ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

Similar documents
Rock Chalk Park - Infrastructure Report. July 2013

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

BID TABULATION BID REQUEST NO

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION PAGE 1 OF 8

BID TABULATION PAGE 1 OF 6

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

TOTAL QUANTITY UNIT COST UNIT

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

LETTING : CALL : 056 COUNTIES : MILLE LACS

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

CITY OF TAMPA ADDENDUM 2. April 18, 2018

Department of Public Works Engineering

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

RFB Addendum 3

ADDENDUM No. 1 January 29, Paving Program Village of Milford

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time

SUBDIVISION IMPROVEMENTS AGREEMENT

BID TABULATION. Engineer's Estmated Opinion of Costs

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

OKLAHOMA TURNPIKE AUTHORITY

Reviax Constracting Corp. DeSantis Construction

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

Exhibit 4 Page 1 of 8

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

Pflugerville, TX St. Hedwig, TX 78152

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

Job No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE


Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

CITY OF SAN MARCOS ENGINEERING DIVISION

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

PART A ROADWAY - BASE BID

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

TAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02

Utility Committee Meeting AGENDA. October 3, 2017

Engineer's Preliminary Estimate - 100% Submittal

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

Job No Medina River Sewer Outfall, Segment 5 Solicitation No. B BB BID PROPOSAL

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

In this chapter, we will talk about the criteria and procedures for these other types of measurement and payment.

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

Addendum 1 13 TH Street Streetscape. September 1, 2017

CURB CUTS SPECIFICATIONS AND STANDARDS

Addendum 1 Downtown North CRA Sidewalks

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

AGENDA. Sartell City Council Special Meeting Sartell City Hall July 31, :30 pm. 2. Public Hearing - Vacation of Drainage and Utility Easements

The bid due date has been changed to 2:50 p.m. May 25, 2018.


PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

CANTON COMMUNITY REQUEST FOR BOARD ACTION

City of Markham Asset Management Plan

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

OKLAHOMA TURNPIKE AUTHORITY

Regular. NECESSARY RESOURCES/IMPACTS (OTHER) n/a. Fiscal Impact

ITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES UNIT PRICE AMOUNT 1a COLD MILLING CLASS 3 (Approx.2") 7,386 S.Y. $ $ 1b COLD MILLING CLASS 3 (Approx 3-

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP

Administrative Policy City of Lawrence, Kansas APPROVED BY TOTAL PAGES POLICY NUMBER: 117

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2

Appendix B Example Project Designs and Engineers Opinion of Costs

Specifications, Forms of Contract, and Proposal Forms for a Service Contract for Various Types of Concrete Work

City of Arcata Engineering Department Encroachment Permit Application

City of Bowling Green Department of Public Works

OKLAHOMA TURNPIKE AUTHORITY

2001 Average Bid Tabs

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

CITY OF DEERFIELD BEACH Request for City Commission Agenda

Public Works Maintenance STORMWATER AND

CITY OF SURREY (the Owner ) INVITATION TO TENDER (ITT)

Transcription:

Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00 $ 8,760.00 3 Demolition and Removal Lump Sum 1 $ 30,000.00 $ 30,000.00 $ 41,285.00 $ 41,285.00 4 Clearing and Grubbing Lump Sum 1 $ 20,000.00 $ 20,000.00 $ 6,850.00 $ 6,850.00 5 Excavation Cu. Yd. 1,513 $ 15.00 $ 22,695.00 $ 12.00 $ 18,156.00 6 Embankment Cu. Yd. 45 $ 10.00 $ 450.00 $ 4.00 $ 180.00 7 Utility Trench & Backfill/Compaction Cu. Yd. 200 $ 20.00 $ 4,000.00 $ 3.25 $ 650.00 8 Subgrade Stabilization (9" Fly Ash Treatment) Sq. Yd. 809 $ 12.00 $ 9,708.00 $ 6.10 $ 4,934.90 9 Subgrade Stabilization (8" KDOT AB-3) Sq. Yd. 2495 $ 11.00 $ 27,445.00 $ 8.50 $ 21,207.50 10 Asphalt Pavement (8") Sq. Yd. 672 $ 35.00 $ 23,520.00 $ 37.40 $ 25,132.80 11 Concrete Pavement (4")(Plain)(Colored) Sq. Yd. 83 $ 70.00 $ 5,810.00 $ 95.20 $ 7,901.60 12 Concrete Pavement (8")(NRDJ) Sq. Yd. 1407 $ 50.00 $ 70,350.00 $ 60.60 $ 85,264.20 13 Concrete Pavement (10")(NRDJ) Sq. Yd. 706 $ 55.00 $ 38,830.00 $ 69.10 $ 48,784.60 14 Temporary Surfacing (Aggregate) Ton 265 $ 55.00 $ 14,575.00 $ 16.00 $ 4,240.00 15 Driveways (6")(Concrete) Sq. Yd. 85 $ 60.00 $ 5,100.00 $ 81.20 $ 6,902.00 16 Driveways (6")(Asphalt) Sq. Yd. 28 $ 30.00 $ 840.00 $ 90.70 $ 2,539.60 17 Sidewalks (4")(Concrete) Sq. Yd. 284 $ 40.00 $ 11,360.00 $ 43.20 $ 12,268.80 18 Shared Use Paths (6 )(Concrete)(Fiber Reinforced) Sq. Yd. 75 $ 50.00 $ 3,750.00 $ 57.10 $ 4,282.50 19 Access Ramps Each 10 $ 1,050.00 $ 10,500.00 $ 1,040.00 $ 10,400.00 20 Curb and Gutter (Type CG-1) Ln. Ft. 1203 $ 30.00 $ 36,090.00 $ 24.20 $ 29,112.60 21 Curb and Gutter (Type CG-1, Dry) Ln. Ft. 87 $ 30.00 $ 2,610.00 $ 30.80 $ 2,679.60 22 Curb and Gutter (Type CG-1, Monolithic) Ln. Ft. 32 $ 30.00 $ 960.00 $ 28.90 $ 924.80 23 Curb and Gutter (Type CG-3) Ln. Ft. 252 $ 30.00 $ 7,560.00 $ 29.00 $ 7,308.00 24 Curb and Gutter (Type CG-3, Dry) Ln. Ft. 20 $ 30.00 $ 600.00 $ 33.80 $ 676.00 25 Storm Sewer Structure (Curb Inlet)(6x4) Each 2 $ 4,500.00 $ 9,000.00 $ 2,950.00 $ 5,900.00 26 Storm Sewer Structure (Curb Inlet)(8x4) Each 1 $ 5,000.00 $ 5,000.00 $ 3,450.00 $ 3,450.00 27 Storm Sewer Structure (Curb Inlet)(6x5) Each 1 $ 4,500.00 $ 4,500.00 $ 3,300.00 $ 3,300.00 28 Storm Sewer Structure (Junction Boxes)(4x5) Each 3 $ 5,000.00 $ 15,000.00 $ 2,925.00 $ 8,775.00 29 Storm Sewer Pipe (15" HDPE) Ln. Ft. 7 $ 45.00 $ 315.00 $ 69.38 $ 485.66 30 Storm Sewer Pipe (18" HDPE) Ln. Ft. 88 $ 50.00 $ 4,400.00 $ 60.88 $ 5,357.44 31 Storm Sewer Pipe (15" RCP) Ln. Ft. 141 $ 55.00 $ 7,755.00 $ 60.35 $ 8,509.35 32 Storm Sewer Pipe (18" RCP) Ln. Ft. 33 $ 60.00 $ 1,980.00 $ 61.50 $ 2,029.50 33 Storm Sewer Pipe (24" RCP) Ln. Ft. 60 $ 75.00 $ 4,500.00 $ 68.10 $ 4,086.00 34 Storm Sewer Pipe (30" RCP) Ln. Ft. 150 $ 90.00 $ 13,500.00 $ 76.15 $ 11,422.50 35 Traffic Signal Lump Sum 1 $ 125,000.00 $ 125,000.00 $ 125,600.00 $ 125,600.00 36 Video Detection System Lump Sum 1 $ 20,000.00 $ 20,000.00 $ 24,000.00 $ 24,000.00 37 Emergency Vehicle System Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 14,000.00 $ 14,000.00 38 Pavement Marking (Temporary)(White)(6") Ln. Ft. 363 $ 6.50 $ 2,359.50 $ 2.00 $ 726.00 39 Pavement Marking (Temporary)(White)(12") Ln. Ft. 82 $ 13.00 $ 1,066.00 $ 4.00 $ 328.00 40 Pavement Marking (Temporary)(Yellow)(4") Ln. Ft. 397 $ 5.50 $ 2,183.50 $ 1.25 $ 496.25 41 Pavement Marking (Temporary)(White)(24") Ln. Ft. 127 $ 20.00 $ 2,540.00 $ 8.00 $ 1,016.00 42 Pavement Marking Symbol (Temporary)(White)(Left Arrow) Each 2 $ 275.00 $ 550.00 $ 135.00 $ 270.00 43 Pavement Marking (Patterned Cold Plastic)(White)(6") Ln. Ft. 238 $ 6.50 $ 1,547.00 $ 6.00 $ 1,428.00 44 Pavement Marking (Patterned Cold Plastic)(White)(12") Ln. Ft. 14 $ 13.00 $ 182.00 $ 25.00 $ 350.00 45 Pavement Marking (Patterned Cold Plastic)(Yellow)(4") Ln. Ft. 683 $ 5.50 $ 3,756.50 $ 5.00 $ 3,415.00 46 Pavement Marking (Intersection Grade)(White)(24") Ln. Ft. 125 $ 20.00 $ 2,500.00 $ 20.00 $ 2,500.00 47 Pavement Marking Symbol (Intersection Grade)(White)(Left Arrow) Each 4 $ 275.00 $ 1,100.00 $ 300.00 $ 1,200.00 48 Pavement Marking Symbol (Intersection Grade)(White)(Right Arrow) Each 4 $ 275.00 $ 1,100.00 $ 300.00 $ 1,200.00 49 Pavement Marking Symbol (Intersection Grade)(White)(ONLY) Each 2 $ 400.00 $ 800.00 $ 500.00 $ 1,000.00 50 Seeding (Permanent) Lump Sum 1 $ 5,000.00 $ 5,000.00 $ 2,250.00 $ 2,250.00 51 Sediment Control Devices (Sediment Fence) Ln. Ft. 200 $ 5.00 $ 1,000.00 $ 3.00 $ 600.00 52 Sediment Control Devices (Inlet Protection) Each 5 $ 500.00 $ 2,500.00 $ 100.00 $ 500.00 53 Traffic Control Lump Sum 1 $ 25,000.00 $ 25,000.00 $ 9,900.00 $ 9,900.00 54 Install 12" Water Line Ln. Ft. 337 $ 125.00 $ 42,125.00 $ 45.15 $ 15,215.55 55 Install 12 Gate Valve Each 3 $ 6,500.00 $ 19,500.00 $ 2,125.00 $ 6,375.00 56 Install 12" Tee and Block Each 2 $ 1,500.00 $ 3,000.00 $ 1,570.00 $ 3,140.00 57 Install 12" Anchor Coupling Each 1 $ 500.00 $ 500.00 $ 1,000.00 $ 1,000.00 58 Install 2" Blowoff Assembly Each 2 $ 2,000.00 $ 4,000.00 $ 625.00 $ 1,250.00 59 Connect to Existing Waterline Each 1 $ 3,500.00 $ 3,500.00 $ 1,000.00 $ 1,000.00

