Advanced Brown Coal Processing (Lelchitsi deposit)

Similar documents
Yanino Waste Processing Plant City of St. Petersburg

Kazakhstan: on the wave of structural reforms. Aset Irgaliyev, PhD First Deputy Chairman Economic Research Institute

«Kekava Bypass» Case Study

PROJECT FINANCE GLOSSARY

The Development Agreement. Long-Term Care Home Renewal Branch October 2016

2014 THE FIRST NATIONAL REPORT ON THE IMPLEMENTATION OF THE EXTRACTIVE INDUSTRIES TRANSPARENCY INITIATIVE (EITI) IN TAJIKISTAN (VISUAL REPORT)

MINISTRY OF NATIONAL ECONOMY OF THE REPUBLIC OF KAZAKHSTAN INVESTMENT OPPORTUNITIES IN KAZAKHSTAN

1THE REPUBLIC 2 2ECONOMY 4 4INDUSTRIAL PARK 8 5THE LAND-USE MASTER PLAN 10 7BENEFITS 14 8 CONTENTS ONE-STOP OF BELARUS

BENCHMARKING PPP PROCUREMENT 2017 IN MAURITIUS

PROCLAMATION No 295/1986 A PROCLAMATION TO REGULATE PETROLUM OPRATIONS

THE REPUBLIC OF ASHKORTOSTAN

Current Status and Prospects for Energy Resources and Infrastructure Development in Uzbekistan

Delivery basis period

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Tibar Bay Port Timor-Leste

Progress Report on the implementation of the planned business development. To : The President of the Stock Exchange of Thailand

(INTERNATIONAL COMPETITIVE BIDDING)

OWNER: COASTAL GUJARAT POWER LIMITED EPC CONTRACTOR: TBD PROJECT MANAGER: THE TATA POWER COMPANY LIMITED

Client Update Top 10 Legal Developments of 2017 in Regulation of Russian Subsoil Use

2.2 The overall aim of Zero Waste: Midlothian and Edinburgh is:

IPP TRANSACTION ADVISOR TERMS OF REFERENCE

The Ministry of Energy, Utilities and Climate 8 th Licensing Round, Denmark

Investment Offer. I. General information about the project

How to tap into the unique opportunity of infrastructure financing within the Argentine PPP framework. Nov 2018

Belarus slide package for a foreign investor

Draft PPP Policy Outline

Frequently Asked Questions

A Primer on the Canadian Oil Sands

Global Expression of Interest For. Sourcing of Coal for Trombay Thermal Power Station

1. Ongoing Projects 2. Future Projects

Great Stone Industrial Park: Investment opportunities on Silk Road Economic Belt

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT

LAW ON GEOTHERMAL RESOURCES AND MINERAL WATERS. Law No Issue Date: 6/3/2007. CHAPTER 1 General Provisions

ANNOUNCEMENT ABOUT ORDER NO 16/2018

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Financial Proposal. Part 6

Implementing Mexico's Energy Reform. Luis Fernando Herrera Deputy General Director of Hydrocarbons Administration

108. PROFILE ON THE PRODUCTION OF ROOF TILES AND BRICKS

Month of delivery, 2019 г.

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED

INVITATION to TENDER

OWNER: MAITHON POWER LIMITED EPC CONTRACTOR: TBD PROJECT MANAGER: THE TATA POWER COMPANY LIMITED

2 ND QUARTER 2017 RESULTS ANNOUNCEMENT

CGN INAUGURAL GREEN BOND ISSUANCE

Exploring investment opportunities in Belarus

Ministerio de Finanzas. Argentina ś PPP Plan Public Private Partnership Under Secretariat

R E P O R T Prepared by A. Larkin, the Chairman of the Chamber of Control and Accounts of the Leningrad Region, for EURORAI Congress (workshop)

Ekološki Sklad Republike Slovenije, Javni Sklad Environmental Fund of the Republic of Slovenia, Public Fund

PUBLIC INVITATION FOR IMPLEMENTATION OF PPP PROJECT Doboj Vukosavlje Motorway, part of the European Vc Corridor

International Monetary Fund Washington, D.C.

