AGREEMENT between Principal and Contractor where the basis of payment is a Stipulated Sum

Similar documents
TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS

AIA Document A101 TM 1997

AIA Document A101 TM 2007

Standard Form of Agreement Between Design-Builder and Contractor. The Design-Builder has entered into a Design-Build Contract with the Owner dated:

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

AIA Document A101 TM 2007

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

Document A101. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM

AIA Document A101 TM 2007

IFB F B-WING RENOVATIONS IFB F C OFFICES BUILD OUT. Addendum 3

ARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES

Document A401 TM. Standard Form of Agreement Between Contractor and Subcontractor

Standard Form of Agreement Between Contractor and Subcontractor

AIA Document A102 TM 2007

Document A Standard Form of Agreement Between Contractor and Subcontractor

Document A Exhibit A

Document A Exhibit A Insurance and Bonds

AIA Document A101 TM 2007

Document A401 TM. Standard Form of Agreement Between Contractor and Subcontractor

AIA Document A103 TM 2007

AIA Document A102 TM 2007

AIA Document A102 TM 2007

Document A401. Standard Form of Agreement Between Contractor and Subcontractor

CONSTRUCTION AGREEMENT (Stipulated Sum) BY AND BETWEEN. NEW YORK UNIVERSITY SCHOOL OF MEDICINE, an administrative unit of NEW YORK UNIVERSITY

SECTION AGREEMENT BETWEEN OWNER AND CONTRACTOR

Standard Form of Agreement Between Owner and Architect without a Predefined

AIA Document B141 TM 1997 Part

! " # $ " % made as of the 24 day of May in the year 2006 (In words, indicate day, month and year) the Owner: (Name, address and other information)

AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN the Owner: (Name, legal status and address)

MASTER SUBCONTRACT AGREEMENT

AIA Document A133 TM 2009

AIA Document A133 TM 2009

Document A107. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope

Document A Standard Abbreviated Form of Agreement Between Owner and Contractor

Contract No BO0. A. Definitions. As used in this Contract the terms are defined as follows:

Subcontract Agreement

Document A102 TM. AGREEMENT made as of the day of in the year 2016 (In words, indicate day, month and year)

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project

AIA Document A201 TM 1997

Document A SP General Conditions of the Contract for Construction, for use on a Sustainable Project, Construction Manager as Adviser Edition

C R D A Capital Region Development Authority

Document A201 TM 2007 SP

Document A General Conditions of the Contract for Construction, Construction Manager as Adviser Edition

WASHTENAW COMMUNITY COLLEGE SMALL PROJECT CONSTRUCTION CONTRACT - GC

SETTLEMENT AND RELEASE AGREEMENT

Document A201 TM. General Conditions of the Contract for Construction. (Name and location or address)

Amount of Contract work per the plans and specifications for project. Specifications Attached. Plans Attached

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE

Standard Form of Agreement Between Contractor and Subcontractor

AGC TEXT COPY THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA AGC DOCUMENT NO. 603 STANDARD SHORT FORM AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR

Document A104 TM. Standard Abbreviated Form of Agreement Between Owner and Contractor

Document A201 TM. General Conditions of the Contract for Construction

AIA Document A201 TM 1997

Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project

ADVERTISEMENT FOR BIDS CSD NO. 158 BID # B CONSOLIDATED SCHOOL DISTRICT # ELEMENTARY SCHOOLS CARPET INSTALLATION

Document A201 TM. General Conditions of the Contract for Construction

AIA Document A107 TM 2007

Document A107 TM. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope

GENERAL CONDITIONS. of the CONTRACT FOR CONSTRUCTION. for the ARCHDIOCESE OF CHICAGO. for SOLE SOURCE CONTRACTS. (2004 Archdiocese Edition)

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES

WASHTENAW COMMUNITY COLLEGE CONSTRUCTION CONTRACT - GC

Appendix C. Standard Form of Agreement Between [Consultant] and the Iowa Department of Transportation with Standard Form of Consultant's Services

AIA Document A201 TM 2007

For further information on the AIA s approach to drafting contract documents, see AIA Document M120, Document Drafting Principles.