Engineering Estimate R. D. Johnson Excavating Co., Inc 60 Install 3/4" Long Service Each 1 $ 2,400.00 $ 2,400.00 $ 875.00 $ 875.00 61 Install 1 Long Service Each 1 $ 2,600.00 $ 2,600.00 $ 825.00 $ 825.00 62 Install Meter Tile, Setter, and Ring & Cover Each 1 $ 2,000.00 $ 2,000.00 $ 925.00 $ 925.00 63 Install Fire Hydrant Assembly with Swivel 90 Each 1 $ 4,500.00 $ 4,500.00 $ 3,700.00 $ 3,700.00 64 12" Sanitary Sewer Pipe Ln. Ft. 285 $ 170.00 $ 48,450.00 $ 104.41 $ 29,756.85 65 Standard Sanitary Manholes Each 2 $ 5,000.00 $ 10,000.00 $ 3,750.00 $ 7,500.00 66 Extra Depth Sanitary Manholes Vert. Ft. 7.4 $ 100.00 $ 740.00 $ 207.00 $ 1,531.80 GRAND TOTAL $ 869,202.50 $ 685,629.40 Grand Total (Written): Six Hundred Eighty-Five Thousand, Six Hundred Twenty-Nine Dollars and Forty Cents The following portions of the project shall be substantially complete and open to vehicular and pedestrian traffic by August 5, 2016: The north portion of Ousdahl and all of 19th Street (the traffic signal does not need to be in operation by that date). Liquidated damages of five hundred dollars ($500.00) per day shall be charged for every day thereafter until these streets are open to said traffic. The south portion of Ousdahl shall be Substantially Complete by October 28, 2016. Liquidated damages of five hundred dollars ($500.00) per day shall be charged for every day thereafter until Substantial Completion is reached and accepted by the Owner. The date for Final Completion for the entire project shall be November 11, 2016. Liquidated damages of five hundred ($500.00) per day shall be charged for every day thereafter until the project is complete and accepted by the Owner. PAGE P-6 AND P-7 MUST BE COMPLETED AND SUBMITTED WITH YOUR BID

