AGGREGATE REVENUE REQUIREMENT AND TARIFF PETITION FOR FY *********

Similar documents
Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur

Madhya Pradesh Poorv Ksthera Vidyut Vitaran Company Limited

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY Petition Nos.

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LTD., BHOPAL

MADHYA PRADESH PASCHIM KSHETRA VIDYUT VITARAN COMPANY LTD., INDORE

TARIFF ORDER

Before the MP Electricity Regulatory Commission 5 TH Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market : BHOPAL.

ORDER ON TRUE-UP OF ARR FOR FINANCIAL YEAR Period From April 2007 to March 2008

ORDER ON TRUE-UP OF ARR FOR THE PERIOD April 06 to March 07

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY

MADHYA PRADESH PASCHIM KSHETRA VIDYUT VITARAN COMPANY LTD., INDORE

Before the MP Electricity Regulatory Commission 5 TH Floor, "Metro Plaza", E-5, Arera Colony, BHOPAL.

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY

Madhya Gujarat Vij Company Ltd.

ORDER ON TRUE-UP OF ARR FOR FINANCIAL YEAR Period From April 2012 to March 2013

TABLE OF CONTENTS. S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY II PRAYER 09 III AFFIDAVIT IV AUTHORIZATION 12

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009

Madhya Gujarat Vij Company Ltd.

Order on. Petition No. 21/2014

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

Petition No. 05 of 2016

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

FILED BY MEGHALAYA POWER DISTRIBUTION CORPORATION LIMITED. Lum Jingshai, Short Round Road, Shillong

2 EXECUTIVE SUMMARY. 1. This Licence may be called the Distribution Licence for The Tata Power Company Ltd. (Distribution Licence No.

Madhya Gujarat Vij Company Ltd.

SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal

BRIHANMUMBAI ELECTRIC SUPPLY and TRANSPORT UNDERTAKING (BEST)

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

2 EXECUTIVE SUMMARY. 2.1 Distribution Business in Mumbai Area

Multi Year Tariff Order For Himachal Pradesh State Electricity Board Limited (HPSEBL) For the period FY to FY

Bhopal: Dated 5 th May 2006

BIHAR STATE ELECTRICITY BOARD

Jharkhand State Electricity Regulatory Commission

Executive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY

Before the MP Electricity Regulatory Commission

Executive Summary. Annual Performance Review towards: Truing up of ARR of FY09, APR of FY10 and Determination of ARR and Tariff for FY11

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION PETITION NO.: 735/2011 & 789/2012 FILED BY. Madhyanchal Vidyut Vitran Nigam Limited IN THE MATTER OF

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1058/2015

BIHAR ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

SOUTH BIHAR POWER DISTRIBUTION COMPANY LIMITED

Distribution Tariff Determination and Rationalization

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

Paschim Gujarat Vij Company Ltd.

Jharkhand State Electricity Regulatory Commission

Analysis of ARR & Tariff Proposal of NESCO for FY

Case No. 3 of Shri V. P. Raja, Chairman Shri Vijay L. Sonavane, Member. Reliance Infrastructure Ltd.

FINANCIAL MANAGEMENT ASSESSMENT AND PROJECTIONS

RInfra-G Multi Year Tariff Petition for FY to FY Executive Summary 1

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION PETITION NO. : 624,625,626,627,628 OF 2009 FILED BY

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR CASE NO: TP 59 / 13 14

COMMERCIAL CIRCULAR No. 80

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited

Torrent Power Limited Distribution Dahej

MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION

Vidarbha Industries Power Limited - Transmission

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Jharkhand State Electricity Regulatory Commission

HARYANA ELECTRICITY REGULATORY COMMISSION

BEFORE THE HONOURABLE KERALA STATE ELECTRICITY REGULATORY COMMISSION

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AT GANDHINAGAR PETITION NO OF 2016

Tariff order for Tata Steel for FY

Himachal Pradesh Electricity Regulatory Commission

TABLE OF CONTENTS EXECUTIVE SUMMARY... 2

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal

BIHAR ELECTRICITY REGULATORY COMMISSION. Case No. 54 of for BIHAR STATE POWER TRANSMISSION COMPANY LIMITED (BSPTCL)

Madhya Gujarat Vij Company Limited (MGVCL)

JBVNL TARIFF FY SALIENT FEATURES

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

(Multi Year Distribution Tariff)

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR AND CASE NO: TP 57 / 13-14

M.P. Power Transmission Company Ltd., Jabalpur Blok No. 2, Shakti Bhawan, Rampur, Jabalpur Petitioner. V/s

Kandla Port Trust (KPT)

MYT PETITION FOR JUBILANT INFRASTRUCTURE LTD

M.P. Electricity Regulatory Commission Bhopal

M.P. Electricity Regulatory Commission Bhopal

Petition for True-Up of FY And Determination of Tariff for FY

Section 2. ARR and Tariff proposal submitted by the JSEB

Jharkhand State Electricity Regulatory Commission

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission

Implementation of Solar Based Projects in MP Dated 20 July, 2012

1Pl r ~1~r11rtr. ~~ ~.nz. I. ~ fcr'lljll ' '-'1\:\:1 ' ~' ~ 18 ~ 2011

Case No. 85 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Jharkhand State Electricity Regulatory Commission

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL)

GUJARAT ELECTRICITY REGULATORY COMMISSION MERGEFORMAT. Tariff Order. Truing up for FY , Approval of Final ARR for FY ,

OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES

Transcription:

AGGREGATE REVENUE REQUIREMENT AND TARIFF PETITION FOR FY 2016-17 ********* Submitted by: - Madhya Pradesh Power Management Company Limited, Shakti Bhawan, Vidyut Nagar, JABALPUR Madhya Pradesh Poorva Kshetra Vidyut Vitran Company Limited, Block No. 7, Shakti Bhawan, Vidyut Nagar, JABALPUR Madhya Pradesh Paschim Kshetra Vidyut Vitran Company Limited, GPH Compound, Polo Ground, INDORE Madhya Pradesh Madhya Kshetra Vidyut Vitran Company Limited, Bijlee Nagar Colony, Nishtha Parisar, Govindpura BHOPAL

