Political and Regulatory Risk in Infrastructure Projects

Similar documents
Mitigation of Political & Regulatory Risk in Infrastructure Projects Introduction and Landscape of Risk

Jay Bhagwan Water Research Commission

OECD-India Investment Roundtable. India s Investment Policies and Outlook

Selecting the Right Projects / Sectors for PPP Implementation

Draft PPP Policy Outline

EAST AFRICAN COMMUNITY. CHALLENGES AND OPPORTUNITIES OF CLIMATE CHANGE: Post COP19 Perspective of East African Civil Society Organizations

Best Practices for Establishing Geothermal Legal Framework. Legal Risk Management in a Geothermal Regime 5.1

Enhancing legal conditions for infrastructure investment in the Mediterranean raising awareness of risk mitigation instruments

Common Agricultural Policy Modernisation and Simplification

LEGAL ASPECTS OF PROJECT FINANCE. Anjan Neupane Partner/Advocate Neupane Law Associates IN NEPAL

Public Private Partnerships for Infrastructure Financing

ImPRovE. Poverty Reduction in Europe: Social policy and innovation

Submission to the House of Commons Standing Committee on Finance. Priorities for the 2015 Federal Budget

FDI & Development: Policy Challenges

transport consultancy and engineering The 3rd of may of 2012

Spain: Opportunities for foreign investors

The Rule of Law as a Factor for Competitiveness

Rewarding expropriation?

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

OECD Workshop on Evaluation and Priority Setting September 2008, 2

Spurring Growth of Renewable Energies in MENA through Private Sector Investment

INDIA & FRANCE. 30/11/2012 Bernard Dufresne Economic Counsellor French Consulate General in Mumbai

Accelerator Discussion Frame Accelerator 1. Sustainable Financing

International Taxation Conference FIT-IBFD

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM between THE KINGDOM OF NORWAY,

Scaling up investment in Infrastructure: The Indian experience

Oshkosh Corporation Tax Strategy

COMPANY PROFILE ACCIONA INTEGRATES SUSTAINABILITY AS A DRIVER OF CHANGE AND PROGRESS VALUES MISSION VISION VALUE GENERATION

Economic Stimulus Packages and Steel: A Summary

WHY INVEST IN TURKEY?

MAY Carbon taxation and fiscal consolidation: the potential of carbon pricing to reduce Europe s fiscal deficits

Utilizing MIGA Products to Support Renewable Energy Projects

POLICY ON RISK MANAGMENET

Green Finance for Green Growth

Welcome to the Presentation On Public Private Partnership Policy, Performance and Prospects of Bangladesh.

Council conclusions on the European Union Strategy for the Adriatic and Ionian Region (EUSAIR)

Sumant Chak MAKING PPP ATTRACTIVE FOR PRIVATE FINANCE IN INFRASTRUCTURE THE INDIA STORY. Asian Institute of Transport Development

User Forum Continuous Descent Operations. Implementation in Europe. Brent Day & Veronica McMahon

Outlines. Myanmar Until Investment Related Reforms Policy Change Legal Framework (MIL & MCL) Regulatory Framework Institutional Framework

CORPORATE SOCIAL RESPONSIBILITY POLICY

POLISH BUSINESS VISIT TO GHANA

ANNUAL REVIEW BY THE COMMISSION. of Member States' Annual Activity Reports on Export Credits in the sense of Regulation (EU) No 1233/2011

Resource Nationalism Managing the Risks

Overview of the framework

Luxembourg High-level Symposium: Preparing for the 2012 DCF

Leveraging Private Investment for Climate-Related Activities. CCXG Global Forum, OECD

Legal aspects to take into account for small hydropower projects in Africa

EU STATE AID. An International Tax Perspective. Wednesday, December 7, :00 p.m. 5:00 p.m. GMT

India: Public Private Partnerships in Highways Sector

SAMOA S SMOOTH TRANSITION STRATEGY REPORT

The Role of the Public and Private Sector in Transport Infrastructure

E1/95. Green Evaluation TenneT Holding B.V. Green Bonds. Transaction Overview. Green Evaluation Overview. Overall Score. Transparency.