Crossland Heavy Contractors, Inc. Kansas Heavy Construction LLC 1 Mobilization Lump Sum 1 2 Contractor Construction Staking Lump Sum 1 3 Demolition and Removal Lump Sum 1 4 Clearing and Grubbing Lump Sum 1 5 Excavation Cu. Yd. 1,513 6 Embankment Cu. Yd. 45 7 Utility Trench & Backfill/Compaction Cu. Yd. 200 8 Subgrade Stabilization (9" Fly Ash Treatment) Sq. Yd. 809 9 Subgrade Stabilization (8" KDOT AB-3) Sq. Yd. 2495 10 Asphalt Pavement (8") Sq. Yd. 672 11 Concrete Pavement (4")(Plain)(Colored) Sq. Yd. 83 12 Concrete Pavement (8")(NRDJ) Sq. Yd. 1407 13 Concrete Pavement (10")(NRDJ) Sq. Yd. 706 14 Temporary Surfacing (Aggregate) Ton 265 15 Driveways (6")(Concrete) Sq. Yd. 85 16 Driveways (6")(Asphalt) Sq. Yd. 28 17 Sidewalks (4")(Concrete) Sq. Yd. 284 18 Shared Use Paths (6 )(Concrete)(Fiber Reinforced) Sq. Yd. 75 19 Access Ramps Each 10 20 Curb and Gutter (Type CG-1) Ln. Ft. 1203 21 Curb and Gutter (Type CG-1, Dry) Ln. Ft. 87 22 Curb and Gutter (Type CG-1, Monolithic) Ln. Ft. 32 23 Curb and Gutter (Type CG-3) Ln. Ft. 252 24 Curb and Gutter (Type CG-3, Dry) Ln. Ft. 20 25 Storm Sewer Structure (Curb Inlet)(6x4) Each 2 26 Storm Sewer Structure (Curb Inlet)(8x4) Each 1 27 Storm Sewer Structure (Curb Inlet)(6x5) Each 1 28 Storm Sewer Structure (Junction Boxes)(4x5) Each 3 29 Storm Sewer Pipe (15" HDPE) Ln. Ft. 7 30 Storm Sewer Pipe (18" HDPE) Ln. Ft. 88 31 Storm Sewer Pipe (15" RCP) Ln. Ft. 141 32 Storm Sewer Pipe (18" RCP) Ln. Ft. 33 33 Storm Sewer Pipe (24" RCP) Ln. Ft. 60 34 Storm Sewer Pipe (30" RCP) Ln. Ft. 150 35 Traffic Signal Lump Sum 1 36 Video Detection System Lump Sum 1 37 Emergency Vehicle System Lump Sum 1 38 Pavement Marking (Temporary)(White)(6") Ln. Ft. 363 39 Pavement Marking (Temporary)(White)(12") Ln. Ft. 82 40 Pavement Marking (Temporary)(Yellow)(4") Ln. Ft. 397 41 Pavement Marking (Temporary)(White)(24") Ln. Ft. 127 42 Pavement Marking Symbol (Temporary)(White)(Left Arrow) Each 2 43 Pavement Marking (Patterned Cold Plastic)(White)(6") Ln. Ft. 238 44 Pavement Marking (Patterned Cold Plastic)(White)(12") Ln. Ft. 14 45 Pavement Marking (Patterned Cold Plastic)(Yellow)(4") Ln. Ft. 683 46 Pavement Marking (Intersection Grade)(White)(24") Ln. Ft. 125 47 Pavement Marking Symbol (Intersection Grade)(White)(Left Arrow) Each 4 48 Pavement Marking Symbol (Intersection Grade)(White)(Right Arrow) Each 4 49 Pavement Marking Symbol (Intersection Grade)(White)(ONLY) Each 2 50 Seeding (Permanent) Lump Sum 1 51 Sediment Control Devices (Sediment Fence) Ln. Ft. 200 52 Sediment Control Devices (Inlet Protection) Each 5 53 Traffic Control Lump Sum 