STANDARD FORM OF AGREEMENT BETWEEN DESIGN CONSULTANT AND DESIGN SUB-CONSULTANT

Document A201 TM. General Conditions of the Contract for Construction

Document A133 TM. AGREEMENT made as of the 4th day of February in the year 2016 (In words, indicate day, month and year.)

Document A South Carolina Division of Procurement Services, Office of the State Engineer Version of

Standard Form of Agreement Between OWNER AND CONSTRUCTION MANAGER Construction Manager At-Risk

Standard Form of Agreement Between. Owner and Design-Builder Cost Plus Fee with an Option for a Guaranteed Maximum Price

AIA CONTRACT DOCUMENTS

Document A107. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope

SUPPLEMENTARY AND SPECIAL TERMS AND CONDITIONS FOR MINOR PROJECTS

ANNEX A Standard Special Conditions For The Salvation Army

AIA Document A201 TM 2007

AIA Document A107 TM 1997

CONSTRUCTION AGREEMENT/CONTRACT

REQUEST FOR PROPOSAL #17-02

B. The Bid is made in compliance with the Bidding Documents.

CONSTRUCTION CONTRACT EXAMPLE

3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents.

AIA Document A201 TM 2007

Document A Instructions

Document A201 TM. General Conditions of the Contract for Construction

TOWN OF QUEEN CREEK S. ELLSWORTH ROAD QUEEN CREEK, AZ (480)

The Toler Firm LLC A Construction Law Firm Timothy N. Toler September 23, 2015

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-BS-EQC as follows:

AIA Document A701 TM 1997

In September 2018, NCARB updated the ARE 5.0 Handbook to include 2017 AIA Contract Documents updates for the following documents:

CONSULTING AGREEMENT STANDARD TERMS AND CONDITIONS

Document A133 TM. AGREEMENT made as of the day of in the year Two Thousand and Sixteen. BETWEEN the Owner:

2018 DIS ARBITRATION RULES. First Edition

Welcome to the Model Residential Owner/Design Consultant Professional Service Agreement

THIS CONSTRUCTION CONTRACT ( Contract ) dated as of ( Owner ) and ( Contractor ) having a principal place of business at.

STANDARD SUBCONTRACT AGREEMENT FOR BUILDING CONSTRUCTION

RECITALS. NOW, THEREFORE, in consideration of the mutual promises set forth herein, it is agreed by and between the parties as follows: TERMS

Document A701 TM. Instructions to Bidders

Transcription:

AGREEMENT between Principal and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the th day of in the year Two Thousand Seventeen BETWEEN the Principal: BluB0X Security, Inc., Limited Liability Company 9 Bartlett Street, Suite 334 Andover MA. 01803 Telephone Number: 844-425-8209 and the Contractor: XXX for the following Project: This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. XXX BluB0X and Contractor agree as follows. TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 - THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9. Agreement where the basis of payment is a Stipulated Sum Page 1

ARTICLE 2 - THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 - DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by BluB0X. 3.2 The Contract Time shall be measured from the date of commencement. 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than XXXX days from the date of commencement, or as follows (subject to adjustments of this Contract Time as provided in the Contract Documents): Portion of Work Substantial Completion Date Cable Installation Installation of Devices Commissioning (with BluB0X assistance) ARTICLE 4 - CONTRACT SUM 4.1 BluB0X shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be XXXX, subject to additions and deductions as provided in the Contract Documents. 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by BluBØX: No Alternates 4.3 Unit prices, if any: No Unit Prices 4.4 Allowances included in the Contract Sum, if any: No Allowances ARTICLE 5 - PAYMENTS 5.1 PROGRESS PAYMENTS 5.1.1 Based upon Applications for Payment submitted to BluB0X by the Contractor, and Certificates for Payment issued to BluB0X by the Owner, BluB0X shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month however, BluB0X may submit Applications bi-monthly if Owner so allows. 5.1.3 Provided that an Application for Payment is received by BluB0X not later than five (5) business days before BluB0X submits an application the Owner, and provided this Application is acceptable to BluB0X, Agreement where the basis of payment is a Stipulated Sum Page 2