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION, BHOPAL Petition No. of 2015 (1) Madhya Pradesh Power Management Company Limited (MPPMCL) Shakti Bhawan, Vidyut Nagar, Jabalpur (MP) --------- Petitioner (2) Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited (MPPoKVVCL) Shakti Bhawan, Vidyut Nagar, Jabalpur (MP) --------- Petitioner (3) Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited (MPPaKVVCL) GPH, Polo Ground, Indore (MP) --------- Petitioner (4) Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited (MPMKVVCL) Nishtha Parisar, Bijlee Nagar, Govindpura, Bhopal (MP) --------- Petitioner IN THE MATTER OF: Filing of ARR application for the distribution and retail supply business for the MYT period FY 2016-17 to FY 2018-19 and tariff proposal petition for FY 2016-17 under tariff principles laid down in "The Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for supply and wheeling of Electricity and Methods and Principles of Fixation of Charges) Regulations, 2015 (RG -35 (II) of 2015)" No. 2256- MPERC,2015 Dated 17-12-2015 communicated to MPPMCL vide Commission s letter no. 2265 dated Dec. 18, 2015 by MPPMCL and MPPoKVVCL, MPPaKVVCL & MPMKVVCL as the Distribution Licensees. The Petitioners above respectfully submit as under:- 1. Madhya Pradesh Power Management Company Ltd., (hereinafter referred to as the 'Petitioner', MPPMCL, 'the Company' or 'the Licensee'), is a Company incorporated under the Companies Act, 1956 (now Companies Act 2013) and having its registered office at Block No.11, Shakti Bhawan, Vidyut Nagar, Jabalpur. 2. Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Ltd., (hereinafter referred to as the 'Petitioner', MPPKVVCL, 'the Company' or 'the Licensee' or East Discom ), is a Company incorporated under the Companies Act, 1956 (now Companies Act 2013) and having its registered office at Block No.7, Shakti Bhawan, Vidyut Nagar, Jabalpur. The Petitioner is a deemed licensee under the Fifth Proviso to Section 14 of the Electricity Act, 2003. The area of

supply of the Petitioner comprises Jabalpur, Rewa, Sagar and Shahdol Commissionary within the State of Madhya Pradesh ('MP'). 3. Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Ltd., (hereinafter referred to as the 'Petitioner', MPPaKVVCL, 'the Company' or 'the Licensee' or West Discom ), is a Company incorporated under the Companies Act, 1956 (now Companies Act 2013) and having its registered office at GPH, Polo Ground, Indore. The Petitioner is a deemed licensee under the Fifth Proviso to Section 14 of the Electricity Act, 2003. The area of supply of the Petitioner comprises Indore and Ujjain Commissionary within the State of Madhya Pradesh ('MP'). 4. Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Ltd. (MPMKVVCL), (hereinafter referred to as the 'Petitioner', MPMKVVCL, 'the Company' or 'the Licensee' or Central Discom ), is a Company incorporated under the Companies Act, 1956 (now Companies Act 2013) and having its registered office at Nishtha Parisar, Bijlee Nagar Colony, Govindpura, Bhopal. The Petitioner is a deemed licensee under the Fifth Proviso to Section 14 of the Electricity Act, 2003. The area of supply of the Petitioner comprises Bhopal, Gwalior, Hoshangabad and Chambal Commissionary within the State of Madhya Pradesh ('MP'). 5. The Government of Madhya Pradesh ('GoMP' or 'State Government'), vide an Order No. 3679- FRS-18-13-2002 dated 31st May, 2005, published in the gazette of Madhya Pradesh dated 31st May 2005, have restructured the functions and undertakings of Generation, Transmission, Distribution and Retail Supply of electricity earlier carried out by the Madhya Pradesh State Electricity Board ('MPSEB' or the 'Board') and transferred the same to five Companies to function independently. The five Companies are as under: - a) M.P. Power Generating Company Ltd., Jabalpur (MPPGCL) b) M.P. Power Transmission Company Ltd., Jabalpur (MPPTCL) c) M.P. Poorv Kshetra Vidyut Vitaran Company Ltd., Jabalpur (MPPoKVVCL) d) M.P. Paschim Kshetra Vidyut Vitaran Company Ltd., Indore (MPPaKVVCL) e) M.P. Madhya Kshetra Vidyut Vitaran Company Ltd. Bhopal (MPMKVVCL) 6. With effect from 1st June 2005, the Operation and Management Agreement that existed between Madhya Pradesh State Electricity Board and the Five Companies came to end with the issue of the said Order dated 31-05-2005. The three Discoms viz. MPPoKVVCL, Jabalpur, MPPaKVVCL, Indore and MPMKVVCL, Bhopal started functioning independently as Distribution Licensees in their respective area of license and from the said date, they are no longer operating as an agent of or on behalf of the Board, subject to Cash Flow Mechanism (CFM) provided in the said Order. 7. On June 3, 2006 GoMP, in exercise of its powers under Section 23 (Sub-section (1), (2) and (3)) and Section 56 (Sub-section (2)) of Madhya Pradesh Vidyut Sudhar Adhiniyam, 2000 read with Section 131 (Sub-sections (1), (2), (5), (6) and (7) of Electricity Act, 2003, effected the transfer of and vesting of the functions, properties, interests, rights and obligations of MPSEB relating to the Bulk Purchase and Bulk Supply of Electricity in the State and simultaneously re-transferred and revested the same to MP Power Trading Company Ltd. ('Tradeco' or 'MP Tradeco'). Since then, MP Tradeco discharged the responsibilities of procurement of power in bulk and supplying to the three Electricity Distribution Companies (DISCOMs), including the Petitioner herein. The transfer was 3

affected through "M.P. Electricity Reforms Transfer Scheme Rules 2006 (Transfer Scheme Rules) vide Notification No.3474 /FRS/17/XIII/2002 dtd 3rd June 2006 (Transfer Scheme Rules). 8. In accordance with GoMP decision, the name of MP Power Trading Company Ltd has been changed to MP Power Management Company Ltd. MPPMCL is the holding Company of the three electricity distribution companies (Discoms) of MP State, viz., M. P. Poorv Kshetra Vidyut Vitaran Company Ltd., M. P. Paschim Kshetra Vidyut Vitaran Company Ltd. and M. P. Madhya Kshetra Vidyut Vitaran Company Ltd. The Petitioner (MPPMCL) has been vested with several of functions and powers that were earlier vested with the erstwhile Madhya Pradesh State Electricity Board. The Registrar of Companies MP has issued the Certificate of Incorporation Consequent upon Change of Name on 10.04.2012. 9. GoMP has entrusted the MPPMCL with the responsibility inter alia of representing the Discoms before the Commission with regard to filing the tariff petition and facilitating all proceedings thereon. The Management and Corporate functions agreement signed by the MPPMCL with the three Discoms of MP also provide for the same. 10. MPPMCL has signed Management and Corporate Functions Agreement on 5th June 2012, with the three Discoms of the State, wherein it has been agreed that the Petitioner shall perform inter alia the following functions of common nature for the Discoms: In consultation with Discoms, undertake long-term/ medium-term/short-term planning and assessment of the power purchase requirements for the three Discoms and explore opportunities for power procurement as per the regulations of MPERC; Allocation of power among the Discoms from the forthcoming projects as per retail tariff order and as per the GoMP notification and further instructions in this regard; Economic, reliable and cost effective power procurement of Short-term, Medium-term and Long-term and sale of surplus power, if any, for the purpose of Banking / maximization of revenue; Exploring opportunities for procurement of power on long-term and medium-term basis, procure power and finalizing Power Purchase Agreements (PPAs); The expenses of MPPMCL have been considered to be included as part of power purchase cost of the Discoms. 11. In the backdrop of the above facts and circumstances, the present application is being made by the MPPMCL along with the three Distribution Companies of MP State under Section 61 and Section 62 (1) (d) of the Electricity Act 2003 for determination of the tariff for distribution and Retail Supply Business for the period FY 2016-17 following the regulations laid down by the Hon ble Commission. 12. While filing the present ARR under the prevailing Regulation, MPPMCL along with the Discoms has endeavored to comply with the various legal and regulatory directions and stipulations 4

