TECHNICAL SAFETY BC FEE SCHEDULE: BOILERS and PRESSURE VESSELS

Similar documents
The Boiler and Pressure Vessel Fees Regulations, 1981

SAFETY STANDARDS GENERAL REGULATION

Organizations shall be accredited by TSSA to perform repairs without the acceptance of a TSSA Inspector pursuant to the provisions set forth below.

Industrial Legislation

Harmonized Requirements for Historical Boilers

Contractor Safety Management Element November 2018

REVISED REGULATIONS OF SASKATCHEWAN

The Boiler and Pressure Vessel Regulations, 2017

Recommendation. Sectoral Employment Order in Respect of the Mechanical Engineering Building Services Contracting Sector

QUOTATION FORM. CLOSING DATE AND TIME: January 24, 2017 at 3:00 P.M.

IN THE MATTER OF THE SAFETY STANDARDS ACT SBC 2003, Chapter 39. AND IN THE MATTER OF an appeal to the British Columbia Safety Standards Appeal Board

IN THE MATTER OF: THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16 (the Act ) - and -

INVITATION TO QUOTE. The Regional District of Fraser Fort George invites written quotations for the following:

13 NCAC is amended with changes as published in 31:09 NCR as follows:

Disclosure Statement for Business Chequing Plus Account

Terms and Conditions for. Christchurch City Council Approved Polyethylene (PE) Welders

Guide for Completing Form AB-83

The Boiler and Pressure Vessel Act

Standard Charge/ Mortgage Terms ALBERTA. MCAP Service Corporation. Filing Details: Filing #:_ _. Filing Date: April 26, 2010

BOILER AND UNFIRED PRESSURE VESSEL LAW Act of Jun. 18, 1998, P.L. 655, No. 85 AN ACT Regulating the construction, equipment, maintenance, operation

The National Board Pressure Equipment Inspector Program

Boilers & Unfired Pressure Vessels

PROCEDURE TO ESTABLISH OPERATING CERTIFICATION FOR STEAM BOILER OPERATORS

Disclosure Statement of Fees and Charges for Business Accounts

REQUEST FOR PROPOSAL. DeMamiel Creek Pedestrian Crossing

GENERAL CONTRACT - PROPOSAL FORM (revised )

Bridgeland Riverside Farmers Market Application Form

Labor Chapter ALABAMA DEPARTMENT OF LABOR ADMINISTRATIVE CODE CHAPTER ADMINISTRATION TABLE OF CONTENTS

ROCK ENERGY COOPERATIVE INTERCONNECTION POLICY Policy M Board Policy Interconnection and Parallel Operation of Distributed Generation

Section Payment Conditions

Gas Heating Application - July 1, 2015 through June,

Disclosure Statement of Fees and Charges for Personal Accounts

Contractor Pre-Qualification Questionnaire

Summer Adult Strength & Conditioning

PART INSTRUCTIONS TO BIDDERS

REGIONAL DISTRICT of OKANAGAN-SIMILKAMEEN

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 27. SUBJECT: Interconnection and Parallel Operation of Distribution Generation

Labor Chapter ALABAMA DEPARTMENT OF LABOR ADMINISTRATIVE CODE CHAPTER GENERAL PROVISIONS TABLE OF CONTENTS

STANDARD MORTGAGE TERMS. Filed By: CMLS Financial Ltd. Filing Date: February 8, Filing Number: MT121004

Land Registration Reform Act. Filing No filed by CMLS Financial Ltd. STANDARD CHARGE TERMS

DEPARTMENT OF TRANSPORTATION & WORKS INVITATION TO TENDER REFIT & DRY- DOCKING,

General & Products Liability

THE CORPORATION OF THE DISTRICT OF SAANICH

INSTRUCTIONS TO BIDDERS

TOWN OF KINDERSLEY Request for Proposals (RFP) Banking Services. Opening Date: November 7, 2016 Closing Date: November 18, 2016

STOREFRONT BUSINESSES

CITY OF DUNDAS, MINNESOTA CITY ENGINEER REQUEST FOR PROPOSALS (RFP)

