The Southern African Power Pool

Similar documents
Southern African Power Pool Project Advisory Unit

Impact of Diminishing Generation Surplus Capacity on Integrated Energy Plans for Southern Africa

Integrating market and bilateral power trading in the Southern African Power Pool

Regional market framework

SENGWA POWER STATION (PVT) LTD

SAPP/SARI EXECUTIVE EXCHANGE TRANSMISSION SYSTEM REQUIREMENTS & SAPP TRANSCATION COSTS

THE SOUTHERN AFRICAN DEVELOPMENT COMMUNITY MEMORANDUM OF UNDERSTANDING MACROECONOMIC CONVERGENCE

Cross-border market operations

ZAMBEZI RIVER AUTHORITY

THE SOUTHERN AFRICAN DEVELOPMENT COMMUNITY MEMORANDUM OF UNDERSTANDING CO-OPERATION IN TAXATION AND RELATED MATTERS

POWERING ASEAN: CAN THE NORDIC MODEL WORK?

9/22/2010. Growing outside South Africa Clive Tasker, Chief Executive: Standard Bank Africa. Strategy

Southern Africa Business Forum South Africa 2 August SADC Integrated Regional Electronic Settlement System SIRESS

Emerging Market Attractiveness Index (for hydropower IPPs) Tyson Weaver- Researcher Centre for Sustainable Energy Studies, Norway

CDM proposed standardized baseline form (Version 01.0)

Cross Border Electricity Trade

WORLD TRADE WT/MIN(98)/ST/96 20 May 1998 ORGANIZATION

GET FIT Programme. Energy Sector Working Group. Maputo, 25 May Julia Crause Infrastructure, Southern Africa KfW Development Bank

Regional Power Market Challenges and Opportunities from Nepalese perspective

FOR OFFICIAL USE ONLY

POWERING ASEAN: CAN THE NORDIC MODEL WORK?

CONFERENCE PAPER MIGRATION OF ELECTRICITY TARIFFS TO COST REFLECTIVITY IN THE SADC REGION A CASE STUDY OF ZAMBIA A PRESENTATION

Tariffs and Tariff Design Promoting Access to the Poor

MODELING ELECTRICITY TRADE IN SOUTHERN AFRICA First Year Report to the Southern African Power Pool

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING GRANT

CASA-1000 Project List of FAQs

The Nordic Market Model 10 Years of Experience

C2-102 COMMON NORDIC BALANCE MANAGEMENT. K.LINDSTRÖM FINGRID (Finland)

The new electricity market arrangements in Ukraine

Commodity 30-Day Price Chart Commodity Prices Commodity Developments

AGREEMENT AMENDING ANNEX 1 (CO-OPERATION ON INVESTMENT) OF THE PROTOCOL ON FINANCE AND INVESTMENT

Title of presentation

Bi-directional 2,206 km 400MW 400kV power transmission line Objectives

20 years operation of the Nordic electricity market

AGREEMENT ON TRANSMISSION SERVICE ON FINGRID'S CROSS-BORDER CONNECTIONS BETWEEN RUSSIA AND FINLAND, NO /2018

ArcelorMittal South Africa Achieving profit in a challenging market. Nonkululeko Nyembezi-Heita, CEO 31 May 2013

Realizing a Central Asia-South Asia Regional Electricity Market: CASA-1000

Procurement of patented medicines by SADC Member States

Eskom 2018/19 Revenue Application

Role of Power Market and Market Intermediaries in Facilitating Investments in South Asian Region

Trading at Power Exchange - IEX

The Business Environment in Southern Africa: Issues Africa Trade Policy Notes in Trade and Market Integration Note #12 Taye Mengistae November, 2010

GUIDELINES FOR ASPIRING NEW GENERATION APPLICANTS

MYPD3 Application January 2013

Energy Imbalance Market Neutrality Technical Workshop. Conference Call: September 3, 2013 Updated: September 5, 2013