UNDAF Outcome(s)/Indicator(s): Sustainable development, disaster management and energy efficiency

Mining (Local Content) THE MINING ACT, (CAP. 123) REGULATIONS. (Made under sections 102 and 112) THE MINING (LOCAL CONTENT) REGULATIONS, 2018

PPP Projects in Finland Success or not Kari Ruohonen General Director, Investments Finnish Transport Agency

HVDC Inter-Island Link Upgrade Project. Investment Proposal. Part V Project Costs

Subsurface Resources Act. PART ONE GENERAL Chapter One SUBJECT AND SCOPE

PacifiCorp Utah All Source Request for Proposal 2016 Resource. Issued January 6, 2012 Responses May 9, 2012

Loan Agreement DMIUMTS OFFICIAL LOAN NUMBER 8131-CN PEOPLE'S REPUBLIC OF CHINA INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

InvestBulgaria Agency

IFRS Financial Statements for Q4 and FY 2014

EIB Procurement Policy and Best Practice

The Mexican Model Production Sharing Contract

Corrigendum No. 2 to Standard Tender Document (Schedule III Coal Mines) (For iron and steel, cement and captive power plant sector)

Sustainable Island Resource Framework Fund OAS / Department of Environment Antigua and Barbuda

PPP IN THE FIELD OF ICT IN VIET NAM A PRACTICAL VIEW. The 5 th ASEAN Connectivity Forum Seoul, November 2017

PPP Regulation in Jordan

Headline Verdana Bold. Uganda PPP Act - Implications for Public Sector Accounting Kenneth LEGESI Deloitte (Uganda) Limited

AS LATVENERGO. in order to reflect recent developments concerning the Company and the Group;

SHELL CANADA OIL SANDS EXPANSION: Jackpine Mine Expansion & Pierre River Mine Public Disclosure

Section III Evaluation and Qualification Criteria (Revision 1)

Deep Onshore DEEP ONSHORE MODEL PRODUCTION SHARING CONTRACT

Consolidated Financial Statements and Report of Independent Certified Public Accountants KARNAVATI HOLDINGS, INC. AND SUBSIDIARIES

Municipality of the District of Chester

Reference of Bidding Document Sl. No. Part / Page Clause Subject / Heading PART I, COMMERCIAL 1.0 INSTRUCTIONS TO BIDDERS

GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES

PROSPECTUS. Kigali Wholesale Market for Fresh Produce (KWSMFP) Kigali,Republic Of Rwanda. National Agricultural Export Development Board (NAEB)

LOTOS Group 2Q 2015 consolidated financial results

NIGERIAN OIL AND GAS INDUSTRY CONTENT DEVELOPMENT ACT, 2010.

INVESTMENT environments IN VIETNAM

FINANCIAL ADMINISTRATION MANUAL

QUARTERLY REPORT. Public Joint-Stock Company Federal Hydrogeneration Company RusHydro. for Q2 2015

TENDER NOTICE GESTAMP WIND 10 SP. Z O.O.

Actualtests.PRINCE2Foundation.120questions

QUARTERLY ACTIVITY REPORT TO 30 SEPTEMBER 2008

Annual Report on Bank of China s Green Bonds. Outstanding BOC Green Bonds

Dahlman Rose & Co. Global Metals, Mining & Materials Conference. November 17, 2011

INVITATION TO PARTICIPATE IN THE PRE-QUALIFICATION STAGE OF AN INTERNATIONAL TENDER FOR THE EXECUTION OF AKKO - CARMIEL AND HAIFA - BET SHEAN RAIL

Investment in Lao PDR Tax updates. 16 August 2017

PRINCE2-PRINCE2-Foundation.150q

Guidelines for Geothermal Projects The Verification Process for Geothermal Projects

World Bank Group Risk Mitigation Solutions for Myanmar s Infrastructure Projects. Workshop Program

Company results in the first half of 2011

TANGER MED, A WORLD CLASS LOGISTICS AND INDUSTRIAL PLATFORM

CURRENT SITUATION OF MONGOLIA-CHINA TRADE AND ECONOMIC COOPERATION AND FURTHER TRENDS

Belarus. Economy update. Natalia Shulzhenko Head of Office, SCHNEIDER GROUP (Minsk) Business Breakfast Russia, St. Petersburg, 10 November 2017

