LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD

Similar documents
Q Financial Results

LEAGOLD ANNOUNCES 2018 EARNINGS, INCLUDING AISC OF $974/oz AND AISC MARGIN OF $83.2 MILLION

LEAGOLD ANNOUNCES FEASIBILITY STUDY FOR LOS FILOS MINE EXPANSION

LEAGOLD MINING IS BUILDING A NEW MID-TIER GOLD PRODUCER FOCUSED ON LATIN AMERICA

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

LEAGOLD MINING CORPORATION

SECOND QUARTER 2018 RESULTS. August 10, 2018

Argonaut Gold Announces Q2 Production of 29,237 Gold Equivalent Ounces. Cash Balance Increases to $54.1 Million. 2 nd Quarter.

Argonaut Gold Announces First Quarter 2015 Production of 43,255 Gold Equivalent Ounces

Marigold Life of Mine Plan

EDV EVR NEWS RELEASE. ENDEAVOUR MINING UPDATES HOUNDÉ PROJECT ECONOMICS FOLLOWING INCREASE IN MINERAL RESERVES TO 2.1Mozs

Orezone Announces Positive Preliminary Economic Assessment

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX: November 12, 2009

Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance

Detour Gold Announces 2016 Operating Results and 2017 Guidance

Alio Gold Reports Second Quarter 2018 Results

Gold Hawk Resources Inc.

Q4 and Year End 2012 Conference Call. ArgonautGold.com

Corporate Presentation

GOLDCORP DELIVERS RECORD 2009 GOLD PRODUCTION; PEER-LEADING FIVE-YEAR GROWTH PROFILE EXTENDED

Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates

ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866)

CANADA S INTERMEDIATE GOLD PRODUCER

TSX:AR CORPORATE PRESENTATION

EDV EVR NEWS RELEASE ENDEAVOUR MINING INCREASES MINERAL RESERVES TO 4.5 MILLION OZ WITH EXPLORATION ADDITIONS OF 870,000 OZ IN 2014

Endeavour Mining. Q4 and Full Year 2015 Results CREATING A PREMIER AFRICAN GOLD PRODUCER

Corporate Presentation

Exeter Secures Second Water Source Outlines Pathway for First Stage Development of Caspiche Oxides

Management s Discussion and Analysis

Spanish Mountain Gold Announces Results of New PEA for the First Zone

Exploration Projects September 30, 2014

SANDSTORM GOLD ACQUIRES 2% NSR ROYALTY ON ENDEAVOUR S HOUNDÉ GOLD MINE FROM ACACIA MINING

Coeur Provides Updated Palmarejo Mine Plan

Corporate Presentation

Argonaut Gold Announces Third Quarter 2018 Operating and Financial Results

Detour Gold Updates Life of Mine Plan for Detour Lake

Argonaut Gold Announces Third Quarter 2017 Operating and Financial Results

Dalradian Resources Reports Positive Preliminary Economic Assessment for the Curraghinalt Gold Project in Northern Ireland

Coeur Announces Initial Reserve Estimate and Reserve-Based Mine Plan for Silvertip Mine

Argonaut Gold Announces First Quarter 2018 Operating and Financial Results

GROWTH THROUGH CASH FLOW. Q Results 3 August 2017

Coeur Reports Year-End 2014 Mineral Reserves and Resources

Turquoise Hill files 2016 Oyu Tolgoi Technical Report

For further information: Investor Relations (416)

SILVERCORP REPORTS SIGNIFICANT GAIN IN MEASURED AND INDICATED MINERAL RESOURCES AT THE YING SILVER-LEAD-ZINC MINING DISTRICT, HENAN PROVINCE, CHINA

LUNDIN GOLD RECONFIRMS PROJECT SCHEDULE AND LOWERS ALL-IN SUSTAINING COST ESTIMATE TO US$583 PER OUNCE FOR ITS FRUTA DEL NORTE GOLD PROJECT

NEWS RELEASE. Coeur Reports Second Quarter 2014 Results

Corporate Presentation

Marlin Gold Closes Acquisition of Commonwealth Silver and Gold and Provides Corporate Update

Coeur Files Technical Report for Kensington Mine

RBC Capital Markets Underground Mining Technical Session Ernest Mast President & COO October 22, 2015

Kişladağ Update March 2018

PRESS RELEASE. Banro Files NI Technical Report on Namoya Project, Democratic Republic of the Congo

FIRST MAJESTIC SILVER CORP.