CROSS BORDER TRAVEL ISSUES IN THE SADC REGION

M acr o eco no m ic and Financial M anagem ent Institute o f Easter n and So uther n Afr ica

Customs Revenue Implications of the SADC Trade Protocol

Request for Proposals (RFP)

The political-economy of power sector reform in South Africa. Prof Anton Eberhard

Role of Private Sector in the growth of Power Infrastructure in South Asia. Mukunda Paudyal, Joint Secretary, Investment Board, Government of Nepal

Africa Evacuation Benefit

EUROPEA U IO. Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 E ER 173 CODEC 704

NATIONAL ENERGY REGULATOR. Eskom s Regulatory Clearing Account (RCA) Application Third Multi-Year Price Determination (MYPD3) Year 1 (2013/14)

INTERNATIONAL TRADE ARRANGEMENTS

Cross-Border Road Transport Agency. Tourism Transport Services Workshop

Electricity Market. July 15.

Quick Guide to the Integrated Single Electricity Market. Version 1

ERGEG Public Consultation on Guidelines on Transmission Tarification 1. - Evaluation of the Comments Received

SADC Financial Integration

1.1. Trading on the MIBEL: energy, economic volume and types of technology Purchases on the MIBEL of the energy traded on the Daily

ScottishPower Segmental Generation and Supply Statements for the year ended 31 December 2012

Electricity blackouts in South Africa: proximate and ultimate causes & recommendations for the future

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-43530,IDA-43540) ON A CREDIT IN THE AMOUNT OF SDR 9.1 MILLION (US$13.8 MILLION EQUIVALENT) TO THE

Organization of MISO States Response to the Midwest ISO October Hot Topic on Pricing

Draft Outline of the 2019 Work Programme

South East Europe Electricity Market options paper

ISO Harmonisation Becoming an operational reality

Revenue Requirement Application 2004/05 and 2005/06. Volume 2

NIGERIA S STRATEGIC INTEREST ON TRADE IN SERVICES: ROLE OF THE NEPC

Settlement Statements and Invoices. IESO Training

Compliance Strategy: Where is Sub-Saharan Africa headed?

Workshop on Regional Electricity Trade and Market Development

Report on regulation and the electricity market. Norway

Amendment to extend exceptional dispatch mitigated energy settlement rules and modify residual imbalance energy settlement rules

Comments of Pacific Gas & Electric Company Energy Imbalance Market Draft Tariff Language

Southern California Edison Stakeholder Comments. Energy Imbalance Market 2 nd Revised Straw Proposal issued July 2, 2013

The current ETSO ITC Model and possible development

PRICING ASPECTS OF FORWARD LOCATIONAL PRICE DIFFERENTIAL PRODUCTS

ELECTRICITY FINAL BUDGET AND FEES:

Local currency financing: some considerations for DBSA

PEAK RELIABILITY COORDINATOR FUNDING

09 MAY 2017 MEDIA STATEMENT NAMPOWER TARIFF ADJUSTMENT FOR THE FINANCIAL PERIOD 2017/2018

REGIONAL MATTERS ARISING FROM REPORTS OF THE WHO INTERNAL AND EXTERNAL AUDITS. Information Document CONTENTS BACKGROUND

Regional Regulatory Guidelines for promoting Cross Border Electricity Trade in South Asia Region

Work Programme Nordic Energy Regulators (NordREG)

Contingency Reserve Cost Allocation. Draft Final Proposal

(Collective Transaction) Procedure for Scheduling

Obstacles to Trade and Compatibility of Market Rules in Southeast Europe

Regulatory Framework for New Bagasse Based Cogeneration Projects

Investor Update Presentation November 2013

ENERGY REGULATION BOARD

NATIONAL ENERGY REGULATOR. Eskom MYPD2 Regulatory Clearing Account (RCA) and RCA Balance THE DECISION