TEXAS DEPARTMENT OF TRANSPORTATION PROCUREMENT DIVISION CORE DRILLING SERVICES PUBLICATION

The Public Service Regulations, 1999

RESIDENTIAL REWARDS PROGRAM SOLAR ELECTRIC (PV) APPLICATION

Standard Terms Residential (British Columbia)

Minimum Balance to Obtain APY Interest Rate Annual Percentage Yield (APY)

LIVESTOCK IDENTIFICATION AND COMMERCE GENERAL REGULATION

BASIC BANKING TERMS & CHARGES DISCLOSURE 1

13 NCAC is amended with changes as published in 29:10 NCR 1197 as follows:

CRCA STANDARD FORM OF ROOFING CONTRACTORS QUALIFICATION STATEMENT At-Large Member

BUGATTI ENGINEERING GMBH / BUGATTI AUTOMOBILES S.A.S / BUGATTI INTERNATIONAL S.A.

SAN DIEGO CONVENTION CENTER CORPORATION

REQUEST FOR PROPOSALS (RFP)

IC Chapter 6. Regulated Boilers and Pressure Vessels; Boiler and Pressure Vessel Inspectors

The amendments to this rule are created pursuant to , and (1)(a) of the Colorado Revised Statutes (CRS).

Rev. 01/17 CERTIFIED PAYROLLS

Business Account Service Fees

CONDITIONS OF SERVICE. PowerStream Energy Services Inc P.O. Box RPO Newmarket CTR Newmarket, ON L3Y 8J8

Ready to Go Checking SM Account

Ketchikan Indian Community Housing Authority

MCR Health Services Inc. Request for Qualifications For Construction Manager/General Contractor Services RFQ GC 2015

CHARTERED PROFESSIONAL ACCOUNTANTS OF ONTARIO

Addendum to HSBC Consumer Savings Terms & Charges Disclosure Effective June 11, 2018

Business Account Service Fees

=====================================================================

Request for Proposal Body Repair and Painting Services for ISD Vehicles

Center Township Butler County, Pennsylvania REQUEST FOR PROPOSALS AND QUALIFICATIONS FOR PROFESSIONAL ENGINEERING SERVICES

LICENCE CONDITIONS FOR TRADING IN GAS BY NGV GAS (PTY) LTD

REFRIGERATION & AIR CONDITIONING AGREEMENT

BRICKLAYERS STANDARD COMMERCIAL/INSTITUTIONAL AGREEMENT

Interprovincial trade Barriers to the Construction Industry

Accident & Sickness Agency Application

Law Firm Self-Report Guidelines to Complete the Self-Report

REQUEST FOR PROPOSALS FEASIBILITY STUDY

6. It is not necessary to complete a separate form for each employee. The hiring of more than one employee can be declared on the same form.

HOME ENERGY PLAN TERMS & CONDITIONS DEFINITIONS:

High-Efficiency Heating Equipment

High-Efficiency Equipment

COUNTY OF ROCKLAND Department of General Services Purchasing Division

CMLS FINANCIAL LTD. Alberta Land Titles Act STANDARD MORTGAGE TERMS. Registration No

In addition, for the purpose of these Services, the following defined terms will be used: An Account enrolled in this Service.

Fees and Charges Bylaw No. 4414, 2005

TRUE NORTH MORTGAGE INC. The Skinny STANDARD CHARGE TERMS

Disclosure Statement of Fees and Charges for Business Accounts

SAFE Companies Registration

The Public Service Regulations, 1999

Quote- QT Teresa L Davis. Chief Mortgage Finance Officer.

microfit RULES Version 1.6 December 8, 2010

CHEROKEE NATION ENTERTAINMENT, L.L.C. REQUEST FOR PROPOSAL ( RFP )

Request for Proposal

HOME ENERGY PLAN TERMS & CONDITIONS DEFINITIONS:

Specification Standards for University of Washington Section

TERMS OF BUSINESS. We will notify you how to renew in good time prior to the expiry of your policy.

