Project No Southport Vehicle Processing Center Design-Build Request for Proposals Philadelphia, Pennsylvania

Similar documents
Philadelphia County, Pennsylvania

GENERAL CONDITIONS AND INSTRUCTIONS TO BIDDERS FOR STATEWIDE CONTRACTS FOR SERVICES

INSTRUCTIONS TO PROPOSERS DRAFT FOR MN/DOT REVIEW

REQUEST FOR PROPOSALS FOR CO-LOCATION OF PHOTO LICENSE CENTER LOCATED IN LEWISBURG, PA ISSUING OFFICE

INSTRUCTIONS TO BIDDERS

City of Coolidge 130 W. Central Avenue Coolidge, Arizona (520) TDD: (520) / Fax: (520)

REQUEST FOR PROPOSALS FOR CO-LOCATION OF PHOTO LICENSE CENTERS ISSUING OFFICE

ORANGE COUNTY EDUCATIONAL ARTS ACADEMY HVAC DESIGN-BUILD SERVICES

INSTRUCTIONS TO BIDDERS

CONSULTING SERVICES ITQ CONTRACT REQUEST FOR QUOTATIONS FOR. LIHEAP Monitoring Planning, Reviews, Analysis and Reports ISSUING OFFICE

REQUEST FOR PROPOSAL Asbestos Inspection, Project Design and Monitoring

REQUEST FOR BID PROPOSALS

REQUEST FOR PROPOSAL FOR PROFESSIONAL DESIGN SERVICES - AERIAL PHOTOGRAPHY, SURVEYING AND MAPPING SERVICES ISSUING OFFICE COMMONWEALTH OF PENNSYLVANIA

Request for Proposals. For. Financial Aid Services. Issued by: Pennsylvania State System of Higher Education Office of the Chancellor

Arkansas Health Insurance Marketplace 1501 North University Avenue, Suite 970 Little Rock, AR REQUEST FOR PROPOSAL

NOTICE INVITING SEALED BIDS FOR THE SR-91 EASTBOUND ON- AND OFF-RAMPS AT BELLFLOWER BOULEVARD PHASE 2 LANDSCAPE IMPROVEMENTS

REQUEST FOR PROPOSALS FOR. Correctional Pharmaceutical Services For The Pennsylvania Department of Corrections ISSUING OFFICE

REQUEST FOR PROPOSALS FOR MOTORCYCLE SAFETY PROGRAM ISSUING OFFICE

REQUEST FOR PROPOSAL FOR PAWTUCKET/CENTRAL FALLS STATION DISTRICT BRAND DEVELOPMENT, COMMUNICATIONS AND MARKETING STRATEGY

REQUEST FOR QUALIFICATIONS/ PROPOSALS LEASE-LEASEBACK CONTRACTOR FOR

OXNARD SCHOOL DISTRICT HVAC AND CONTROLS DESIGN-BUILD SERVICES FOR (5) SCHOOLS PHASE 2

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104

INVITATION TO BID (ITB) DOCUMENTS. General Contractor

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104

EUSTACE INDEPENDENT SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS TOTAL CAMPUS ENERGY OPTIMIZATION SERVICES

COUNTY OF WISE, VIRGINIA REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL CONSULTING SERVICES BROWNFIELDS GRANT. Date of Issue: September 25, 2017

UNIVERSITY OF ROCHESTER INSTRUCTIONS TO BIDDERS

2017 HUD Sidewalk and ADA Ramp Project, Phase II start construction 09/2017 and be completed by 12/2017.

REQUEST FOR PROPOSALS FOR. Project Management and Business Analysis Work Order Services ISSUING OFFICE. Pennsylvania Turnpike Commission

St. Charles City County Library District Invitation for bid HVAC Replacement at Winghaven Branch

Request for Proposals RFP#8-012 FLEET MANAGEMENT SERVICES

REQUEST FOR PROPOSALS FOR. Application Development Work Order Services ISSUING OFFICE. Pennsylvania Turnpike Commission

REQUEST FOR SUPPLIER QUALIFICATION

B. The Bid is made in compliance with the Bidding Documents.

REQUEST FOR PROPOSAL FINANCIAL AUDIT SERVICES RETURN TO:

INSTRUCTIONS TO BIDDERS

RETAIL ELECTRIC GENERATION SUPPLY SERVICE

State of Florida Department of Financial Services

REQUEST FOR PROPOSAL

Southwest Florida Affordable Housing Choice Foundation, Inc Renaissance Preserve Way Fort Myers, FL 33916

INVITATION TO NEGOTIATE REGISTRATION

SAN DIEGO CONVENTION CENTER CORPORATION

FAYETTE COUNTY SCHOOL DISTRICT REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT AT RISK SERVICES

AIA Document A701 TM 1997

Request for Proposals ( RFP ) for Public Works Inspection Services On An As Needed Basis

EAP SERVICES B REQUEST FOR PROPOSAL CLAY COUNTY SHERIFF S OFFICE EMPLOYEE ASSISTANCE PROGRAM (EAP) RFP B16-002

Instructions to Bidders Page 1

CITY OF PORT ARANSAS, TEXAS REQUEST FOR QUALIFICATIONS (RFQ) ENGINEERING PROFESSIONAL SERVICES NOTICE TO BIDDERS

State College Area School District 131 West Nittany Avenue State College, PA REQUEST FOR PROPOSAL RFP #2010/11-01

REQUEST FOR PROPOSALS For. Guaranteed Energy Savings Contract

INSTRUCTIONS TO BIDDERS

CHARLOTTE PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR PROPOSALS ("RFP")

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104

NOTICE OF PROPOSAL INVITATION

INVITATION TO BID. (713) Phone BEC Project No.: (832) Fax April 24, 2013

Botetourt County Public Schools

Request for Proposal # Executive Recruitment Services

RFP # FACILITIES MANAGEMENT SERVICES

PUBLIC AFFAIRS AND COMMUNITY OUTREACH SERVICES FOR THE JACKSONVILLE PORT AUTHORITY

KANSAS PUBLIC EMPLOYEES RETIREMENT SYSTEM REQUEST FOR PROPOSALS

PDE March 2011 REQUEST FOR PROPOSALS FOR. ADMINISTRATION OF THE POWER LIBRARY AND THE AskHerePA RESOURCES ISSUING OFFICE

REQUEST FOR PROPOSAL RFP #14-03

INVITATION FOR BID ATTENTION: This is not an order. Read all instructions, terms and conditions carefully.