applicable, including the directions given by the Hon'ble Commission in the Business Rules of the Commission, the Guidelines, previous ARR and Tariff Orders and the Madhya Pradesh Electricity Regulatory Commission (Terms & Conditions for determination of Tariff) Regulation 2015 (hereinafter referred to as the Regulations ). 13. It is submitted that as soon as the retail tariff order becomes applicable, the voltage level and consumer category wise cross subsidy surcharge, additional surcharge, wheeling charges and transmission charges in respect of open access customers should also be notified and made effective from the tariff application date. It is therefore, prayed to kindly issue the approach paper for determination of the voltage level and consumer category wise cross subsidy surcharge, additional surcharge, wheeling charges and transmission charges also along with the retail tariff order for open access customers. 14. It is also submitted that the Petitioners have not separated the consumers, connected load, energy units sold and projected revenue in the Franchisee areas of Sagar, and Ujjain from their sales and revenue model as the consumers in the franchisee area remain to be the consumers of the Distribution Licensee and not the Franchisee. The franchisee is only a collection agent working on behalf of the Distribution Licensee and recovers charges from consumers at the tariff determined by the Hon ble MPERC. The revenue realized by the Distribution Licensee is completely in accordance with the tariff determined by the Hon ble MPERC. The projections of these parameters have been done on the basis of most feasible growth rate out of Compounded Annual Growth Rate (CAGR) for the last 3 and 2 years, YoY growth and corresponding period growth up to September 2015. 15. This petition is filed on the basis of normative parameters as provided by Hon ble MPERC in Regulation no: 2256-MPERC.2015 dated 17/12/2015 regarding MPERC (Terms and Conditions for Determination of Tariff for Supply and Wheeling of Electricity and Methods and Principles for Fixation of Charges) Regulations 2015. The Regulation does not provide segregation of normative losses for the Distribution Licensees into voltage wise normative losses in respect of technical and commercial losses. Therefore, the Petitioners face difficulty in segregation of normative losses in voltage level wise technical and commercial losses. The Hon ble MPERC in the previous year s order has referred to an Appellate Tribunal for Electricity (APTEL) judgment to determine the voltage level wise Cost of Supply in the state of MP. However, this judgment is to determine the voltage level wise cross subsidy surcharge and not consumer tariff. In the present petition, the Petitioners have proposed consumer category wise tariff on the basis of Average Cost of Supply, which is in line with the National Tariff Policy 2006. The Hon ble Commission is requested to determine the voltage level and consumer category wise cross subsidy surcharge on the basis of the available data with the Distribution Licensees in accordance with the methodology suggested by the APTEL and also approved by Hon ble Commission in its Retail Supply Tariff Order for FY 2016-17. 16. Based on the information available, the Petitioners have made sincere efforts to comply with the Regulations of the Hon'ble Commission and discharge its obligations to the best of its ability and resources at its command. However, should any further information of material significance 5

becomes available during the process of determination, the petitioners may be permitted to reserve the right to file such additional information and consequently amend/ revise the petition. 17. In consequences of the APTEL s judgement, the Hon ble Commission has approved the balance amount of true- up costs for all the three Discoms for FY 2005-06. The approved true up amount has also been considered while filing the total ARR for FY 2016-17. Further it is submitted that the balance amount of true-up cost for FY 2006-07, 2007-08, 2008-09, 2009-10, 2010-11 and 2011-12 has not been included as the Hon ble Commission has still not issued any order for balance true-up cost consequent to the judgement of Supreme Court/APTEL regarding true-up for aforementioned years. Further, the true-up cost for the year FY 2012-13 is still under consideration with the Hon ble Commission. Therefore, this cost also has not been included in this petition. It is prayed that after issuing the relevant orders, the Hon ble Commission may include these costs before issuing the final tariff order. 18. The salient features of the ARR for FY 2016-17 are as under:- S.No. ARR Items East Central West Total- State 1 Total ARR (excluding True Up) Rs Crs 9,551 9,656 10,537 29,744 2 Revenue at current tariffs Rs Crs 8,071 8,121 9,114 25,306 3 Gap (excluding true-up) Rs Crs 1,480 1,534 1,423 4,438 4 Average Cost of Supply (excluding true-up) Rs/kWh 6.07 6.42 5.92 6.13 Impact of True-Up Amounts of Past Years A Impact of True Up for Discoms for FY 2005-06 Rs Crs 104 125 138 366 B Impact of True Up for MPGenco for FY 2012-13 Rs Crs -34-32 -38-104 C Impact of True-Up for MPTransco for FY 2013-14 Rs Crs 91 87 103 281 5 Total ARR (Including True Up) Rs Crs 9,713 9,835 10,740 30,288 6 Total Revenue Gap (including True-up) Rs Crs 1,642 1,714 1,626 4,982 7 Average Cost of Supply (including true-up) Rs/kWh 6.17 6.54 6.04 6.24 19. However, despite the various measures taken to improve commercial and technical efficiencies, Discoms are unable to recover the costs incurred, which are compelling the Discoms to propose for an increase in the existing tariff. 20. The petitioners would like to reiterate their proposal to alter the mechanism for deriving Fuel Cost Adjustment (FCA) for recovery/adjustment of uncontrollable costs due to increase or decrease in the cost of fuel in case of coal, oil and gas based generating stations. The petitioners would like to resubmit that the existing mechanism to calculate FCA does not have any provision to recover the incremental power purchase. The petitioners also urge that the average power purchase cost should 6

be considered in the formula instead of only variable costs, thus passing on the complete fixed costs on to the consumers as a legitimate cost. 21. Shri F.K. Meshram, Chief General Manager (Revenue Management) of MPPMCL; Shri P.K. Singh, Executive Director (Commercial) of MPPoKVVCL; Shri Pavan Kumar Jain, ASE (Commercial) of MPPaKVVCL and Shri A.R. Verma, General Manager & Superintending Engineer (Commercial) of MPMKVVCL have been authorized to execute and file all the documents on behalf of the respective petitioners in this regard. Accordingly, the current filing is signed and verified by, and backed by the affidavit of respective authorized signatories. 7

PRAYER In view of the aforesaid facts and circumstances, the Applicants request that the Hon'ble Commission may be pleased to: (a) (b) (c) (d) (e) (f) (g) Take the accompanying ARR/Tariff petition of the above petitioners on record and treat it as complete; Consider and approve petitioners ARR (including true-up amounts of all companies previous years) amounting to Rs. 9,713 Cr for East Discom, Rs. 9,835 Cr for Central Discom and Rs. 10,740 Cr for West Discom for the year FY 2016-17; Considering the aforesaid facts and circumstances the Hon ble Commission may be pleased to allow expenses of MPPMCL as stated to be allowed and include them as a part of power purchase cost of three Discoms, to meet the ends of justice; Consider and approve Petitioners tariff proposal for FY 2016-17 to recover the costs for the ensuing year; Consider and determine the wheeling charges, voltage level and consumer category wise cross subsidy surcharge, additional surcharge and transmission charges for open access customers on the basis of ARR petition for FY 2016-17 and make applicable w.e.f the application date of the revised tariff; Condone any inadvertent omissions/ errors/ shortcomings and permit the petitioners to add/ change/ modify/ alter portion(s) of this filing and make further submissions as may be required at a later stage; and Pass such an order as the Hon'ble Commission deems fit and proper as per the facts and circumstances of the case. Date: - 21 st December 2015 Shri F.K. Meshram, Chief General Manager (Revenue Management) MPPMCL, Jabalpur Shri P.K. Singh, Executive Director (Commercial) MP Poorv Kshetra Vidyut Vitaran Co. Ltd., Jabalpur Shri Pavan Kumar Jain, ASE (Commercial) MP Paschim Kshetra Vidyut Vitaran Co. Ltd., Indore. Shri A.R. Verma, GM & SE (Commercial) MP Madhya Kshetra Vidyut Vitaran Co. Ltd., Bhopal. 8

