GoldSeiten.de - Gold & Silber, Münzen und Barren sowie Minengesellschaften CNW

Similar documents
SIERRA METALS INCREASES MINERAL RESERVE ESTIMATE BY 83% FOR ITS BOLIVAR MINE, MEXICO

Gold Resource Corporation Reports First Quarter Net Income of $0.10 Per Share, Maintains 2018 Production Outlook

Great Panther Silver Reports First Quarter 2018 Financial Results

Taseko Reports First Quarter 2018 Financial Results

Equinox Gold to Acquire the Mesquite Gold Mine in California for $158 Million

Pretivm Reports First Quarter 2018 Results

Alio Gold Reports Third Quarter 2018 Results

Metalla Reports Financial Results for the Second Quarter of Fiscal 2019

Cleveland-Cliffs Inc. Reports First-Quarter 2018 Results

Metalla Reports Financial Results for Fiscal 2018

Stornoway Reports Second Quarter 2018 Production And Sales Results

Newmont Provides Updated 2019 and Longer-term Outlook

SolGold PLC Announces Issue of Equity

Centerra Gold Exceeds 2018 Production Guidance with Gold Production of 729,556 Ounces and Announces 2019 Outlook

Spanish Mountain Gold Announces Results of New PEA for the First Zone

POLYMETALLIC PRODUCER with exciting GROWTH POTENTIAL

Q Results Webcast & Conference Call

Endeavour Reports Q3 Results

SIERRA METALS INC. MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE THREE MONTHS ENDED MARCH 31, 2018

Sierra Metals Produces Record 3.1 Million Silver Equivalent Ounces in Q2-2015

POLYMETALLIC PRODUCER with exciting GROWTH POTENTIAL

SIERRA METALS INC. MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE YEAR ENDED DECEMBER 31, 2017

COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES

NEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE

Hudbay Announces Updated Technical Report for Constancia and Provides Annual Reserve and Resource Update

Q PRESENTATION

HBM. Creating Sustainable Value through High Quality Long Life Deposits

Trevali Reports Record Preliminary Q and 2017 Annual Production, and Provides 2018 Production and Cost Guidance

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

SSR Mining's Seabee Gold Operation Strong Preliminary Economic Assessment Supports Mine Expansion Plan

NEWS RELEASE JANUARY 29, 2015

Lupaka Announces Positive PEA for Invicta with Average Annual Pre-Tax Cash Flow of US$10.2 Million

SILVERCORP REPORTS SIGNIFICANT GAIN IN MEASURED AND INDICATED MINERAL RESOURCES AT THE YING SILVER-LEAD-ZINC MINING DISTRICT, HENAN PROVINCE, CHINA

Turquoise Hill files 2016 Oyu Tolgoi Technical Report

SSR MINING S SEABEE GOLD OPERATION STRONG PRELIMINARY ECONOMIC ASSESSMENT SUPPORTS MINE EXPANSION PLAN

MCEWEN MINING ANNOUNCES UPDATED PRELIMINARY ECONOMIC ASSESSMENT FOR THE LOS AZULES COPPER PROJECT (All Dollar Amounts in US Dollars)

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

Hudbay Announces 2016 Production Guidance and Capital and Exploration Expenditure Forecasts

Dalradian Resources Reports Positive Preliminary Economic Assessment for the Curraghinalt Gold Project in Northern Ireland

Aldridge Announces Results for Yenipazar Optimization Study

Skouries Update March 2018

SECOND QUARTER 2018 RESULTS. August 10, 2018

SANDSTORM GOLD ROYALTIES RELEASES HOD MADEN PFS AND INCREASES PRODUCTION GUIDANCE

May 31, 2017 News Release SILVER STANDARD FORMS JOINT VENTURE WITH GOLDEN ARROW AND FILES TECHNICAL REPORT FOR THE CHINCHILLAS PROJECT

Trevali Provides Murray Brook Project Update

POLYMETALLIC PRODUCER with exciting GROWTH POTENTIAL

POLYMETALLIC PRODUCER with exciting GROWTH POTENTIAL

POLYMETALLIC PRODUCER

Marigold Life of Mine Plan

First Quarter 2018 Results April 26, 2018

Q4 and FY 2018 Earnings Review

POLYMETALLIC PRODUCER

Trevali reports Q financial results

AVINO SILVER & GOLD MINES LTD.