AMENDMENTS EN United in diversity EN. European Parliament 2015/0263(COD) Draft opinion Curzio Maltese (PE582.

Improving the business environment for SMEs through effective regulation

CLIMATE REPORT 2017 PRIVATE SECTOR AND CLIMATE FINANCE IN THE G20 COUNTRIES

The EU s Comprehensive Approach in External Conflict and Crisis: from Strategy to Practice

Eversheds. Contents. Doing Business in Africa Avoiding legal pitfalls. 1. Presentation of Eversheds in Africa. 2. Doing Business in Africa

Investor Day April 2010 INVESTMENT STRATEGY. Mr. DAVID DIAZ Corporate Development Director

COMMON TRENDS 2016; ESG, CSR & SDG s. Parul Sharma Head of CSR Compliance, Advokatfirman Vinge

IFC Transaction Advisory Services Creating opportunity where it s needed most. From Concept Design to Project Execution

EVALUATION AND FITNESS CHECK (FC) ROADMAP

Making the case for road preservation to meet social expectations

SUPPORTING INFRASTRUCTURE DEVELOPMENT IN ASEAN ECONOMIES: THE ACCESS TO RISK MITIGATION INSTRUMENTS. Knut Gummert, OECD Southeast Asia Division

Joint Venture and Shareholder Dispute Advisory Services

The Proposed UNPAN Classified Keywords 1 August 2001

DOCUMENT OF THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT STRATEGY FOR CROATIA: REPORT ON THE INVITATION TO THE PUBLIC TO COMMENT

Zimbabwe National Review Report on SDG Implementation

Table of Recommendations

Structural transformation in the era of international production: Risks, Opportunities and Policy Challenges

European Parliament resolution of 6 April 2011 on the future European international investment policy (2010/2203(INI))

Improving public investment efficiency for infrastructure development

ANNUAL REVIEW BY THE COMMISSION. of Member States' Annual Activity Reports on Export Credits in the sense of Regulation (EU) No 1233/2011

The Connecting Europe Facility (CEF) Regulation and its impact on Cyprus Republic

The European debate on TTIP and global impacts of free

REPORT FROM THE COMMISSION. State Aid Scoreboard. Report on state aid granted by the EU Member States. - Autumn 2012 Update. {SEC(2012) 443 final}

ON FOREIGN INVESTMENT

Investment Policy and Regulatory Framework in Nepal, FY ( )

This action is co-financed by UfM member countries for an amount of EUR 4.21 million. Aid method / Method of implementation

Investment Opportunities in Infrastructure Exciting Times to be in India

Climate Change Finance Mainstreaming: A Snapshot

Summary of negotiating objectives

Innovation and Green Finance: A Joint Schumpeterian Perspective

THE NEW GENERATION OF BUSINESS LAWS

Enterprise Risk Management Balancing Risks & Identifying Opportunities WEBINAR

Private Sector and development: a global responsibility?

Effectiveness of Aid for Trade

IPP TRANSACTION ADVISOR TERMS OF REFERENCE

RAB comments to the Green paper on disaster insurance. Our reference: RAB Date: 15 July 2013

DOCUMENT OF THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT STRATEGY FOR ALBANIA

The Attractiveness of Tax-Efficient IFCs in The New World Order. Onshore vs. Offshore perspective

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Key Elements of a Wind / Solar PPP. Cathy Oxby Commercial Director Mob:

Dubai s Growth Drivers

Country brief MALAWI. Debt and Aid Management Division Ministry of Finance, Economic Planning and Development. October 2014

Moving the Discussion Forward: Exploring Alternatives to ISDS

IBERDROLA FRAMEWORK FOR GREEN FINANCING

FP7 ( ) Environment Programme (incl. Climate Change) International Cooperation

The OECD Guidelines for Multinational Enterprises

Science for DRM 2020: acting today, protecting tomorrow. Table of Contents. Forward Prepared by invited Author/s

Global Project Finance Alert

Transcription:

Political and Regulatory Risk in Infrastructure Projects 2017

3. Political and Regulatory Risk The World Economic Forum s Framework

Knowledge Series 2011/12 2012/13 2013/14 Project origination Project preparation Project implementation Prioritization and selection of infrastructure projects Report (Oct 2012) Strat. Infrastructure Planner Tool Preparation and acceleration of Public-Private Partnerships Report (May 2013) PPP Maturity Assessment Tool 2014/15 Political Risk Mitigation Operations and maintenance of existing infrastructure Report (Apr 2014) O&M Evaluation Tool Mitigation of political & regulatory risk in infrastructure projects Report (25 Feb 2015) Political & regulatory risk landscape

Context Major constraints on foreign investments in emerging markets over the next three years 20% 15% 10% 5% 0% 2011 2012 2013 Macroeconomic Instability Political and Regulatory Access to Qualified Skills Access to Finance Corruption Infrastructure Capacity Limited Market Opportunities Increased Government Intervention Number of investor-vs-state arbitration cases Developed economies Transition economies Developing economies 27 7% (2) 19% (5) 74% (20) 2010 39 23% (9) 15% (6) 62% (24) 2012 40 30% (12) 18% (7) 53% (21) 2014 4

Risk factor Preparation/Planning/ Design/Construction phase Operation phase Termination phase Business factors Physical conditions/ Demand side/ Business partners/ Own performance Political & regulatory decisions Affecting specific project Affecting sector or entire economy 1 2 3 10 11 12 13 Site risk, e.g. difficult geological conditions Design risk, e.g. inadequate planning Construction risk, e.g. cost overrun Financing risk, e.g. failure to place bond Cancellation & change of scope risk e.g. rejection of PPP contract by parliament Environmental & other permit risk e.g. delay of construction permits Community risk e.g. non-approval by native populations Currency transfer & convertibility risk, e.g. interdiction of profit repatriation 5 6 Change of industry regulation risk, e.g. feed-in tariff cut, change of emission laws, change of labour laws, foreign-ownership restrictions Taxation risk, e.g. introduction of special taxes, increase in corporate tax rate 4 Commercial risk, e.g. false demand estimate Operating-cost risk, e.g. wage increase Performance risk, e.g. unavailability Re-financing risk, e.g. floating interest rates Expropriation risk e.g. nationalization Breach of contract risk e.g. denial of payment Asset-specific regulation risk e.g. operating time restrictions Judicial risk, e.g. lack of predictability and timeliness of court decisions, uncertain enforceability of legal titles 5 6 7 8 9 End-value risk, e.g. overly depleted asset Focus of report Concession duration/renewal risk e.g. early termination Transfer risk e.g. dispute over asset quality Decommissioning risk e.g. severe disposal requirements 14 Corruption risk/market-distortion risk, e.g. demand of side-payments by agencies; opaque procurement processes Macro- & socioeconomic environment Force majeure Risk of change to macro-economic fundamentals, e.g. economic crisis, exchange rate volatility, interest rate volatility, inflation Risk of change to socio-economic fundamentals, e.g. ageing society, xenophobia Risk of man-made events, e.g. war, terrorism, civil disturbance, labour strikes/industrial action Risk of natural disasters, e.g. earthquake, flooding, hurricane, landslide