9

Table of Contents PRAYER 8 1. Estimation of sales 16 1.1 Method adopted for Estimation of Sales 16 1.2 Category-wise sales projection 18 1.2.1. LV -1: Domestic 18 1.2.2. LV -2: Non-Domestic 22 1.2.3. LV -3.1: Public Water Works 24 1.2.4. LV -3.2: Street Light 27 1.2.5. LV -4.1: Non- Seasonal Industrial 30 1.2.6. LV -4.2: Seasonal Industrial 33 1.2.7. LV -5.1: Agricultural 35 1.2.8. LV -5.2: Other allied agricultural Use 38 1.2.9. HV -1: Railway Traction 42 1.2.10. HV -2: Coal Mines 44 1.2.11. HV-3: Industrial and Non-Industrial 45 1.2.12. HV -4: Seasonal 49 1.2.13. HV -5 Water Works, Lift Irrigation & Other allied Agricultural use 51 1.2.14. HV -6: Bulk Residential users 55 2. Energy Requirement at Discom Boundary and Ex-Bus Energy Requirement 57 2.1. Conversion of annual sales to monthly sales 57 2.2. MPPTCL Losses 57 2.3. Distribution Losses 58 2.3.1. Conversion of annual Distribution loss levels to monthly losses 58 3. Assessment of Availability 65 3.1. Details of Generation Capacities allocated to Discoms 65 3.2.1 Availability from MP Discoms allocated stations 68 3.2. Details of Generation Capacities allocated to MPPMCL Existing and Capacity Addition for the MYT period FY 17-FY 19 70 3.2.1. Availability from MPPMCL allocated stations 72 3.3. Overall availability 73 3.4. Backdown of Power 73 3.5. Inter-State Transmission Losses 74 3.6. Management of Surplus Energy 75 10

3.7. Energy Balance 76 3.7.1. Energy Requirement vis-à-vis Availability and Management of Shortfall 76 4. Power Purchase Cost 77 4.1. Details of Costs for Stations allocated to MP Discoms 77 4.2. Merit Order Dispatch (MoD) 80 4.3. RPO Cost 87 4.4. Estimation of Other Power Purchase Costs 88 4.4.1. Inter-State Transmission Charges 88 4.4.2. Intra-State Transmission Charges MPPTCL fixed costs excluding Terminal Benefits (Cash Outflow) 88 4.4.3. Intra-State Transmission Charges Terminal Benefits (Cash Outflow) to be included in MPPTCL costs 89 4.4.4. MPPMCL Costs 90 4.4.5. Total Power Purchase Costs 91 5. O&M Expenses - Discoms 93 5.1. Employee Costs 93 5.2. Administrative & General Expenses 94 5.3. Repair and Maintenance Expenses 94 5.4. Gist of O&M Expenses 94 6. Investment Plan Discoms 95 6.1.1. Capital Investment Plan 95 6.1.2. Scheme Wise Capitalization 96 6.1.3. CWIP 97 6.1.4. Fixed Assets Addition 98 7. Other Costs/ Income Discoms 99 7.1. Depreciation 99 7.2. Interest and Finance Charges 99 7.2.1. Interest on Project Loans 99 7.2.2. Interest on Working Capital 101 7.2.3. Interest on Consumer Security Deposit 103 7.3. Other Income 104 7.4. Return on Equity 105 7.5. Bad and Doubtful Debts 106 8. Income/Expenses of MPPMCL 107 11

8.1 Income 107 8.2 Expenses 108 9. Annual Revenue Requirement 113 9.1. Annual Revenue Requirement of MPPMCL 113 9.2. Annual Revenue Requirement of Discoms 113 10. Terminal Benefits (Pension, Gratuity and Leave Encashment) Provision 116 11. Power Purchase Cost Adjustment (PPCA) 119 12. Tariff Proposal for FY 2016-17 123 12.1. Salient Features of the Tariff Proposal 125 12.1.1. Merging of tariff slabs of 0 to 50 units and 51 to 100 units as 0 to 100 units in LV 1.2 Domestic Category 125 12.1.2. Removal of optional demand based tariff (only for contract demand above 10 kw and upto 20 kw) in LV 2.1 and LV 2.2 Non Domestic category 125 12.1.3. Merging of LV 3.1 Public Water Works and LV 3.2 Street Light categories 125 12.1.4. Rebate to all LT consumers for online payment of bills 125 12.1.5. Permission to use 10% of connected load/ contracted demand for temporary usage by LT consumers 126 12.1.6. Limiting the sanctioned load/ connected load under LT connection to 75 kw/ 100 HP 126 12.1.7. Merging of HV 3.2 Non Industrial use and HV 3.3 Shopping Mall 126 12.1.8. Merging of HV 5.1 Public Water Works and HV 5.2 Other Allied Agricultural use126 12.1.9. Addition of apartments/ colonies/ townships in HV 6.2 Bulk Residential Use 127 12.1.10. Rebate on energy charges for incremental load factor for HT consumers 127 12.1.11. Rebate for online bill payment by HT consumers 127 12.1.12. ToD surcharge reduced to 0% for HT consumers 127 12.1.13. Additional Charges for energy for Excess Demand by HT consumers 127 12.1.14. Rebate of 5 paise per unit for all domestic and non-domestic consumers having prepaid meters 128 13. Voltage-Wise Cost of Supply 129 13.1. Commission Directives 129 13.2. Voltage-wise Losses 130 13.2.1. Methodology 130 13.3. Calculation 131 13.4. Determination of Cross-Subsidy Surcharge 134 14. Compliance on Tariff Order FY 2015-16 135 12

14.1.1. Distribution losses 135 14.1.2. Meterization of unmetered connections 139 14.1.3. Capex plan for reduction in technical losses 141 14.1.4. Segregation of rural feeders into agricultural and others 143 14.1.5. Issue of tariff card with first bill based on new tariff 145 14.1.6. Filing of ARR and tariff proposals in Hindi language 145 14.1.7. Accounting of rebates/incentives/surcharge 146 14.1.8. Maintaining uniform accounts 147 14.1.9. Compliance of Regulations 148 14.1.10. Mandatory demand based tariff for all Non-domestic LV consumers having load in excess of 25 HP 148 14.1.11. Assessment of consumption for billing to consumers 149 14.1.12. Technical studies of the Distribution network to ascertain voltage-wise cost of supply 149 15. TARIFF SCHEDULES 153 Incentive/ Rebate / penalties 192 Other Terms and Conditions for permanent connections: 200 13