PPP TO BOOST INFRASTRUCTURE DEVELOPMENT INVESTMENT

Presentation of Polimex Mostostal Capital Group s Financial Results I Q May 2018

Mexico s Round One: Bidding and Contract Terms for Shallow Water Areas

Investment Environment of the Republic of Uzbekistan

State Aid in Energy Efficiency (Financial Instruments)

MEGAPROJECT Case Study

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS

Transcription:

Advanced Brown Coal Processing (Lelchitsi deposit) Tender 3 February 2011 National Agency of Investment and Privatization

Table of Contents Sections 1.Executive Summary.. 3 2.Republic of Belarus, Pripyat Polesie Region..5 3.«Coal-Mining Enterprise» Project Overview 8 4.«Coal-Based Heat Power Plant» Project Overview..13 5.Project Realization Risks Evaluation.. 17 6.Tender. Requirements to Participants.19 7.Next Steps and Q&A...23 Appendix 1 Questionnaire.25

Executive Summary 3

Executive Summary Republic of Belarus is considering to launch an open international tender for the right to sign an investment agreement to construct a coal-mining enterprise based on the Lelchitsi deposit of brown coal with an output of 1.8 million tons per year and a solid-fuel power plant consisting of one power unit of capacity 460 MW within the coal deposit region. The proposed scheme is designing, construction, funding, mining and power production. The projects secure the State financial backing and are aimed at satisfying demands of the economy of the Republic of Belarus in hydrocarbon materials and their processing products. Full transparency and international standards of running the tender process is demonstrated by the National Agency of Investment and Privatization Fast track project timeline (signing of the agreement is envisaged by the end of 2011) 4

Republic of Belarus, Pripyat Polesie Region 5

Republic of Belarus, Pripyat Polesie Region (1) Belarus, Key Facts Territory of Belarus totals 207.6 thousand sq km Population 9,45 millions 2010 GDP 49 billion USD Advantages to make business in Belarus Full protection given to foreign investments and there are a variety of channels available to businesses to engage with the government. Country is constantly developing new initiatives to Reduce red tape for business: "one window" approach Attract international small and medium enterprises (SMEs) Provide preferential tax treatment for investors Country has a highly skilled workforce, a large scale privatization programme, attractive incentives, including six Free Economic Zones and a specialist High Technologies Park (HTP). 6

Republic of Belarus, Pripyat Polesie Region (2) Pripyat Polesie Region, Key Facts: Area 1,825,300 hectares Population 568,4 thousand Supportive local authorities Main resources: Oil, potassium and rock salts, brown coal, combustible shale, granite, raw materials for the construction industry Resources Utilization: The state program of socio-economic development and comprehensive utilization of natural resources of Pripyat Polesie in 2010 2015 is aimed at sustainable social and economic development of the region. These goals can be achieved through comprehensive natural resources utilization, attracting investments, promoting reproduction of natural resources. 7

Project Overview «Coal-Mining Enterprise» 8

Project «Coal-Mining Enterprise» (1) Mining and advanced processing of brown coal is to enforce utilization of national energy resources. Lelchitsi brown coal deposit: Location: settlement of Lelchitsi, Gomel region Recoverable brown coal reserves of the projected mining enterprise are estimated at 35.715 million tons Coal quality: - moisture content 5.0-8.8 % - average ash content 34 % - volatile compounds 43.2-44.9 % - total sulfur content 0.8-1.5 % - maximum heat of combustion 27.2-28.9 MJ/kg - heat of combustion in terms of dry fuel 16.0-20.4 MJ/kg Coal-bearing strata parameters Promising area of coal occurrence is more than 40 km2 Depth of coal occurrence ranges from 90 to 400 m and deeper Coal-bearing strata consist of 1 to 7 brown coal layers Main coal layer thickness ranges from 0,5 to 12,2 m 9

Project «Coal-Mining Enterprise» (2) Deposit section Legend: Neogene and Quaternary deposits (sand, clay) Paleogene deposits (sand, siltstone) Cretaceous deposits (chalk) Jurassic deposits (sand, sandstone, clay) Triassic deposits (sand, sandstones with clay interlayers) Carboniferous deposits (sandstones with clay and browncoal interlayers) Brown coal beds Coal is of a transition technological coal rank between 3 Б (dense low moisture brown coal) and Д (long-flame coal) 10

