SAMPLE INTERCONNECTION AGREEMENT FOR NET ENERGY METERING

Similar documents
STANDARD GENERATION INTERCONNECTION AGREEMENT BETWEEN CITY OF ANAHEIM AND

INTERCONNECTION AGREEMENT FOR NET BILLING FOR RENEWABLE ELECTRICAL GENERATING FACILITIES OF ONE MEGAWATT OR LESS

2. IDENTITY AND LOCATION OF GC

INTERCONNECTION & NET ENERGY METERING AGREEMENT FOR RESIDENTIAL AND COMMERCIAL ELECTRIC GENERATING FACILITIES

Clark Public Utilities

CITY OF UKIAH PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR NET ENERGY METERING FROM SOLAR ELECTRIC GENERATING FACILITIES OF 1 KW (KILOWATT) TO 100 KW

NET-ENERGY METER AGGREGATION INTERCONNECTION AGREEMENT FOR RESIDENTIAL AND COMMERCIAL ELECTRIC CUSTOMERS

Mason County PUD No. 1. Net Energy Metering Interconnection Agreement

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

Solar: Wind: Total: (AC Nameplate Rating) x (720 hrs/mo) x (0.15 = solar/ 0.10 = wind) Date(s) of Parallel Operation Rebate Expiration

ALAMEDA MUNICIPAL POWER INTERCONNECTION AGREEMENT GENERAL CONDITIONS

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Tier 1 Net Metering and Renewable Resource Interconnection Agreement. Grantee: Abbreviated Legal Description: Assessor s Tax Parcel Number(s):

ALAMEDA MUNICIPAL POWER INTERCONNECTION AGREEMENT GENERAL CONDITIONS

NET ENERGY METERING AND INTERCONNECTION AGREEMENT

Taunton Municipal Lighting Plant. This INTERCONNECTION & NET METERING AGREEMENT 1. CUSTOMER ELECTRIC GENERATING SYSTEM

SALEM CITY. NET METERING LICENSE AGREEMENT For Customer-Owned Electric Generating Systems of 100kW or Less

Public Utility District No. 1 Of Jefferson County

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

STANDARD INTERCONNECTION AGREEMENT FOR QUALIFYING FACILITIES (QF) 10 KW OR LESS

STANDARD INTERCONNECTION APPLICATION FOR NET METERING FACILITIES

PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR ELECTRIC GENERATING FACILITES Customer Owned Generation-Distribution Rate (Schedule G-1)

Holden Municipal Light Department Interconnection Agreement for Net Metering Service

STANDARD INTERCONNECTION AGREEMENT Fayetteville Public Works Commission

STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES

Interconnection of Electric Generators

Please Refer to Attached Sample Form

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR RESIDENTIAL NET METERING FACILITIES (for systems 20 kw or less)

Town of Highlands Board Approved as of May 17, 2012

Form No. 23 DECLARATIONS

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No E.

Please Refer to Attached Sample Form

INTERCONNECTION GENERATION AND NET METERING POLICY

Renewable Generation (Category 1-20 kw and less):

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR NON-RESIDENTIAL NET METERING FACILITIES (for kw systems)

STANDARD INTERCONNECTION AGREEMENT FOR RENEWABLE GENERATION SYSTEM

Renewable Generation (Category 1 20 kw and less):

Customer Information Packet on Net(B) Metering SYSTEM MUST BE OWNED AND OPERATED BY CUSTOMERS OF WAKEFIELD MUNICIPAL GAS AND LIGHT DEPARTMENT

Please Refer to Attached Sample Form

Tier 1 Standard Interconnection Agreement Customer-Owned Renewable Generation System

ENTERGY NEW ORLEANS, INC. STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES LOCATED IN ORLEANS PARISH

INTERCONNECTION AND OPERATING AGREEMENT

Superseding REVISED Sheet No. 38 REVISED SHEET NO. 38 Effective March 20, 2008 Effective February 6, 2014 RULE NO. 18. Net Energy Metering

MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT

AIRPORT HANGAR LICENSE AGREEMENT

Solar Generator Interconnection Agreement

Palmetto Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Less Than 2 MVA With Cooperative s Electric Systems (CES)

Standard Interconnection Agreement for Customer-Owned Renewable Generation System kw

POWER PURCHASE and INTERCONNECTION AGREEMENT FOR SNAP GENERATION

Berkeley Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Up To 500 KVA with the Cooperative s Electric Systems (CES)

GARLAND POWER & LIGHT. GP&L s Solar Generation Installation Requirements 2018

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) 1. Overview:

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

Parkland Light & Water Company Park Ave Tacoma, WA 98444

ENTERGY LOUISIANA, LLC STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES

Electricity (Net-Metering) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 45 and 46) THE ELECTRICITY (NET-METERING) RULES, 2018

APPLICATION FOR STANDARD CONTRACT BY A QUALIFYING COGENERATOR OR SMALL POWER PRODUCER

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Tri-Party Net Billing Power Purchase Agreement

WATER QUALITY MAINTENANCE-SPARKS MARINA CANAL CITY OF SPARKS, NEVADA

Customer s Name: Address: Contact Person: Telephone Number: Service Point Address: (Name and Address) Signature

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

WHITBY HYDRO CONNECTION AGREEMENT FOR A GENERATOR WITH MOMENTARY CLOSED TRANSITION OPERATION

Standard Interconnection Agreement for Customer-Owned Renewable Generation System

Recitals: Whereas, Interconnection Customer is the State of Maryland ( State ) or a local governmental entity of the State of Maryland;


RENOVATION CONTRACT. Borrower Name(s): Phone #: Phone #:

Lane Electric Cooperative, Inc. Eugene, Oregon Policy 311 (Net-Metering Services)

7 th Revision of Sheet No. 150 Canceling 6 th Revision WN U-60 of Sheet No. 150

Cboe Global Markets Subscriber Agreement

PUBLIC SERVICE COMPANY OF NEW MEXICO AGREEMENT NO.

INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS

Power Partner Program Agreement. Energy For Tomorrow

TRI-COUNTY ELECTRIC COOPERATIVE APPLICATION AND AGREEMENT FOR INTERCONNECTION AND NET METERING OF SYSTEMS WITH CAPACITY OF 100 kw OR LESS

USE AGREEMENT BETWEEN <OWNER> AND ORANGE COUNTY. THIS AGREEMENT (the Agreement ), is entered into by and between

EL PASO ELECTRIC COMPANY SCHEDULE NO. DG INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

Rate Code: L L-16 SOUTH CAROLINA PUBLIC SERVICE AUTHORITY (SANTEE COOPER) LARGE LIGHT AND POWER SCHEDULE L-16

Net Metering Interconnections Standards

PEPCO CUSTOMER NET ENERGY METERING CONTRACT. Qualifying facility of 1000 KW or less

I. Members Applying for New Interconnection/Submission of Plans/Specifications.

SCHEDULE SGI : SMALL GENERATOR INTERCONNECTIONS OTHER THAN NET METERING

1fi7-IO INTERLOCAL AGREEMENT KC-.-:::::::-41 BETWEEN KITSAP COUNTY AND KITSAP TRANSIT REIMBURSABLE WORK PERFORMED BY KITSAP COUNTY PUBLIC WORKS

Now, therefore, for and in consideration of the mutual covenants and agreements set forth herein, the Parties agree as follows:

AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

STANDARD INTERCONNECTION AGREEMENT FOR TIER 2 RENEWABLE GENERATOR SYSTEMS

THIS CONSTRUCTION CONTRACT ( Contract ) dated as of ( Owner ) and ( Contractor ) having a principal place of business at.