MYPD 3 (Year 2013/14) Regulatory Clearing Account Submission to NERSA

The Road to the I-SEM

X P Guma: Banking in Africa and its future outlook

African Financial Markets Initiative

ZESCO LTD TARIFF APPLICATION 2008/9

Financial Inclusion in SADC

- When did the regulation(s) regarding disclosure come into force? 12/5/2015

Transcription:

The Southern African Power Pool www.sapp.co.zw By Willem Theron Eskom GM Business Development, Southern Africa CC Board Member SAPP MANCO Member 2012

CONTENTS 1. INTRODUCTION TO THE SAPP 2. MANAGEMENT, GOVERNANCE & REPORTING STRUCTURE 3. SAPP TRADING ARRANGEMENTS 4. SAPP CHALLENGES 5. PRIORITIZATION OF PROJECTS 6. SAPP LEARNINGS FROM SARI / ENERGY

1. INTRODUCTION TO THE SAPP 1.1 Geographic 12 Countries 250 Million people Average Electricity growth rate 3% p.a. DR Congo Tanzania For South Africa demand growth was 4.9% in 2007 and for whole region 4.6%. Angola Namibia Malawi Zambia Zimbabwe Botswana Mozambique Swaziland South Africa Lesotho

1.2 Historic DRC 1950s: DRC Zambia 1 x 220kV, 210MW Tanzania 1960s: Zambia Zimbabwe 2 x 330kV, 1,400MW Angola Namibia Zambia Zimbabwe Malawi Botswana Mozambique 1975: Mozambique South Africa 500kV HVDC, 2,000MW South Africa Lesotho Swaziland

1.2 Historic Hydro Northern Network DRC Tanzania The two networks were linked by weak lines 220kV & 132kV via Botswana until 1995 when the 400kV was constructed. Angola Namibia Zambia Malawi Zimbabwe Botswana Mozambique Thermal Southern Network South Africa Lesotho Swaziland

1.2 HISTORIC The interconnection of the northern and southern networks created a platform for regional trade and cooperation. In 1995, the Ministers responsible for energy in the Southern African Development Community (SADC) signed an Inter-Government MOU that lead to the creation of a power pool under the name, Southern African Power Pool (SAPP).

1.3 SAPP Creation and Aim The SAPP was created in August 1995 through the signing of the Inter-Governmental MOU. The Aim was to optimise the use of available energy resources in the region and support one another during emergencies.

1.4 Governing Legal Documents Inter-Governmental MOU Established SAPP Signed by SADC Member Countries in 1995 Revised document signed on 23 February 2006 Inter-Utility MOU Established the Management of SAPP Revised document signed on 25 April 2007 Agreement Between Operating Members Signed by Operating Members only. Revised document was signed in April 2008 Operating Guidelines Under Review and to be finalized in 2012

The SAPP Vision is to: 1.5 SAPP Vision Facilitate the development of a competitive electricity market in the Southern African region. Give the end user a choice of electricity supply. Ensure that the Southern African region is the region of choice for investment by energy intensive users. Ensure sustainable energy developments through sound economic, environmental & social practices.

To promote her vision, the SAPP is Changing from a co-operative pool to a competitive power market. Reviewing membership to allow for more players. Expanding both transmission & telecommunication links between members. Expanding generation capacity and attract high intensive energy users. Enhancing Human Capacity development and expansion A Coordination Centre was established in Harare, Zimbabwe, in February 2000.