List of tables Table 1: Sales for FY 2015-16 (Revised Estimates) and the MYT Period FY 2017 to FY 2019... 17 Table 2: LV-1 Domestic Unit Projection... 19 Table 3: LV-2 Non-Domestic Unit Projection... 22 Table 4: LV-3.1 PWW Unit Projection... 24 Table 5: LV-3.2 Street Light Unit Projection... 27 Table 6: LV-4.1 Non-Seasonal Industrial Unit Projection... 30 Table 7: LV-4.2 Seasonal Industrial Unit Projection... 33 Table 8: LV-5.1 Agriculture Unit Projection... 35 Table 9: LV-5.2 Other allied Agriculture Unit Projection... 38 Table 10: HV-1 Railway Traction Projection... 42 Table 11: HV-2 Coal Mines Projection... 44 Table 12: HV-3 Industrial and Non-Industrial Projection... 45 Table 13: HV-4 Seasonal Projections... 49 Table 14: HV-5 Water Works, Lift Irrigation & Other allied Agricultural use Projections... 51 Table 15: HV-6 Bulk Residential user Projections... 55 Table 16: Month-Wise Sales Profiles of Discoms... 57 Table 17: MPPTCL Losses: Past Data from MP-SLDC... 57 Table 18: Loss level targets (%) for Discoms (as per MPERC regulations)... 58 Table 19: Monthly energy requirement at State Boundary (MU) for FY 17- FY 19... 59 Table 20: Ex-bus energy purchases to be done during MYT FY 17-19... 64 Table 21: Stations with MP Share which are allocated to MP Discoms... 65 Table 22: Allocation percentage for FY 17... 67 Table 23: Allocation percentage for FY 18... 67 Table 24: Allocation percentage for FY 19... 68 Table 25: Past and Projected ex-bus availability of Stations with MP Share which are allocated to MP Discoms (MU)... 69 Table 26: Stations allocated to MPPMCL Existing and Capacity Addition till FY 19... 70 Table 27: Stations allocated to MPPMCL Projected-Ex Bus Availability till FY 19 (MU)... 72 Table 28: Overall availability till FY 19 (MU)... 73 Table 29: Management of Surplus Energy with Discoms for the MYT period FY 17-FY 19... 75 Table 30: Ex-Bus Purchases by Discoms from Various Sources... 76 Table 31: Fixed and Variable Costs of Discom Allocated Stations for MYT FY 2016-17 to FY 2018-19... 77 Table 32: Fixed and Variable Costs of MPPMCL allocated stations... 78 Table 33: MoD of station for FY 17... 80 Table 34: Total Fixed Costs and Variable Costs of Discom Allocated Stations... 82 Table 35: Total Fixed and Variable Costs of fixed and variable costs of MPPMCL allocated stations 85 Table 36: RPO Obligation for MYT FY 17-FY 19... 87 Table 37: Inter-State Transmission Charges... 88 Table 38: Intra-state Costs excluding Terminal Benefits... 89 Table 39: Total Intra-State Transmission Costs and Allocation to Discoms (Rs Cr)... 90 Table 40: MPPMCL Costs: Details and Discoms Allocation (Rs Cr)... 90 Table 41: Total Power Purchase Costs - FY'17 to FY'19... 91 14

Table 42: Employee Cost... 93 Table 43: Administrative and General Expenses-As per Regulation (Rs. Cr.)... 94 Table 44: Repair and Maintenance Expenses-As per Regulation (Rs. Cr.)... 94 Table 45: Gist of O&M expenses-as per Regulation (Rs. Crores)... 94 Table 46: Capital expenditure Plan (Rs. Crores)... 95 Table 47: Scheme Wise Capitalization (Rs. Crores)... 96 Table 48: CWIP (Rs. Cr.)... 97 Table 49: Fixed Assets Addition (Rs. Cr.)... 98 Table 50: Depreciation as per regulation (Rs. Cr.)... 99 Table 51: Interest on Project Loans (Rs. Cr.)... 99 Table 52: Interest on Working Capital (Rs. Cr.)... 101 Table 53: Interest on consumer security deposit as per regulation (Rs. Crores)... 103 Table 54: Other Income (Rs. Cr.)... 104 Table 55: Return on equity as per regulation (Rs. Crores)... 105 Table 56: Bad and Doubtful Debts As per regulation (Rs. Crores)... 106 Table 57: Other Income (Rs. Cr.)... 107 Table 58: Other Income (Rs. Cr.)... 109 Table 59: Other Income (Rs. Cr.)... 110 Table 60: Employee particulars... 111 Table 61: Employee expenses (Rs. Cr.)... 111 Table 62: Summary of ARR for MPPMCL (Rs. Cr.)... 113 Table 63: Summary of ARR of Discoms as per the Regulation (Rs. Crores)... 114 Table 64: Future Contribution rate of liability on account of Actuary... 116 Table 65: Calculation of Terminal Benefits Provisions (Rs. Crores)... 116 Table 66: Terminal Benefits Provisions Liability for Discoms (Rs. Cr.)... 118 Table 67: Summary of proposed tariff for FY 2016-17... 123 Table 68: Category-wise proposed revenue for FY 2016-17... 124 Table 69: Cost of Supply Calculation for East Discom for FY17... 131 Table 70: Cost of Supply Calculation for Central Discom for FY17... 132 Table 71: Cost of Supply Calculation for West Discom for FY17... 132 Table 72: Cost of Supply Calculation for MP State for FY17... 133 15

1. Estimation of sales 1.1 Method adopted for Estimation of Sales For the purpose of projection of sales, the distribution licensees have considered category wise and slab wise actual data of the sale of electricity, number of consumers, connected / contracted load, etc. of the preceding four years i.e. FY 2011-12, FY 2012-13, FY 2013-14 and FY 2014-15 and available data of the FY 2015-16 i.e. up to the month of September 2015. The licensees, in the previous year s filing for FY 2015-16, had projected the Sales based on the actual data of FY 2013-14. Since the actual data of FY 2014-15 is now available and it has been observed that the actual sales during FY 2014-15 have deviated significantly from the sales forecasted by the Licensee and those allowed by the Hon ble Commission during the previous filings, the licensees feel that it will be appropriate to revise the sales forecast for FY 2015-16 and thereafter project the sales for FY 2016-17. The sales for FY 2016-17 have been projected on the basis of the actual data of Number of Consumers, Connected Load and Consumption during the last 4 years and on the basis of revised estimate for FY 2015-16. The approach being followed is to analyze 3 year and 2 year Compound Annual Growth Rates (CAGRs) and year on year growth rate of each category and its sub-categories in respect of urban & rural consumers separately. After analysis of the data, appropriate / reasonable growth rates have been assumed for future consumer forecasts from the past CAGRs of the Category/Sub-category by the three Discoms. The past CAGR on sales per consumer / sales per kw and connected load has been applied while forecasting the connected load and sales in each category/sub-category. The use of specific consumption i.e. consumption per consumer and / or consumption per unit load is the basic forecasting variable and is widely used in load and energy sales forecasting. The basic intent in using this model is that, the specific consumption per consumer and / or consumption per unit load captures the trends and variations in the usage of electricity over a growth cycle more precisely. This method has been recommended by the C.E.A. also. The forecast also considers the impact of schemes / plans of licensee such as the RGGVY (Rajiv Gandhi Grameen Vidyutikaran Yojana and separation of feeders of Agricultural and other categories of consumers and increase in supply hours in rural areas. The projections for each tariff category and the relevant assumptions of the three Discoms have been discussed in the following sections. The overall sales forecast is as follows: 16