City of Harris Harris, Minnesota Public Works Department GRADING GRAVEL ROADS REQUEST FOR PROPOSALS Fax #

Transcription:

DESCRIPTION TECHNICAL SAFETY BC Contractor Licensing New Boiler Contractor Licence $ 409 $ 417 $ 425 $ 434 per unit No New Boiler Contractor Licence with Quality Control Program $ 921 $ 939 $ 958 $ 977 per unit No Boiler Contractor Licence (if renewed within one year after expiry). If renewed later than 1year after expiry, then new boiler contractor Licence fee is charged. $ 170 $ 173 $ 176 $ 180 per unit No Audit or Re-audit / Interview to obtain or maintain contractors Licence. Interview is part of the contractor Licensing process. Safety Services Rate Safety Services Rate Safety Services Rate Safety Services Rate per hour No Testing Agency Certificate of Recognition (minimum of 5 hour charge) Safety Services Rate Safety Services Rate Safety Services Rate Safety Services Rate per hour Yes Testing Agency Certificate of Recognition renewal (1 hour charge) Safety Services Rate Safety Services Rate Safety Services Rate Safety Services Rate per hour Yes Qualified Worker Certification and Examination (Fees for examination will be assessed based on the examination written date and not the application date.) Exams / Papers Papers: Power Engineers, Boiler Operators, Refrigeration Operators. Evaluation fee applies before final Power Engineer exam. $ 140 $ 143 $ 146 $ 149 per paper Yes Ice Facility Operator $ 207 $ 211 $ 215 $ 219 per paper Yes Safety Awareness, Oil Well, Greenhouse. $ 140 $ 143 $ 146 $ 149 per paper Yes API / National Board Exam $ 347 $ 354 $ 361 $ 368 per exam Yes Evaluation Fee. Power Engineers, Boiler Operators, Refrigeration Operators, IFO and Safety Awareness. Evaluation fee applies before final Power Engineer exam. $ 70 $ 100 $ 102 $ 104 one time fee Yes Evaluation Fee. Power Engineers with Canadian education and international work experience, Evaluation fee applies before final Power Engineer exam. (Maximum 5.5 N/A $ 240 $ 245 $ 250 per hour Yes hours) Evaluation Fee. Power Engineers of international worker, Evaluation fee applies before final Power Engineer exam. $ 1,390 $ 1,390 $ 1,418 $ 1,446 one time fee Yes Power Engineer Renewal N/A Waived Waived $ 100 per unit Yes Exam Rescheduling Fee. Charged when an exam is rebooked more than once. $ 50 $ 51 $ 52 $ 53 per time Yes Re-examination Fee $ 140 $ 143 $ 146 $ 149 per paper Yes Re-Examination Fee - Ice Facility Operator $ 207 $ 211 $ 215 $ 219 per paper Yes Exam Re-marking Fee $ 70 $ 71 $ 72 $ 73 per exam Yes Welder Fees Welder Certification $ 112 $ 114 $ 116 $ 118 per procedure Yes Certification Interim "A" Certificate of Qualification, initial and renewal. In force for 12 months or less. $ 276 $ 282 $ 288 $ 294 per site Yes Interim "B" Certificate of Qualification, initial and renewal. In force for 60 days or less (initial) or 30 days or less (renewal). $ 208 $ 212 $ 216 $ 220 per site Yes Granting of Certificate of Qualification (a) Power Engineers (i) 1st Class $ 416 $ 424 $ 432 $ 441 per unit Yes (ii) 2nd Class $ 347 $ 354 $ 361 $ 368 per unit Yes (iii) 3rd Class $ 243 $ 248 $ 253 $ 258 per unit Yes (iv) 4th Class $ 173 $ 176 $ 180 $ 184 per unit Yes (iv) 5th Class $ 173 $ 176 $ 180 $ 184 per unit Yes (b) Boiler, Refrigeration and Oil Well Operator $ 153 $ 156 $ 159 $ 162 per unit Yes Installations Permits Boiler Installation or Alteration Permit Note 1: Permit fee does not include inspection. Inspection hours will be charged in addition. UNITS $ 136 $ 139 $ 142 $ 145 per unit No Refrigeration Installation or Alteration Permit: - More than 125 kw prime mover nameplate capacity rating using Group Al, A2 or B1 - More than 25 kw prime mover nameplate capacity rating using Group A3, B2 or B3 Note 1: Permit fee does not include inspection. Inspection hours will be charged in addition. $ 136 $ 139 $ 142 $ 145 per unit No Refrigeration Installation or Alteration Permit: (Decal applicable for all refrigeration equipment conforming to CSA B52 section 5.2 within the following parameters) - Using Group Al, A2 or B1 and having a capacity >5kW to not more than125 kw prime mover nameplate rating, or - Using Group A3, B2 or B3 and having a capacity >5kW to not more than 25 kw prime mover nameplate rating Note 1: The refrigeration contractor is to supply a declaration of installation that includes details of: - equipment type - certification standard - date and location of installation Note 2: A decal is to be applied to the unit Note 3: An assessment will be carried out to determine if an inspection is required *This became effective on April 15, 2013 $ 28 $ 29 $ 30 $ 31 per unit No Inspection Fees Safety Services Rate Safety Services Rate Safety Services Rate Safety Services Rate per site Yes Re-inspection Fees. Inspections for non-compliance purposes will be billed on an hourly basis. Please refer to the Hourly Rates section. Safety Services Rate Safety Services Rate Safety Services Rate Safety Services Rate per hour Yes Operating Permits High Pressure Boilers, Low Pressure Boilers, Thermal Fluid Boilers (a) with a heating surface to 25 m2 inclusive $ 253 $ 258 $ 263 $ 268 (b) with a heating surface more than 25 m2 to 50 m2 inclusive $ 380 $ 388 $ 396 $ 404 (c) with a heating surface more than 50 m2 to 100 m2 inclusive $ 463 $ 472 $ 481 $ 491 (d) with a heating surface more than 100 m2 to 500 m2 inclusive $ 673 $ 686 $ 700 $ 714 (e) with a heating surface more than 500 to 1,000 m2 inclusive $ 1,305 $ 1,331 $ 1,358 $ 1,385 (f) with a heating surface more than 1,000 to 2,000 m2 inclusive $ 1,515 $ 1,545 $ 1,576 $ 1,608 Additional charge per 1,000 m2 of heating surface over 2,000 m2 rounded up to the nearest 1,000 m2 $ 505 $ 515 $ 525 $ 536 per 1,000 m2 No Hot Water Boilers (a) with a heating surface to 25 m2 inclusive $ 125 $ 128 $ 131 $ 134 (b) with a heating surface more than 25 m2 to 50 m2 inclusive $ 151 $ 154 $ 157 $ 160 (c) with a heating surface more than 50 m2 to 100 m2 inclusive $ 168 $ 171 $ 174 $ 177 (d) with a heating surface more than 100 m2 to 500 m2 inclusive $ 253 $ 258 $ 263 $ 268 (e) with a heating surface more than 500 m2 to 1,000 m2 inclusive $ 463 $ 472 $ 481 $ 491 (f) with a heating surface more than 1,000 m2 to 2,000 m2 inclusive $ 589 $ 601 $ 613 $ 625 Additional charge per 1,000 m2 of heating surface over 2,000 m2 rounded up to the nearest 1,000 m2 $ 210 $ 214 $ 218 $ 222 per 1,000 m2 No Digesters Shell volumetric measurement not more than 280 m3 $ 505 $ 515 $ 525 $ 536 Shell volumetric measurement more than 280 m3 $ 807 $ 823 $ 839 $ 856 GST Boilers and Pressure Vessels Fee Schedule with Tables Page 1 of 5 FSBP-932-03 (2/27/2018)