Risk factor Preparation/Planning/ Design/Construction phase Operation phase Termination phase Business factors Physical conditions/ Demand side/ Business partners/ Own performance Political & regulatory decisions Affecting specific project Affecting sector or entire economy 1 2 3 10 11 12 13 Site risk, e.g. difficult geological conditions Design risk, e.g. inadequate planning Construction risk, e.g. cost overrun Financing risk, e.g. failure to place bond Cancellation & change of scope risk e.g. rejection of PPP contract by parliament Environmental & other permit risk e.g. delay of construction permits Community risk e.g. non-approval by native populations Currency transfer & convertibility risk, e.g. interdiction of profit repatriation 5 6 Commercial risk, e.g. false demand estimate Operating-cost risk, e.g. wage increase Performance risk, e.g. unavailability Re-financing risk, e.g. floating interest rates Expropriation risk e.g. nationalization Breach of contract risk e.g. denial of payment Asset-specific regulation risk e.g. operating time restrictions Judicial risk, e.g. lack of predictability and timeliness of court decisions, uncertain enforceability of legal titles Focus of report Concession duration/renewal risk e.g. early termination Change of industry regulation risk, e.g. feed-in tariff cut, change of emission laws, change of labour laws, foreign-ownership restrictions Taxation risk, e.g. introduction of special taxes, increase in corporate tax rate 4 5 6 7 8 9 End-value risk, e.g. overly depleted asset Transfer risk e.g. dispute over asset quality Decommissioning risk e.g. severe disposal requirements 14 Corruption risk/market-distortion risk, e.g. demand of side-payments by agencies; opaque procurement processes Macro- & socioeconomic environment Force majeure Risk of change to macro-economic fundamentals, e.g. economic crisis, exchange rate volatility, interest rate volatility, inflation Risk of change to socio-economic fundamentals, e.g. ageing society, xenophobia Risk of man-made events, e.g. war, terrorism, civil disturbance, labour strikes/industrial action Risk of natural disasters, e.g. earthquake, flooding, hurricane, landslide

Risk factor Business factors Physical conditions/ Demand side/ Business partners/ Own performance Political & regulatory decisions Affecting specific project Affecting sector or entire economy Macro- & socioeconomic environment Force majeure 1 2 3 10 11 12 13 Preparation/Planning/ Design/Construction phase 1 Cancellation/Change Operation phase of scope risk: Lisbon Madrid high-speed line Termination phase Site risk, e.g. difficult geological conditions Commercial risk, e.g. false demand estimate End-value risk, e.g. overly depleted asset In 2009, the first 165km section of the Lisbon Design risk, e.g. inadequate planning Operating-cost risk, e.g. wage increase Madrid line is awarded to consortium ELOS Following elections, new Portuguese Construction risk, e.g. cost overrun Performance risk, e.g. unavailability government cancels project in 2011 as part of Financing risk, e.g. failure to place bond austerity measures in wake of public-debt crisis Re-financing risk, e.g. floating interest rates Focus of report Cancellation & change of scope risk 4 Expropriation risk 7 Concession duration/renewal risk e.g. rejection of PPP contract by parliament e.g. nationalization e.g. early termination Environmental & other permit risk 5 5 Breach 2of Environmental contract risk & other permit 8 Transfer risk: risk e.g. delay of construction permits e.g. denial of payment e.g. dispute over asset quality Datteln IV power plant Community risk 6 6 Asset-specific regulation risk 9 Decommissioning risk e.g. non-approval by native populations e.g. operating time restrictions e.g. severe disposal requirements E.ON receives construction permit for 1 GW hard coal block in 2007 Change of industry regulation risk, e.g. feed-in tariff cut, change of emission laws, change of labour laws, foreign-ownership restrictions At ~90% completion, court ruling declares Taxation risk, e.g. introduction of special taxes, increase in corporate tax rate permits faulty in 2009/10 permit procedure is restarted, with final outcome still uncertain in 2014 Currency transfer & convertibility risk, e.g. interdiction of profit repatriation Judicial risk, e.g. lack of predictability and timeliness of court decisions, uncertain enforceability of legal titles Community risk: HidroAysén hydropower 14 Corruption risk/market-distortion risk, e.g. demand of side-payments by agencies; opaque procurement processes 3 Risk of change to macro-economic fundamentals, e.g. economic crisis, exchange rate volatility, interest rate volatility, inflation International JV HidroAysén gets Chilean Risk of change to socio-economic fundamentals, e.g. ageing society, xenophobia government approval for US$3 billion dam projects in 2011 Local population strongly opposes project Risk of man-made events, e.g. war, terrorism, civil disturbance, labour strikes/industrial action (60 75% against, according to opinion polls) following protests and lawsuits, project put on Risk of natural disasters, e.g. earthquake, flooding, hurricane, landslide hold in 2012 and finally rejected in 2014