MAG Silver Reports Juanicipio Updated PEA Study Prepared by AMC

Q Earnings Review

POLYMETALLIC PRODUCER

PRESS RELEASE New Gold Reports Consolidated Reserve & Resource Statements

Q Conference Call August 15, 2012 HBM

Bellhaven Receives Favourable Preliminary Economic Assessment for its 100%- Controlled La Mina Gold-(Copper, Silver) Project, Colombia

Pretivm Reports Third Quarter 2018 Results

First Quarter 2012 Results

Q Conference Call November 2, 2012 HBM

Q Earnings Review

June 19, 2014 News Release Updated Feasibility Study for Brucejack Project Confirms Positive Economics

NEWS RELEASE Trevali reports positive Preliminary Economic Assessment of Halfmile-Stratmat Zinc-Lead-Silver Deposits in New Brunswick

Q CONFERENCE CALL

POLYMETALLIC PRODUCER with exciting RESOURCE GROWTH POTENTIAL

Q May 2, 2013 HBM

AGNICO-EAGLE MINES LIMITED. Corporate Update. May 2012

Trevali Reports 2017 Annual Financial Results

Golden Star Announces Wassa Mine Feasibility Study Results

Antioquia Gold Announces Preliminary Economic Assessment and Mineral Resource Update for Cisneros Gold Project

Telson Mining Corporation Announces Positive Preliminary Economic Assessment for the Campo Morado Mine

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance

Trevali significantly increases resources at Santander zinc-lead-silver project in Peru

CANADA S INTERMEDIATE GOLD PRODUCER

For further information: Investor Relations (416)

Agnico-Eagle Mines Limited Corporate Update May 2010

October 01, 2018 News Release Release #

Q4 and Year End 2012 Conference Call. ArgonautGold.com

January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts in US dollars)

YEAR END 2015 CONFERENCE CALL

ABACUS MINING & EXPLORATION CORPORATION (An exploration stage company) Management s discussion & analysis. For the period ended March 31, 2012

For personal use only

NEWS RELEASE 03/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742

Community Consultation Committee Meeting Woodlawn 14 September 2016 Heron Resources Limited Community Consultation Committee September

Barrick Reports Project Study Results

Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance

Detour Gold Updates Life of Mine Plan for Detour Lake

PURE GOLD ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE MADSEN GOLD PROJECT

CANADA S INTERMEDIATE GOLD PRODUCER

MIDWAY ANNOUNCES SIGNIFICANT UPGRADE IN RESOURCE AND 2014 BUDGET INCREASE AT SPRING VALLEY PROJECT, NEVADA

Detour Gold Reports Third Quarter 2018 Results

TSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS

Exeter Secures Second Water Source Outlines Pathway for First Stage Development of Caspiche Oxides

All amounts are in US dollars, unless otherwise indicated.

YEAR END 2016 CONFERENCE CALL. February 24, 2017

Detour Gold Announces 2016 Operating Results and 2017 Guidance

Corporate Update. June 2013

Transcription:

Sierra Metals Announces Positive Preliminary Economic Assessment Results for a 67% Output Expansion at its Bolivar Mine in Mexico to 5,000 Tonnes Per Day Yielding a Return on Investment of 550% 09.07.2018 CNW TORONTO, July 9, 2018 /CNW/ - Sierra Metals Inc. (TSX: SMT) (BVL: SMT) (NYSE AMERICAN: SMTS) ("Sierra Metals" or "the Company") is pleased to report the results of a Preliminary Economic Assessment ("PEA") regarding the Company's Bolivar Mine, located in Chihuahua State, Mexico. The PEA is based on technical inputs from various independent consulting groups, including; SRK, Redco, Anddes and Transmin. Based on the technical work from the various independent consultants, the PEA was compiled under National Instrument 43-101 standards by Mining Plus Peru SAC. The full technical report will be filed on SEDAR within 45 days of this news release. Highlights of the PEA include: After-tax Net Present Value (NPV): US$214 Million at an 8% discount rate Return on Investment (ROI): 550% After-tax Payback Period: 3.4 years Life of Mine Capital Cost: US$96 Million Net After-tax Cash Flow: US$303 Million Total Operating Unit Cost: US$21.18/tonne Plant Processing Rate: 5,000 tonnes per day (TPD) Average Copper Recovery Rate 85% Mine Life: 11 years based on existing Mineral Resource Estimate Life of Mine Copper Payable Production: 252,507,942 pounds Igor Gonzales, President and CEO of Sierra Metals commented: "The Company is very encouraged by the results of this PEA as they support the plan to profitably develop and grow the Bolivar Mine in sustainable and staged steps from 3,000 TPD currently, to 3,600 TPD in Q1-2019, and to 5,000 TPD in mid-2020, based on consensus metal pricing. The Company is incorporating an aggressive Capex program into the PEA of US$96.0 million over the life of the mine, which includes exploration drilling to increase the mineral resources and convert the existing resources to reserves. Additionally, the PEA reflects an aggressive development program designed to open a mineable reserve at depth and on strike. The Opex reflects yearly production development, definition drilling programs, and other operational costs. The current study focuses on the current Mineral Resource reported in the 43-101 Technical Report filed on July 5, 2018 and does not include any drilling completed after October 31, 2017. The Company is continuing with its successful brownfield exploration programs and expects to continue to grow the mineral resources at the Bolivar Mine this year. We believe that this expansion not only provides additional value to the company, as the PEA quantifies, but could also leverage the value of future resource additions. Potential new copper pounds discovered could be incorporated into production plans earlier than if the Company maintained current capacity levels." He concluded, "We are continuing with our strategy to increase shareholder value and grow the reserve and resource base at the Company. We successfully completed brownfield exploration programs at all three mines and increased the mineral reserves and resources during the past two years. Additionally, we implemented a successful operational improvement program in Peru and have completed an effective turn-around program in Mexico, and we have already seen returns on this well-spent capital. Building upon these successes, we have completed a PEA at Cusi and Bolivar, and scoping studies at the Yauricocha Mine expected shortly, which will maximize value and profitability through the implementation of automation and possible throughput increases which will further drive growth and benefit all shareholders in the future." Mineral Reserve and Resource Estimate 14.07.2018 Seite 1/9