1 54 Install 12" Water Line Ln. Ft. 337 55 Install 12 Gate Valve Each 3 56 Install 12" Tee and Block Each 2 57 Install 12" Anchor Coupling Each 1 58 Install 2" Blowoff Assembly Each 2 59 Connect to Existing Waterline Each 1 $ 33,500.00 $ 33,500.00 $ 50,000.00 $ 50,000.00 $ 9,680.00 $ 9,680.00 $ 6,000.00 $ 6,000.00 $ 60,500.00 $ 60,500.00 $ 42,000.00 $ 42,000.00 $ 7,180.00 $ 7,180.00 $ 24,000.00 $ 24,000.00 $ 23.00 $ 34,799.00 $ 23.50 $ 35,555.50 $ 40.00 $ 1,800.00 $ 98.00 $ 4,410.00 $ 23.00 $ 4,600.00 $ 95.00 $ 19,000.00 $ 9.50 $ 7,685.50 $ 24.85 $ 20,103.65 $ 8.50 $ 21,207.50 $ 11.00 $ 27,445.00 $ 46.50 $ 31,248.00 $ 43.00 $ 28,896.00 $ 99.00 $ 8,217.00 $ 100.00 $ 8,300.00 $ 59.00 $ 83,013.00 $ 62.00 $ 87,234.00 $ 68.70 $ 48,502.20 $ 77.50 $ 54,715.00 $ 15.30 $ 4,054.50 $ 25.00 $ 6,625.00 $ 46.50 $ 3,952.50 $ 55.00 $ 4,675.00 $ 225.00 $ 6,300.00 $ 88.50 $ 2,478.00 $ 38.00 $ 10,792.00 $ 37.50 $ 10,650.00 $ 45.00 $ 3,375.00 $ 51.00 $ 3,825.00 $ 695.00 $ 6,950.00 $ 1,050.00 $ 10,500.00 $ 19.70 $ 23,699.10 $ 28.00 $ 33,684.00 $ 21.20 $ 1,844.40 $ 28.00 $ 2,436.00 $ 21.20 $ 678.40 $ 28.00 $ 896.00 $ 21.20 $ 5,342.40 $ 29.00 $ 7,308.00 $ 21.20 $ 424.00 $ 32.00 $ 640.00 $ 2,730.00 $ 5,460.00 $ 4,350.00 $ 8,700.00 $ 3,395.00 $ 3,395.00 $ 5,700.00 $ 5,700.00 $ 3,100.00 $ 3,100.00 $ 4,950.00 $ 4,950.00 $ 2,635.00 $ 7,905.00 $ 4,600.00 $ 13,800.00 $ 173.00 $ 1,211.00 $ 205.00 $ 1,435.00 $ 67.00 $ 5,896.00 $ 74.00 $ 6,512.00 $ 60.00 $ 8,460.00 $ 81.00 $ 11,421.00 $ 69.00 $ 2,277.00 $ 86.00 $ 2,838.00 $ 75.00 $ 4,500.00 $ 93.00 $ 5,580.00 $ 89.00 $ 13,350.00 $ 100.00 $ 15,000.00 $ 137,500.00 $ 137,500.00 $ 138,160.00 $ 138,160.00 $ 26,500.00 $ 26,500.00 $ 26,400.00 $ 26,400.00 $ 15,470.00 $ 15,470.00 $ 15,400.00 $ 15,400.00 $ 2.20 $ 798.60 $ 2.20 $ 798.60 $ 4.40 $ 360.80 $ 4.40 $ 360.80 $ 1.40 $ 555.80 $ 1.40 $ 555.80 $ 8.80 $ 1,117.60 $ 8.80 $ 1,117.60 $ 150.00 $ 300.00 $ 150.00 $ 300.00 $ 6.70 $ 1,594.60 $ 6.75 $ 1,606.50 $ 27.70 $ 387.80 $ 28.00 $ 392.00 $ 5.50 $ 3,756.50 $ 5.50 $ 3,756.50 $ 22.00 $ 2,750.00 $ 22.00 $ 2,750.00 $ 330.00 $ 1,320.00 $ 330.00 $ 1,320.00 $ 330.00 $ 1,320.00 $ 330.00 $ 1,320.00 $ 550.00 $ 1,100.00 $ 550.00 $ 1,100.00 $ 2,765.00 $ 2,765.00 $ 5,500.00 $ 5,500.00 $ 2.20 $ 440.00 $ 1.60 $ 320.00 $ 140.00 $ 700.00 $ 90.00 $ 450.00 $ 10,497.80 $ 10,497.80 $ 10,890.00 $ 10,890.00 $ 65.00 $ 21,905.00 $ 125.00 $ 42,125.00 $ 2,325.00 $ 6,975.00 $ 2,900.00 $ 8,700.00 $ 1,115.00 $ 2,230.00 $ 1,315.00 $ 2,630.00 $ 850.00 $ 850.00 $ 800.00 $ 800.00 $ 1,727.00 $ 3,454.00 $ 2,300.00 $ 4,600.00 $ 1,285.00 $ 1,285.00 $ 2,000.00 $ 2,000.00