1.6 Membership No Full Name of Utility Status Abbreviation Country 1 Botswana Power Corporation OP BPC Botswana 2 Electricidade de Mocambique OP EDM Mozambique 3 Hidro Electrica Cahora Bassa OB HCB Mozambique 4 Mozambique Transmission Company OB MOTRACO Mozambique 5 Electricity Supply Corporation of Malawi NP ESCOM Malawi 6 Empresa Nacional de Electricidade NP ENE Angola 7 ESKOM OP Eskom South Africa 8 Lesotho Electricity Corporation OP LEC Lesotho 9 NAMPOWER OP Nam Power Namibia 10 Societe Nationale d Electricite OP SNEL DRC 11 Swaziland Electricity Board OP SEB Swaziland 12 Tanzania Electricity Supply Company Ltd NP TANESCO Tanzania 13 ZESCO Limited OP ZESCO Zambia 14 Copperbelt Energy Corporation ITC CEC Zambia 15 Lunsemfwa Hydro Power Company IPP LHPC Zambia 16 Zimbabwe Electricity Supply Authority OP ZESA Zimbabwe OP = Operating Member NP = Non-Operating Member OB = Observer IPP = Independent Power Producer ITC = Independent Transmission Company CEC & LHPC (Zambia) are new Members of SAPP 11

1.7 Funding of SAPP Activities SAPP-CC activities are funded as follows: 1. Annual Contribution from all Members using an agreed formula defined in the IUMOU. 2. Administration Fees levied on Market participants. 3. Projects are mostly funded by Donors: The Government of Norway (NORAD) Sida (Sweden) The World Bank Development Bank of Southern Africa Others such as USAID, DFID and DANIDA

1.8 Conclusion on SAPP Overview The SAPP was initially an Association of National Power Utilities residing in the SADC region. SAPP Membership has now been extended to include all the eligible Electricity Enterprises residing in the SADC region. Electricity Enterprises outside of the SADC region have to be approved by the SADC Energy Ministers. Participation in energy trading is open to all SAPP Members and Observers residing in the SADC region.

2. SAPP MANAGEMENT, GOVERNANCE & REPORTING STRUCTURE The management & governance of SAPP is described in the Inter-Utility Memorandum of Understanding. SADC-DIS Executive Committee Management Committee Planning Sub- Committee Operating Sub- Committee Coordination Centre Board Environmental Sub- Committee Markets Sub- Committee Coordination Centre

2.2 SAPP Management & Governance The SADC Government Ministers and Officials are responsible for policy matters normally under their control within the national administrative and legislative mechanisms regulating the relations between the Government and the national power utility. The chief executives of the members and a representative from the SADC Secretariat form the Executive Committee. The Executive Committee will refer matters such as requests for membership by non-sadc countries and major policy issues that may arise to the SADC Energy Ministers. A country with more than one utility would need to designate one utility to represent it on the Executive Committee.

2.2 SAPP Management & Governance The Management Committee oversees and decides on the recommendations of the Sub-Committees and the Coordination Centre Board. The Operating Sub-Committee consists of representatives from those power utilities already interconnected and exchanging power on a major scale (Operating Members): Presently Botswana, South Africa, Zambia, Zimbabwe, Democratic Republic of Congo, Lesotho, Mozambique, Namibia and Swaziland. The duties of the Committee i.a. include the establishment and updating of methods and standards to measure technical performance, operating procedures including operating reserve obligations

2.2 SAPP Management & Governance The Planning Sub-Committee establishes and updates: Common planning and reliability standards Review integrated generation and transmission plans Evaluate software and other planning tools Determine transfer capability between systems etc. The Environmental Sub-Committee: Develops Environmental Guidelines for SAPP Liaise with Governments to keep abreast of world and regional matters relating to air quality, water quality, land use and other environmental issues. Where Governments have in place related Environmental Organisations, the Committee has to liaise with them to assist one another on specific issues.

2.2 SAPP Management & Governance The Markets Sub-Committee shall i.a. contribute to the design and continued development of the electricity market in the region and determine criteria to authorise this trade. The Coordination Centre reports to a Co-ordination Centre Board consisting of a maximum of two representatives of each National Power Utility (i.e. the signatories of the IUMOU). Note: All Sub-Committees consists of a maximum of two representatives per Member who are of sufficient seniority in their own organisation to make all relevant decisions.