WITNESSETH: WHEREAS, This Agreement does not address the sale of electricity to or from Consumers; and

SAMPLE CONTRACT BETWEEN THE BOARD OF COMMISSIONERS OF THE PORT OF NEW ORLEANS AND CONTRACTOR NAME FOR SERVICES

STANDARD INTERCONNECTION AGREEMENT FOR INTERCONNECTED CUSTOMER-OWNED BATTERY SUBSYSTEMS 1 KW OR MORE

USE AGREEMENT AMONG <DEVELOPER>, <HOMEOWNERS ASSOCIATION>, AND ORANGE COUNTY. THIS AGREEMENT (the Agreement ) is entered into by and among

REGIONAL ROAD CONCURRENCY AGREEMENT CONSTRUCTION OF IMPROVEMENTS

OVERTON POWER DISTRICT No North Moapa Valley Boulevard P O Box 395 Overton, Nevada

SolarCurrents Program Agreement

Please Refer to Attached Sample Form

SURPLUS ENERGY PURCHASE AGREEMENT PARALLEL CUSTOMER GENERATION CGS 8 WISCONSIN AGGREGATE RENEWABLE CAPACITY OF 20 KILOWATTS OR LESS

Solar*Rewards REC Purchase Contract Customer-Owned PV Systems Greater than 25 kw DC nameplate capacity

Transcription:

SAMPLE INTERCONNECTION AGREEMENT FOR NET ENERGY METERING This Interconnection Agreement for Net Energy Metering ("Agreement") dated insert 1 st of month, for identification purposes only, is entered into by and between [Customer Name - All caps], [an individual or a corporation] ("CUSTOMER"), and the City of Anaheim, a municipal corporation ("ANAHEIM"), referred to herein jointly as Parties or individually as Party. 1. APPLICABILITY 1.1 This Agreement is applicable only to residential and small commercial customers operating solar or wind electrical generating facilities of 1 MW or less and who satisfy all requirements of the definition of an Eligible Customer-Generator set forth in Section 2827 of the California Public Utilities Code, as may be amended from time to time. 1.2 CUSTOMER represents that CUSTOMER is an Eligible Customer-Generator, and that no other sources of electric generation, other than those listed under Section 2.2, are installed on the Property and interconnected directly with CUSTOMER s electric service, unless approved by ANAHEIM through a separate agreement. 2. DESCRIPTION OF GENERATING FACILITY 2.1 CUSTOMER owns or leases property located at: [Customer Street Address], [City, State, Zip Code] (the Property ). 2.2 CUSTOMER has elected to interconnect and operate a solar or wind electric generating facility on the Property in parallel with ANAHEIM s electric grid. The solar or wind electric generating facility is intended primarily to offset part or all of the CUSTOMER s own electrical requirements. This solar or wind electric generating facility is specifically identified in the plans and design package on file at ANAHEIM's Building Division under the address of the Property. (the Generating Facility ). 2.3 The Generating Facility shall not be relocated or modified without ANAHEIM s written consent. 3. INTERRUPTION OR REDUCTION OF DELIVERIES 3.1 ANAHEIM shall not be obligated to accept or pay for and may, without any penalty to ANAHEIM, require CUSTOMER to interrupt or reduce deliveries of available energy from the Generating Facility (a) when necessary in order to construct, install, maintain, repair, replace, remove, investigate, or inspect any of ANAHEIM s equipment or part of its system; (b) if ANAHEIM determines in its sole discretion that curtailment, interruption, or reduction is necessary because of emergencies, forced or scheduled outages, force majeure, or compliance with prudent electrical practices; or (c) when CUSTOMER fails to operate the Generating