then Contractor s Application shall be submitted to the Owner concurrently with BluBOX's own Application for Payment. 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as BluB0X and the Owner may require. This schedule, unless objected to by the Owner, shall be used as a basis for reviewing the Contractor's Applications for Payment. 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: 1. Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of ten percent (10%). Amounts not in dispute shall be included pending final determination of the cost to BluB0X of any changes in the Work. 2. Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by BluB0X, suitably stored off the site at a location agreed upon in writing), less retainage of ten percent (10%) 3. Subtract the aggregate of previous payments made by BluB0X; and 4. Subtract amounts, if any, for which Owner or BluB0X has withheld or nullified a Certificate for Payment. 5.1.7 The progress payment amount determined in accordance with Section 5.1.6 shall be further modified under the following circumstances: 1. Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to the full amount of the Contract Sum, less such amounts as BluB0X or the Owner shall determine for incomplete Work, retainage applicable to such work and unsettled claims; and 2. Add any additional amounts payable if final completion of the Work is thereafter materially delayed through no fault of the Contractor. 5.1.8 Reduction or limitation of retainage, if any, shall be as follows: The amount of retainage shall be reduced when the project nears substantial completion if the Owner agrees to such reduction. 5.1.9 Except with BluB0X's prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. 5.2 FINAL PAYMENT 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by BluB0X to the Contractor when: Agreement where the basis of payment is a Stipulated Sum Page 3

1. The Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2.2 of AlA Document A201-2007, and to satisfy other requirements, if any, which extend beyond final payment; and 2. A final Certificate for Payment has been issued by the Owner. 5.2.2 BluB0X's final payment to the Contractor shall be made no later than 30 days after the issuance of the Owner's final Certificate for Payment. ARTICLE 6 - DISPUTE RESOLUTION 6.1 INITIAL DECISION MAKER BluB0X will serve as Initial Decision Maker pursuant to Section 15.2 of AlA Document A201-2007, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. 6.2 BINDING DISPUTE RESOLUTION For any Claim subject to, but not resolved by, mediation pursuant the method of binding dispute resolution shall be as follows: 1 Arbitration 2 Litigation in a court of competent jurisdiction ARTICLE 7 - TERMINATION OR SUSPENSION 7.1 The Contract may be terminated by BluB0X or the Contractor as provided in Article 14 of AIA Document A20 1-2007. 7.2 The Work may be suspended by BluB0X as provided in Article 14 of AIA Document A201-2007. ARTICLE 8 - MISCELLANEOUS PROVISIONS 8.1 Where reference is made in this Agreement to a provision of AIA Document A201-2007 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. Rate: Zero percent (0%) because BluB0X cannot get an interest provision from the Owner. Agreement where the basis of payment is a Stipulated Sum Page 4

8.3 BluB0X's representative: Patrick decavaignac 205 W76 St- Suite 6J New York, NY 10023 Telephone Number: 844-425-8209 Ext 703 Mobile Number: 617-901-3871 Email Address: patdecav@blub0x.com 8.4 The Contractor's representative: XXXX 8.5 Neither BluB0X's nor the Contractor's representative shall be changed without ten days written notice to the other party. ARTICLE 9 - ENUMERATION OF CONTRACT DOCUMENTS 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below. 9.1.1 The Agreement is modeled on AIA Document A101-2007, Standard Form of Agreement Between Owner and Contractor. 9.1.2 The General Conditions are AIA Document A201-2007, General Conditions of the Contract for Construction. 9.1.3 The Supplementary and other Conditions of the Contract: All THE Documents in the project s DropBox Submittals Folder dated on or before the effective date of this contract. 9.1.4 The Specifications: The Installation Partner Statement of Work in its entirety The General Contractor SOW and the House Electrician SOW. 9.1.5 The Drawings: All the Drawings in the project s Dropbox Submittals Folder dated on or before the effective date of this contract. 9.1.6 The Addenda, if any: None 9.1.7 Additional documents, if any, forming part of the Contract Documents: AIA Document A201-2007 ARTICLE 10 - INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article II of AIA DocumentA201-2007. Agreement where the basis of payment is a Stipulated Sum Page 5

No bonding required Limit of liability or bond amount ($0.00) This Agreement entered into as of the day and year first written above. BluB0X (Signature) Patrick decavaignac, COO (Printed name and title) CONTRACTOR (Signature) (Printed name and title) Agreement where the basis of payment is a Stipulated Sum Page 6