The property is located in the Piedras Verdes District of Chihuahua State, Mexico, approximately 250 kilometers southwest of the city of Chihuahua and consists of 14 mineral concessions (6,800 hectares). The Bolivar deposit is a Cu-Zn skarn and is one of many precious and base metal deposits of the Sierra Madre belt, which trends north-northwest across the states of Chihuahua, Durango and Sonora in northwestern Mexico (Meinert, 2007). Mineralization exhibits strong stratigraphic control and two stratigraphic horizons host the bulk of the mineralization: an upper calcic horizon, which predominantly hosts Zn-rich mineralization, and a lower dolomitic horizon, which predominantly hosts Cu-rich mineralization. In both cases, the highest grades are developed where structures and associated breccia zones cross these favorable horizons near skarn-marble contacts. This PEA considers depleted measured, indicated and inferred resources reported on 2017 by SRK and effective date as of October 31, 2017. The results of this PEA are indicative of conceptual potential and are not definitive. Table 1-1: Summary of resource reported by SRK, 2017 (Effective October 31, 2017) Class Tonnes (000's) Ag Au Cu Ag Au Cu (g/t) (g/t) (%) (koz) (koz) (t) Indicated 13,267 22.5 0.29 1.04 9,616 124 137,537 Inferred 8,012 22.4 0.42 0.96 5,779 109 76,774 (1) Mineral resources are not mineral reserves and do not have demonstrated economic viability. All?gures rounded to re?ect the relative accuracy of the estimates. Copper, gold and silver assays were capped where appropriate. (2) Mineral resources are reported at cut-off values based on metal price assumptions*, metallurgical recovery assumptions**, mining/transport costs (US$17.59/t), processing costs (US$8.33/t), and general and administrative costs (US$2.41/t). (3) The metal value cut-off grade for the Bolivar Mine is US$29/t. No mineral resources are reported for the remaining pillars. * Metal price assumptions considered for the calculation of metal value are: Copper (Cu): US$/lb 3.00, Silver (Ag): US$/oz 18.25, and Gold (Au): US$/oz 1,291.00. ** Metallurgical recovery assumptions are 83% Cu, 78% Ag, and 64% Au. The resources were estimated by David Keller of SRK consulting (Canada) using Ordinary Kriging (OK), and reviewed and validated by Giovanny Ortiz, B.Sc., PGeo, FAusIMM #304612 of SRK, a Qualified Person. Note: Mining has continued since the publication of this resource and resources have not been subsequently depleted. Sierra Metals commissioned various specialist groups (Table 1-2) to evaluate how, on a conceptual level, mining, mineral processing, and tailings management could be adapted at the property to achieve a sustainable and staged increase in mine production and mill throughput from 3,000 TPD, to 3,600 TPD in Q1-2019, to 5,000 TPD by mid-2020. Table 1-2: Groups involved in development for conceptual plan considered in the PEA Group Concept Report SRK Consulting (U.S), Inc. Resource Estimation SRK, 2018 Redco Mining Consultants Increase mine output to 5,000 TPD Redco, 2018 Sierra Metals (SM) Increase Piedras Verdes Pant Capacity to 5,000 TPD Sierra, 2018 Transmin Metallurgical Consultants (TM) Engineering associated with increased Plantas Verdes plant capacity Transmin, 2018 Anddes Asociados 14.07.2018 Seite 2/9

Executive Summary Tailings Expansion Design 14.07.2018 Seite 3/9

Andess, 2018 14.07.2018 Seite 4/9

14.07.2018 Seite 5/9

Mining Methodology To determine how mine output could be increased, Sierra Metals commissioned Redco Mining Consultants ("Redco') to undertake a scoping study, considering; existing development and infrastructure, geotechnical characteristics, geological controls and mineralization style. The study (Redco, 2018) determined that Longhole Stoping could be used to achieve sustainable production of 5,000 TPD. As part of their scoping study, Redco considered plans for ventilation on a general scale. Sierra Metals recognizes that further and more detailed ventilation plans are required to support a deeper conceptual mine design. Mineral Processing The Piedras Verdes Plant, located 5.1 kilometers from the Bolivar Mine, uses a conventional crushing-milling-flotation circuit to recover mineral and to produce commercial quality copper concentrates with silver and gold by-product credits. Mineral is delivered from the mine to the plant in 18-tonne trucks. Mineral processing and the recovery of the mineral is demonstrated, and copper, silver and gold recoveries are established at 85.0%, 78.2% and 63.7% respectively. The Piedras Verdes Plant current throughput is 3,000 TPD. In line with proposed increases in mine output, the processing capacity at Piedras Verdes will increase to 3,600 TPD in Q1-2019, and to 5,000 TPD by mid-2020. The current tailings storage facility has an in-situ capacity to store tailings until year end 2019. A plan is currently underway to construct a much larger capacity facility which will include the installation of a starter dam followed by deposition of filtered - dewatered tailings in a facility which will accommodate 14 million tonnes of filtered tailings providing capacity for future plant expansion. Engineering for this program is provided by ANDDES Engineers from Peru. Economic Analysis The PEA calculates a Base Case after-tax NPV of US$214 million, with an after tax Return on Investment of 550% using a discount rate of 8%. The total life of mine capital cost of the project is estimated to total US$96.0 million. The payback period for the Life of Mine (LoM) capital is estimated at 3.4 years. Operating costs of the life of mine total US$359 million, equating to an operating cost of US$21.18 per tonne milled. 14.07.2018 Seite 6/9