2.3 SAPP Reporting Structure Council Integrated Council of Ministers Committee of Senior Government Officers SADC Directorate of Infrastructure and Services SAPP

3. SAPP TRADING ARRANGEMENTS 3.1 Rational for Power Trading Three technical building blocks that provide opportunities for Energy Trading in the SAPP Good generation mix Good Transmission Interconnection Some utilities have excess generation capacities, others are in deficit In addition there is good Political support through SADC Regulatory support through RERA

3.2 Generation Mix & Contributions Year 2009 74.3% Coal 20.1% Hydro 4.0% Nuclear 1.6% Gas/Diesel 80.4% South Africa 5.0% Mozambique 4.1% Zimbabwe 3.6% Zambia 2.6% DRC 4.4% Rest

Some Members are in Excess and others in Deficit No. Country Utility Installed Capacity [MW] As at Dec 2011 Available Capacity [MW] Dec 2011 Installed minus Available [MW] 2011 Peak Demand [MW] 1 Angola ENE 1,187 990 197 870 2 Botswana BPC 202 190 12 542 3 DRC SNEL 2,442 1,170 1,272 1,050 4 Lesotho LEC 72 72-125 5 Malawi ESCOM 287 287-300 6 Mozambique EDM 233 174 59 616 HCB 2,075 2,075-7 Namibia NamPower 393 360 33 611 8 South Africa Eskom 44,170 41,074 3,096 36,664 9 Swaziland SEC 70 70-200 10 Tanzania TANESCO 1008 880 128 890 11 Zambia ZESCO 1,812 1,215 597 1,660 12 Zimbabwe ZESA 2,045 1,320 725 2,029 Capacity Required [MW] 10.2% Reserve Deficit (MW) TOTAL SAPP 55,996 49,877 6,119 45,557 50,204 (327) Total Interconnected SAPP 53,514 47,720 5,794 43,497 47,934 (214) Managed to meet peak due to Load Management Programs Potential Buyers Potential Sellers 22

3.3 SAPP Trading Markets EARLY YEARS Bilateral contracts CURRENT AND FUTURE Bilateral contracts Day-Ahead Market (DAM) From 2009 Energy Imbalance Settlement From 2010 Ancillary Services Market From 2013/14 Balancing Market From 2014 Financial Markets From 2014/15 FROM YEAR 2001 Bilateral contracts Short-Term Energy Market (STEM) - 2001 Post STEM (Balancing Market) - 2002

3.4 Bilateral Market The bulk of cross border trading in electricity is governed by fixed co-operative bilateral contracts. Generally cover a period from 1-5 five years, could be longer. The agreements provide for assurance of security of supply but are not flexible to accommodate varying demand profiles and prices. The pricing of electricity depends on the consumption period; Peak, Standard and off-peak. Essential for financing of new generation & transmission projects. Price: Negotiated between willing buyer & seller.

2008 Bilateral Contracts in SAPP HCB-EdM Eskom -MOZAL EdM-SEC EdM-NamPower EdM-BPC ZESA-NamPower SNEL-Eskom SNEL-ZESA HCB-Eskom HCB-ZESA Eskom-LEC Eskom-EdM Eskom-NamPower Eskom-BPC Eskom-SEC 270 40 40 45 40 150 100 250 100 120 200 210 96 950 1370 0 200 400 600 800 1000 1200 1400 Capacity [MW]

3.5 Short-Term Energy Market 3.5.1 STEM Governance The SAPP documents that govern the STEM are: Legal Agreement STEM Book of Rules: Trading Rules Financial Rules 3.5.2 Participation Participation was open to all Operating Members and IPPs. Participants were levied a 1% administration fee.

3.5.3 STEM Design Principles Pricing of STEM Contracts Participants would send bids and offers to the SAPP-CC. SAPP-CC would match bids and offers. The prices were set based on matching sellers price. Once matched these became firm STEM contracts Billing The SAPP-CC billed participants on a daily basis. Billing was on schedules and not on actuals. Metering and settlement Financial settlement was on a monthly basis. Penalties indicated where applicable. Inadvertent EM was part of the overall settlement.

