EROSION & SEDIMENT POLLUTION CONTROL (E&SPC) PLAN REVIEW APPLICATION

Similar documents
***EXPEDITED REVIEW***

TRANSFEREE/CO-PERMITTEE APPLICATION FOR A GENERAL OR INDIVIDUAL NPDES PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES

REGULATORY FEE RECOMMENDATION REPORT TO THE ENVIRONMENTAL QUALITY BOARD

Permit Subtype: One Acre or More (total project size), Less Than One Acre (total project size) and Early Grading.

Wetland. Streams. Floodplains

DRIVEWAY (Residential) PERMIT

TITLE 18. ENVIRONMENTAL QUALITY CHAPTER 14. DEPARTMENT OF ENVIRONMENTAL QUALITY PERMIT AND COMPLIANCE FEES ARTICLE 1. WATER QUALITY PROTECTION FEES

Therefore, having understood the above information, I am signing this certification as contractor to the aforementioned NPDES general permit.

South Carolina NPDES GENERAL PERMIT FOR STORM WATER DISCHARGES FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES

Residential - required if disturbing more than 6 inches of earth

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Program Integration

DEP Webinar 25 Pa. Code Chapter 105 Dam Safety and Waterway Management Fee Revisions

FEE SCHEDULE

STORMWATER MANAGEMENT FUND Department of Environmental Services

CITY OF MOUNTLAKE TERRACE RESOLUTION NO.

PROPOSED RULEMAKING DEPARTMENT OF ENVIRONMENTAL PROTECTION [ 25 PA. CODE CH. 77 ] Noncoal Mining Fees; Notice of Public Comment Period

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach

DEPARTMENT OF ENVIRONMENTAL PROTECTION OFFICE OF PROGRAM INTEGRATION

*** DRAFT - NOT YET FILED ***

RESOLUTION # THE MUNICIPALITY OF EAST BRADFORD TOWNSHIP CHESTER COUNTY, PENNSYLVANIA

LOST PINES GROUNDWATER CONSERVATION DISTRICT OPERATING PERMIT

Monroe County Soil & Water Conservation District

INTERGOVERNMENTAL STORMWATER COMMITTEE AGREEMENT THIS INTERGOVERNMENTAL STORMWATER COMMITTEE AGREEMENT,

Section moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert:

Request for Proposals (RFP): Lake Avondale Stormwater Mitigation Facility Design and Construction Documents

FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5)

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF OIL AND GAS MANAGEMENT

IRRC 2Q11 JAN 23 P q 5

Stormwater Utility Report #2 April 5, 2016

City of Maryville, Tennessee STORMWATER UTILITY Credit Manual for Stormwater Fees

City of Lebanon, Tennessee Stormwater Utility Credit Manual for Stormwater Fees

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

Phase 3 WIP Development Guide

City of Kinston. Stormwater Utility Credit Manual

CHECKLIST FOR CONSTRUCTION STAGING PLAN IN CORAL GABLES

ANNUAL MEETING AGENDA

4. New $ 100 Minimum Plumbing, HVAC, Alarms, Sprinklers, and any permanent systems 5. Replacement $ 50 Minimum

Stormwater Management Utility Fee Reduction Credit Application

Center Township Butler County, Pennsylvania REQUEST FOR PROPOSALS AND QUALIFICATIONS FOR PROFESSIONAL ENGINEERING SERVICES

Sugar Hill Stormwater Utility Credit Technical Manual

Implementing Grants & Obtaining Funds for Lake Improvements/Dredging. President, MPOA Wonder Lake, Illinois

APPLICATION. How did you hear about our program? AGREEMENT

COMMUNITY CERTIFICATIONS

Article 23-6 FLOODPLAIN DISTRICT

Ch. 83 STATE CONSERVATION COMMISSION CHAPTER 83. STATE CONSERVATION COMMISSION

A. All Responses to Request for Statements shall be sent to:

APPLICATION FOR GRADING PERMIT

CITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP)

CHESTER UPLAND SCHOOL DISTRICT

Manor Township, Lancaster County, PA Zoning Permit Application ( section 702) App. number App. date

Ch. 111 QUALITY CONTROL CHAPTER 111. QUALITY CONTROL

RESOLUTION NO A RESOLUTION ESTABLISHING PLAN REVIEW, PERMIT, AND INSPECTION FEES; RESCINDING RESOLUTION NO

NPDES Small MS4 General Permit (OHQ000002) Annual Reporting Form

Audit Report Department of Conservation and Natural Resources Division of Environmental Protection 2011

As Introduced. 132nd General Assembly Regular Session H. B. No

Peachtree City Public Works Department. Peachtree City Stormwater Utility. Stormwater Utility Credit Technical Manual ...

