MCEWEN MINING ANNOUNCES UPDATED PRELIMINARY ECONOMIC ASSESSMENT FOR THE LOS AZULES COPPER PROJECT (All Dollar Amounts in US Dollars)

Similar documents
MCEWEN MINING ANNOUNCES UPDATED RESERVE & RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES

MCEWEN MINING ANNOUNCES RECORD RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

McEWEN MINING REPORTS 2015 FIRST QUARTER OPERATING & FINANCIAL RESULTS

McEWEN MINING ANNOUNCES POSITIVE FEASIBILTY STUDY FOR EL GALLO PHASE II, MEXICO

MCEWEN MINING PROVIDES FIRST QUARTER 2012 OPERATIONAL AND DEVELOPMENT UPDATE

MCEWEN MINING ANNOUNCES Q OPERATING & FINANCIAL RESULTS

MCEWEN MINING REPORTS 2017 FULL YEAR AND Q4 RESULTS

MCEWEN MINING REPORTS 2015 FULL YEAR AND Q4 RESULTS

MCEWEN MINING INTERSECTS 53.9 g/t GOLD OVER 8.3 m AT THE FROOME FOOTWALL

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

NEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE

MCEWEN MINING UPDATES POSITIVE FEASIBILITY STUDY FOR GOLD BAR MINE, NEVADA

ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866)

Spanish Mountain Gold Announces Results of New PEA for the First Zone

Exeter Secures Second Water Source Outlines Pathway for First Stage Development of Caspiche Oxides

PRESS RELEASE FOR IMMEDIATE RELEASE May 13, 2016

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

Kişladağ Update March 2018

Los Azules Copper NSR Royalty Holding

January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts in US dollars)

Turquoise Hill files 2016 Oyu Tolgoi Technical Report

Argonaut Gold Announces Updates on the Magino and San Agustin Projects. Magino Metallurgical Column Test Work Shows Results of up to 70% Recovery

Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019

Bellhaven Receives Favourable Preliminary Economic Assessment for its 100%- Controlled La Mina Gold-(Copper, Silver) Project, Colombia

NEWS RELEASE JANUARY 29, 2015

AVINO SILVER & GOLD MINES LTD.

PRESS RELEASE New Gold Reports Consolidated Reserve & Resource Statements

Skouries Update March 2018

TSX:AR CORPORATE PRESENTATION

PRUDENTAND DISCIPLINED

SANDSTORM GOLD ROYALTIES RELEASES HOD MADEN PFS AND INCREASES PRODUCTION GUIDANCE

Ann Mason and the Revival of the Yerington District Nevada, USA. Robert Cann Robert Cinits Tom Watkins December 2014

Capstone Extends Pinto Valley Mine Life to 2026 (all amounts in US dollars)

Hudbay Announces Updated Technical Report for Constancia and Provides Annual Reserve and Resource Update

NOVEMBER NYSE American: PZG

Telson Mining Corporation Announces Positive Preliminary Economic Assessment for the Campo Morado Mine

Detour Gold Updates Life of Mine Plan for Detour Lake

CANAMEX RESOURCES CORP. Suite 303, 595 Howe Street Vancouver, B.C. V5C 2T5 Phone: (604) Fax: (604)

AGNICO-EAGLE MINES LIMITED. Corporate Update. May 2012

May 31, 2017 News Release SILVER STANDARD FORMS JOINT VENTURE WITH GOLDEN ARROW AND FILES TECHNICAL REPORT FOR THE CHINCHILLAS PROJECT

YEAR END 2016 CONFERENCE CALL. February 24, 2017

Antioquia Gold Announces Preliminary Economic Assessment and Mineral Resource Update for Cisneros Gold Project

Q Earnings Review

Coeur Provides Updated Palmarejo Mine Plan

GOLD RESERVE ANNOUNCES IMPROVED BRISAS PROJECT ECONOMICS AND UPDATES BRISAS PROJECT REPORT

YEAR END 2015 CONFERENCE CALL

ATLANTIC ANNOUNCES STRATEGIC INVESTMENT IN VELOCITY MINERALS LTD.

SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS

Gold Hawk Resources Inc.

AGM Presentation June 14, 2018

Allied Nevada Announces Hycroft Mill Expansion Feasibility Results Highlighted by Improved Projected Returns

Continental Gold Announces a Positive Feasibility Study for the Buriticá Project

MAG Silver Reports Juanicipio Updated PEA Study Prepared by AMC

Boto Gold Project Feasibility Study Conference Call

Hudbay Announces 2016 Production Guidance and Capital and Exploration Expenditure Forecasts

Orezone Announces Positive Preliminary Economic Assessment

AVINO SILVER & GOLD MINES LTD.

Avnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project

Q Earnings Review

Detour Gold Reports Third Quarter 2018 Results

HBM. Creating Sustainable Value through High Quality Long Life Deposits

(PEA) for its project in. anticipated. which are. to produce. Highlights. ounces is now. The 3,500 tpd. After-tax NAV. Guatemala this year,

Q PRESENTATION

First Quarter 2012 Results

Coeur Announces Initial Reserve Estimate and Reserve-Based Mine Plan for Silvertip Mine

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance

Bank of America Merrill Lynch 2014 Global Metals, Mining & Steel Conference

Q4 and FY 2018 Earnings Review

OSISKO UPDATES CANADIAN MALARTIC MINE PLAN

MIDWAY ANNOUNCES SIGNIFICANT UPGRADE IN RESOURCE AND 2014 BUDGET INCREASE AT SPRING VALLEY PROJECT, NEVADA

Barrick Reports Project Study Results

Northgate Minerals Reports Second Quarter Results

Corporate Update. June 2013

Goldcorp and Teck Combine El Morro and Relincho Projects in Chile

MAG Silver Corp. August 14, 2013

Q4 and Year End 2012 Conference Call. ArgonautGold.com

All amounts are in US dollars, unless otherwise indicated.

NEWS RELEASE. Centerra Gold Announces Positive Feasibility Study on the Öksüt Project

Detour Gold Reports 2017 Fourth Quarter and Year-End Results

Allied Nevada Announces Improved Mine Plan and Economics for Hycroft Mill Expansion With 77% IRR and $2.7 Billion NPV

Torex Announces Q Results With Record Gold Production

PRESS RELEASE. Banro Files NI Technical Report on Namoya Project, Democratic Republic of the Congo

TSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS

Marigold Life of Mine Plan

MANAGEMENT S DISCUSSION & ANALYSIS QUARTERLY HIGHLIGHTS SEPTEMBER 30, 2017

Copper and Gold at Our Core

Coeur Files Technical Report for Kensington Mine

GOLDEN MINERALS REPORTS FIRST QUARTER 2018 RESULTS

KINROSS GOLD CORPORATION

Argonaut Gold Announces Q2 Production of 29,237 Gold Equivalent Ounces. Cash Balance Increases to $54.1 Million. 2 nd Quarter.

GSCI/S&P500 Ratio: Relative Value Equities vs Commodities

NEWS RELEASE NR: October 11, 2017

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX: November 12, 2009

NEWS RELEASE. Coeur Reports Second Quarter 2014 Results

Marlin Gold Closes Acquisition of Commonwealth Silver and Gold and Provides Corporate Update

Pretivm Reports Third Quarter 2018 Results

International Tower Hill Mines Announces Livengood Gold Project Feasibility Study Results

Forward Looking Statement

SILVER PRODUCER STRENGTH UPSIDE PRIMARY SILVER PRODUCER. Primary Silver Producer 57% Ag, 33% Au, 10% Pb-Zn

Transcription:

MCEWEN MINING ANNOUNCES UPDATED PRELIMINARY ECONOMIC ASSESSMENT FOR THE LOS AZULES COPPER PROJECT (All Dollar Amounts in US Dollars) TORONTO, ONTARIO - (September 23, 2013) - McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) is pleased to announce the results of an updated Preliminary Economic Assessment ( PEA ) on its 100% owned Los Azules Copper Project (the "Project") in San Juan Province, Argentina. The results from the PEA demonstrate that Los Azules has the potential to become one of the largest, lowest cost copper mines in the world. In addition, there remains excellent exploration potential to further expand the size of the existing mineral resource. Highlights from the PEA are shown below: PEA Study Highlights* ($3.00/lb Copper and $1,300/oz Gold) Pre-tax Net Present Value ( NPV ) of $3.0 billion (8% discount rate) and an Internal Rate of Return ( IRR ) of 17.6%. After-tax NPV of $1.7 billion (8% discount rate) and an IRR of 14.3%. Annual copper production during years 1-5 to average 255,000 tonnes (563 million lbs), which would have placed it in the top 3%¹ of copper mines in the world during 2012. Life of mine ( LOM ) annual copper production to average 171,000 tonnes (377 million lbs) over 35 years. Cash operating costs during years 1-5 to average $0.87/lb copper (net of gold by-product), placing it in the bottom 14%¹ in the world during 2012. Cash operating costs over entire mine life to average $1.08/lb copper (net of gold by-product). Indicated resource of 5.4 billion pounds of copper and 0.8 million ounces of gold and Inferred resource of 14.3 billion pounds of copper and 2.6 million ounces of gold (please see Table 2 below for resource details). Initial capital costs to construct the mine and a 120,000 tonnes per day ( tpd ) process plant have been estimated at $3.9 billion. Capital payback on a pre-tax basis has been estimated at 3.8 years at $3.00/lb copper and $1,300/oz gold. ¹ Based on internal market data. Our updated PEA is the result of a very successful exploration program which has significantly increased our resources. Combined with a change in the process method the estimated mine life has increased by 37%, total copper production by 44%, and production costs per pound of copper remain low. The new PEA includes plans for producing a copper cathode at site, which will greatly reduce export taxes and project risk by eliminating the need for a slurry pipeline, stated Rob McEwen, Chief Owner. McEwen Mining Inc. September 23, 2013 Page 1