Table 1: Sales for FY 2015-16 (Revised Estimates) and the MYT Period FY 2017 to FY 2019 East Discom Central Discom West Discom MP State TC Category FY 16 FY 17 FY 18 FY 19 FY 16 FY 17 FY 18 FY 19 FY 16 FY 17 FY 18 FY 19 FY 16 FY 17 FY 18 FY 19 LV 1 Domestic 3,695 4,294 5,106 6,157 3,512 4,039 4,557 5,275 3,559 3,858 4,241 4,634 10,767 12,192 13,904 16,067 LV 2 Non-Domestic 756 848 952 1,070 784 901 1,040 1,202 845 911 983 1,060 2,386 2,660 2,975 3,332 LV 3.1 WW & Street Light 530 596 672 759 343 407 490 601 364 401 442 487 1,238 1,404 1,604 1,847 LV 4 LT Industrial 327 363 406 459 271 301 334 372 550 584 620 659 1,147 1,247 1,360 1,490 LV 5.1 Agriculture Irrigation Pumps 4,665 4,877 5,106 5,347 4,377 4,940 5,632 6,499 7,119 8,079 8,858 9,727 16,161 17,896 19,597 21,572 LV 5.3 Agriculture related Use 12 15 19 24 29 35 42 51 2 2 2 2 43 52 63 77 Total (LT) 9,985 10,993 12,262 13,816 9,317 10,623 12,096 13,999 12,439 13,835 15,146 16,570 31,741 35,451 39,503 44,385 HV 1 Railway Traction 614 672 736 807 1,039 1,195 1,375 1,581 434 434 434 434 2,087 2,301 2,545 2,821 HV 2 Coal Mines 485 504 525 547 35 35 35 35 0 0 0 0 520 539 560 582 HV 3.1 Industrial 2,529 2,826 3,163 3,543 2,140 2,387 2,675 3,010 2,474 2,474 2,474 2,474 6,961 7,494 8,107 8,810 HV 3.2 Non-Industrial 225 242 260 279 405 439 476 517 375 375 375 375 986 1,036 1,089 1,147 HV 3.3 Shopping Mall 7 7 8 9 0 0 0 0 42 42 42 42 67 69 71 74 HV 3.4 Power Intensive industries 67 74 81 90 0 0 0 0 204 204 204 204 454 471 490 512 HV 4 Seasonal 10 11 12 13 2 2 2 3 5 5 6 6 17 18 20 21 HV 5.1 Public Water Works and 84 92 100 109 155 163 171 180 387 387 387 387 626 642 659 677 Irrigation HV 5.2 Other Agricultural 14 16 18 21 7 7 8 9 6 6 6 6 27 30 33 36 HV 6 Bulk Residential Users 291 292 293 295 163 177 192 209 31 31 31 31 485 500 516 534 HV 7 RECS/Start-up Power 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 Total (HT) 4,326 4,736 5,196 5,713 3,947 4,406 4,935 5,543 3,959 3,959 3,959 3,959 12,231 13,101 14,090 15,215 TOTAL LT+HT 14,311 15,730 17,458 19,529 13,264 15,029 17,030 19,542 16,397 17,793 19,105 20,529 43,972 48,552 53,593 59,600 * Digits rounded off to the nearest integer 17

1.2 Category-wise sales projection 1.2.1. LV -1: Domestic 1.2.1.1. Assumptions for Projecting Unmetered Domestic Sales In the tariff order for FY 2014-15, Hon ble Commission had revised the benchmark of billing to unmetered domestic connections in rural areas to 75 units per month per connection and had continued the same for FY 2015-16 and ensuing years also. Therefore, the petitioners have considered the same for projecting consumption of unmetered domestic connections. The projections of consumption of un-metered domestic connections in this petition have been considered as NIL for urban areas (since all domestic consumers in urban areas have been metered). 1.2.1.2. RGGVY In addition to the growth rate assumed for domestic category, the impact of implementation of RGGVY has also been taken into account for future consumer/load/consumption projections for Central Discom. The implementation roadmap of RGGVY forms the basis of future projections by the Central Discom. While no consumers and consumption has been estimated for East and West Discoms separately for RGGVY. However, the same has not been projected separately, but has been included in the overall projection for Domestic category. For Central Discom 1.2 lakh consumers and corresponding sales of 12.51 MUs for FY 2016-17 have been projected. After factoring the growth in consumers the following projections has been arrived at for LV-1 category: 18

Table 2: LV-1 Domestic Unit Projection Area Sub Category East Discom Central Discom West Discom MP State FY 16 FY 17 FY 18 FY 19 FY 16 FY 17 FY 18 FY 19 FY 16 FY 17 FY 18 FY 19 FY 16 FY 17 FY 18 FY 19 Urban Metered 1,900 2,057 2,225 2,407 2,508 2,522 2,729 2,953 2,086 2,175 2,268 2,364 6,317 6,754 7,222 7,724 Urban Un-metered 1 0 0 0 2 0 0 0 0 0 0 0 3 0 0 0 Urban Temporary 18 18 18 18 16 16 17 17 20 21 22 24 53 55 57 59 Urban Total 1,919 2,074 2,243 2,425 2,525 2,539 2,746 2,970 2,106 2,196 2,290 2,388 6,373 6,809 7,279 7,783 Rural Metered 1,455 2,058 2,781 3,691 1,029 1,432 1,742 2,302 1,372 1,621 1,910 2,245 3,856 5,110 6,433 8,237 Rural Un-metered 320 160 80 40 134 67 67 0 79 40 40 0 533 267 187 40 Rural Temporary 2 2 2 2 1 2 2 3 2 2 2 2 5 5 6 7 Rural Total 1,777 2,220 2,864 3,733 1,164 1,500 1,811 2,305 1,453 1,662 1,951 2,246 4,394 5,382 6,626 8,284 Total Metered 3,354 4,115 5,006 6,097 3,360 3,954 4,471 5,254 3,458 3,796 4,177 4,609 10,172 11,865 13,655 15,961 Total Un-metered 321 160 80 40 136 67 67 0 80 40 40 0 536 267 187 40 Total Temporary 20 20 20 20 17 18 19 20 21 22 24 25 58 60 63 66 Total Total 3,695 4,294 5,106 6,157 3,512 4,039 4,557 5,275 3,559 3,858 4,241 4,634 10,767 12,192 13,904 16,067 1.2.1.3.East Discom The growth percentages assumed for the category for the MYT period are as shown below: Area Category Urban Rural Metered Un-metered Temporary Growth rate Description Growth rate Description Consumer 5.42% 2 year CAGR has been considered 15.00% Nominal growth rate has been considered Average Load (kw) per Consumer 0.00% Current year load from Apr'15 to Sep'15 has been considered 0.00% Current year load from Apr'15 to Sep'15 has been considered Average consumption per consumer per month 2.61% YoY growth rate has been considered 13.83% YoY growth rate has been considered Consumer 0.00% No growth rate has been considered 0.00% No growth rate has been considered Average Load per Consumer (in kw) 0.00% Current year load from Apr'15 to Sep'15 Current year load from Apr'15 to Sep'15 0.00% has been considered has been considered Average consumption per consumer per month 0.00% No growth rate has been considered 0.00% No growth rate has been considered Consumer 0.00% No growth rate has been considered 0.00% No growth rate has been considered Average Load per Consumer (in kw) 0.00% Current year load from Apr'15 to Sep'15 0.00% Current year load from Apr'15 to Sep'15 19

