. In the event of such suspension, abandonment or termination, Architect shall be paid for Services and reimbursable expenses rendered up to the date of such suspension, abandonment or termination, pursuant to the schedule of payments provided for in this Agreement, less any damages suffered by District as a result of the default, if any, by Architect. Upon the District s request and authorization, Architect shall perform any and all additional Services necessary to wind up the work performed to the date of suspension, abandonment or termination. Architect hereby expressly waives any and all claims for damages or compensation arising under this Section, except as set forth herein, in the event of such suspension, abandonment or termination. - 10 - Agreement for Architectural Services