The updated PEA contemplates the construction of a mine and process plant operating over a 35 year mine life at a throughput of 120,000 tonnes per day. The mine would produce a copper cathode via a pressure oxidative leach process, in addition to heap leaching the lower grade mineralized material. Compared to the previous PEA released in December 2010, there have been two significant improvements to the project: 1) Resource Size: Indicated and Inferred resources have increased by 184% and 55% respectively, which were slightly offset with decreases in respective grades of 14% and 12%. Overall, this has led to a 37% increase in mine life and 44% increase in total copper production. 2) Process Methodology: The current PEA plans to produce copper cathode at site whereas the 2010 PEA contemplated producing copper concentrate and transporting it via pipeline through Chile. The main advantages of producing copper cathode at site are that it eliminates this previously planned pipeline through Chile, which was a substantial risk for the project, as well as an overall increase in recovered metal, both copper and gold. Additional benefits include: i) a reduction in export taxes (5% payable on cathode versus 10% on concentrate) and, ii) the removal of treatment and refining charges from the smelting process. Table 1: Pertinent Details of the PEA Pre-tax NPV ($3.00/lb Cu, 8% discount rate) $3.02 billion After-tax NPV $1.68 billion Pre-tax IRR 17.6% After-tax IRR 14.3% Initial Capital Expenditure $3.92 billion LOM Sustaining Capital $1.47 billion LOM Average Operating Costs $8.65/t ore First 5 Years Average C-1¹ Cash Costs (net of by-product credits) $0.87/lb Cu LOM Average C-1 Cash Costs (net of by-product credits) $1.08/lb Cu Nominal Mill Capacity 120,000 tpd Average Tonnes of Mineralized Material Processed Annually Mill 43 million tonnes Average Tonnes of Mineralized Material Processed Annually - Heap Leach 6 million tonnes Mine Life 34.9 years LOM Strip Ratio 0.76 LOM average annual copper production 171,000t or 377m lbs First 5 years average annual copper production 255,000t or 563m lbs ¹ C-1 cash costs include at-mine cash operating costs, treatment and refining charges, mine reclamation and closure costs, and copper cathode and gold doré transportation and freight costs. In comparing the economics to the 2010 PEA, the pre-tax NPV discounted at 8% has increased from $2.8 billion to $3.0 billion and the IRR has decreased from 21.4% to 17.6%. In addition, the payback of pre-production capital has increased from 3.1 years to 3.8 years from the start of production. The previous PEA did not include economics that were calculated on an after-tax basis. The PEA contains a cash flow model based upon the geological and engineering work completed to date and technical and cost inputs developed by Samuel Engineering, Inc., Ausenco Vector, WLR Consulting, Inc., and MTB Project Management Professionals, Inc. The base case was developed using long term forecast metal prices of $3.00/lb for copper and $1,300/oz for gold. The Canadian National Instrument 43-101 ( NI 43-101 ) technical report summarizing the results of the updated PEA will be filed on SEDAR and the Company s website within 45 days of this press release. McEwen Mining Inc. September 23, 2013 Page 2