Crossland Heavy Contractors, Inc. Kansas Heavy Construction LLC 60 Install 3/4" Long Service Each 1 61 Install 1 Long Service Each 1 62 Install Meter Tile, Setter, and Ring & Cover Each 1 63 Install Fire Hydrant Assembly with Swivel 90 Each 1 64 12" Sanitary Sewer Pipe Ln. Ft. 285 65 Standard Sanitary Manholes Each 2 66 Extra Depth Sanitary Manholes Vert. Ft. 7.4 GRAND TOTAL $ 1,495.00 $ 1,495.00 $ 5,150.00 $ 5,150.00 $ 1,605.00 $ 1,605.00 $ 5,500.00 $ 5,500.00 $ 1,075.00 $ 1,075.00 $ 1,000.00 $ 1,000.00 $ 4,360.00 $ 4,360.00 $ 5,850.00 $ 5,850.00 $ 147.00 $ 41,895.00 $ 125.00 $ 35,625.00 $ 3,090.00 $ 6,180.00 $ 6,200.00 $ 12,400.00 $ 170.00 $ 1,258.00 $ 240.00 $ 1,776.00 $ 778,700.00 $ 907,965.95 Grand Total (Written): Six Hundred Eighty-Five Thousand, Six Hundred Twenty-Nine Dollars and Forty Cents The following portions of the project shall be substantially complete and open to vehicular and pedestrian traffic by August 5, 2016: The north portion of Ousdahl and all of 19th Street (the traffic signal does not need to be in operation by that date). Liquidated damages of five hundred dollars ($500.00) per day shall be charged for every day thereafter until these streets are open to said traffic. The south portion of Ousdahl shall be Substantially Complete by October 28, 2016. Liquidated damages of five hundred dollars ($500.00) per day shall be charged for every day thereafter until Substantial Completion is reached and accepted by the Owner. The date for Final Completion for the entire project shall be November 11, 2016. Liquidated damages of five hundred ($500.00) per day shall be charged for every day thereafter until the project is complete and accepted by the Owner. PAGE P-6 AND P-7 MUST BE COMPLETED AND SUBMITTED WITH YOUR BID