Exhibit A. City of Roswell Stormwater Utility. Stormwater Utility Credit Manual. December 27, 2010

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

Contractors Pollution Liability Supplemental Application

2. Pest Management Area Name:

Keystone Special Development Zone

BUREAU OF WASTE MANAGEMENT. DIVISION OF MUNICIPAL and RESIDUAL WASTE GENERAL PERMIT WMGR147

STATEMENT OF WORK. Installations, Repair and/or Maintenance of Sewage and Drain Lines. Presque Isle State Park (Erie County)

Offsetting Impacts to Wetlands and Waters in the United States. Palmer Hough U.S. Environmental Protection Agency November 2013

PART III. COAL AND CLAY MINE SUBSIDENCE INSURANCE BOARD

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

Public Notice. Proposed anchor structures, dredging, and discharge at the Enbridge Line 5 pipeline in the Straits of Mackinac, Michigan

CITY OF NORTH RIDGEVILLE STORMWATER UTILITY

Updated Planning Commission Work Program ( )

CONSTRUCTION DIVISION (CD)

COUNTY ADMINISTRATOR PUBLIC WORKS

*Editor's note: Art. XIII was formerly art. XII, div. 4. The section numbers have not changed.

Tri-State Montrose-Nucla-Cahone Transmission Line Improvement Project. Plan of Development

GREAT PLAINS 7 END WHEEL NO-TILL DRILL December 2016

REQUEST FOR PROPOSAL/QUALIFICATIONS FOR MUNICIPAL ENGINEER

PART VII. PENNSYLVANIA INFRASTRUCTURE INVESTMENT AUTHORITY

Gov's Planning Estimates Project Title Rank Fund Project Requests for State Funds

COUNTY OF GREENVILLE PROPRIETARY FUNDS

SECTION INSTRUCTIONS TO BIDDERS

Viera Stewardship District General Fund Budget Fiscal Year 2019

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

B. The Bid is made in compliance with the Bidding Documents.

APPENDIX A. Effective January 1, WATER AND SEWER TAP FEES - SINGLE FAMILY RESIDENTIAL TAP FEE

DATE: TO: FROM: REVIEWED BY: RE: Mayor s Executive Directive on Housing

DIRT, GRAVEL, AND LOW VOLUME ROAD MAINTENANCE PROGRAM - STATEMENT OF POLICY

CITY OF CARLSBAD RFP. NO AGREEMENT FOR THE PURCHASE OF EFFLUENT WASTE WATER

SITE PLAN PROCESS SITE PLAN APPLICATION PROCEDURES MANUAL. The City of Cornwall Planning Division

Name. Address. City, State, Zip. Telephone #

CASE NUMBER: 15SN0626 APPLICANT: Vernon McClure

Thurston County Habitat Conservation Plan. HCP Update January 20, 2016

Ch. 265a INTERIM STATUS STANDARDS a.1

PROPOSED RULEMAKING DEPARTMENT OF AGRICULTURE

Rental Policy & Fee Schedule

SPECIAL EVENT WEDDING APPLICATION

OHIO TURNPIKE OUTFALL PERMIT APPLICATION - GENERAL CONDITIONS

Pollution Control and Ecology Commission ARKANSAS POLLUTION CONTROL AND ECOLOGY COMMISSION Regulation No. 9.