Pressure Vessels DESCRIPTION TECHNICAL SAFETY BC Regular Service ble B (Pressure Vessels Fe See Table B (Pressure Vessels Fee Table) Designated Service le C (Pressure Vessels Fe See Table C (Pressure Vessels Fee Table) Special Service le D (Pressure Vessels Fe See Table D (Pressure Vessels Fee Table) LPG Service ble E (Pressure Vessels Fe See Table E (Pressure Vessels Fee Table) Refrigeration Plants More than 125 kw prime mover nameplate capacity rating using Group Al, A2 or B1 $ 370 $ 377 $ 385 $ 393 More than 25 kw prime mover nameplate capacity rating using Group A3, B2 or B3 $ 370 $ 377 $ 385 $ 393 Special Plant Registration Fees - Risk Assessed & General Supervision Plants Registration of Special Plant (One time registration includes up to 5 hours documentation review, additional review charged at hourly rate) $ 942 $ 961 $ 980 $ 1,000 per registration No Initial Safety Audit Inspection by a safety officer Safety Services Rate Safety Services Rate Safety Services Rate Safety Services Rate per hour Yes Biennial Safety Audit (inspected every 2 years) Safety Services Rate Safety Services Rate Safety Services Rate Safety Services Rate per hour Yes Biennial Renewal Certificate of Special Plant Registration (inspected every 2 years) $ 68 $ 69 $ 70 $ 71 per certificate Yes Boiler / PV Additional Inspection on Request Safety Services Rate Safety Services Rate Safety Services Rate Safety Services Rate per hour Yes Re-inspection Fees. Assessed when an inspection of a previous noncompliance is performed. (minimum 1 hour) Boilers Safety Services Rate Safety Services Rate Safety Services Rate Safety Services Rate per hour Yes Hot Water Boilers Safety Services Rate Safety Services Rate Safety Services Rate Safety Services Rate per hour Yes Digesters Safety Services Rate Safety Services Rate Safety Services Rate Safety Services Rate per hour Yes Pressure Vessels Safety Services Rate Safety Services Rate Safety Services Rate Safety Services Rate per hour Yes Refrigeration Safety Services Rate Safety Services Rate Safety Services Rate Safety Services Rate per hour Yes Manufacturing Shop Inspection, Audits, Design Revisions and Registered Design Manufacturing Shops and Audit Hourly Safety Services Rate Safety Services Rate Safety Services Rate Safety Services Rate per hour Yes ASME Welding Procedure Registration $ 204 $ 208 $ 212 $ 216 per unit Yes Design Registration Reciprocal Design Registration 1 $ 291 $ 297 $ 303 $ 309 per unit Yes Standard Design Registration 2 & 5 $ 609 $ 621 $ 633 $ 646 per unit Yes Complex Design Registration 3 $ 1,116 $ 1,138 $ 1,161 $ 1,184 per unit Yes Exceptional Design Registration 4 $ 3,284 $ 3,350 $ 3,417 $ 3,485 per unit Yes Expedited Service A - initial review within 10 business days 5 2x applicable fee above 2x applicable fee above 2x applicable fee above 2x applicable fee above per unit Yes Expedited Service B - initial review within 5 business days 5 3.5x applicable fee above 3.5x applicable fee above 3.5x applicable fee above 3.5x applicable fee above per unit Yes Application Cancellation Fee 6 $ 393 $ 401 $ 409 $ 417 per unit Yes Administrative Cancellation Fee 7 $ 114 $ 116 $ 118 $ 120 per unit Yes Boiler Design Compliance Consultation Rate 8 $ 263 $ 268 $ 273 $ 278 per hour Yes Design Registration Notes: 1: A design which has been previously registered by another Province in Canada and has a Canadian Registration Number (CRN). Both the design documentation and the proof of registration in another Province must be included with the application. 2: Boiler, pressure vessel, pressure piping, pressure fitting designs whose application contents are consistent with the published guidance material and are not likely to require any substantial review effort to verify compliance. 