Cumberland Completes Cannu Gold Resource Estimate, Plans for New Reserves and Continued Exploration in 2007 at Meadowbank Gold Project

RNC MINERALS. Q Results Conference Call TSX:RNX. November 15, 2017

I N V E S T O R P R E S E N T A T I O N

A $100 per ounce decline in the gold price would reduce the reserves by approximately 3.3% or 310,000 ounces.

Goldcorp and Teck Combine El Morro and Relincho Projects in Chile

NEWS RELEASE New York AG February 25, 2019 Toronto FR Frankfurt FMV

October 25, Third Quarter Conference Call

New Gold Announces 2017 Financial Results with 11% Increase in Cash Flow Per Share (All dollar figures are in US dollars unless otherwise indicated)

Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019

Mako Mining Provides Corporate Update

YEAR END 2015 CONFERENCE CALL

Patrick F.N. Anderson President & CEO

Allied Nevada Announces Improved Mine Plan and Economics for Hycroft Mill Expansion With 77% IRR and $2.7 Billion NPV

KINROSS GOLD CORPORATION Q Results Conference Call & Webcast

Q CONFERENCE CALL

WESDOME ANNOUNCES FOURTH QUARTER AND FULL YEAR 2016 FINANCIAL RESULTS AND RESERVE AND RESOURCE UPDATE

AGNICO-EAGLE MINES LIMITED. Corporate Update. May 2012

ARGONAUT GOLD INC. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE MONTHS ENDED MARCH 31, 2014

Great Panther Reports First Quarter 2019 Production Results

Jinshan Gold Mines Inc. April 24, 2006

YEAR END 2016 CONFERENCE CALL. February 24, 2017

Scotiabank Mining Conference. December 3, 2014

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

PRESS RELEASE New Gold Reports Consolidated Reserve & Resource Statements

September 15, 2016 News Release SILVER STANDARD PROVIDES MARIGOLD FIVE-YEAR OUTLOOK

Corporate Update. June 2013

Focused on Cash Flow Generation NYSE: GSS TSX: GSC

RNC MINERALS. Q Results Conference Call TSX:RNX. August 15, 2018

Saramacca Reserve Declaration

SILVERCORP REPORTS Q1 RESULTS: NET INCOME UP 73%, CASH FLOWS FROM OPERATIONS UP 52% TO US$20.2 MILLION

AGM Presentation June 14, 2018

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance

ARGONAUT GOLD INC. (Formerly Argonaut Gold Ltd.) MANAGEMENT S DISCUSSION & ANALYSIS FOR THE QUARTER ENDED SEPTEMBER 30, 2010

Coeur Reports Year-End 2015 Mineral Reserves and Resources

SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS

CANADA S INTERMEDIATE GOLD PRODUCER

CANAMEX RESOURCES CORP. Suite 303, 595 Howe Street Vancouver, B.C. V5C 2T5 Phone: (604) Fax: (604)

Detour Gold Reports First Quarter 2018 Results and Provides Update on Mine Plan Assessment with Guidance Revisions for 2018

GOLDCORP REPORTS FIRST QUARTER 2016 RESULTS

THE ELEMENTS OF VALUE CREATION. Revised Prefeasibility Study Results. Dumont Nickel Project May 14, 2012

MIDWAY ANNOUNCES SIGNIFICANT UPGRADE IN RESOURCE AND 2014 BUDGET INCREASE AT SPRING VALLEY PROJECT, NEVADA

January 11, 2017 News Release SILVER STANDARD REPORTS FOURTH QUARTER 2016 PRODUCTION RESULTS AND 2017 GUIDANCE

Torex Announces Q Results With Record Gold Production

KINROSS GOLD CORPORATION

PRELIMINARY ECONOMIC ASSESSMENT FOR THE COMBINED LOS HELADOS AND JOSEMARIA COPPER/GOLD DEPOSITS NEARING COMPLETION

Coeur Reports 89% Increase in Silver Reserves and 76% Increase in Gold Reserves at Palmarejo Post-Paramount Acquisition