Village Plan Commission Ordinances

VII. County of Hanover. Board Meeting: February 24, 2016

Special Conditions, Regulations and Instructions for Right of Way Permit Applications

Transcription:

325 Smiths Pond Road Shavertown, PA 18708 Phone: (570) 674-7991 Fax: (570) 674-7989 www.luzernecd.org EROSION & SEDIMENT POLLUTION CONTROL (E&SPC) PLAN REVIEW APPLICATION Project Name: Applicant s Name: Project Address: Applicant s Address: Municipality: Total Project Acres: Total Acres to be Disturbed: Number of Residential Lots/Units: Site Supervisor: Site Phone: Applicant s Phone: Applicant s Email: Plan Preparer: Preparer s Phone: Preparer s Fax: Preparer s Email: PROJECT FEES (Per the current Luzerne Conservation District E&SPC Program Fee Schedule) Administrative Fee Residential Only for E&SPC Plans not associated with NPDES Permits = 100 (Does not apply to Section C. Small Projects.) Fee based on number of lots/units. See current Fee Schedule for applicable amount. Industrial/Commercial/ Institutional Fee based on the disturbed area or linear feet for utility lines. See current Fee Schedule for applicable amount. Small Projects Non-Profit, Open Space, Greenways & Outdoor Recreation All small project reviews = 100 See current Fee Schedule for types of projects. 500 (basic fee) + (20 per disturbed acre) TOTAL PROJECT SERVICE FEE: (Check made payable to the Luzerne Conservation District) NPDES Base Permit Fee (If applicable) NPDES Acreage Permit Fee (If applicable) General NPDES Permits = 500 Individual NPDES Permits = 1,500 (Separate check made payable to the Luzerne County Clean Water Fund) General & Individual NPDES Permits = 100 per disturbed acre For fractional acreage, the acreage shall be rounded to the closest whole number. (Separate check made payable to the Commonwealth of PA Clean Water Fund) Page 1 of 2

The applicant hereby agrees as follows: To acknowledge the stipulations and requirements contained in the Luzerne Conservation District s E&SPC Program Service Fee Schedule and E&SPC Program Service Fee Schedule Policy. To acknowledge that the E&SPC Plan will be reviewed for adequacy to control erosion and sedimentation, in accordance with 25 Pa. Code Chapter 102 and the Clean Streams Law, and not for adequacy of structural design. To retain full responsibility for any damage which may result from any construction activity not withstanding Conservation District approval of the subject E&SPC Plan. It is understood that approval of the plan submitted with this application shall be valid only for the duration of the initial project granted by the municipality. All municipal renewals of this project will require resubmission and approval by the Conservation District. To notify the Conservation District in writing or by phone at least 72 hours prior to any earth disturbance activity. To notify the Conservation District upon completing the project. To maintain a copy of the approved E&SPC Plan on the project site. To allow Conservation District representatives to enter the project site for inspection. That any conveyance of the project prior to its completion will include the transfer to the subsequent owner(s) the full responsibility of compliance with the approved E&SPC Plan and applicable regulations. Applicant s Name (please print): Applicant s Signature: Date: For District Use Only Initial Date Received: Date of Final Approval: Plan Reviewer s Signature: Page 2 of 2

325 Smiths Pond Road Shavertown, PA 18708 Phone: (570) 674-7991 Fax: (570) 674-7989 www.luzernecd.org EROSION & SEDIMENT POLLUTION CONTROL PROGRAM FEE SCHEDULE The following fees will be charged by the Luzerne Conservation District for services under the Erosion and Sediment Pollution Control (E&SPC) Program and National Pollutant Discharge Elimination System (NPDES) Permit Program. Applications cannot be accepted for review without the appropriate fee and a completed E&SPC Plan Review Application. 1. ADMINISTRATIVE FEES For E&SPC plans not associated with NPDES Permit applications = 100 per plan (Applies to projects that fall under sections A, B, and D below. Does not apply to projects that fall under section C. Small Projects. For NPDES Permit application, see the permit administrative fees listed under #3 below.) 2. PROJECT SERVICE FEES A. RESIDENTIAL Lot/Unit(s) Fee Lot/Unit(s) Fee 1-2 325 51-75 3,900 3-4 650 76-100 4,500 5-10 1,300 101-125 5,000 11-20 1,700 126-150 5,700 21-30 2,400 151-175 6,300 31-40 3,000 176-200 6,800 41-50 3,500 200+ 6,800 + 50 per lot above 200 B. INDUSTRIAL/COMMERCIAL/INSTITUTIONAL (Use linear feet to determine fees for underground utility lines. All other projects, including structures related to utility projects, use disturbed acreage to determine fees.) Disturbed Acres Linear Feet Fee 0-0.99 0 899 1,200 1-4.99 900 4,499 2,000 5-9.99 4,500 8,999 2,800 10-14.99 9,000 13,499 3,200 15-19.99 13,500 17,999 3,800 20-25.0 18,000 22,500 4,600 Over 25.0 Over 22,500 4,600 + 100 for each additional acre above 25 or additional 900 feet above 22,500