3.5.4 STEM DEMAND AND SUPPLY Supply Demand Energy in GWh 4 500 4 000 3 500 3 000 2 500 2 000 1 500 1 000 500-2001 2002 2003 2004 2005 2006 2007 Year

3.5.5 STEM Trading - Summary

GOALS of the SAPP DAM design: 3.6 The Day-ahead Market (DAM) 3.6.1 DAM Goals and Methodology Ensure an efficient and competitive marketplace Ensure that consumers benefit from the market METHODOLOGY: Development of consistent market mechanisms. Efficient price signals for the procurement and transmission of electricity. Assurance of fair and open access to the transmission system. Optimization of generation & transmission capacity.

3.6.2 DAM Main Features Market for secure, effective and nondiscriminatory trade of electricity: Trading to be concluded daily for delivery next day Forward bidding up to 10 days Participants submit bids (purchase) & (sale) offers Closed market only market operator and participant know the details of the bid / offer Provides a neutral reference price Price discovery Could provide reference for bilateral contracts

3.7 Conclusion on SAPP Markets Electricity Markets are a reality world wide. The SAPP believes that the creation of a competitive market would: Help to optimise the use of regional resources Assist in determining the correct electricity price in the pool Send signals for investments and real time utilization of existing assets; transmission, generation and consumption. Enable the demand side to respond to the supply side price signals. Market Oversight is key to market confidence Requires efficient & transparent Market Surveillance

4. CHALLENGES 4.1 Start-up Challenges The Challenges experienced by SAPP at start of the pool: Language of communication Local languages Foreign languages - English, French and Portuguese Dispute resolution How will disputes be resolved? Who will be the referee? Harmonisation Issues Different legal frameworks Different technical standards

4.2 Operational Challenges The SAPP is faced with the following operational challenges: a. The migration from a cooperative pool to a competitive pool. b. The implementation of a competitive market at a time that the region has run out of generation surplus capacity. c. The provision of a reliable power supply in an environment with diminished generation surplus capacity and low tariffs. d. The implementation of cost reflective tariffs and the adoption of regulatory principles that would enhance those tariffs. e. Skills development and retention of trained personnel.

4.3. Other Challenges Reducing Green House Gas Emissions SAPP s energy mix, 70% coal fired vs. 30% others Increasing Renewable Energy Projects in a situation where tariffs are largely not cost reflective Different levels in implementing Environmental protection legislation in different countries

The main challenges faced in Trading include: a. Low Number of Market Participants The number of active participants on the DAM for most months is around four (4). This is not good enough to achieve competition. b. Transmission constraints 4.4 Trading Challenges Transmission constraints are response for low volumes traded on the market when compared to bids received. Energy matched could not go through in some cases due to transmission constraints. c. Mismatch of prices between buyers and sellers This also affects bids that are eventually matched

END OF 1-4

5. SAPP Project Prioritization Criteria

CONTENTS 1. INTRODUCTION 2. CLASSIFICATION OF GENERATION PROJECTS 3. CLASSIFICATION OF TRANSMISSION PROJECTS 4. PROJECT SELECTION CRITERIA 5. PRIORITY TRANSMISSION PROJECTS 6. COMMITTED GENERATION PROJECTS 7. CONCLUSION

1. INTRODUCTION On 20 October 2011, the SAPP Executive Committee agreed to: Develop a prioritisation and selection criteria for projects in the SAPP. Promote the projects so selected by the criteria to investors. The SAPP Executive Committee to deliberate on the way forward on the priority projects

2. Classification of Generation Projects The following categories for generation projects were agreed to by the Management Committee: i. Generation projects with secured funding: The inclusion was to illustrate SAPP commitment. ii. Rehabilitation projects: It was agreed to define rehabilitation and to differentiate from expansion projects. iii. Short-term generation projects: These projects should have completed EIA and feasibility studies. iv. Long-term generation projects: Covers the period from 2016 onwards.