3: Applications may be reclassified by BCSA as "complex" following submission where there is a large scope of design review effort resulting from: - dependence upon application of engineering judgement rather than prescriptive design code clauses - unfamiliarity with applicable codes, standards, design practices or registration process - and/or significant communication exchanges are required due to the applicant's lack of responsiveness in responding to questions and issues which may arise during the registration process 4: Applications may be reclassified by BCSA as "exceptional" following submission where, in addition to the factors considered for "complex", reviews as defined above, one or more of the following conditions are - the design is novel - codes and standards are unique, unfamiliar or new to the Province of BC - very large scope of review requiring multiple days of dedicated effort 5: Turn-Around Times - Standard Design Registration and Expedited Services BCSA works to an average turn-around time of 20-30 business days for the initial engineering review of standard design registrations, dependent on the volume of applications. Complete registration time is dependent upon the quality of the application and timeliness of the applicant's responses during the process. Two options for expedited service (A & B) are available dependent on the volume of applications and response times for the initial engineering review under each service are provided above. 6: Applied to boiler, pressure vessel, pressure piping, pressure fitting designs in the event that an application is cancelled by the applicant or rejected by TECHNICAL SAFETY BC after engineering review has occurred. This fee is in lieu of any design registration fee. 7: Applied to boiler, pressure vessel, pressure piping, pressure fitting design applications in the event that an application is cancelled by the applicant or rejected by TECHNICAL SAFETY BC prior to engineering review. This fee is in lieu of any design registration fee. 8: This rate applies for optional services that are separate from and beyond the scope of the official design registration process; for example: clients who may be seeking input on compliance of a proposed boiler design prior to submitting a completed application for registration. Miscellaneous Custom Reports & Searches (per Technology) Admin Hourly Rate Admin Hourly Rate Admin Hourly Rate Admin Hourly Rate per hour Yes Replacement / Duplicate Standard Certificate of Qualification or Wallet Card (each) $ 65 $ 66 $ 67 $ 68 per unit Yes UNITS GST Application for each copy of a certificate of inspection $ 65 $ 66 $ 67 $ 68 per unit Yes Application for variance from the Code Safety Services Rate Safety Services Rate Safety Services Rate Safety Services Rate per hour Yes Hourly Rates Administrative Rate 4:30 p.m. 8:00 a.m., per hour, charged at 1.5x Administrative rate Saturdays, Sundays and Holiday working hours, per hour, charged at 2x Administrative rate Safety Services Rate 4:30 p.m. Plus expenses incurred where applicable. 8:00 a.m., per hour, charged at 1.5x Safety Services rate Saturdays, Sundays and Holiday working hours, per hour, charged at 2x Safety Services rate Professional Services Rate 4:30 p.m. Plus expenses incurred where applicable 8:00 a.m., per hour, charged at 1.5x Professional Services rate Saturdays, Sundays and Holiday working hours, per hour, charged at 2x Professional Services rate Plus expenses incurred, where applicable $ 65 $ 66 $ 67 $ 68 per hour Yes $ 98 $ 100 $ 102 $ 104 per hour Yes $ 131 $ 134 $ 137 $ 140 per hour Yes $ 170 $ 173 $ 176 $ 180 per hour Yes $ 256 $ 261 $ 266 $ 271 per hour Yes $ 341 $ 348 $ 355 $ 362 per hour Yes $ 240 $ 245 $ 250 $ 255 per hour Yes $ 360 $ 367 $ 374 $ 381 per hour Yes $ 479 $ 489 $ 499 $ 509 per hour Yes Late Payment Fees may be charged on overdue accounts $ 65 $ 66 $ 67 $ 68 per unit Yes NSF Cheques A charge will be levied when cheques are returned "NSF" $ 39 $ 40 $ 41 $ 42 per unit Yes Boilers and Pressure Vessels Fee Schedule with Tables Page 2 of 5 FSBP-932-03 (2/27/2018)