REQUEST FOR PROPOSAL

Request for Proposal #2036. Orange Coast College Exterior Lighting Energy Efficiency Project Implementation

ARTICLE 8: BASIC SERVICES

Monroe County Water Authority. September Norris Drive Rochester, New York 14610

INSTRUCTIONS TO BIDDERS

Specification Standards for University of Washington Section

DOCUMENT SCHEDULING OF WORK PART 1 GENERAL 1.1 RELATED DOCUMENTS AND PROVISIONS

SUPERIOR COURT OF CALIFORNIA COUNTY OF SAN MATEO REQUEST FOR PROPOSAL FILE FOLDERS PRINTING

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104

University of California, Riverside Barn Expansion

Request for Proposals for Agent of Record/Insurance Broker Services

REQUEST FOR PROPOSALS FOR. Job Order Contracting Program Consultant ISSUING OFFICE. Pennsylvania Turnpike Commission

A competitive bidding process shall be utilized to the greatest extent possible for all construction contracts.

HOUSING AUTHORITY OF THE COUNTY OF LAKE, IL REQUEST FOR PROPOSAL FOR HCV HQS INSPECTIONS RFP # 18-HCV HQS IINSPECTIONS-OF

Request for Bid/Proposal

GEORGIA LOTTERY CORPORATION

REQUEST FOR PROPOSALS FOR. Advisory, Strategy and Independent Verification and Validation (IV&V) Work Order Services ISSUING OFFICE

Austin Independent School District Contract and Procurement Services 1111 West 6th Street Suite A330 Austin, Texas

REQUEST FOR PROPOSALS FINANCIAL STATEMENT AUDIT SERVICES. Cumberland Mountain Community Services Board RFP#: AUDIT Issue Date April 23, 2018

State of Florida Department of Transportation

Albany Parking Authority 25 Orange Street Albany, NY

RSU # 78 RFP # 1 BASELINE ASSESSMENT OF FACILITY

REQUEST FOR PROPOSAL. Architectural and Space Planning Services

SECTION 115 PENSION TRUST ADMINISTRATION RFP #1828 December 2017

TARGET MARKET RESPONSES RESTRICTED TO CITY OF CHICAGO OR COOK COUNTY CERTIFIED MBE/WBE FIRMS IN THIS PARTICULAR AREA OF SPECIALTY

HOUSING AUTHORITY OF THE CITY OF TULSA

CITY OF GAINESVILLE INVITATION TO BID

RFP NO: REQUEST FOR PROPOSAL BUILDING DEMOLITION SERVICES CITY OF SOUTH BAY 335 SW 2ND AVENUE, SOUTH BAY, FLORIDA 33493

REQUEST FOR PROPOSAL For PARKING LOT ASPHALT/CONCRETE REMOVAL AND REPLACEMENT. Colorado Springs, CO (PPLD RFP # )

Sample Request For Proposals

PARTNERS PROJECT IDENTIFICATION PROJECT IDENTIFICATION

THE CITY OF FOREST PARK PLANNING, BUILDING AND ZONING DEPARTMENT JONATHAN JONES, DIRECTOR 785 Forest Parkway Forest Park, GA 30297

City of Forest Park Request for Proposals. Landscape Installation, 803 & 785 Forest Parkway, Forest Park Ga

REQUEST FOR PROPOSAL. PIKES PEAK LIBRARY DISTRICT Colorado Springs, CO

REQUEST FOR PROPOSALS FOR. Infrastructure and Security Support and Maintenance Services ISSUING OFFICE. Pennsylvania Turnpike Commission

Instruction To Bidders

Transcription:

34BRequest for Proposal for a 35BDesign Build Contractor Project No. 18-002.1 Southport Vehicle Processing Center Design-Build Request for Proposals Philadelphia, Pennsylvania 2018

March 7, 2018 NOTICE TO PROPOSERS The following Project is being released utilizing the Request for Proposal Contracting Method of Procurement by Philadelphia Regional Port Authority ( PhilaPort ), an independent agency of the Commonwealth of Pennsylvania, where PhilaPort will consider technical qualifications, costs, and Diversity Inclusion participation. Proposals received by PhilaPort after the Proposal Submission Deadline will be rejected. It is the responsibility of each Proposer to ensure that its proposal is received by PhilaPort prior to the Proposal Submission Deadline, regardless of method of delivery used. Proposals delivered in person by the proposer or through an authorized representative will be received by the Proposal Contact Person from individuals presenting picture identification on behalf of the proposer. PROJECT INFORMATION Project: PhilaPort 18-002.1 Project Location: Philadelphia County, PA Brief Description: The project consists of a Design Build for a Vehicle Processing Center at Southport. Pre-Proposal Conference: March 12, 2018 at 10:00 AM EST All contractors who have secured contract documents are Request for Proposal Coordinator / Issuing Office: invited and urged to attend this Pre-Proposal Conference. Kate Bailey Director of Procurement 3460 North Delaware Avenue Philadelphia PA, 19134 (215 423-5668 procurement@philaport.com Bid Guaranty: A Bid Guaranty is required for this Project. Contract Duration: Substantial Completion by December 31, 2018. Proposal Period: 22 days allowed from Proposal submission deadline until Notice of Selection. Liquidated Damages: Section 8.18 of General Conditions Request for Proposal Notice to Proposers - 1 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

CALENDAR OF EVENTS Activity Date Notice to Proposers/Issue RFP Wednesday, March 7, 2018 Pre-Proposal Conference Monday, March 12, 2018 at 10:00 AM EST Deadline to Submit Questions Monday, March 19, 2018 at 12:00 PM EST Deadline to Issue Addendums Amending the RFP Monday, April 9, 2018 Proposal Submission Deadline Monday, April 16, 2018 at 2:00 PM EST MANDATORY Vendor Registration: All Proposers must have a Current and Active Vendor Number. Proposal Documents require Proposers to provide this number. Register at www.pasupplierportal.state.pa.us. Request for Proposal Notice to Proposers - 2 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