Transcription:

News Release TSX: LMC March 8, 2018 LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD Vancouver, March 8, 2018 Leagold Mining Corporation (TSX:LMC; OTCQX:LMCNF) ( Leagold or the Company ) has filed a NI 43-101 technical report on SEDAR entitled Technical Report for the Los Filos Gold Mine, Guerrero State, Mexico dated March 7, 2018 and having an effective date of December 31, 2017 (the Los Filos Technical Report ). As of December 31, 2017, Leagold s Proven and Probable mineral reserves ( P&P reserves ) totaled 2.7 million ounces ( Moz ) of gold (see Table 1), a 59% increase over the previous year. With estimated depletion from mining of 0.3 Moz during 2017, the estimated total addition to Proven and Probable reserves was 1.3 Moz during 2017. Figure 1: Los Filos P&P Reserve Growth during 2017 (excludes Bermejal Underground) +59% +1.3Moz -0.3Moz 2.7Moz 1.7Moz Dec 31/16 P&P Reserves (1) 2017 Depletion 2017 Additions Dec 31/17 P&P Reserves (2) 1 See NI 43-101 compliant technical report entitled Amended NI 43-101 Technical Report and Preliminary Economic Assessment, Los Filos Gold Mine, Guerrero State, Mexico dated March 1, 2017 and having an effective date of December 31, 2016 (the 2017 Technical Report ) for disclosure of the Proven and Probable mineral reserves. The 2017 Technical Report has been filed under Leagold s profile on SEDAR at www.sedar.com. 2 Disclosure of the Proven and Probable mineral reserves with Effective Date of December 31, 2017 is in Table 1. The detailed Mineral Resource and Mineral Reserve Tables and the accompanying notes are provided in an appendix to this news release. Neil Woodyer, CEO, stated We are extremely pleased with the 59% increase in P&P reserves at Los Filos, which reflects the success of our 2017 programs focused on extending mine life. Furthermore, this growth we are reporting today excludes any additional contribution from the Bermejal Underground expansion project, which has M&I resources of 2.1 Moz of gold (see Table www.leagold.com Page 1

3) at a grade of 5.96 g/t, as reported as of December 31, 2017. The Bermejal Underground expansion is currently in the mine design phase in preparation for declaration of reserves in mid- 2018. With the exploration success during 2017 and the reassessment of Los Filos long-term potential, studies are underway to evaluate building a carbon-in-leach processing plant, enabling higher recoveries for a wider range of ore types. The Los Filos Technical Report filed today focuses on the current Los Filos operations and excludes the additional contribution from the Bermejal Underground expansion project, which can only be reported as a mineral resource at this time until feasibility level studies are completed. A new site-wide technical report is expected in mid-2018 that will incorporate the Bermejal Underground expansion project within a site-wide production plan for Los Filos. Table 1. Los Filos Mine Mineral Reserve Statement (Effective Date of December 31, 2017) Classification Tonnes (kt) Au Grade Au Contained Ounces Ag Grade Ag Contained Ounces Proven 14,440 0.97 449 3.38 1,568 Probable 47,004 1.36 2,050 13.19 19,935 Subtotal Proven and Probable 61,444 1.26 2,499 10.88 21,503 Probable Leach Pad Inventory 216 Total Proven and Probable 2,715 1. Mineral Reserves are based on Measured and Indicated Mineral Resources. 2. Metal price assumption for gold was US$1,200/oz. 3. Tonnage and grade measurements are in metric units. Contained gold and silver ounces are reported as troy ounces. 4. Summation errors may be present due to rounding. 5. The detailed Mineral Resource and Mineral Reserve Tables and the accompanying notes are provided in an appendix to this news release. As detailed in Table 1 and as of December 31, 2017, Leagold s P&P open pit and underground mineral reserves totaled 61.4 Mt at an average grade of 1.26 g/t containing 2.5 Moz of gold plus a Probable heap leach reserve of 216 koz recoverable ounces (net of 2017 depletion and additions) for a total of 2.7 Moz of gold. Figure 2. Los Filos M&I Resource & Inferred Resource Growth during 2017 (including Bermejal Underground) 4.0Moz 5.7Moz 11.5Moz 11.4Moz Dec 31/16 M&I & Inferred Resources (1,3) M&I Resources Dec 31/17 M&I & Inferred Resources (2,3) Inferred Resources www.leagold.com Page 2