PEA Highlights Unit Value Base case of $1,291/oz Gold, $18.25/oz Silver, $3.00/lb. Copper Net Present Value (After Tax 8% Discount Rate) US$ M 214 Return on Investment ROI (%) 550 Mill Feed Tonnes (Mt) 16.9 Peak Mining Production Rate t/year 1,800,000 LOM Project Operating Period Years 11 Total Life of Mine (LoM) Capital Costs US$ M 96 Net After Tax Cashflow US$ M 303 Total Operating Unit Costs US$/t 21.18 LOM Gold Production (Payable) oz 86,472 LOM Silver Production (Payable) oz 7,013,157 LOM Copper Production (Payable) t 114,537 Quality Control All technical data contained in this news release has been reviewed and approved by: Gordon Babcock, P.Eng., Chief Operating Officer and a Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects. Americo Zuzunaga, MAusIMM CP (Mining Engineer) and Vice President of Corporate Planning is a Qualified Person and chartered professional qualifying as a Competent Person under the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Augusto Chung, FAusIMM CP (Metallurgist) and Consultant to Sierra Metals is a Qualified Person and chartered professional qualifying as a Competent Person on metallurgical processes. About Sierra Metals Sierra Metals Inc. is Canadian based growing polymetallic mining company with production from its Yauricocha Mine in Peru, and its Bolivar and Cusi Mines in Mexico. The Company is focused on increasing production volume and growing mineral resources. Sierra Metals has recently had several new key discoveries and still has many more exciting brownfield exploration opportunities at all three Mines in Peru and Mexico that are within close proximity to the existing mines. Additionally, the Company also has large land packages at all three mines with several prospective regional targets providing longer-term exploration upside and mineral resource growth potential. The Company's Common Shares trade on the Bolsa de Valores de Lima and on the Toronto Stock Exchange under the symbol "SMT" and on the NYSE American Exchange under the symbol "SMTS." 14.07.2018 Seite 7/9