Preparation/Planning/ Operation phase Termination phase Risk factor Design/Construction phase 4 Expropriation risk: Railway systems of Zambia Business factors Site risk, e.g. difficult geological conditions Commercial risk, e.g. false demand estimate End-value risk, e.g. overly depleted asset Physical conditions/ Operation of Zambian Railway network is Design risk, e.g. inadequate planning Operating-cost risk, e.g. wage increase concessioned to RSZ (consortium incl. South Demand side/ African financial Construction institutions risk, and e.g. the cost World overrun Performance risk, e.g. unavailability Business partners/ Bank) in 2003 for 20 years Own performance In 2012, Financing Zambian government risk, e.g. failure cancels to place bond Re-financing risk, e.g. floating interest rates concession with immediate effect, citing Focus of report mismanagement (which is disputed by the company) 1 Cancellation & change of scope risk 4 Expropriation risk 7 Concession duration/renewal risk e.g. rejection of PPP contract by parliament e.g. nationalization e.g. early termination 5 Breach of contract Affecting risk: 2 specific Environmental & other permit risk 5 5 Breach of contract risk 8 Transfer risk Cochabamba e.g. denial of payment project water supply e.g. delay of construction permits e.g. dispute over asset quality 3 Community risk 6 6 Asset-specific regulation risk 9 Decommissioning risk International e.g. non-approval JV AdT receives by native 40-year populations e.g. operating time restrictions e.g. severe disposal requirements Political & concession for water-service operation & expansion 10 regulatory Change in 1999of industry regulation risk, e.g. feed-in tariff cut, change of emission laws, change of labour laws, foreign-ownership restrictions After riots against water-tariff increases in decisions 1999/2000, 11 Affecting Taxation government risk, e.g. declares introduction contract of special taxes, increase in corporate tax rate revoked legal cases with foreign investors sector or settled 12by Currency 2006 transfer & convertibility risk, e.g. interdiction of profit repatriation entire economy 13 Judicial risk, e.g. lack of predictability and timeliness of court decisions, uncertain enforceability of legal titles 6 Asset-specific regulation risk: 14 Night-flight restrictions at Corruption Zurich Airport risk/market-distortion risk, e.g. demand of side-payments by agencies; opaque procurement processes Macro- & socioeconomic environment Force majeure Aircraft noise affecting residents in Switzerland Risk of change to macro-economic fundamentals, e.g. economic crisis, exchange rate volatility, interest rate volatility, inflation and Germany, motivating regulatory changes (e.g. limitations Risk of of change approaches to socio-economic from German fundamentals, e.g. ageing society, xenophobia side introduced in 2003, bilateral treaty with further limitations signed in 2012) Fund set Risk up to of cover man-made costs incurred events, through e.g. war, terrorism, civil disturbance, labour strikes/industrial action aircraft noise at night Risk of natural disasters, e.g. earthquake, flooding, hurricane, landslide

Risk factor Business factors Physical conditions/ Demand side/ Business partners/ Own performance Political & regulatory decisions Affecting specific project Affecting sector or entire economy Macro- & socioeconomic environment Force majeure 7 Preparation/Planning/ Concession-duration/renewal Design/Construction phase risk: German nuclear phase-out Operation phase Site risk, e.g. difficult geological German conditions parliament decides Commercial to phase-out risk, nuclear e.g. false demand estimate power plants by 2022, and cuts individual plants Design risk, e.g. inadequate planning Operating-cost risk, e.g. wage increase remaining lifetime Shorter plant lifetimes causing losses for Vattenfall of Construction risk, e.g. cost overrun Performance risk, e.g. unavailability 5 billion, according to press international Financing risk, e.g. failure to arbitration place bond is ongoing in 2014 Re-financing risk, e.g. floating interest rates 1 Cancellation & change of scope risk e.g. rejection of PPP contract by parliament 8 Transfer risk: 2 Environmental & other permit risk 5 e.g. Delhi delay of Airport construction Metro permitsexpress Line 4 5 Expropriation risk e.g. nationalization Breach of contract risk e.g. denial of payment 13 Judicial risk, e.g. lack of predictability and timeliness of court decisions, uncertain enforceability of legal titles 9 14 Corruption Decommissioning risk/market-distortion risk: risk, e.g. demand of side-payments by agencies; opaque procurement processes Offshore installations near UK coast Risk of change to macro-economic 400 500 offshore fundamentals, Oil & Gas e.g. installations economic crisis, will exchange rate volatility, interest rate volatility, inflation decommission by 2030, according to estimates, plus Risk of change to socio-economic offshore wind fundamentals, farms being e.g. ramped-up ageing society, xenophobia Cost for decommissioning will greatly depend on Risk of man-made events, environmental e.g. war, terrorism, standards civil disturbance, for dismantling, labour strikes/industrial removing action and disposing of the installations at end of asset Risk of natural disasters, e.g. lifetime earthquake, flooding, hurricane, landslide 7 8 Termination phase End-value risk, e.g. overly depleted asset Focus of report Concession duration/renewal risk e.g. early termination Transfer risk e.g. dispute over asset quality 3 Community risk 6 6 Asset-specific regulation risk 9 Airport high-speed metro line in Delhi based on a BOT Decommissioning risk e.g. non-approval by native populations e.g. operating time restrictions e.g. severe disposal requirements contract termination of the contract after 1 year in 10 2013 due to operational problems Change of industry regulation risk, e.g. feed-in tariff cut, change of emission laws, change of labour laws, foreign-ownership restrictions Termination payment depending on whether public 11 Taxation risk, authorities are held responsible for the problems e.g. introduction of special taxes, increase in corporate tax rate arbitration is pending 12 Currency transfer & convertibility risk, e.g. interdiction of profit repatriation