1 See the 2017 Technical Report for disclosure of the Measured and Indicated resources, Inferred resources. The 2017 Technical Report has been filed under Leagold s profile on SEDAR at www.sedar.com. 2 Disclosure of the Measured and Indicated mineral resources with an effective date of December 31, 2017 is provided in Table 2. The detailed Mineral Resource and Mineral Reserve Tables and the accompanying notes are provided in an appendix to this news release. 3 Mineral Resources are inclusive of Mineral Reserves and do not include dilution. Mineral resources were added at both the Bermejal Underground and Guadalupe areas, however more restrictive mineral resource classification was applied which resulted in movement of some mineral resources to the Inferred category; this is illustrated in Figure 2, which shows that the contained gold in Leagold s Measured and Indicated mineral resource categories remained similar to the previous year, but the contained gold in the Inferred mineral resource category increased by 1.7 Moz. Table 2. Los Filos Mine Mineral Resource Statement (Effective Date of December 31, 2017) Class Tonnes (kt) Gold grade Gold ounces Silver grade Silver ounces Measured 59,119 0.90 1,709 4.19 7,971 Indicated 321,482 0.94 9,751 10.23 105,714 Measured & Indicated 380,602 0.94 11,459 9.29 113,684 Inferred 240,469 0.74 5,739 10.23 79,056 1. Mineral resources are inclusive of mineral reserves and do not include dilution. 2. Metal price assumption for gold was US$1,400/oz. 3. Tonnage and grade measurements are in metric units. Contained gold and silver ounces are reported as troy ounces. 4. Summation errors may be present due to rounding. 5. The detailed Mineral Resource and Mineral Reserve Tables and the accompanying notes are provided in an appendix to this news release. The update of the Bermejal Underground mineral resource estimate to the end of 2017 is provided in Table 3 and reflects the additional infill holes that were completed at the end of the drilling program. Mine design and engineering is ongoing using this mineral resource estimate. Table 3. Mineral Resource for the Bermejal Underground Deposit (below current open pit mine design, Effective Date of December 31, 2017) Class Tonnes (kt) Gold grade Gold ounces Silver grade Silver ounces Measured 429 7.50 103 27.27 376 Indicated 10,384 5.90 1,969 19.28 6,437 Measured & Indicated 10,812 5.96 2,073 19.60 6,812 Inferred 3,643 4.65 545 16.36 1,916 1. Mineral resources are inclusive of mineral reserves and do not include dilution. 2. Metal price assumption for gold was US$1,400/oz. 3. Tonnage and grade measurements are in metric units. Contained gold and silver ounces are reported as troy ounces. 4. Summation errors may be present due to rounding. 5. This is the Bermejal Underground Deposit that is entirely below the current Mineral Reserves open pit. 6. The detailed Mineral Resource and Mineral Reserve Tables and the accompanying notes are provided in an appendix to this news release. www.leagold.com Page 3