3. Classification of Transmission Projects For transmission projects, the following categories were agreed to: i. Outstanding transmission interconnectors whose aim is to interconnect non-operating members of the SAPP, SAPP priority Interconnectors. ii. iii. Transmission interconnectors aimed at relieving congestion on the SAPP grid, and New transmission interconnectors aimed to evacuate power from generating stations to the load centres.

4. PROJECTS SELECTION CRITERIA The proposed criteria for generation projects had 8 primary key aspects as follows: 1. Size of the project 2. Levelised costs 3. Transmission integration 4. Economic impact 5. Project time domain 6. Percentage off-take committed 7. Regional contribution as a percent of project capacity 8. Number of participating countries

KEY FACTORS 1. Fuel diversity 2. Geographical spread of Projects 3. Regional Impact 4. Project Readiness

Projects Screening and Evaluation Listing of Generation Projects Capacity > 1000 MW Listing of Generation Projects Capacity < 1000 MW Projects with a score more than 50 % included in priority list

Item No Key Aspects Weight 1 2 3 4 5 % Weak Below Standard Above Best Standard Standard 1 Size of Project, MW 15 <50 50-200 200-500 500-1000 >1000 2 3 Levelised costs in Country (Including Transmission Lines), USD/MWh 25 >=131 101-130 71-100 Transmission integration aspects/stability/ technology 10 >750km 4 Economic impact 10 Little impact, limited to small area 101-750km National impact only -jobs, >GDP 50-100 km Mainly national impact - jobs, >GDP and some 41 70 <=40 <50km Balance between regional and national impact Existing infrastru cture, plug in Mainly regional impact - jobs, > GDP Project Time domain 5 (Commissioning date) 10 After 2019 2018 2017 2016 < 2015 6 Percentage off-take committed 10 <20 21-35 36-50 51-80 >80 7 Regional contribution as (Including a % of project import replacement) Number of 15 <20 21-35 36-50 51-80 >80 8 participating member countries 5 1 2 3 4 >= 5

5. PRIORITY TRANSMISSION PROJECTS Category A: Transmission Projects to Interconnect Non Operating Members 1. Zambia Tanzania 2. Mozambique - Malawi 3. Namibia - Angola 4. DRC Angola Category B: Transmission Project to alleviate Congestion 1. ZIZABONA (Zimbabwe- Zambia- Botswana - Namibia) 2. Central Transmission Corridor (CTC) (Zimbabwe) 3. Kafue Livingstone Upgrade (Zambia)

5. PRIORITY TRANSMISSION PROJECTS Category C: Transmission Project related to new Generation projects 1. Mozambique Transmission Backbone CESUL Other Candidate Transmission Projects a) Second Mozambique Zimbabwe Interconnector b) Second Zimbabwe RSA Interconnector c) Second DRC Zambia Interconnector (Kolwezi Solwezi)

6. COMMITTED GENERATION PROJECTS [2012-2016] No Country Committed Generation Capacity, MW 2012 2013 2014 2015 2016 TOTAL 1 Angola 315 0 80 0 700 1095 2 Botswana 600 0 0 300 0 900 3 DRC 120 8 0 580 0 708 4 Lesotho 0 25 40 110 0 175 5 Malawi 0 64 0 0 0 64 6 Mozambique 100 0 265 300 0 665 7 Namibia 92 60 0 0 0 152 8 South Africa 303 722 3591 2244 1522 8382 9 Swaziland 0 0 0 0 0 0 10 Tanzania 160 0 0 0 0 160 11 Zambia 236 180 195 460 600 1671 12 Zimbabwe 30 0 140 0 300 470 TOTAL 1956 1059 4311 3994 3122 14442 Note: Projects under construction or with secured funding