10 Change of industry regulation Preparation/Planning/ risk: Spanish renewable subsidy cut Operation phase Termination phase Risk factor In wake of Design/Construction public-debt crisis, Spain retroactively phase cuts feed-in tariff for existing solar-power projects in 2010 and provides in 2014 subsidy system that electricity producers may not earn more than 7.5% p.a. over their life time Several operators face bankruptcy foreign investors file for international arbitration in 2014 Business factors Site risk, e.g. difficult geological conditions Commercial risk, e.g. false demand estimate End-value risk, e.g. overly depleted asset Physical conditions/ Design risk, e.g. inadequate planning Operating-cost risk, e.g. wage increase Demand 11 side/ Taxation risk: "Crisis taxes" in Hungary Construction Performance risk, e.g. unavailability Business partners/ Hungary risk, introduces e.g. cost special overrun crisis taxes in the energy, retail and telecommunications sectors in 2010, mainly affecting foreign operators Own performance Financing risk, e.g. failure to place bond Re-financing risk, e.g. floating interest rates Following EU pressure, certain discriminatory crisis taxes phased out at end of 2012 but new utility tax in force since 2013, and future tax situation for foreign companies remains uncertain in 2014 Focus of report 1 Cancellation & change of scope risk 4 Expropriation risk 7 Concession duration/renewal risk e.g. rejection of PPP contract by parliament e.g. nationalization e.g. early termination Affecting 12 Currency transfer and convertibility risk: CADIVI exchange controls in Venezuela 2 specific Environmental & other permit Venezuela risk introduces 5 5exchange Breach controls of contract under risk new Commission CADIVI in 8 2003: Transfer risk e.g. delay of construction permits e.g. denial of payment e.g. dispute over asset quality project restrictions on currency conversion and profits repatriation for foreign companies 3 Community risk Subsequently, international 6 6 Asset-specific companies freeze/reduce regulation risk investment, and foreign-currency 9 Decommissioning scarcity occurs risk e.g. non-approval by native populations e.g. operating time restrictions e.g. severe disposal requirements Political & regulatory decisions Affecting sector or entire economy 10 11 12 13 Change of industry regulation risk, e.g. feed-in tariff cut, change of emission laws, change of labour laws, foreign-ownership restrictions Taxation risk, e.g. introduction of special taxes, increase in corporate tax rate Currency transfer & convertibility risk, e.g. interdiction of profit repatriation Judicial risk, e.g. lack of predictability and timeliness of court decisions, uncertain enforceability of legal titles 14 Corruption risk/market-distortion risk, e.g. demand of side-payments by agencies; opaque procurement processes 13 14 Judicial Macro- risk: & socioeconomic enforcement in Italy the Golden Quadrilateral in India Dispute settlement Risk of change and to macro-economic fundamentals, Corruption e.g. economic risk/market-distortion crisis, exchange rate volatility, interest risk: rate Corruption volatility, inflation related to contract Risk of change to socio-economic fundamentals, e.g. ageing society, xenophobia environment According to Global Competitiveness Report, Italy ranks 143rd The US$13 billion highway network (largest highway project in India) connects out of 144 in efficiency of legal system in settling disputes Mumbai, Chennai, Kolkata, and Delhi companies require Risk on average of man-made 1,185 days events, to enforce e.g. war, a Launched in 2001 and managed by the National Highways Authority of India terrorism, civil disturbance, labour strikes/industrial action contract (OECD average = 529 days) (NHAI), the project was at the centre of massive corruption allegations, Force majeure As a result, judicial Risk system of natural now regarded disasters, impediment e.g. earthquake, to including leakage of insider information from NHAI, unlawful sub-contracting, flooding, hurricane, landslide investment and growth and neglected follow-up of unlawful sub-contracting