C. SMALL PROJECTS (Stream crossings, 1 acre or less disposal areas for construction projects, logging activities, wetland mitigation projects and E&SPC Plan Guide for Small Projects submissions.) All reviews 100 D. NON-PROFIT, OPEN SPACE, GREENWAYS & OUTDOOR RECREATION (Game fields, parks, playgrounds, rail/trails, fire stations, etc.) 500 basic fee + 20 per disturbed acre 3. NPDES PERMIT FEES - Two separate checks required: a. One check payable to Luzerne County Clean Water Fund in the amount of: 500.00 for General NPDES Permits 1,500.00 for Individual NPDES Permits b. One check payable to Commonwealth of Pennsylvania Clean Water Fund in the amount of: 100.00 per disturbed acre (for fractional acreage, the acreage shall be rounded to the closest whole number) 4. REVISION FEES A Revision Fee equal to 40% of the initial Project Service Fee will apply to the second and subsequent technical comment/deficiency/review letters. 5. PLAN MODIFICATION FEES (Changes made after the ESPC Plan has been approved) a. Minor Modifications to the E&SPC Plan/NPDES Permit 10% of the initial fee b. Major Modification to the E&SPC Plan/NPDES Permit Fee based on schedules above. (Proposed earth disturbance activities that will take place outside the permitted area, or that will have an additional point source discharge to a receiving water, not previously identified in the application/noi) Please Note: Failure to begin earth disturbance activities within two (2) years from the original plan approval date will require resubmission of the E&SPC Plan and additional fees based on the schedule above, unless otherwise determined by state law and/or regulation. Pennsylvania Law requires persons proposing or conducting earth disturbance activities to develop, implement and maintain best management practices to minimize the potential for accelerated erosion and sedimentation. An E&SPC Plan must be available at the project site at all times. (25 Pa. Code Chapter 102. Erosion and Sediment Control)

EROSION & SEDIMENT POLLUTION CONTROL PROGRAM SERVICE FEE SCHEDULE POLICY 1. AUTHORITY: The Luzerne Conservation District, by authority of Act 217 of 1945, The Conservation District Law, as amended, has adopted the Luzerne Conservation District Service Fee Schedule for services under the Erosion & Sediment Pollution Control (E&SPC) Program and the National Pollutant Discharge Elimination System (NPDES) Program. 2. EFFECTIVE DATE: This resolution shall become effective February 20, 2014, and shall remain in effect until modified, amended, or rescinded by the Luzerne Conservation District Board of Directors. 3. INTENT: The purpose of this fee schedule is to defray the costs incurred by the Luzerne Conservation District in its delegated authority of the Pennsylvania Department of Environmental Protection s (PA DEP) Erosion & Sediment Pollution Control Program in accordance with Title 25, Chapter 102, Erosion and Sediment Control rules & regulations of the Pennsylvania Code and the Pennsylvania Clean Streams Law. 4. WAIVER OF FEES: District service fees may be waived for applications filed by agencies of the Commonwealth of Pennsylvania. This exemption does not apply to other government entities or private, non-profit organizations. In unique situations, the District Manager shall have the authority to waive and/or reduce fees on a case by case basis. 5. PROJECT AREA DELINEATION: To determine the applicable project area, please refer to the Service Fee Section (Sec. 2) of the Fee Schedule. 6. PROCEDURES: A. Applicants will submit a check or money order payable to the Luzerne Conservation District, 1 copy of the complete District E&SPC Plan Review Application, and 2 sets of the E&SPC Plan and narrative (3 sets for NPDES Permit applications)*. An adequacy letter and stamped plans will be mailed to the Applicant upon District approval. B. The Luzerne Conservation District fee shall not be combined with any other municipal or county fee. The cancelled check will be the applicants receipt. C. In accordance with PA DEP s Administrative Policy and Permitting Manual for the ESCP and the NPDES Program, NPDES permit application submissions not containing the appropriate information will not be reviewed for technical adequacy. The applicant will be informed of any additional information or fees needed for a complete review. D. A 50.00 charge will be assessed for any check refused by the bank due to insufficient funds, and the entire application package will be returned to the applicant with no further action taken. E. The maximum technical review time for E&SPC plans is 22 business days from the date the submission is deemed complete. The District has 15 business days to determine if the submission contains the information needed to be considered complete. F. Applications for NPDES permits require, by state regulation, a separate check made payable to Luzerne County Clean Water Fund for the following administrative filing base fees: General Permits 500.00 and Individual Permits 1,500.00. In