NPV @ 8% (billions) IRR (%) Table 2: Los Azules Mineral Resource Estimate Cut-off Grade Tonnage Cu Grade Cu lbs Au Grade Au Oz (Cu%) (million (%) (billions) (grams per (millions) tonnes) tonne) Indicated Resource 0.35 389 0.63 5.39 0.07 0.84 Inferred Resource 0.35 1,397 0.46 14.3 0.06 2.58 * The PEA is preliminary in nature and includes the use of inferred resources which are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Thus, there is no certainty that the results of the PEA will be realized. Actual results may vary, perhaps materially. The level of accuracy for the estimates contained within the PEA is approximately +/- 35%. The following chart shows the sensitivity of the base case's pre-tax NPV (8% discount rate) and IRR to changes in the copper price: Sensitivity of NPV and IRR to Copper Price $7 $6 $5 35% 30% 25% $4 $3 $2 $1 $0 -$1 $2.00 $2.25 $2.50 $2.75 $3.00 $3.25 $3.50 $3.75 $4.00 NPV @ 8% (billions) -$.4 $.4 $1.3 $2.2 $3.0 $3.9 $4.7 $5.6 $6.4 IRR (%) 6.5% 9.6% 12.4% 15.1% 17.6% 20.0% 22.3% 24.5% 26.6% Copper Price ($/lb) 20% 15% 10% 5% 0% -5% McEwen Mining Inc. September 23, 2013 Page 3

NPV @ 8% (billions) The following chart shows the sensitivity to copper price, operating costs, and capital costs. The graph shows that the project pre-tax NPV is much more sensitive to copper price than to capital or operating costs. Sensitivity of NPV to Copper Price, Operating Costs and Capital Costs $8 Copper Price Operating Costs Capital Costs $7 $6 $5 $4 $3 $2 $1 $0 -$1 -$2-40% -30% -20% -10% Base +10% +20% +30% +40% % Increase or Decrease of Variable ABOUT MCEWEN MINING (www.mcewenmining.com) The goal of McEwen Mining is to qualify for inclusion in the S&P 500 by creating a high growth gold producer focused in the Americas. McEwen Mining's principal assets consist of the San José mine in Santa Cruz, Argentina (49% interest); the El Gallo 1 mine and El Gallo 2 project in Sinaloa, Mexico; the Gold Bar project in Nevada, US; the Los Azules project in San Juan, Argentina and a large portfolio of exploration properties in Argentina, Mexico and Nevada. McEwen Mining has 297,114,359 shares issued and outstanding at September 13, 2013. Rob McEwen, Chairman, President and Chief Owner, owns 25% of the shares of the Company (assuming all outstanding Exchangeable Shares are exchanged for an equivalent amount of Common Shares). TECHNICAL INFORMATION The information presented in this press release has been reviewed and approved by Richard Kunter, FAusIMM CP, QP, Steven Pozder, PE, Robert Sim, P.Geo., Bruce Davis, PhD, FAusIMM, James K. Duff, P.Geo., William Rose, PE, and Scott Elfen, PE, all of whom are qualified persons and all of whom but James K. Duff are considered independent of McEwen Mining, as defined by Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects ( NI 43-101 ). The PEA has been prepared in accordance with the standards set out in NI 43-101 and was prepared by the following consortium of independent professionals and technical firms: McEwen Mining Inc. September 23, 2013 Page 4

Consultant MTB Project Management Professionals, Inc. Richard Kunter of Samuel Engineering, Inc. Steven Pozder of Samuel Engineering, Inc. Robert Sim of SIM Geological, Inc. Bruce Davis of BD Resource Consulting Bruce Davis of BD Resource Consulting William Rose of WLR Consulting, Inc. Scott Elfen of Ausenco Vector James K. Duff Contribution PEA study manager, provided input on project infrastructure, owner s costs, mine capital and operating costs (in collaboration with William Rose of WLR Consulting), and cash flow modeling. Review of metallurgical testing and mineral processing. Review of cash flow modeling, project infrastructure, operating costs and economic evaluation. Mineral resource estimate. Quality control for the assaying of the Los Azules drill core. Development of the mine plan and production schedule. Project infrastructure, geotechnical facilities design, capital and operating costs. Information about the geology and mineralization, exploration, and environmental liabilities, studies and permitting. All drill core samples were collected in accordance with industry standards. Splits from the drill core samples were submitted to the ACME sample preparation laboratory in Mendoza, Argentina, and then transferred to ACME's laboratory in Santiago, Chile for fire assay and ICP analysis. Accuracy of results is tested through the systematic inclusion of standards, blanks and check assays.. For further information about the current Los Azules Mineral Resource, see the Company s news release titled McEwen Mining Continues to Expand Los Azules Large, High-Grade, Mineral Resource, dated February 5, 2013. The mineral resource estimate referenced in this news release was prepared in January 2013 by Robert Sim, P.Geo. and Bruce Davis, PhD, FAusIMM, each a qualified person and independent of McEwen Mining, as defined by NI 43-101. The foregoing mineral resource estimate was employed in the preparation of the PEA that is the subject matter of this news release and is the current mineral resource on the Los Azules Copper Project. For additional non-resource information about the Los Azules project see the technical Report titled "Los Azules Porphyry Copper Project, San Juan Province, Argentina" dated August 1, 2012, with an effective date of June 15, 2012, prepared by D. Ernest Winkler, PE, Robert Sim, P.Geo., Bruce Davis, PhD, FAusIMM and James K. Duff, P.Geo., all of whom are qualified persons and all of whom but James K. Duff are independent of McEwen Mining, each as defined by NI 43-101. The foregoing news release and technical report are available under the Corporation s profile on SEDAR (www.sedar.com). The 2010 PEA is included for comparative purposes as it represents the most recent economic analysis completed on the Los Azules Copper Project prior to the PEA disclosed herein. Readers are cautioned that the 2010 PEA was superseded by the technical report and news release referenced immediately McEwen Mining Inc. September 23, 2013 Page 5