Freeman Concrete Construction, LLC Kissick Construction Company 1 Mobilization Lump Sum 1 2 Contractor Construction Staking Lump Sum 1 3 Demolition and Removal Lump Sum 1 4 Clearing and Grubbing Lump Sum 1 5 Excavation Cu. Yd. 1,513 6 Embankment Cu. Yd. 45 7 Utility Trench & Backfill/Compaction Cu. Yd. 200 8 Subgrade Stabilization (9" Fly Ash Treatment) Sq. Yd. 809 9 Subgrade Stabilization (8" KDOT AB-3) Sq. Yd. 2495 10 Asphalt Pavement (8") Sq. Yd. 672 11 Concrete Pavement (4")(Plain)(Colored) Sq. Yd. 83 12 Concrete Pavement (8")(NRDJ) Sq. Yd. 1407 13 Concrete Pavement (10")(NRDJ) Sq. Yd. 706 14 Temporary Surfacing (Aggregate) Ton 265 15 Driveways (6")(Concrete) Sq. Yd. 85 16 Driveways (6")(Asphalt) Sq. Yd. 28 17 Sidewalks (4")(Concrete) Sq. Yd. 284 18 Shared Use Paths (6 )(Concrete)(Fiber Reinforced) Sq. Yd. 75 19 Access Ramps Each 10 20 Curb and Gutter (Type CG-1) Ln. Ft. 1203 21 Curb and Gutter (Type CG-1, Dry) Ln. Ft. 87 22 Curb and Gutter (Type CG-1, Monolithic) Ln. Ft. 32 23 Curb and Gutter (Type CG-3) Ln. Ft. 252 24 Curb and Gutter (Type CG-3, Dry) Ln. Ft. 20 25 Storm Sewer Structure (Curb Inlet)(6x4) Each 2 26 Storm Sewer Structure (Curb Inlet)(8x4) Each 1 27 Storm Sewer Structure (Curb Inlet)(6x5) Each 1 28 Storm Sewer Structure (Junction Boxes)(4x5) Each 3 29 Storm Sewer Pipe (15" HDPE) Ln. Ft. 7 30 Storm Sewer Pipe (18" HDPE) Ln. Ft. 88 31 Storm Sewer Pipe (15" RCP) Ln. Ft. 141 32 Storm Sewer Pipe (18" RCP) Ln. Ft. 33 33 Storm Sewer Pipe (24" RCP) Ln. Ft. 60 34 Storm Sewer Pipe (30" RCP) Ln. Ft. 150 35 Traffic Signal Lump Sum 1 36 Video Detection System Lump Sum 1 37 Emergency Vehicle System Lump Sum 1 38 Pavement Marking (Temporary)(White)(6") Ln. Ft. 363 39 Pavement Marking (Temporary)(White)(12") Ln. Ft. 82 40 Pavement Marking (Temporary)(Yellow)(4") Ln. Ft. 397 41 Pavement Marking (Temporary)(White)(24") Ln. Ft. 127 42 Pavement Marking Symbol (Temporary)(White)(Left Arrow) Each 2 43 Pavement Marking (Patterned Cold Plastic)(White)(6") Ln. Ft. 238 44 Pavement Marking (Patterned Cold Plastic)(White)(12") Ln. Ft. 14 45 Pavement Marking (Patterned Cold Plastic)(Yellow)(4") Ln. Ft. 683 46 Pavement Marking (Intersection Grade)(White)(24") Ln. Ft. 125 47 Pavement Marking Symbol (Intersection Grade)(White)(Left Arrow) Each 4 48 Pavement Marking Symbol (Intersection Grade)(White)(Right Arrow) Each 4 49 Pavement Marking Symbol (Intersection Grade)(White)(ONLY) Each 2 50 Seeding (Permanent) Lump Sum 1 51 Sediment Control Devices (Sediment Fence) Ln. Ft. 200 52 Sediment Control Devices (Inlet Protection) Each 5 53 Traffic Control Lump Sum 1 54 Install 12" Water Line Ln. Ft. 337 55 Install 12 Gate Valve Each 3 56 Install 12" Tee and Block Each 2 57 Install 12" Anchor Coupling Each 1 58 Install 2" Blowoff Assembly Each 2 59 Connect to Existing Waterline Each 1 $ 70,000.00 $ 70,000.00 $ 40,000.00 $ 40,000.00 $ 10,900.00 $ 10,900.00 $ 8,000.00 $ 8,000.00 $ 50,000.00 $ 50,000.00 $ 57,000.00 $ 57,000.00 $ 9,000.00 $ 9,000.00 $ 22,000.00 $ 22,000.00 $ 57.00 $ 86,241.00 $ 52.00 $ 78,676.00 $ 29.00 $ 1,305.00 $ 80.00 $ 3,600.00 $ 54.00 $ 10,800.00 $ 20.00 $ 4,000.00 $ 10.00 $ 8,090.00 $ 15.00 $ 12,135.00 $ 13.00 $ 32,435.00 $ 9.00 $ 22,455.00 $ 51.00 $ 34,272.00 $ 45.00 $ 30,240.00 $ 75.00 $ 6,225.00 $ 77.00 $ 6,391.00 $ 64.00 $ 90,048.00 $ 98.00 $ 137,886.00 $ 74.00 $ 52,244.00 $ 92.00 $ 64,952.00 $ 33.00 $ 8,745.00 $ 30.00 $ 7,950.00 $ 60.00 $ 5,100.00 $ 100.00 $ 8,500.00 $ 235.00 $ 6,580.00 $ 95.00 $ 2,660.00 $ 45.00 $ 12,780.00 $ 57.00 $ 16,188.00 $ 62.00 $ 4,650.00 $ 104.00 $ 7,800.00 $ 1,220.00 $ 12,200.00 $ 1,500.00 $ 15,000.00 $ 21.50 $ 25,864.50 $ 23.00 $ 27,669.00 $ 21.50 $ 1,870.50 $ 23.00 $ 2,001.00 $ 11.00 $ 352.00 $ 25.00 $ 800.00 $ 21.50 $ 5,418.00 $ 23.00 $ 5,796.00 $ 21.50 $ 430.00 $ 23.00 $ 460.00 $ 3,470.00 $ 6,940.00 $ 4,300.00 $ 8,600.00 $ 4,460.00 $ 4,460.00 $ 5,000.00 $ 5,000.00 $ 4,020.00 $ 4,020.00 $ 4,800.00 $ 4,800.00 $ 3,730.00 $ 11,190.00 $ 4,500.00 $ 13,500.00 $ 119.00 $ 833.00 $ 144.00 $ 1,008.00 $ 96.00 $ 8,448.00 $ 125.00 $ 11,000.00 $ 77.00 $ 10,857.00 $ 110.00 $ 15,510.00 $ 125.00 $ 4,125.00 $ 153.00 $ 5,049.00 $ 140.00 $ 8,400.00 $ 165.00 $ 9,900.00 $ 154.00 $ 23,100.00 $ 150.00 $ 22,500.00 $ 146,650.00 $ 146,650.00 $ 140,000.00 $ 140,000.00 $ 28,000.00 $ 28,000.00 $ 28,000.00 $ 28,000.00 $ 16,350.00 $ 16,350.00 $ 17,000.00 $ 17,000.00 $ 2.30 $ 834.90 $ 2.20 $ 798.60 $ 4.70 $ 385.40 $ 4.40 $ 360.80 $ 1.50 $ 595.50 $ 1.35 $ 535.95 $ 9.30 $ 1,181.10 $ 8.50 $ 1,079.50 $ 158.00 $ 316.00 $ 150.00 $ 300.00 $ 7.00 $ 1,666.00 $ 6.50 $ 1,547.00 $ 29.00 $ 406.00 $ 27.00 $ 378.00 $ 6.00 $ 4,098.00 $ 5.50 $ 3,756.50 $ 23.00 $ 2,875.00 $ 22.00 $ 2,750.00 $ 350.00 $ 1,400.00 $ 330.00 $ 1,320.00 $ 350.00 $ 1,400.00 $ 330.00 $ 1,320.00 $ 580.00 $ 1,160.00 $ 550.00 $ 1,100.00 $ 4,500.00 $ 4,500.00 $ 4,500.00 $ 4,500.00 $ 3.00 $ 600.00 $ 6.00 $ 1,200.00 $ 117.00 $ 585.00 $ 175.00 $ 875.00 $ 11,560.00 $ 11,560.00 $ 11,000.00 $ 11,000.00 $ 112.00 $ 37,744.00 $ 115.00 $ 38,755.00 $ 2,200.00 $ 6,600.00 $ 2,300.00 $ 6,900.00 $ 990.00 $ 1,980.00 $ 1,650.00 $ 3,300.00 $ 688.00 $ 688.00 $ 450.00 $ 450.00 $ 575.00 $ 1,150.00 $ 2,400.00 $ 4,800.00 $ 1,540.00 $ 1,540.00 $ 3,000.00 $ 3,000.00