Project «Coal-Mining Enterprise» (3) Project participants: 1. Foreign partner any kind of participation (Investor, Coordinator, Subcontractor). 2. Ministry of Natural Resources and Environmental Protection of the Republic of Belarus, Department for Geology, RUE Belgeologiya Project Initiators and coordinators. 3. Concern Belneftekhim Project consultant 4. Housing and communal services, construction works (cement plants) brown coal users. The participation of one or other institution is specified in the course of negotiations. Required Financial Assistance (Lelchitsi Deposit): Funding required, type of financial participation required: Funding by strategic investor: representative of industry, manufacturer of advance brown coal processing, power-generating companies, financial companies Funding sources Type of investment Amount (mln USD) - indicative Foreign investment funds Capital in equity, technology. Financial institutions involved: No financial institutions has been involved as of February 3, 2011 578.7 11

Project «Coal-Mining Enterprise» (4) Expenditures Capital Investment Items (total investments in fixed capital stock): Project physical components Capital investment (mln USD) Construction and assembly works 304.9 Processing equipment procurement Expenses connected with the development of production to the design figure 122.5 80.6 Total (Indicative): 508 Costs (estimated): - Mining and loading in railway cars 50.43 USD per ton - Mining and shipment to users 51.36 USD per ton Type of users/ markets : Housing and communal services, construction works (cement plants) Investments return Investments return is planned through the income from selling of coal refining products 12

Project Overview «Coal-Burning Power Plant» 13

Project «Coal-Burning Power Plant» (1) Construction of a coal-burning power plant consisting of one power-generating unit (capacity - 460 MW) within the coal deposit area with the maximum mine production rate Construction goal: electrical power generation using the Lelchitsi deposit coal resources. Activities performed: The coal layer N 2 was preliminary estimated as suitable for commercial mining; minable reserves - 35.72 million tons. Estimated coal cost depending on the mining intensity will be as follow: Annual output, thousand tons Cost USD/t 400 140.6 700 96.1 1800 56.4 Operation expenses for coal mining are 273.23 billion rubles per year in current prices Forecasted mine operation period in the Northern area with the annual mine output of 1, 800 thousand tons per year is 20 years. 14

Project «Coal-Burning Power Plant» (2) Major equipment: Up-to-date electrical power unit 460 MW with a heat-transfer agent of supercritical parameters and a condensing steam turbine Boiler unit capacity Superheated steam pressure 1350 t/h 28.5 MPa Superheated steam temperature 600/620 C Generator power 460 MW Electrical power plant construction cost is: 1 159 billion rubles including equipment cost of 360 billion rubles (reference price of 2006). Transport junctions: Access to the railway branch-line 80 km in length connecting the fuel-energy complex to the nearest railway station (can be used for transport structural materials, equipment, specialists in the course of the mine and power plant development). After the complex is put into operation the railway will serve to ship coal to other coal users, to transport chemical agents and reserve fuel (fuel oil) to the railway station of passenger service. The cost of the railway line construction is 513 billion rubles (reference price of 2006). 15

Project «Coal-Burning Power Plant» (3) Required personnel: - 730 workers for the power plant - 1000 worker for the mine The population of the Lelchitsi settlement is 8 thousand persons and can not satisfy demand of the fuel-energy complex (FEC) in personnel Problem solution: construction of residential buildings residential construction cost in Lelchitsi is estimated at 477 billion rubles (reference price of 2006). cost of construction of sewage disposal and purification facilities for the residential settlement, power plant and mine is estimated at 24 billion rubles (reference price of 2006). cost of construction of a drinking water intake for the residential settlement, power plant and mine is 66 billion rubles (reference of 2006). High-voltage lines (330 кv and 110 кv): The cost of supply-line construction is estimated by RUE Belenergosetproekt at 232 billion rubles (reference of 2006). 16

Project realization risks 17

Project realization risks Key Risks Allocation Key risks Country Head Contractor * Sub Contractor Investors** Access to land resources Construction incl. design and permits Technology performance Maintenance and operating Inflation and utilities prices Insurance Force majeure Changes in regulation Environment subsequent Contract termination Grantor s fault Subcontractors default (*) Head Contractor will bear allocated risks only during their involvement in the project (i.e. construction period) (**) Creditors bear the residual project risk, to the extent not covered by contracts or mitigated by other means (insurance) 18