4. Assessment Manifestation of Political and Regulatory Risk in Indonesia

Workshop objectives Identify and characterize the main manifestations of political and regulatory risks in infrastructure projects Highlight the actions taken by public and private sectors to mitigate such risks Build multi-sectorial commitment towards public-private collaborative responses to political and regulatory risks in infrastructure projects 12

Opening BWG Progress to date Risk Framework & Assessment Next Steps Assessment Methodology 1. Proceed individually, using the printed risk framework. Consider the current and nearterm (e.g., the next 5 years) conditions in the region for infrastructure projects, and identify: a. The risk with the greatest likelihood. b. The risk with the greatest impact. 2. Proceed individually, transferring your assessment to the map on the wall. Please place two colored adhesive dots indicating your top choice for each: a. One blue dot on the with the greatest likelihood b. One orange dot on with the greatest impact

Assessment Results Impact # Risk % of votes 1 2 3 Likelihood # Risk % of votes 1 2 3 14

Discussion 1. What are the reasons behind your assessment?

5. Mitigation Measures Availability and state of development in Indonesia

Source: World Economic Forum; Boston Consulting Group World Economic Forum x.x Report section 4. Culture of open dialogue Joint public-private measures Management of risk perception and return expectation Multi-stakeholder dialogue beyond specific projects Private-sector measures 3.1 3.2 3.3 3.4 Appropriate use of Effective interaction Inclusive financial instruments with public sector community engagement Responsible business conduct Risk guarantees and political-risk insurances Constructive communication with public agencies Participatory planning and low-burden construction Prevention and prosecution of illegal or unethical behaviour Tradeable instruments and ownership structure Monitoring of political developments, and advocacy strategy Ongoing community involvement during operation Professional and sustainable operations Public-sector measures 2.1 Robust infrastructure regulation and contracts 2.2 General stability of laws and regulation 2.3 Reliable and efficient administration Rules that are adaptive in a predictable way Legal architecture conducive to preserving established principles Clear agency set-up, and efficient procurement and permit processes Stress-tested regulation that will function under unfavourable conditions Non-partisan alignment on infrastructure vision and strategic decisions Strict implementation of anti-corruption and transparency standards 2.4 Reliable dispute-resolution mechanisms Range of dispute-resolution options Effective judicial capacity 2.5 International commitments International investment agreements Transnational programme management for cross-border infrastructure projects

Source: World Economic Forum; Boston Consulting Group World Economic Forum x.x Report section 4. Culture of open dialogue Joint public-private measures Management of risk perception and return expectation Multi-stakeholder dialogue beyond specific projects Private-sector measures 3.1 3.2 3.3 3.4 Appropriate use of Effective interaction Inclusive financial instruments with public sector community engagement Responsible business conduct Risk guarantees and political-risk insurances Constructive communication with public agencies Participatory planning and low-burden construction Prevention and prosecution of illegal or unethical behaviour Tradeable instruments and ownership structure Monitoring of political developments, and advocacy strategy Ongoing community involvement during operation Professional and sustainable operations Public-sector measures 2.1 Robust infrastructure regulation and contracts 2.2 General stability of laws and regulation 2.3 Reliable and efficient administration Rules that are adaptive in a predictable way Legal architecture conducive to preserving established principles Clear agency set-up, and efficient procurement and permit processes Stress-tested regulation that will function under unfavourable conditions Non-partisan alignment on infrastructure vision and strategic decisions Strict implementation of anti-corruption and transparency standards 2.4 Reliable dispute-resolution mechanisms Range of dispute-resolution options Effective judicial capacity 2.5 International commitments International investment agreements Transnational programme management for cross-border infrastructure projects