above. Historic information pertaining to the economic analysis disclosed in the 2010 PEA should not be relied upon. The 2010 PEA was disclosed in a technical report titled "Canadian National Instrument 43-101 Technical Report Updated Preliminary Assessment, Los Azules Project, San Juan Province, Argentina" with an effective date of December 1, 2010 (released December 16, 2010) was prepared by Kathleen Altman, Ph.D., PE, Robert Sim, P.Geo,. Bruce Davis, PhD, FAusIMM, Richard Jemielita, Ph.D., MIMMM, William Rose, PE, and Scott Elfen, PE. Each of the authors was at the time of publication independent of Minera Andes Inc. (now McEwen Mining Inc.) and Qualified Persons, as defined by NI 43-101. The 2010 PEA is available under the Minera Andes Inc. s (acquired by McEwen Mining Inc. in 2012) profile on SEDAR (www.sedar.com). CAUTIONARY NOTE TO US INVESTORS REGARDING RESOURCE ESTIMATION McEwen Mining prepares its resource estimates in accordance with standards of the Canadian Institute of Mining, Metallurgy and Petroleum referred to in Canadian National Instrument 43-101 (NI 43-101). These standards are different from the standards generally permitted in reports filed with the SEC. Under NI 43-101, McEwen Mining reports measured, indicated and inferred resources, measurements, which are generally not permitted in filings made with the SEC. The estimation of measured resources and indicated resources involve greater uncertainty as to their existence and economic feasibility than the estimation of proven and probable reserves. U.S. investors are cautioned not to assume that any part of measured or indicated resources will ever be converted into economically mineable reserves. The estimation of inferred resources involves far greater uncertainty as to their existence and economic viability than the estimation of other categories of resources. CAUTION CONCERNING FORWARD-LOOKING STATEMENTS This news release contains certain forward-looking statements and information, including "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. The forward-looking statements and information expressed, as at the date of this news release, McEwen Mining Inc.'s (the "Company") estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements and information are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties, risks and contingencies, and there can be no assurance that such statements and information will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements and information. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements and information include, but are not limited to, factors associated with fluctuations in the market price of precious metals, mining industry risks, political, economic, social and security risks associated with foreign operations, the ability of the corporation to receive or receive in a timely manner permits or other approvals required in connection with operations, risks associated with the construction of mining operations and commencement of production and the projected costs thereof, risks related to litigation, the state of the capital markets, environmental risks and hazards, uncertainty as to calculation of mineral resources and reserves and other risks. Readers should not place undue reliance on forward-looking statements or information included herein, which speak only as of the date hereof. The Company undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. See McEwen Mining's Annual Report on Form 10-K for the fiscal year ended December 31, 2012 and other filings with the Securities and Exchange Commission, under the caption "Risk Factors", for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information regarding the Company. All forward-looking statements and information made in this news release are qualified by this cautionary statement. The NYSE and TSX have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this news release, which has been prepared by management of McEwen Mining Inc. McEwen Mining Inc. September 23, 2013 Page 6

For further information contact: Sheena Scotland Investor Relations Tel: (647) 258-0395 ext 410 Toll Free: (866) 441-0690 Fax: (647) 258-0408 Mailing Address 181 Bay Street Suite 4750 Toronto, ON M5J 2T3 PO box 792 E-mail: info@mcewenmining.com Facebook: facebook.com/mcewenrob Twitter: twitter.com/mcewenmining McEwen Mining Inc. September 23, 2013 Page 7