Tender. Requirements to Participants 19

Tender. Requirements to participants(1) Tender Process Phases The tender documentation sets out the following tender process timeline: Bidding Phase Bidding Phase Signing of of Investment Agreement Tender Announcement (March, 18 2011) Selection of the Successful Bidder (October 3, 2011) Pre-qualifacation Submission (June, 8 2011) Negotiations with the Successful Bidder Submission of Bids (September 8, 2011) Signing of the PPP Agreement (December 1st, 2011) Selection of the Successful Bidder: October 3, 2011 Financial Close (before the end of 2011) 20

Tender. Requirements to participants (2) General Prequalification Criteria* - Applicant shall not be subject to liquidation proceedings - Shall not have undergone bankruptcy or insolvency proceedings within the last 5 years - Shall not be indebted to the country of origin state budget or any regional or local budget in regards to taxes, fees, and other mandatory payments in an amount exceeding 15% of the Applicant s assets Special Prequalification Criteria** Financial - Total assets of at least EUR 50 million (or equivalent) during each of the last 3 financial years - Revenue in excess of EUR 50 million (or equivalent) during each of the last 3 financial years - Profit (after taxes) during each of the last two years Technical - Appropriate fit between the Applicant s business plan and Belarusian strategic procurement objectives - Proposed project operator has delivered at least one similar project - Demonstrates quality assurance, environmental management systems and compliance with all relevant health and safety regulations -Satisfactory client references and examples of similar projects -Meeting criteria to the processing volume, power generation and processing products (*) - applicable to the Applicant and each member of the consortium (**) - applicable to the Strategic Investor. Strategic Investor is a consortium member who has at least 25% interest in the consortium and satisfy special prequalification criteria 21

Tender. Requirements to participants (3) Indicative Bid Evaluation Approach First Stage Technical & Legal Second Stage* Financial Technical Legal Financial Up to 40 Points Up to 20 Points Up to 40 Points Each Bidder shall prepare detailed plans for granite extraction and in particular Strategic Development Business Plan Construction Programme Risk Management Safety Management Environmental Management Technical Support Operations Output and realisation of recycled materials and energy Evaluation Criteria: *Up to 20 points - Technology track record and compliance with output requirements (flexibility, facility outputs and etc) *Up to 20 points - Operational track record and impacts (reliability, enforcement, downtime, etc.) Each Bidder shall submit the mark up of the Investment Agreement Separate document listing all proposed amendments and justification Signed Term sheet with the Operator Signed Term sheet with the Head Contractor Acceptance of the Bid does not mean acceptance of the proposed mark up of the Investment Agreement Up to 40 points for financial deliverability -Bank Support Letter - Shareholding Funding - Commitment Letters - Shareholder Approvals - Financial Model (*) Bids disqualified due to technical and legal reasons at the first stage will not be considered 22

Next Steps and Q&A 23

Next Steps and Q&A Republic of Belarus would like to sound out the market in relation to appetite, capacity and capability for investing (or participating as an operator, Head contractor, equipment supplier as part of a consortium) into the Coal-Mining Enterprise and Coal-Based Heat Power Plant Projects Recipients are therefore invited to provide responses to the questions set out in Appendix 1 of this presentation and to return them to the Advisor by the close of business day of 15th of March 2011 Recipients are requested to send their response or address their inquiries to the Advisor: Ministry of Natural Resources and Environmental Protection of the Republic of Belarus Attn: Lis Anatoli Deputy Minister Tel:+ 375 172 200 70 48 Mob:+ 375 296 56 51 56 Email: minproos@mail.belpak.by Attn: Karpuk Vladimir Director of Department for Geology Tel.:+ 375 17 292 54 22 Mob:+ 375 29 112 37 12 Email: oppgrr@gmail.com 24

Appendix 1 Questionnaire 25

Questionnaire We appreciate your thoughts on the below questions: What is the degree of your general interest in participating in the tender for the Lelchitsi Project? What is your experience and view on projects in Belarus? What new technology would you recommend to the Belarus? What are your thoughts on the proposed risk allocation? What would be your required return on investment for this type of project in Belarus (nominal in EUR before tax)? How do you view the proposed Tender Process timetable? What is your anticipated level of equity investment / financial leverage for the Project? How would you manage FX risk (given that project cashflows will be denominated in roubles)? Questionnaire 26