Source: World Economic Forum; Boston Consulting Group World Economic Forum x.x Report section 4. Culture of open dialogue Joint public-private measures Management of risk perception and return expectation Multi-stakeholder dialogue beyond specific projects Private-sector measures 3.1 3.2 3.3 3.4 Appropriate use of Effective interaction Inclusive financial instruments with public sector community engagement Responsible business conduct Risk guarantees and political-risk insurances Constructive communication with public agencies Participatory planning and low-burden construction Prevention and prosecution of illegal or unethical behavior Tradeable instruments and ownership structure Monitoring of political developments, and advocacy strategy Ongoing community involvement during operation Professional and sustainable operations Public-sector measures 2.1 Robust infrastructure regulation and contracts 2.2 General stability of laws and regulation 2.3 Reliable and efficient administration Rules that are adaptive in a predictable way Legal architecture conducive to preserving established principles Clear agency set-up, and efficient procurement and permit processes Stress-tested regulation that will function under unfavourable conditions Non-partisan alignment on infrastructure vision and strategic decisions Strict implementation of anti-corruption and transparency standards 2.4 Reliable dispute-resolution mechanisms Range of dispute-resolution options Effective judicial capacity 2.5 International commitments International investment agreements Transnational programme management for cross-border infrastructure projects

Source: World Economic Forum; Boston Consulting Group World Economic Forum x.x Report section 4. Culture of open dialogue Joint public-private measures Management of risk perception and return expectation Multi-stakeholder dialogue beyond specific projects Private-sector measures 3.1 3.2 3.3 3.4 Appropriate use of Effective interaction Inclusive financial instruments with public sector community engagement Responsible business conduct Risk guarantees and political-risk insurances Constructive communication with public agencies Participatory planning and low-burden construction Prevention and prosecution of illegal or unethical behaviour Tradeable instruments and ownership structure Monitoring of political developments, and advocacy strategy Ongoing community involvement during operation Professional and sustainable operations Public-sector measures 2.1 Robust infrastructure regulation and contracts 2.2 General stability of laws and regulation 2.3 Reliable and efficient administration Rules that are adaptive in a predictable way Legal architecture conducive to preserving established principles Clear agency set-up, and efficient procurement and permit processes Stress-tested regulation that will function under unfavourable conditions Non-partisan alignment on infrastructure vision and strategic decisions Strict implementation of anti-corruption and transparency standards 2.4 Reliable dispute-resolution mechanisms Range of dispute-resolution options Effective judicial capacity 2.5 International commitments International investment agreements Transnational programme management for cross-border infrastructure projects

Assessment Methodology 1. Proceed individually, using the printed mitigation measures diagram. Consider the current and near-term (e.g., the next 5 years) conditions in the region for infrastructure projects, and identify: a. The measure with the greatest degree of development. b. The measure with the greatest need for development. 2. Proceed individually, transferring your assessment to the map on the wall. Please place two colored adhesive dots indicating your top choice for each: a. One green dot on the measure with the greatest degree of development b. One orange dot on the measure with the greatest need for development

Assessment Results In place In need 1 # Existing, well developed measures % of votes 1 # Measure in greatest need for development % of votes 2 2 3 3 22

Discussion 1. What are the reasons behind your assessment? 2. How can the region accelerate the development/creation of the most needed measures?

91-93 route de la Capite CH-1223 Cologny/Geneva Switzerland Tel.: +41 22 869 1212 Fax: +41 22 786 2744 contact@weforum.org www.weforum.org