<1M 43 71 107 143 179 213 1 2M 66 94 130 166 202 236 2 3M 84 112 148 184 220 254 3 4M 107 135 171 207 243 277 4 5M 125 153 189 225 261 295 >5M 148 176 212 248 284 318 <1M 86 143 213 284 355 425 1 2M 128 185 255 326 397 467 2 3M 168 225 295 366 437 507 3 4M 210 267 337 408 479 549 4 5M 251 308 378 449 520 590 >5M 294 351 421 492 563 633 <1M 132 213 319 425 532 639 1 2M 197 278 384 490 597 704 2 3M 255 336 442 548 655 762 3 4M 320 401 507 613 720 827 4 5M 380 461 567 673 780 887 >5M 444 525 631 737 844 951 <1M 28 42 66 84 108 129 1 2M 39 53 77 95 119 140 2 3M 55 69 93 111 135 156 3 4M 66 80 104 122 146 167 4 5M 76 90 114 132 156 177 >5M 91 105 129 147 171 192 <1M 44 72 109 146 183 217 1 2M 67 95 132 169 206 240 2 3M 86 114 151 188 225 259 3 4M 109 137 174 211 248 282 4 5M 128 156 193 230 267 301 >5M 151 179 216 253 290 324 <1M 88 146 217 290 362 434 1 2M 131 189 260 333 405 477 2 3M 172 230 301 374 446 518 3 4M 214 272 343 416 488 560 4 5M 256 314 385 458 530 602 >5M 300 358 429 502 574 646 Boilers and Pressure Vessels Fee Schedule with Tables Page 3 of 5 FSBP-932-03 (2/27/2018)