TABLE OF CONTENTS PART 1 GENERAL INFORMATION FOR PROPOSERS PART 2 PROPOSAL FORMAT AND REQUIRED INFORMATION PART 3 EVALUATION CRITERIA PART 4 WORK STATEMENT LIST OF APPENDICES List of Documents to Be Submitted with Proposal APPENDIX A. PROPOSAL SIGNATURE PAGE B. NONCOLLUSION AFFIDAVIT C. COST SUBMISSION FORM E. DIVERSITY INCLUSION HUB SOLICITATION AND COMMITMENT STATEMENT SUBMISSION FORM List of Documents for Reference; NOT to be submitted with Proposal F. REQUIREMENTS CHECKLIST G. EVALUATION COMMITTEE SCORING MATRIX H. DESIGN-BUILD CONTRACT I. DESIGN-BUILD GENERAL CONDITIONS TO THE DESIGN-BUILD CONTRACT J. DESIGN-BUILD ADMINISTRATIVE PROCEDURES K. STANDARD CONTRACT PROVISIONS L. PA PREVAILING WAGE DETERMINATION M. BRIDGING DOCUMENTS (under separate cover) N. SPECIFICATIONS (under separate cover) O. PUBLIC WORKS EMPLOYMENT VERIFICATION ACT Request for Proposal Table of Contents Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

PART 1 GENERAL INFORMATION FOR DESIGN BUILD FIRMS 1-1 Project Information. This Request for Proposals ( RFP ) provides interested Proposers with information to enable them to prepare and submit a proposal consisting of three separately sealed parts: Technical Submittal, Cost Submittal and Diversity Inclusion Submittal for consideration by Philadelphia Regional Port Authority ( PhilaPort ) for construction work on the Project reference in the Notice to Proposers. 1-2 Issuing Office. This RFP is issued by PhilaPort. The Request for Proposal Coordinator is the sole point of contact for this RFP. All correspondence concerning this RFP shall be directed to the Request for Proposal Coordinator and shall include the Project Name and Project Number. 1-3 Scope. The general scope of work encompassed under this RFP consists of the design and construction work for the Project identified on the cover sheet of this RFP and in the Notice to Proposers. The complete scope of work for this Project is further described by the Bridging Documents (provided as Appendices to this RFP), which shall take precedence over this general description. 1-4 Bidding Stage of the Request for Proposal Process. The Proposer is not required to identify in the RFP Technical Submission any proposed HVAC (Mechanical), Electrical and Plumbing ( MEP ) Construction firms, unless explicitly required to do so. The Proposer may contact and engage in discussions with any MEP firms it deems necessary up until the Proposal Submission Date. In the event that the Proposer receives cost estimates from any MEP firms, it may not share those estimates with any other MEP firm. Following the Proposal Submission Deadline the DBC shall have no further contact or discussions concerning this Project with any MEP firms that may perform work under the DBC contract except as provided for herein. PhilaPort does not require the Proposer to submit qualifications for the aforementioned three divisions of work. The Proposer, as part of the signature page requirements set forth in Appendix A of the RFP, certifies to: The Proposer will provide a Lump Sum amount to be paid for all services necessary to provide the complete project described in the contract documents. Allowances for any of the work shall not be allowed. Regardless of the entities eventually selected by the DBC to perform the Work, the DBC shall be contractually committed to achieving Request for Proposal Part1-1 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

the diversity inclusion percentage proposed in the HUB Solicitation and Commitment Statement Submission Form ( HUB ). Such percentage shall be calculated on the entire Lump Sum amount proposed. 1. Design-Build Contract Includes Design and Construction The Design-Build Contract will encompass the costs for any and all design and construction services necessary to provide the complete project described in the contract documents, including, but not limited to, costs for the HVAC, Plumbing and Electrical design and construction work. The successful Proposer will become the DBC. 2. Design Documents Separate HVAC, Plumbing and Electrical Work The Final Design Submission from the DBC to PhilaPort shall be submitted to PhilaPort for review and conformance with the project scope. Final Design shall be organized into bid packages. Nothing in this requirement should be construed as prohibiting the DBC from developing multiple bid packages for award of different portions of the HVAC, Plumbing and/or Electrical Construction. 1-4 Type and Award of Contract. If a contract is entered into as a result of the RFP process, it will be a Design-Build Contract and Contract Bond, including the Contract Documents (all attached to this RFP as Appendices). The Contract Bond will be in the amount of 100% of the awarded contract. This Design-Build Contract will encompass the costs for any and all design and construction services necessary to provide the complete project described in the contract documents, including costs for the HVAC, Plumbing and Electrical work. The successful Proposer will become the DBC. No contract exists until all signatures required by law are affixed to the contract. The estimated date for the Initial Job Conference is 60 days from the Notice of Selection. PhilaPort reserves the right to issue a Letter of Intent to the successful proposer. The Letter of Intent will authorize the successful proposer to incur costs by commencing off-site work immediately as specifically described in the Letter of Intent. Liquidated damages will be calculated for the contract as noted in the Contract and in the Cost Submittal Form (attached to this RFP as Appendix I). 1-5 Owner s Rights Reserved. PhilaPort reserves the right to cancel or withdraw this RFP in whole or in part any time prior to full execution of the contract. PhilaPort reserves the right to reject any and all proposals received as a result of this RFP. Request for Proposal Part1-2 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

PhilaPort may, in its discretion, waive any informality or technical deficiencies in proposals. 1-6 Incurring Costs. PhilaPort is not liable for any costs incurred by Proposers in preparing, delivering or submitting any proposals for the RFP or in anticipation of award of the contract. 1-7 Pre-Proposal Conference. PhilaPort has scheduled a Pre-Proposal Conference as listed in the Notice to Proposers. Although attendance at the Pre-Proposal Conference is not mandatory, all prospective proposers, subcontractors and suppliers should plan to attend. The Conference will not be videotaped, so anyone who does not attend will not have an opportunity to participate in the discussion. Attendance will be taken and a list of attendees will be posted on the PhilaPort website. The purpose of the Pre-Proposal Conference is for PhilaPort and the Professional to present an overview of the Project and the proposal process. If possible, questions about the RFP and the Project should be forwarded to the Issuing Office prior to the conference to ensure sufficient analysis can be made before an answer is supplied. Questions may be asked at the conference but any answers furnished during the Conference will not be binding Answers furnished during the Conference will not be official until verified, in writing, by the Issuing Office. Questions and answers from the Pre-Proposal Conference issued as a bulletin become part of this RFP. Do not contact the Request for Proposal Coordinator or the Agency by phone with questions. 1-8 Clarification to the RFP: If there are any further technical questions, requests for information, requests for clarification, or requests for data after the Pre-Proposal Conference, the questions shall be submitted to PhilaPort s Request for Proposal Coordinator prior to the deadline set forth in the Calendar of Events for questions. If the Issuing Office deems it necessary to revise or clarify any part of this RFP or its Appendices, the Request for Proposal Coordinator will issue addenda recording the revision or clarification. These addenda will become part of this RFP. By submitting a Proposal, the Proposer acknowledges the receipt of all addenda issued for this Project and that they have read and understood them. PhilaPort will not issue any addendum later than indicated in the RFP Calendar of Events, unless PhilaPort cancels or extends the Proposal Submission Deadline. A written addendum issued by PhilaPort is the only binding amendment/revision to this RFP and no other form of amendment/revision, either written or oral, will be considered binding by PhilaPort. Proposers shall not rely on information other than written addenda issued by PhilaPort. 1-9 Proposal Submission Deadline. To be considered for selection by PhilaPort, proposals must be delivered to the Request for Proposal Coordinator (address listed in Notice to Proposers) on or before the Proposal Submission Deadline. Proposers Request for Proposal Part1-3 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