6. COMMITTED GENERATION PROJECTS [2012-2016] No PERIOD : 2012 TO 2016 Country Total Planned Capacity,MW % Planned 1 Angola 1,095 7.6% 2 Botswana 900 6.2% 3 DRC 708 4.9% 4 Lesotho 175 1.2% 5 Malawi 64 0.4% 6 Mozambique 665 4.6% 7 Namibia 152 1.1% 8 RSA 8,382 58.0% 9 Swaziland - 0.0% 10 Tanzania 160 1.1% 11 Zambia 1,671 11.6% 12 Zimbabwe 470 3.3% TOTAL 14,442 100.0%

CONCLUSION SAPP has agreed on the Priority Projects and has endorsed them. The SAPP has drafted an MOU to be signed by the SADC Energy Ministers approving the priority projects. The Priority Projects will be marketed by SADC as regional projects.

END OF 5

6. SAPP LEARNINGS FROM SARI / ENERGY

HANDLING OF IMBALANCE ENERGY IN THE SAPP Following my participation in the 2009 SARI / Energy program in NEPAL

CONTENTS 1. INTRODUCTION 2. CLASSIFICATION OF IMBALANCES 3. INADVERTENT ENERGY 4. DECLARED EMERGENCY 5. OTHER ENERGY IMBALANCE 6. CONCLUSION

1. INTRODUCTION Imbalance Energy (IE) at the point of interconnection is defined as: IE NI A NA S Where IE NI A NA S is Imbalance Energy in MW is the Actual Net Interchange in MW is the Scheduled Net Interchange in MW

2. CLASSIFICATION OF IMBALANCES SAPP has agreed to classify the Imbalance Energy into 3-categories as follows: i. Inadvertent Energy ii. Declared Emergency Energy iii. Other Energy Imbalance

3. INADVERTENT ENERGY Inadvertent Energy is that imbalance within a tolerance band of +/-25MW This imbalance shall be settled in kind by the three Control Areas (Eskom, ZESA and ZESCO)

4. DECLARED EMERGENCY Utility emergency energy rates will be used to compensate the supplier unless otherwise specified in bilateral agreements. Utility emergency energy rates are to be declared on a monthly basis by each Operating Member. The SAPP-CC has the responsibility to verify the rates.

Rate (US$/MWh) 5. OTHER ENERGY IMBALANCE 0 A B C D Block Imbalance Energy Rates A C Pool highest generation cost Pool average generation cost E Zero (0) E f (Hz) 49.85 49.95 50.05 50.15 50.20 50.00 Block System frequency range A f < 49.85 Hz B f >= 49.85 and f < 49.95 Hz C f >= 49.95 and f < = 50.05 Hz D f > 50.05 Hz and f < = 50.15 Hz E f > 50.15 Hz

BLOCK-C The aggregated SAPP system marginal generation production cost per MWh, as defined in the ABOM, shall be used as the rate for block C. The rate shall be calculated for two seasons: winter and summer. For each season, different rates shall apply for peak, standard and off-peak.

BLOCK-A SAPP system most expensive generation cost per MWh [currently the OCGT] shall be used as the rate for block A. BLOCK- B and D These shall be linearly calculated as shown. BLOCK-E This shall attract zero-rate. No payment shall be made to the party causing frequency to rise.

BLOCK-A SAPP system most expensive generation cost per MWh [currently the OCGT] shall be used as the rate for block A. BLOCK- B and D These shall be linearly calculated as shown. BLOCK-E This shall attract zero-rate. No payment shall be made to the party causing frequency to rise.

6. CONCLUSION SAPP has implemented the methodology from 1 April 2009 onwards. The methodology is subject to review quarterly. SAPP-CC has been given mandate to: Monitor and receive data on daily basis Run the model monthly Prepare and send invoices to the 3-CAs Make settlements