addition to the administrative base fee, a separate check made payable to Commonwealth of PA Clean Water Fund is required in the amount of 100.00 per disturbed acre (fractional acreage shall be rounded to the closest whole number). Unless otherwise determined by PA DEP, these fees are required for all NPDES permit applications, including those submitted by government agencies. 7. APPLICABILITY: A. The fee schedule will apply whenever an E&SPC Plan Review Application and E&SPC Plan are submitted for an adequacy determination. B. In applications consisting of combined residential and commercial usage, the fee will be calculated by determining a separate fee for each portion according to the schedule, and then adding those separate fees together. C. Plans requiring more than one (1) technical comment/deficiency/review letter will be assessed a fee of 40% of the initial fee. D. If earth disturbance activities are not commenced within two years of the E&SPC Plan approval date, the plan must be resubmitted and will be subject to a full review fee as provided by the fee schedule, unless otherwise determined by state law and/or regulation. A new review and review fee will be required when an NPDES Permit or E&SPC plan approval has expired. 8. E&SPC PROGRAM SERVICE FEE SCHEDULE: Attached to this policy. 9. E&SPC PLAN WITHDRAWAL: Upon written request by the applicant, and approval by the District Manager, a portion of the District s service fee may be refunded if the applicant withdraws the plan prior to review. Written requests for plan withdrawal and fee refund must be submitted within 90 days of the District s administrative or technical review of the application. If the District does not receive a resubmission of the application or a request to withdraw the application within that timeframe, the application will be considered withdrawn and all fees will be retained by the district. Review fees will not be refunded once a technical adequacy determination has been made by the Luzerne Conservation District. 10. NOTIFICATION OF CHANGES: The Luzerne Conservation District Board of Directors reserves the right to revise the Fee Schedule as deemed necessary or appropriate. Luzerne County municipalities will be notified in writing of any changes. 11. APPROVAL OF POLICY: Be it resolved, as of the 20 th day of February, 2014, that all previous Luzerne Conservation District Fee Schedules are hereby defunct as agreed upon by the Board of Directors. Be it also resolved that the Board of Directors adopts the Service Fee Schedule and the Luzerne Conservation District will assess fees for services under the Erosion and Sediment Pollution Control Program as authorized by the Commonwealth of Pennsylvania under Act 217 of 1945, The Conservation District Law, as amended, in accordance with the attached schedule of charges. LUZERNE CONSERVATION DISTRICT BOARD OF DIRECTORS *In order to conserve paper, the District allows plan preparers to submit only one copy of the Erosion and Sediment Control Plan, Erosion and Sediment Control Narrative, Post Construction Stormwater Management Plan and Post Construction Stormwater Management Narrative until the plans are ready for final approval. The additional copies will be required once the plans are ready for final approval or if there is a request to review public records associated with the application. This option is at the discretion of the plan preparer or the applicant. By choosing this option, you will be agreeing to provide additional copies within 5 working days if so requested by the District. The number of NPDES Permit Applications remains the same.