who mail proposals should allow sufficient mail delivery time to ensure timely receipt of their proposals. If, due to inclement weather, natural disaster, or any other cause, PhilaPort is closed on the Proposal Submission Deadline, the deadline for submitting proposals shall be automatically extended until the next PhilaPort business day (and time of day specified in the Notice to Proposers) on which PhilaPort is open, unless Proposers are notified otherwise by PhilaPort. The Proposer shall be solely responsible for assuring that the proposal arrives prior to the Proposal Submission Deadline. Proposals delivered after the Proposal Submission Deadline, regardless of the reason for lateness, will automatically be rejected and returned unopened to the Proposer. 1-10 Proposals. To be considered by PhilaPort, a Proposer must meet the Mandatory Requirements of this RFP and should also submit a complete response to this RFP, using the format provided in Part 2. Proposals must be signed by an official authorized to bind the Proposer to its provisions. By submitting a proposal, the Proposer acknowledges that it has carefully reviewed this solicitation and agrees to comply with all applicable conditions and requirements. The contents of the proposal of the successful Proposer, which do not conflict with this RFP and/or its Appendices, will become contractual obligations if a contract is entered into by PhilaPort. The proposal shall remain valid and binding for at least 90 (ninety) days from the Proposal Submission Deadline, or until a contract has been fully executed. 1-11 If the Proposer is a Joint Venture. If the entity that will be signing the proposal is a joint venture, then there are additional requirements that apply. 1. The Joint Venture must submit a copy of the Joint Venture Agreement with the Technical Proposal. 2. Each entity comprising the Joint Venture must submit with the Proposal the corporate resolution or other legal document evidencing the entity s authorization to participate or form the Joint Venture. 3. The Joint Venture is the Design-Build Contractor / DBC throughout this RFP. 4. The Prime Contractor Qualification Statement shall be completed by the Joint Venture with the Joint Venture as the firm and not as separate entities. 5. The Joint Venture should specifically identify and discuss in the Work Plan section of this RFP the responsibilities and scope of work on the Project for each entity in the Joint Venture. 1-12 Withdrawal of Proposal. Proposals may be withdrawn by written request, which shall be received by the Request for Proposal Coordinator prior to the Proposal Submission Deadline. A proposal may also be withdrawn in person by the Proposer or its authorized representative, provided their identity is made known and he/she signs a receipt for a proposal, but only if the withdrawal is made prior to the Request for Proposal Part1-4 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

Proposal Submission Deadline. A proposal may only be modified by the submission of a new sealed proposal or submission of a sealed modification received by the Request for Proposal Coordinator prior to the Proposal Submission Deadline. After the Proposal Submission Deadline, a Proposer may withdraw a proposal without penalty up until the time PhilaPort issues a Notice of Selection. With the request for withdrawal, the Proposer must submit evidence that the reason for withdrawal is a clerical mistake as opposed to a judgment mistake and was actually due to an unintentional arithmetical error or an unintentional omission of a substantial quantity of work, labor, material or services made directly in the compilation of its bid. The evidence should be attached to the request to Withdraw at the time the request is submitted. 1-13 Public Works Employment Verification Act. The Proposer determined to be the most advantageous to PhilaPort will be required to comply with the Public Works Employment Verification Act by submitting to PhilaPort a Public Works Employment Verification Form (Form) prior to award of the contract. Proposers shall either provide the Form to PhilaPort with its Technical Submission or within three (3) days after receipt of notice to provide the Form. Failure or refusal to provide the Form will be considered a refusal to comply with the proposal, and the Proposer may be entered into the Contractor Responsibility Program. The Form and relevant information are located at http://www.dgs.state.pa.us/portal/server.pt/community/construction_and_public_ works/1235/act_127-2012_public_works_employment_verification/1357211. 1-14 Alternate Proposals. The Issuing Office has identified the basic approach to meeting its requirements, allowing Proposers to be creative and propose their best method of meeting these requirements. The Issuing Office will not accept alternate proposals or alternate base bids. 1-15 Design-Build Contractor Responsibilities. The contract will require the selected Proposer to assume responsibility for all work and services offered in its proposal whether it produces them itself or by subcontract. The Issuing Office will consider the selected Proposer to be the sole point of contact with regard to contractual matters. 1-16 Disclosure of Proposal Contents. 1. Confidential Information. PhilaPort is not requesting, and does not require, confidential proprietary information or trade secrets to be included as part of Proposers submissions in order to evaluate proposals submitted in response to this RFP. Accordingly, except as provided herein, Proposers should not label proposal submissions as confidential or proprietary or trade secret protected. Any Proposer who determines that it must divulge such information as part of its proposal must submit the signed written statement described in subsection 3 below and must additionally provide a redacted version of its proposal, which removes only the confidential proprietary information and trade secrets, for required public disclosure purposes. Request for Proposal Part1-5 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