Qualified Persons The year-end mineral reserves and mineral resources are derived from Los Filos Technical Report that was prepared under National Instrument 43-101 Standards of Disclosure for Mineral Projects ( NI 43-101 ). The Los Filos Technical Report was prepared for Leagold by Doug Reddy (Leagold, SVP Technical Services), Rodolfo Balderrama Neder (Administración Los Filos, S.A.P.I de C.V., a wholly-owned subsidiary of the Company, Mine Operations Manager), Paul Sterling (Consultant to Leagold) and Dr. Gilles Arseneau (Associate Consultant with SRK Consulting (Canada) Inc., and independent of the Company), each of whom is a Qualified Person as that term is defined in NI 43-101. The authors of the Los Filos Technical Report prepared or supervised the preparation of the technical information upon which this news release is based. Each of the authors have reviewed and approved the technical contents of this news release. The Los Filos Technical Report has been filed with the securities regulatory authorities in each of the Provinces and Territories of Canada, other than Québec, and can be found under the Company s profile on SEDAR at www.sedar.com. About Leagold Mining Corporation Leagold is building a new mid-tier gold producer with a focus on opportunities in Latin America. Leagold is based in Vancouver, Canada and is listed on the TSX under the trading symbol LMC and trades on the OTCQX market as LMCNF. The 2017 acquisition of the Los Filos Mine, a low-cost gold producer in Mexico, provides an excellent platform for growth. For more information on Leagold please visit the Company website at www.leagold.com or contact: Meghan Brown, VP Investor Relations +1-604-398-4525 mbrown@leagold.com CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS This news release contains forward looking information or forward looking statements within the meaning of applicable securities legislation. Forward-looking information and forward looking statements include, but are not limited to, statements with respect to the underground expansion project, declaration of reserves in mid-2018, possibility of a carbon-in-leach processing plant, potential for higher recoveries, and completion of a site-wide technical report. Generally, these forward looking information and forward looking statements can be identified by the use of forward looking terminology such as plans, expects or does not expect, is expected, budget, scheduled, estimates, forecasts, intends, anticipates or does not anticipate, will continue or believes, or variations of such words and phrases or state that certain actions, events or results may, could, would, might or will be taken, occur or be achieved. Statements concerning mineral resource estimates may also be deemed to constitute forward looking information to the extent that they involve estimates of the mineralization that will be encountered. The material factors or assumptions used to develop forward looking information or statements are disclosed throughout this document. Forward looking information and forward looking statements, while based on management s best estimates and assumptions, are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Leagold to be materially different from those expressed or implied by such forward-looking information or forward looking statements, including but not limited to: risks related to international operations; risks related to general economic conditions and credit availability, actual results of current exploration activities, unanticipated reclamation expenses; changes in project parameters as plans continue to be refined; fluctuations in prices of metals including gold; fluctuations in foreign currency exchange rates, increases in market prices of mining consumables, possible variations in mineral reserves, grade or recovery rates; www.leagold.com Page 4

failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes, title disputes, claims and limitations on insurance coverage and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, changes in national and local government regulation of mining operations, tax rules and regulations, and political and economic developments in countries in which the Company operates, actual resolutions of legal and tax matters, as well as those factors discussed in the section entitled Description of the Business Risk Factors in Leagold s most recent AIF available on SEDAR at www.sedar.com. Although Leagold has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information and forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information or statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information or statements. The Company has and continues to disclose in its Management s Discussion and Analysis and other publicly filed documents, changes to material factors or assumptions underlying the forward-looking information and forward-looking statements and to the validity of the information, in the period the changes occur. The forward-looking statements and forward looking information are made as of the date hereof and Leagold disclaims any obligation to update any such factors or to publicly announce the result of any revisions to any of the forward looking statements or forward looking information contained herein to reflect future results. Accordingly, readers should not place undue reliance on forward-looking statements and information. Appendix Mineral Resource Statement By Mining Method for Los Filos Mine (Effective Date of December 31, 2017) Class Mining Method Tonnes (kt) Measured Indicated Measured & Indicated Inferred Gold grade Gold ounces Silver grade Silver ounces Open Pit 58,008 0.75 1,405 3.87 7,208 Underground 1,111 8.49 304 21.31 763 Total 59,119 0.90 1,709 4.19 7,971 Open Pit 317,226 0.85 8,711 10.07 102,743 Underground 4,256 7.58 1,040 21.66 2,971 Total 321,482 0.94 9,751 10.23 105,714 Open Pit 375,234 0.84 10,116 9.11 109,951 Underground 5,367 7.79 1,344 21.64 3,734 Total 380,602 0.94 11,459 9.29 113,684 Open Pit 237,837 0.69 5,265 10.12 77,369 Underground 2,632 5.59 474 19.89 1,687 Total 240,469 0.74 5,739 10.23 79,056 1. Mineral resources are inclusive of mineral reserves and do not include dilution. 2. Mineral resources that are not mineral reserves do not have demonstrated economic viability. 3. Mineral resources are reported to a gold price of US$1,400/oz and a silver price of US$4.26/oz. 4. Open pit Mineral resources are defined within pit shells that use variable mining and recovery estimates depending on the geometallurgical domain and whether mineralization is projected to report to crush leach or is considered typical run-of-mine for processing requirements. 5. Open pit Mineral resources are reported to variable gold cut-off grades: Los Filos Open Pit 0.198 g/t Au, Bermejal Open Pit of 0.179 g/t Au. 6. Underground Mineral resources use a mining cost of US$84.78/t for Cut-and-Fill, process cost of US$6.75/t, and a process recovery of 80%. 7. Mineral resources are reported to a gold cut-off grade: Los Filos Underground of 3.39 g/t Au; Bermejal Underground of 3.0 g/t Au. 8. Tonnages are rounded to the nearest 1,000 tonnes, grades are rounded to two decimal places for Au, grades for Ag are rounded to two decimal places; rounding as required by reporting guidelines may result in apparent summation differences. 9. Includes both oxide and sulphide mineralization. www.leagold.com Page 5