Area Category Urban Rural Average consumption per consumer per month Growth rate Description Growth rate Description has been considered has been considered 0.00% No growth rate has been considered 0.00% No growth rate has been considered 1.2.1.4 Central Discom The growth percentages assumed for the category are as shown below Area Category Urban Rural Growth rate Description Growth rate Description Current year growth rate has been 3 year CAGR has been Consumer 5.96% 9.86% considered considered Average Load (kw) per No growth rate has been No growth rate has been Metered 0.00% 0.00% Consumer considered considered Un-metered Temporary Average consumption per consumer per month 2.11% Current year growth rate has been considered 15.01% Consumer 0.00% 0.00% Average Load per 0.00% All unmetered consumers are Consumer (in kw) expected to be metered by the Average consumption per FY16 0.00% consumer per month 0.00% 0.00% Consumer 3.43% Average Load per Consumer (in kw) Average consumption per consumer per month YoY growth rate has been considered 41.95% 0.00% No growth rate has been 0.00% 0.00% considered 0.00% 3 year CAGR has been considered All unmetered consumers are expected to be metered by the FY16 3 year CAGR has been considered No growth rate has been considered 20

1.2.1.5 West Discom The growth percentages assumed for the category are as shown below: Area Category Urban Rural Metered Consumer 4.25% Average Load (kw) per Consumer Average consumption per consumer per month Growth rate Description Growth rate Description 0.00% 2 year CAGR has been considered has been considered Current year load from Apr'15 to Aug'15 has been considered 10.76% 0.00% 0.00% No growth rate has been considered 0.00% YoY growth has been considered has been considered Current year load from Apr'15 to Aug'15 has been considered No growth rate has been considered has been considered Consumer 0.00% No growth rate has been considered 0.00% No growth rate has been considered Un-metered Temporary Average Load per Consumer (in kw) Average consumption per consumer per month 0.00% Consumer 6.59% Average Load per Consumer (in kw) Average consumption per consumer per month Current year load from Apr'15 to Aug'15 has been considered 0.00% Current year load from Apr'15 to Aug'15 has been considered 0.00% No growth rate has been considered 0.00% No growth rate has been considered 0.00% 2 year CAGR has been considered has been considered Current year load from Apr'15 to Aug'15 has been considered 0.00% No growth rate has been considered 0.00% Current year load from Apr'15 to Aug'15 has been considered 0.00 No growth rate has been considered 0.00 No growth rate has been considered 21

1.2.2. LV -2: Non-Domestic The future projections are as below Table 3: LV-2 Non-Domestic Unit Projection Sub Category East Discom Central Discom West Discom MP State FY 16 FY 17 FY 18 FY 19 FY 16 FY 17 FY 18 FY 19 FY 16 FY 17 FY 18 FY 19 FY 16 FY 17 FY 18 FY 19 Metered 735 826 930 1,048 735 852 990 1,150 806 872 944 1,021 2,276 2,550 2,863 3,220 Temporary 22 22 22 22 49 50 51 52 39 39 39 39 110 110 111 112 Total 756 848 952 1,070 784 901 1,040 1,202 845 911 983 1,060 2,386 2,660 2,975 3,332 1.2.2.1.East Discom The growth percentages assumed for the category are as shown below: Area Category Urban Rural Growth rate Description Growth rate Description Metered Temporary Consumer 4.07% 2 year CAGR has been considered 8.24% 3 year CAGR has been considered Average Load (kw) per Consumer 3.43% YoY growth rate has been considered 2.72% 3 year CAGR has been considered Average consumption per kw per month 2.52% YoY growth rate has been considered 6.87% YoY growth rate has been considered Consumer 0.00% 0.00% Average Load (kw) per Consumer 0.00% No growth rate has been considered 0.00% Average consumption per consumer per month 0.00% 0.00% No growth rate has been considered 22

1.2.2.2.Central Discom The growth percentages assumed for the category are as shown below: Area Category Urban Rural Growth rate Description Growth rate Description Consumer 3.78% Current year growth rate has been considered 3.93% YoY growth has been considered Metered Temporary Average Load (kw) per Consumer 6.91% YoY growth has been considered 4.66% 2 year CAGR has been considered Average consumption per kw per month 5.00% Nominal growth rate has been considered 5.00% Nominal growth rate has been considered Consumer 0.00% No growth rate has been considered 5.00% Nominal growth has been considered Average Load (kw) per Consumer 0.00% 0.00% Average consumption per consumer per No growth rate has been considered 1.48% 3 year CAGR has been considered 0.00% month 1.2.2.3.West Discom The growth percentages assumed for the category are as shown below: Area Category Urban Rural Metered Temporary Growth rate Description Growth rate Description 2 year CAGR has been considered has been 3 year CAGR has been considered has been Consumer 3.39% 4.00% considered considered Average Load (kw) per Consumer 5.16% Current year growth has been considered 0.00% No growth rate has been considered Average consumption per kw per 2 year CAGR has been considered has been 0.00% No growth rate has been considered 1.46% month considered Consumer 0.00% 0.00% Average Load (kw) per Consumer 0.00% 0.00% No growth rate has been considered Average consumption per consumer per 0.00% 0.00% month No growth rate has been considered 23

1.2.3. LV -3.1: Public Water Works Considering the anticipated increase in supply hours, the future projections are as follows: Table 4: LV-3.1 PWW Unit Projection Sub Category East Discom Central Discom West Discom MP State FY 16 FY 17 FY 18 FY 19 FY 16 FY 17 FY 18 FY 19 FY 16 FY 17 FY 18 FY 19 FY 16 FY 17 FY 18 FY 19 Municipal Corp. 50 53 55 57 79 82 85 89 41 46 51 56 170 180 191 202 Nagar Panchayat 63 70 77 86 82 92 104 117 56 61 65 70 201 222 246 273 Gram Panchayat 230 256 285 317 69 101 149 220 117 130 145 161 417 488 579 698 Temporary 6 6 6 6 4 5 6 7 5 5 5 5 15 16 17 18 Total 350 384 423 466 233 280 344 433 220 241 265 292 803 906 1,033 1,191 1.2.3.1.East Discom The growth percentages assumed for the category are as shown below: Area Category Urban Rural Growth rate Description Growth rate Description Consumer 1.33% YoY growth rate has been considered 0.00% No growth rate has been considered Municipal Corporation Nagar Panchayat Gram Panchayat Average Load (kw) per Consumer 2.77% 3 year CAGR has been considered 9.50% 2 year CAGR has been considered Average consumption per kw per month 0.00% No growth rate has been considered 0.00% No growth rate has been considered Consumer 5.55% Current year growth rate has been considered Average Load (kw) per Consumer 4.33% 2 year CAGR has been considered 3.82% Average consumption per consumer per month 15.53% 3 year CAGR has been considered Current year growth rate has been considered 0.00% No growth rate has been considered 0.00% No growth rate has been considered Consumer 0.00% No growth rate has been considered 6.22% Current year growth rate has been considered Average Load (kw) per Consumer 4.44% 2 year CAGR has been considered 5.31% 2 year CAGR has been considered 24