2. PhilaPort Use of Proposal Contents. All material submitted with the proposal shall be considered the property of PhilaPort and may be returned only at the Issuing Office s option. PhilaPort has the right to use any or all ideas not protected by intellectual property rights that are presented in any proposal regardless of whether the proposal becomes part of the contract. Notwithstanding any Proposer copyright designations contained on proposals, PhilaPort shall have the right to make copies and distribute proposals internally and to comply with public record or other disclosure requirements under the provisions of any Commonwealth or United States statute or regulation, or rule or order of any court of competent jurisdiction. 3. Public Disclosure. After the award of a contract pursuant to this RFP, all proposal submissions are subject to disclosure in response to a request for public records made under the Pennsylvania Right-to-Know-Law, 65 P.S. 67.101, et seq. If a proposal submission contains confidential proprietary information or trade secrets, a signed written statement to this effect must be provided with the submission in accordance with 65 P.S. 67.707(b) for the information to be considered exempt under 65 P.S. 67.708(b)(11) from public records requests. Financial capability information submitted with this RFP is exempt from public records disclosure under 65 P.S. 67.708(b) (26). 1-17 News Releases. All news releases and media contacts regarding this Project will be made only by PhilaPort, unless PhilaPort directs otherwise in specific instances. Proposer(s) shall not initiate news releases of media contact without prior written permission of the PhilaPort. This paragraph does not apply to any advertisement soliciting interested subcontractors made by the Proposer during the preparation of the proposal. 1-18 Restriction of Contact. From the issue date of this RFP until the date of the Notice of Selection all contacts with PhilaPort personnel concerning this RFP, proposals and the evaluation process must be approved through the Request for Proposal Coordinator. Any violation of this condition is cause for PhilaPort to reject the Proposer's proposal. If it is later discovered that any violations have occurred, PhilaPort may reject any proposal or rescind any contract awarded pursuant to this RFP. Proposers agree to make no other distribution of any part of their proposal beyond that made to the Request for Proposal Coordinator. A Proposer who shares information contained in their proposal with other PhilaPort personnel and/or competing Proposer s personnel may be subject to disqualification. 1-19 Notification of Selection. Upon completion of the Evaluation Committee s review of all eligible proposals, PhilaPort shall issue written notification of its selection for award to the Proposer whose proposal is determined to be the most advantageous to the Commonwealth in accordance with the evaluation factors, procedures, and criteria set forth in this RFP. PhilaPort will post the following information on the PhilaPort website: Request for Proposal Part1-6 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

The successful Proposers Technical Submissions (in.pdf format) The successful Proposers Cost Submission The successful Proposers Small Diverse Business and Small Business Submission All Proposers Proposal Score Summary with the successful Proposers identity only (Technical Submission Score, Cost Submission Score, and Small Diverse Business and Small Business Submission Score) 1-20 Debriefing of Unsuccessful Proposers. PhilaPort will notify in writing all Proposers not selected for award of their opportunity for a debriefing and the timeframe for this optional debriefing. Any unsuccessful Proposer who wants to be debriefed must fax or email in a written request to the RFP Coordinator within two (2) calendar days of the date of the notice they were unsuccessful. PhilaPort will hold a debriefing conference for each unsuccessful Proposer who submitted a written request for such a conference within five (5) calendar days of receipt of notice of a request for a debriefing but no later than seven (7) calendar days from the date of Notice of Selection. The PhilaPort Request for Proposal Coordinator of the Proposal Evaluation Committee will hold the debriefing conference and will discuss only the proposal of the Proposer being debriefed. The Proposer may request to be debriefed by phone. The timeframe for debriefing of unsuccessful Proposers neither extends nor modifies in any way the deadlines for the RFP Protest Procedure set forth herein. 1-21 Term of Contract. The term of contract is the Contract Duration listed in the Notice to Proposers and will commence upon the effective date of the contract, as defined in the General Conditions of the Design-Build Contract (attached as Appendix H to this RFP). PhilaPort shall fix the effective date after the contract has been fully executed by the selected Proposer and by PhilaPort and all approvals required by Commonwealth contracting procedures have been obtained. The selected Proposer shall not start the performance of any work prior to the effective date unless authorized to do so in a Letter of Intent. PhilaPort shall not be liable to pay the selected Proposer for any service or work performed or expenses incurred before the effective date unless a Letter of Intent has been issued and the service, work performed or expenses incurred is in accordance with the terms of the Letter of Intent. 1-22 RFP Protest Procedure. In addition to the summary provided herein, the Protest Procedure is available in the Procurement Code (62 Pa.C.S. 1711.1). Proposers are advised to download the Protest Form which is available in e-builder under the Bid Documents tab in the Invitation to Bid for the Project. 1. Who may file Any Proposer or Prospective Proposer who is aggrieved in connection with the RFP or the award of a contract resulting from the RFP may file a protest. Request for Proposal Part1-7 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

a. Prospective Proposer is an entity that has not submitted a proposal in response to the RFP. b. Proposer is an entity that has submitted a proposal in response to the RFP. 2. Time limits a. If a protest is filed by a Prospective Proposer, it must be filed, in writing, with the Request for Proposal Coordinator prior to the Proposal Submission Deadline by e-mail or regular mail. i. E-MAIL. Prospective Proposers may complete and submit a Protest Form. The Form is available under the Bid Documents tab in the Invitation to Bid for the Project. The Form, along with any supporting documentation, must be e-mailed, as indicated on the Protest Form. MAIL. Prospective Bidders may file a protest, in writing, with the Contracting Officer, Philadelphia Regional Port Authority, 3460 N. Delaware Avenue, Philadelphia, PA 19134. b. If a protest is filed by a Proposer, it must be filed, in writing, with the Request for Proposal Coordinator within seven (7) days after the protesting Proposer knew or should have known of the facts giving rise to the protest except in no event may a protest be filed later than 7 days after the Notice of Selection is posted on the PhilaPort website. Proposers must file protests by either: i. E-MAIL. Proposers may complete and submit a Protest Form. The Form, along with any supporting documentation, must be e- mailed, to Procurement@philaport.com, or ii. MAIL. Protest may be filed, in writing, with the Contracting Officer, Philadelphia Regional Port Authority, 3460 N. Delaware Avenue, Philadelphia, PA 19134. c. Filed is defined as the date upon which the Protest Form is submitted via e-mail or, if a written protest is filed, the date upon which PhilaPort receives the written protest. d. If the Proposer fails to file/submit a bid protest or files/submits an untimely protest, then the Proposer shall be deemed to have waived the right to protest the solicitation or award of the contract in any forum. Untimely protests will be disregarded by PhilaPort. Request for Proposal Part1-8 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

3. PhilaPort may cancel a Request for Proposal or may reject all proposals at any time prior to the time a contract is executed by all parties when it is in the best interests of the Commonwealth. The Proposer may not submit a protest relating to cancellation of the solicitation or rejection of all bids. 4. A protest shall state all grounds upon which the protestant asserts that the solicitation or award of the contract was improper. The protestant may submit with the protest any documents or information it deems relevant to the protest. 1-23 Job Posting. Pennsylvania, along with the rest of the nation, is experiencing high rates of unemployment. Recognizing that construction workers are among the hardest hit by the economic recession and their re-employment is essential, the DBC and all subcontractors and suppliers are encouraged to post jobs created by this Project or jobs they seek to fill, to the PaCareerLink system at www.cwds.state.pa.us The DBC, subcontractors and suppliers, can locate their local PA Career Link office through the same website. Staff at local PA Career Link can assist employers to post positions and explain how to retrieve resumes or applications generated by their systems. END OF PART 1 Request for Proposal Part1-9 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