Continue to Follow, Like and Watch our progress: Web: www.sierrametals.com Twitter: sierrametals Facebook: SierraMetalsInc LinkedIn: Sierra Metals Inc. Forward-Looking Statements This press release contains "forward-looking information" and "forward-looking statements" within the meaning of Canadian and U.S. securities laws related to the Company (collectively, "forward-looking information"). Forward-looking information includes, but is not limited to, statements with respect to the Company's operations, including the anticipated developments in the Company's operations in future periods, the Company's planned exploration activities, the adequacy of the Company's financial resources, and other events or conditions that may occur in the future. Statements concerning mineral reserve and resource estimates may also be considered to constitute forward-looking statements to the extent that they involve estimates of the mineralization that will be encountered if and when the properties are developed or further developed. These statements relate to analyses and other information that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "plans", "projects", "estimates", "assumes", "intends", "strategy", "goals", "objectives", "potential" or variations thereof, or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of risks and uncertainties, which could cause actual events or results to differ from those reflected in the forward-looking information, including, without limitation, risks inherent in the mining industry including environmental hazards, industrial accidents, unusual or unexpected geological formations, floods, labour disruptions, explosions, cave-ins, weather conditions and criminal activity; commodity price fluctuations; higher operating and/or capital costs; lack of available infrastructure; the possibility that future exploration, development or mining results will not be consistent with the Company's expectations; risks associated with the estimation of mineral resources and the geology, grade and continuity of mineral deposits and the inability to replace reserves; fluctuations in the price of commodities used in the Company's operations; risks related to foreign operations; changes in laws or policies, foreign taxation, delays or the inability to obtain necessary governmental permits; risks relating to outstanding borrowings; issues regarding title to the Company's properties; risks related to environmental regulation; litigation risks; risks related to uninsured hazards; the impact of competition; volatility in the price of the Company's securities; global financial risks; inability to attract or retain qualified employees; potential conflicts of interest; risks related to a controlling group of shareholders; dependence on third parties; differences in U.S. and Canadian reporting of mineral reserves and resources; potential dilutive transactions; foreign currency risks; risks related to business cycles; liquidity risks; reliance on internal control systems; credit risks, including risks related to the Company's compliance with covenants with respect to its BCP Facility; uncertainty of production and cost estimates for the Yauricocha Mine, the Bolivar Mine and the Cusi Mine; and other risks identified in the Company's filings with Canadian securities regulators and the U.S. Securities and Exchange Commission ("SEC"), which filings are available at www.sedar.com and www.sec.gov, respectively. This list is not exhaustive of the factors that may affect any of the Company's forward-looking information. Forward-looking information includes statements about the future and are inherently uncertain, and the Company's actual achievements or other future events or conditions may differ materially from those reflected in the forward-looking information due to a variety of risks, uncertainties and other factors. The Company's statements containing forward-looking information are based on the beliefs, expectations, and opinions of management on the date the statements are made, and the Company does not assume any obligation to update forward-looking information if circumstances or management's beliefs, expectations or opinions should change, other than as required by applicable law. For the reasons set forth above, one should not place undue reliance on forward-looking information. Note Regarding Reserve and Resource Estimates All reserve and resource estimates reported by the Company are calculated in accordance with the Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects and the Canadian Institute of Mining and Metallurgy Classification system. These standards differ significantly from the requirements of the SEC. The differences between these standards are discussed in our SEC filings. Mineral resources which are not mineral reserves do not have demonstrated economic viability. View original content:http://www.prnewswire.com/news-releases/sierra-metals-announces-positive-preliminary-economic-assessment-results-for-a SOURCE Sierra Metals Inc. 14.07.2018 Seite 8/9

Contact Sierra Metals, please visit www.sierrametals.com or contact: Mike McAllister V.P., Corporate Development, Sierra Metals Inc., +1 (416) 366-7777, Email: info@sierrametals.com; Igor Gonzales, President & CEO, Sierra Metals Inc., +1(416) 366-7777; Gordon Babcock, Chief Operating Officer, Sierra Metals Inc., +1(416) 366-7777 Dieser Artikel stammt von GoldSeiten.de Die URL für diesen Artikel lautet: https://www.goldseiten.de/artikel/382079--sierra-metals-announces-positive-preliminary-economic-assessment-results-for-a-67prozent-outp Für den Inhalt des Beitrages ist allein der Autor verantwortlich bzw. die aufgeführte Quelle. Bild- oder Filmrechte liegen beim Autor/Quelle bzw. bei der vom ihm benannten Que können Fehler nicht ausgeschlossen werden. Der vertretene Standpunkt eines Autors spiegelt generell nicht die Meinung des Webseiten-Betreibers wieder. Mittels der Veröffen ein pluralistisches Meinungsbild darstellen. Direkte oder indirekte Aussagen in einem Beitrag stellen keinerlei Aufforderung zum Kauf-/Verkauf von Wertpapieren dar. Wir wehre Hass, Diskriminierung und Verletzung der Menschenwürde. Beachten Sie bitte auch unsere AGB/Disclaimer! Die Reproduktion, Modifikation oder Verwendung der Inhalte ganz oder teilweise ohne schriftliche Genehmigung ist untersagt! Alle Angaben ohne Gewähr! Copyright by GoldSeiten.de 1999-2018. Es gelten unsere AGB und Datenschutzrichtlinen. 14.07.2018 Seite 9/9