Area Category Urban Rural Temporary Growth rate Description Growth rate Description Average consumption per consumer per month 0.00% No growth rate has been considered 0.00% No growth rate has been considered Consumer 0.00% 0.00% No growth rate has been considered Average Load (kw) per Consumer 0.00% 0.00% No growth rate has been considered 1.2.3.2. Central Discom The growth percentages assumed for the category are as shown below: Area Category Urban Rural Growth rate Description Growth rate Description Consumer 0.00% No growth rate has been considered 0.00% Current year growth rate has been Average Load (kw) per Consumer 1.00% 0.00% No growth rate has been Municipal Corporation considered considered Average consumption per kw per month 3.37% 3 year CAGR has been considered 0.00% Nagar Panchayat Consumer 6.80% YoY growth has been considered 0.00% Average Load (kw) per Consumer 0.38% 2 year CAGR has been considered 0.00% Average consumption per consumer per month 4.95% YoY growth has been considered 18.99% Consumer 19.98% 3 year CAGR has been considered 12.62% No growth rate has been considered 3 year CAGR has been considered Gram Panchayat Average Load (kw) per Consumer 3.07% YoY growth has been considered 0.00% Average consumption per consumer per month No growth rate has been considered 8.18% 3 year CAGR has been considered 32.04% YoY growth has been considered Temporary Consumer 0.00% No growth rate has been considered 0.00% No growth rate has been considered 25

Area Category Urban Rural Growth rate Description Growth rate Description Average Load (kw) per Consumer 8.45% 0.00% 3 year CAGR has been considered Average consumption per consumer per 13.88% 0.00% month 1.2.3.3. West Discom The growth percentages assumed for the category are as shown below: Area Category Urban Rural Growth rate Description Growth rate Description Consumer 4.60% 2 year CAGR has been considered has been considered 0.00% No growth rate has been considered Municipal Corporation Average Load (kw) per Consumer 5.71% Current year growth has been 2 year CAGR has been considered has 0.05% considered been considered Average consumption per kw per Nominal growth rate has been considered 0.00% No growth rate has been considered 10.00% month has been considered Consumer 6.91% 2 year CAGR has been considered has 0.00% Nagar Panchayat Gram Panchayat Temporary Average Load (kw) per Consumer 1.62% Average consumption per consumer per month been considered Current year growth has been considered 0.00% 0.00% No growth rate has been considered 0.00% No growth rate has been considered 2 year CAGR has been considered has Consumer 2.40% 9.29% Current year growth has been considered been considered Current year growth has been 2 year CAGR has been considered has Average Load (kw) per Consumer 10.12% 0.52% considered been considered Average consumption per consumer 3 year CAGR has been considered has 8.93% 0.00% No growth rate has been considered per month been considered Consumer 0.00% 0.00% Average Load (kw) per Consumer 0.00% 0.00% No growth rate has been considered No growth rate has been considered Average consumption per consumer 0.00% 0.00% per month 26

1.2.4. LV -3.2: Street Light Considering the anticipated increase in supply hours, the future projections are as below: Table 5: LV-3.2 Street Light Unit Projection Sub Category East Discom Central Discom West Discom MP State FY 16 FY 17 FY 18 FY 19 FY 16 FY 17 FY 18 FY 19 FY 16 FY 17 FY 18 FY 19 FY 16 FY 17 FY 18 FY 19 Municipal Corp. 70 84 101 121 48 53 57 63 58 65 72 80 176 201 230 263 Nagar Panchayat 51 57 64 72 57 68 81 96 37 41 46 50 145 166 190 218 Gram Panchayat 60 71 84 99 5 6 8 10 49 54 59 65 114 131 151 174 Total 180 212 249 293 110 127 146 168 145 160 176 195 435 498 571 656 1.2.4.1.East Discom The growth percentages assumed for the category are as shown below. Area Category Urban Rural Municipal Corporation Nagar Panchayat Gram Panchayat Consumer 8.87% Growth rate Description Growth rate Description Current year growth rate has been considered Average Load (kw) per Consumer 2.36% YoY growth rate has been considered 20.00% 0.00% No growth rate has been considered Nominal growth rate has been considered Average consumption per kw per month 7.93% 3 year CAGR has been considered 0.00% No growth rate has been considered Consumer 4.21% YoY growth rate has been considered 15.07% 3 year CAGR has been considered Average Load (kw) per Consumer 7.83% Average consumption per consumer per month Current year growth rate has been considered 10.92% 2 year CAGR has been considered 0.00% No growth rate has been considered 0.00% No growth rate has been considered Consumer 0.00% No growth rate has been considered 0.00% No growth rate has been considered Average Load (kw) per Consumer 19.46% 3 year CAGR has been considered 13.49% 3 year CAGR has been considered Average consumption per consumer per month 0.00% No growth rate has been considered 4.14% 2 year CAGR has been considered 27

1.2.4.2.Central Discom The growth percentages assumed for the category are as shown below: Area Category Urban Rural Growth rate Description Growth rate Description Municipal Corporation Consumer 4.25% Current year growth has been considered 0.00% Average Load (kw) per Consumer 0.02% 2 year CAGR has been considered 0.00% Average consumption per kw per month 4.69% Current year growth has been considered No growth rate has been considered 10.00% Nominal growth has been considered Consumer 6.61% YoY growth has been considered 0.00% No growth rate has been considered Nagar Panchayat Gram Panchayat Average Load (kw) per Consumer 1.10% 2 year CAGR has been considered 6.06% YoY growth has been considered Average consumption per consumer per month 10.10% YoY growth has been considered 4.86% 2 year CAGR has been considered Consumer 32.00% 3 year CAGR has been considered 2.54% Average Load (kw) per Consumer 16.29% Average consumption per consumer per month Current year growth has been considered 4.61% Current year growth has been considered 0.00% No growth has been considered 10.00% Nominal growth has been considered 28

1.2.4.3.West Discom The growth percentages assumed for the category are as shown below: Area Category Urban Rural Municipal Corporation Nagar Panchayat Gram Panchayat Growth rate Description Growth rate Description Consumer 10.96% Current year growth has been considered 0.00% Average Load (kw) per Consumer 0.00% No growth rate has been considered 0.00% No growth rate has been considered Average consumption per kw per month 0.00% No growth rate has been considered 0.00% Consumer 9.85% 3 year CAGR has been considered has been considered 0.00% No growth rate has been considered Average Load (kw) per Consumer 0.64% 2 year CAGR has been considered has 2 year CAGR has been considered has been 5.87% been considered considered Average consumption per consumer Nominal growth rate has been considered 0.00% No growth rate has been considered 2.00% per month has been considered Consumer 0.00% 0.00% Average Load (kw) per Consumer 0.00% 0.00% No growth rate has been considered Average consumption per consumer per month No growth rate has been considered 0.00% 10.00% Nominal growth rate has been considered has been considered 29