PART 2 INFORMATION REQUIRED FROM DESIGN BUILD FIRM 2-1. Proposal Submission. The RFP is intended to provide interested Proposers with the basic information necessary to evaluate the project scope and requirements. Each Proposer shall develop an independent assessment of the project that shall form a suitable basis for their respective proposal. Each proposal should be a complete response to the RFP, following the format described in this RFP. Proposals shall be straightforward, concise presentations. Proposers shall include information for all items requested in the RFP as completely and accurately as possible. By submitting a proposal, the Proposer agrees to the terms and conditions as stated in this RFP. A proposal should be submitted in the format discussed below. To be considered by PhilaPort, the proposal shall respond to all requirements in this part of the RFP. Each proposal shall consist of the following 3 separate parts: 1) Technical Submittal; 2) Cost Submittal; and 3) Diversity Inclusion HUB Solicitation and Commitment Statement Submittal (HUB) PhilaPort will reject as non-responsive any submission that is not submitted and properly separated as described in this RFP. PhilaPort reserves the right to request and to evaluate additional information from secondary sources (such as a Dunn & Bradstreet report) which, in PhilaPort s opinion, is necessary to assure that the Proposer s competence, number of qualified employees, business organization and financial resources are adequate to perform according to the contract. PhilaPort may make such investigations as deemed necessary to determine the ability of the Proposer to perform the Contract Work. The Proposer shall furnish to PhilaPort all such information and data for this purpose as requested by PhilaPort. PhilaPort reserves the right to reject any proposal if the evidence submitted by, or investigation of, such Proposer fails to satisfy PhilaPort that such Proposer is properly qualified to carry out the obligations of the Contract and to complete the Contract Work. 2-2. 1BMandatory Proposal Requirements. To qualify for evaluation, each proposal must, as applicable, include or meet the mandatory items listed on the Requirements Request for Proposal Part 2-1 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

Checklist (provided as Appendix F to the RFP). Any proposal that does not comply with these listed mandatory requirements may be rejected as non-responsive 2-3. Proposal Format. The proposal shall consist of separate parts and shall be submitted in separately sealed envelopes or packages clearly labeled as 1) Technical Submittal, 2) Cost Submittal, and 3) HUB Solicitation and Commitment Statement Submittal. The submittals shall be in the following format: The Technical Submittal package/envelope shall include: o Four (4) electronic versions of the Technical Submittal submitted on 4 Compact Discs or Flash Drives in a PDF format, with each clearly labeled with the Proposer s name and Technical Submittal. o One paper document of the Proposal Signature Page provided as an Appendix A to this RFP, with original signatures; o One notarized original paper document of the Non-Collusion Affidavit (provided as Appendix B to this RFP). The Cost Submittal package/envelope shall include: o One paper document of the Cost Submittal Form provided as Appendix C to this RFP; HUB Solicitation and Commitment Statement Submittal package/envelope shall include: o Two (2) (one original and one copy) of the HUB Solicitation and Commitment Statement Submittal Forms for each Base Bid. The label on each separately sealed package should include the Proposer s name, address, contact person (phone number and email), and project information, including the contract for which the proposal is being submitted, as described in Part I of this RFP. The Proposer should submit a cover letter in the Technical Submittal envelope providing, at a minimum, the following information: Company name Company mailing address Contact person Contact person s phone number and e-mail address 2-4. 2Technical Submission Requirements. The Technical Submittal shall fully demonstrate the qualifications and capabilities of the Proposer and its subcontractors to perform the work. Those Proposers whose Technical Submissions do not receive at least 75% of the total available Technical Submission points from the Evaluation Committee, prior to using the pro-rata formula, will be deemed non-responsive and rejected. Request for Proposal Part 2-2 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

Proposers shall not include cost information for this project in the Technical Submittal. Cost information for other projects that the Proposer worked on, including project budget and actual costs, may be included in the Technical Submittal. Small Diverse Businesses may be identified as such in the Technical Submittal, so long as no cost information is revealed. If cost information for this Project (including, but not limited to monthly cash flow, design costs, subcontract dollar values, or total proposed values) is revealed in the Technical Submittal, the proposal will be rejected as nonresponsive. The Technical Submission shall include the sections immediately following. The Issuing Office strongly recommends Proposers provide concise responses that adhere to suggested number of pages and present the requested information in the order listed below. TECHNICAL SECTION 1: PROJECT TEAM S QUALIFICATIONS, EXPERIENCE AND PAST PERFORMANCE 28B2-4. 1 Project Management Team Overview (suggest 8 pages plus 2 pages 11x17 for Organization Charts): 1. Provide Project Management Team Organization Chart(s) that graphically depict the hierarchy and reporting structure of the team members, with specific personnel identified. Two (2) 11x17 charts may be provided representing the management structures at different major phase of the Project effort. a. Personnel identified should include, as practical, executives, project managers, etc. down through field supervisors; b. Provide personnel qualification forms with their respective firms under Qualifications Forms below. 2. Provide a brief description of your management structure for the overall Project Team and their prior experience, if any, working together. The Proposer shall include, at a minimum, a brief narrative on the following items for each firm on the Project Team as appropriate: Clearly identify the Project Team personnel and their roles and responsibilities on the project; Describe any history of working relationship between team members; Clearly describe Proposer s understanding of the services and materials to be provided on the project; Describe this team s experience with design build contract projects; Request for Proposal Part 2-3 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