<1M 135 217 325 434 543 652 1 2M 201 283 391 500 609 718 2 3M 260 342 450 559 668 777 3 4M 327 409 517 626 735 844 4 5M 388 470 578 687 796 905 >5M 453 535 643 752 861 970 <1M 29 43 68 87 111 133 1 2M 40 54 79 98 122 144 2 3M 57 71 96 115 139 161 3 4M 68 82 107 126 150 172 4 5M 78 92 117 136 160 182 >5M 93 107 132 151 175 197 <1M 45 73 111 149 187 221 1 2M 68 96 134 172 210 244 2 3M 88 116 154 192 230 264 3 4M 111 139 177 215 253 287 4 5M 131 159 197 235 273 307 >5M 154 182 220 258 296 330 <1M 90 149 221 296 369 443 1 2M 134 193 265 340 413 487 2 3M 176 235 307 382 455 529 3 4M 219 278 350 425 498 572 4 5M 261 320 392 467 540 614 >5M 306 365 437 512 585 659 <1M 138 221 332 443 554 665 1 2M 205 288 399 510 621 732 2 3M 266 349 460 571 682 793 3 4M 334 417 528 639 750 861 4 5M 396 479 590 701 812 923 >5M 462 545 656 767 878 989 <1M 30 44 70 90 114 137 1 2M 41 55 81 101 125 148 2 3M 59 73 99 119 143 166 3 4M 70 84 110 130 154 177 4 5M 80 94 120 140 164 187 >5M 95 109 135 155 179 202 Boilers and Pressure Vessels Fee Schedule with Tables Page 4 of 5 FSBP-932-03 (2/27/2018)

<1M 46 74 113 152 191 225 1 2M 69 97 136 175 214 248 2 3M 90 118 157 196 235 269 3 4M 113 141 180 219 258 292 4 5M 134 162 201 240 279 313 >5M 157 185 224 263 302 336 <1M 92 152 225 302 376 452 1 2M 137 197 270 347 421 497 2 3M 180 240 313 390 464 540 3 4M 224 284 357 434 508 584 4 5M 266 326 399 476 550 626 >5M 312 372 445 522 596 672 <1M 141 225 339 452 565 678 1 2M 209 293 407 520 633 746 2 3M 272 356 470 583 696 809 3 4M 341 425 539 652 765 878 4 5M 404 488 602 715 828 941 >5M 471 555 669 782 895 1008 <1M 31 45 72 93 117 141 1 2M 42 56 83 104 128 152 2 3M 61 75 102 123 147 171 3 4M 72 86 113 134 158 182 4 5M 82 96 123 144 168 192 >5M 97 111 138 159 183 207 Boilers and Pressure Vessels Fee Schedule with Tables Page 5 of 5 FSBP-932-03 (2/27/2018)