Los Filos Mine Total Mineral Reserve Statement (Effective Date of December 31, 2017) Class Mining Method Tonnes (kt) Gold grade Gold ounces Silver grade Silver ounces Open Pit 13,921 0.70 312 3.01 1,349 Proven Underground 519 8.21 137 13.10 219 Total 14,440 0.97 449 3.38 1,568 Open Pit 45,679 0.70 1,702 3.01 18,956 Probable Underground 1,325 8.55 348 13.10 979 Total 47,004 1.36 2,050 13.19 19,935 Open Pit 59,600 1.05 2,014 10.60 20,305 Proven & Probable Underground 1,844 8.18 485 20.20 1,198 Total 61,444 1.26 2,499 10.88 21,503 1. Mineral Reserves are based on Measured and Indicated Mineral Resources within pit designs and supported by a mine plan, featuring variable throughput rates (depending on the pit being mined), variable metallurgical recoveries (depending on geometallurgical domain), and cut-off optimization. 2. Metal price assumption for gold was US$1,200/oz. 3. Open Pit Mineral Reserves: a. Los Filos Open Pit includes the mineralization within the planned 4P pit extension. Bermejal Open Pit includes the mineralization within the planned Guadalupe pit extension. b. Los Filos Open Pit crush-leach ore is based on an operational 0.433 g/t Au cut-off grade; ROM ore is based on a variable 0.247 to 0.581 g/t Au operational cut-off grade that is determined by lithology. Los Filos Mineral Reserve is based on a 0.191 g/t Au cut-off grade. El Bermejal Open Pit crush-leach ore is based on an operational 0.395 g/t Au cut-off grade; ROM ore is based on a variable 0.257 to 0.368 g/t Au operational cut-off grade that is determined by lithology. Bermejal Open Pit Mineral Reserve is based on a 0.20 g/t Au cut-off grade. c. Process gold recoveries vary from 54% to 76% for crush-leach ore and from 30% to 64% for ROM ore at Los Filos Open Pit; recoveries at Bermejal Open Pit for crush-leach ore vary from 51% to 68 and from 42% to 58% for ROM ore. A 5% silver recovery is assumed from all geometallurgical domains. 4. Underground Mineral Reserves: a. Are contained within stope designs that have a minimum horizontal continuity of 10 m, and minimum mining width of 3.5 m, and supported by a mine plan that features variable stope thicknesses depending on zone; and cut-off optimization. b. Are reported based on a cut-off grade of 3.77 g/t Au for stopes within 100 m of planned ramp and 4.44 g/t Au for stopes requiring development. c. Dilution is assigned an average of 14% at a 0 grade for Au and Ag. d. Mining recovery is variable, based on stope width and can range from 75% to 100%. e. Process gold recoveries are estimated at 80% for Los Filos Underground ore. A 5% silver recovery is assumed from all zones. 5. Tonnage and grade measurements are in metric units. Contained gold and silver ounces are reported as troy ounces. 6. Summation errors may be present due to rounding. www.leagold.com Page 6