3. State why the proposed management structure will best serve the interests of the Project and provide a narrative clearly describing your Project Management Plan. If awarded the DBC contract, the Proposer shall not alter the Project Team identified in the Proposal at any time during design and/or construction without prior written permission by PhilaPort. 29B2-4.2 Work Plan (suggest 8 sheets): The Proposer shall describe its technical plan for accomplishing the Project. Outline and describe the steps necessary to successfully undertake the project from the Notice of Selection/Letter of Intent through completion. Specifically: a. Addresses design effort and phases of the design. Demonstrates Proposer's understanding of the design effort. b. c. Demonstrates Proposer's understanding of the Design/Build concept. Identifies potential design issues. d. Describes how team will minimize PhilaPort's risk. Detailed and logical approach to potential early construction packages, e. long lead items, and phasing of construction. f. Detailed and logical explanation and identification of critical material and equipment. Discusses/explains why they are critical, timing/lead times for acquisition and how they will be managed. g. Detailed and logical identification of construction challenges and proposed solutions. h. Outlines construction plan, site operations, and logistics. i. Identifies and describes jobsite controls, systems, practices. j. Addresses Information Technology solutions for document control, systems to be utilized and types of information to be controlled. k. Addresses Project Safety Plan. l. Provides outline of QA/QC plan. m. Detailed description of closeout process for training of tenant personnel, manuals, occupancy permits, commissioning, punch listing, and final closeout. 30B2-4.3 Project Master Schedule (suggest 3 sheets plus 3 pages 11x17 for CPM Schedule): Proposer s RFP Project Master Schedule This initial milestone schedule that is to be submitted as part of the Proposer s Technical Submission. a. Submitted detailed CPM schedule b. CPM schedule includes key interim milestones Request for Proposal Part 2-4 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

c. d. e. Schedule Narrative identifies and describes challenges and proposed solutions, critical path, and achievement of milestones Logic, credibility of schedule, and completeness of design elements of schedule Logic, credibility of schedule, and completeness of construction elements of schedule Full Design and Construction Schedule Do Not Submit a Full and Complete detailed CPM Schedule in the Technical Submission. Upon a receipt of a Letter of Intent/Notice of Selection/Notice of Award from PhilaPort, the successful DBC shall submit a full and complete contract schedule per the requirements of the General Conditions and Administrative Procedures. 31B2-4.4 Qualification Forms (See specific sheet/page limits below. Note also that Entity s Resource Availability shall be as of the date of the Technical Submission): 1. Design Build Contractor Qualification Form (suggest 4 sheets plus 1 sheet per person or if DBC is a Joint Venture, suggest no more than 3 sheets per member partner including Organization Chart plus 1 sheet per person.) Provide clear and concise information that will demonstrate the following qualifications. Combine qualifications if Joint Venture, Partnership, or other legally combined entity. a. Entity s Experience on Design Build Projects. i. Include date(s), location, owner, owner contact, project amount, and description. Complete and/or incomplete projects may be submitted. Discuss status of project and if completed as originally scheduled. b. Entity s Experience on projects with Vehicle Processing Centers processes and facilities. i. Include date(s), location, owner, owner contact, project amount, and project description. Complete and/or incomplete projects may be submitted. Discuss status of project and if completed as originally scheduled. c. Entity s Experience on projects with Vehicle Processing Centers. i. Include date(s), location, owner, owner contact, project amount, and project description. Complete and/or incomplete projects may be submitted. Discuss status of project and if completed as originally scheduled. d. Management Team Individual Qualifications (6 person limit). i. Describe project responsibilities, time with firm, experience with design build projects, educational or technical training, and Request for Proposal Part 2-5 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

any other information relevant to the evaluation of the individual. e. Entity s Statement of Readiness and Commitment of Resources. i. Provide a written statement confirming the persons identified in this RFP are available and will be committed to the project for the time period(s) referenced in the above Project Master Schedule and that the Resource Availability reported in item d. above will be committed to the project, as referenced in the Project Master Schedule and Work Plan. f. Entity s Statement regarding the entity s policy as to Diversity in the Workplace, and the Employment of Veterans. g. Entity s Prior history of default of debarment on projects. 2. Design Architect(s) Qualification Form (3 sheets including organization chart plus 1 sheet per person) Proposer shall provide clear and concise information that will demonstrate the following qualifications. Combine if Joint Venture, Partnership, or other legally combined entity. a. Firm s Experience on Design-Build projects greater than $25M. i. Include date(s), location, owner, owner contact, project amount, and project description. Complete and/or incomplete projects may be submitted. Discuss status of project and if completed as originally scheduled. b. Firm s Experience on Vehicle Processing Center projects. i. Include date(s), location, owner, owner contact, project amount, and project description. Complete and/or incomplete projects may be submitted. Discuss status of project and if completed as originally scheduled. b. Individual Qualifications (4 person limit). i. Describe project responsibilities, time with firm, experience with design build projects, and experience in Elevator projects, educational or technical training,, and any other information relevant to the evaluation of the individual. c. Firm s Statement of Readiness and Commitment of Resources per the Project Master Schedule. i. Provide a written statement confirming the person(s) identified in this RFP are available and will be committed to the project for the time period(s) referenced in the Request for Proposal Part 2-6 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

attached Project Master Schedule and that the Resource Availability reported in item d. above will be committed to the project, as referenced in the attached Project Master Schedule and Work Plan. d. Firm s Statement regarding the firm s policy as to Diversity in the Workplace, and the Employment of Veterans. e. Entity s Prior history of default of debarment on projects. 3. Design Site/Civil Engineer s Qualification Form (suggest 2 sheets including organization chart plus 1 sheet per person) Proposer shall provide clear and concise information that will demonstrate the following qualifications. Combine if Joint Venture, Partnership, or other legally combined entity. a. Firm s Experience on projects in excess of $25M. i. Include date(s), location, owner, owner contact, project amount, and project description. Complete and/or incomplete projects may be submitted. Discuss status of project and if completed as originally scheduled. b. Firm s Experience on Vehicle Processing Center projects. i. Include date(s), location, owner, owner contact, project amount, and project description. Complete and/or incomplete projects may be submitted. Discuss status of project and if completed as originally scheduled. c. Individual Qualifications (4 person limit). i. Describe project responsibilities, time with firm, experience with design build projects, and experience in elevator projects, educational or technical training, and any other information relevant to the evaluation of the individual. d. Firm s Statement of Readiness and Commitment of Resources per the Project Master Schedule. i. Provide a written statement confirming the person(s) identified in this RFP are available and will be committed to the project for the time period(s) referenced in the attached Project Master Schedule and that the Resource Availability reported in item d. above will be committed to the project, as referenced in the attached Project Master Schedule and Work Plan. e. Firm s Statement regarding the firm s policy as to Diversity in the Workplace, and the Employment of Veterans. Request for Proposal Part 2-7 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