Freeman Concrete Construction, LLC Kissick Construction Company 60 Install 3/4" Long Service Each 1 61 Install 1 Long Service Each 1 62 Install Meter Tile, Setter, and Ring & Cover Each 1 63 Install Fire Hydrant Assembly with Swivel 90 Each 1 64 12" Sanitary Sewer Pipe Ln. Ft. 285 65 Standard Sanitary Manholes Each 2 66 Extra Depth Sanitary Manholes Vert. Ft. 7.4 GRAND TOTAL $ 3,280.00 $ 3,280.00 $ 1,500.00 $ 1,500.00 $ 3,420.00 $ 3,420.00 $ 1,800.00 $ 1,800.00 $ 620.00 $ 620.00 $ 3,800.00 $ 3,800.00 $ 3,630.00 $ 3,630.00 $ 5,500.00 $ 5,500.00 $ 290.00 $ 82,650.00 $ 220.00 $ 62,700.00 $ 3,530.00 $ 7,060.00 $ 4,000.00 $ 8,000.00 $ 90.00 $ 666.00 $ 95.00 $ 703.00 $ 1,003,513.90 $ 1,038,055.35 Grand Total (Written): Six Hundred Eighty-Five Thousand, Six Hundred Twenty-Nine Dollars and Forty Cents The following portions of the project shall be substantially complete and open to vehicular and pedestrian traffic by August 5, 2016: The north portion of Ousdahl and all of 19th Street (the traffic signal does not need to be in operation by that date). Liquidated damages of five hundred dollars ($500.00) per day shall be charged for every day thereafter until these streets are open to said traffic. The south portion of Ousdahl shall be Substantially Complete by October 28, 2016. Liquidated damages of five hundred dollars ($500.00) per day shall be charged for every day thereafter until Substantial Completion is reached and accepted by the Owner. The date for Final Completion for the entire project shall be November 11, 2016. Liquidated damages of five hundred ($500.00) per day shall be charged for every day thereafter until the project is complete and accepted by the Owner. PAGE P-6 AND P-7 MUST BE COMPLETED AND SUBMITTED WITH YOUR BID