f. Entity s Prior history of default of debarment on projects. 4. Design Geotechnical Engineer s Qualification Form (suggest 2 sheets including organization chart plus 1 sheet per person) Proposer shall provide clear and concise information that will demonstrate the following qualifications. Combine if Joint Venture, Partnership, or other legally combined entity. g. Firm s Experience on projects in excess of $10M. i. Include date(s), location, owner, owner contact, project amount, and project description. Complete and/or incomplete projects may be submitted. Discuss status of project and if completed as originally scheduled. h. Firm s Experience on Vehicle Processing Center projects. ii. Include date(s), location, owner, owner contact, project amount, and project description. Complete and/or incomplete projects may be submitted. Discuss status of project and if completed as originally scheduled. i. Individual Qualifications (4 person limit). ii. Describe project responsibilities, time with firm, experience with design build projects, and experience in elevator projects, educational or technical training, and any other information relevant to the evaluation of the individual. j. Firm s Statement of Readiness and Commitment of Resources per the Project Master Schedule. ii. Provide a written statement confirming the person(s) identified in this RFP are available and will be committed to the project for the time period(s) referenced in the attached Project Master Schedule and that the Resource Availability reported in item d. above will be committed to the project, as referenced in the attached Project Master Schedule and Work Plan. k. Firm s Statement regarding the firm s policy as to Diversity in the Workplace, and the Employment of Veterans. l. Entity s Prior history of default of debarment on projects. 5. Design Structural Engineer s Qualification Form (suggest 2 sheets including organization chart plus 1 sheet per person) Request for Proposal Part 2-8 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

Proposer shall provide clear and concise information that will demonstrate the following qualifications. Combine if Joint Venture, Partnership, or other legally combined entity. m. Firm s Experience on projects in excess of $10M. i. Include date(s), location, owner, owner contact, project amount, and project description. Complete and/or incomplete projects may be submitted. Discuss status of project and if completed as originally scheduled. n. Firm s Experience on Vehicle Processing Center projects. iii. Include date(s), location, owner, owner contact, project amount, and project description. Complete and/or incomplete projects may be submitted. Discuss status of project and if completed as originally scheduled. o. Individual Qualifications (4 person limit). iii. Describe project responsibilities, time with firm, experience with design build projects, and experience in elevator projects, educational or technical training, and any other information relevant to the evaluation of the individual. p. Firm s Statement of Readiness and Commitment of Resources per the Project Master Schedule. iii. Provide a written statement confirming the person(s) identified in this RFP are available and will be committed to the project for the time period(s) referenced in the attached Project Master Schedule and that the Resource Availability reported in item d. above will be committed to the project, as referenced in the attached Project Master Schedule and Work Plan. q. Firm s Statement regarding the firm s policy as to Diversity in the Workplace, and the Employment of Veterans. r. Entity s Prior history of default of debarment on projects. 6. Design MEP Design Qualification Form (suggest 2 sheets including organization chart plus 1 sheet per person) Proposer shall provide clear and concise information that will demonstrate the following qualifications. Combine if Joint Venture, Partnership, or other legally combined entity. MEP designer cannot be an affiliated company/firm in any way related to future MEP subcontract bidders. See Section 1-5. s. Firm s Experience on Design-Build projects greater than $25M. Request for Proposal Part 2-9 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

i. Include date(s), location, owner, owner contact, project amount, and project description. Complete and/or incomplete projects may be submitted. Discuss status of project and if completed as originally scheduled. t. Firm s Experience on Vehicle Processing Center projects. iv. Include date(s), location, owner, owner contact, project amount, and project description. Complete and/or incomplete projects may be submitted. Discuss status of project and if completed as originally scheduled. u. Individual Qualifications (4 person limit). iv. Describe project responsibilities, time with firm, experience with design build projects, and experience in elevator projects, educational or technical training,, and any other information relevant to the evaluation of the individual. v. Firm s Statement of Readiness and Commitment of Resources per the Project Master Schedule. iv. Provide a written statement confirming the person(s) identified in this RFP are available and will be committed to the project for the time period(s) referenced in the attached Project Master Schedule and that the Resource Availability reported in item d. above will be committed to the project, as referenced in the attached Project Master Schedule and Work Plan. w. Firm s Statement regarding the firm s policy as to Diversity in the Workplace, and the Employment of Veterans. x. Entity s Prior history of default of debarment on projects. 5. Construction - General Construction Entity Qualification Form (DBC or Subcontractor) (suggest 3 sheets including organization chart plus 1 sheet per person) Proposer shall provide clear and concise information that will demonstrate the following qualifications. Combine if Joint Venture, Partnership, or other legally combined entity. a. Entity s Experience on Design Build Projects greater than $25M. i. Include date(s), location, owner, owner contact, project amount, and description. Complete and/or incomplete projects may be submitted. Discuss status of project and if completed as originally scheduled. Request for Proposal Part 2-10 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1

b. Entity s Experience on projects with Vehicle Processing Center projects and facilities. i. Include date(s), location, owner, owner contact, project amount, and project description. Complete and/or incomplete projects may be submitted. Discuss status of project and if completed as originally scheduled. c. Entity s Experience on projects with Vehicle Processing Center projects. i. Include date(s), location, owner, owner contact, project amount, and project description. Complete and/or incomplete projects may be submitted. Discuss status of project and if completed as originally scheduled. d. Individual Qualifications (4 person limit). i. Describe project responsibilities, time with firm, experience with Design Build projects, and experience in Vehicle Processing Center projects and facilities, educational or technical training, and any other information relevant to the evaluation of the individual. e. Entity s Statement of Readiness and Commitment of Resources per the Project Master Schedule. i. Provide a written statement confirming the person(s) identified in this RFP are available and will be committed to the project for the time period(s) referenced in the attached Project Master Schedule and that the Resource Availability reported in item d. above will be committed to the project, as referenced in the attached Project Master Schedule and Work Plan. f. Statement regarding the Entity s policy as to Diversity in the Workplace, and the Employment of Veterans. g. Entity s Prior history of default of debarment on projects. 2-5. 3BCost Submittal Requirements. The Proposers shall submit one (1) original of its Cost Submittal Form in a sealed envelope which must be separate from the Technical and Small Diverse Business Submissions. The Cost Submittal shall be submitted using the Cost Submittal Form, which is provided as an Appendix C to this RFP. The Cost Submittal Form shall indicate a Lump Sum price to complete the scope of contract work required for this RFP. PhilaPort will not accept alternate pricing. Any attempt to submit alternate prices or alternate base bids other than as requested by the Cost Request for Proposal Part 2-11 Philadelphia Regional Port Authority PhilaPort Project No. 18-002.1