Facility in conformance with applicable municipal, state, and federal law, including, but not limited to the ANAHEIM Charter and Municipal Code, the ANAHEIM Electric Rates, Rules and Regulations, and the Guidelines for Interconnection of Customer Generators on file with ANAHEIM and incorporated herein by reference (collectively, ANAHEIM Rules and Regulations ). 3.2 Whenever reasonably possible, ANAHEIM will give CUSTOMER reasonable notice of the possibility that interruption or reduction of deliveries may be required. 3.3 Notwithstanding any other provision of this Agreement, if at any time ANAHEIM, in its sole discretion, determines that either (a) the Generating Facility, or its operation, may endanger ANAHEIM personnel or any person; or (b) the continued operation of the Generating Facility may endanger ANAHEIM s electric system, the environment, or any property, ANAHEIM may disconnect the Generating Facility from ANAHEIM s system. The Generating Facility shall remain disconnected until such time as ANAHEIM determines that the condition(s) referenced in (a) or (b) of this Section 3.3 have been corrected to ANAHEIM s satisfaction. 4. INTERCONNECTION 4.1 ANAHEIM shall own, operate and maintain on the Property a single meter capable of registering the flow of electricity in two directions ( Net Meter ). CUSTOMER shall deliver the available energy from the Generating Facility to the Net Meter. 4.2 Prior to parallel operation of the Generating Facility, CUSTOMER shall obtain any governmental authorizations and permits required for the construction and operation of the Generating Facility. Thereafter, CUSTOMER shall not commence parallel operation of the Generating Facility until ANAHEIM successfully installs a power production meter and a netmeter on the Property. 5. DESIGN, OPERATION, AND MAINTENANCE REQUIREMENTS 5.1 CUSTOMER shall be responsible for the design, installation, operation, and maintenance of the Generating Facility and shall obtain and maintain any required governmental authorizations and/or permits at CUSTOMER s sole cost and expense. 5.2 In its design, operation, and maintenance of the Generating Facility, CUSTOMER shall at all times conform to all applicable solar or wind electrical generating system safety and performance standards established by (a) the National Electrical Code ("NEC"), (b) the Institute of Electrical and Electronics Engineers ("IEEE"), (c) accredited testing laboratories such as Underwriters Laboratories, (d) applicable state and federal law, (e) applicable building codes, and (f) the ANAHEIM Rules and Regulation as may be amended from time to time. 5.3 CUSTOMER shall maintain the Generating Facility in a safe and prudent manner and in conformance with all applicable federal, state and local laws and regulations including, but not limited to the ANAHEIM Rules and Regulations. CUSTOMER shall permit ANAHEIM to inspect and shall promptly provide ANAHEIM copies, at CUSTOMER s expense, of CUSTOMER s testing and maintenance records for the Generating Facility. 2

5.4 CUSTOMER shall reimburse ANAHEIM for any and all losses, damages, claims, penalties, or liability it incurs as a result of CUSTOMER s failure to obtain or maintain any governmental authorizations and permits required for construction and operation of the Generating Facility. In its sole discretion, ANAHEIM may immediately disconnect the Generating Facility, if ANAHEIM determines that the Generating Facility does not comply with this Section 5. 6. ELECTION If CUSTOMER is a residential or small commercial customer, as defined in Public Utilities Code section 2827, CUSTOMER hereby agrees to be billed and to make payment to ANAHEIM for its net energy consumption as follows: _X_Monthly Annually If CUSTOMER chooses annual billing, he or she shall pay a deposit or provide security in accordance with the ANAHEIM Electric Rates, Rules and Regulations. 7. MONTHLY BILLING 7.1 If, during any normal billing cycle the energy supplied by ANAHEIM is greater than the energy supplied to ANAHEIM by the Generating Facility, CUSTOMER shall pay ANAHEIM for his or her energy consumption at the applicable energy rate schedule adopted by ANAHEIM. As used in this Section 7, normal billing cycle shall mean monthly billing, as applicable. 7.2 Customer hereby elects to receive one of the following: _X_a credit as set forth in Section 7.3; or compensation as set forth in Section 7.4. Thereafter, CUSTOMER shall only change this election in writing once a year between June 1 and June 30. For purposes of this Section 7, the foregoing shall be known as the Election Period. CUSTOMER shall mail his or her election to ANAHEIM addressed to the Solar Energy Program Manager, 201 S. Anaheim Boulevard, Suite 801, Anaheim, California 92805. If CUSTOMER fails to make an election in any given year, the last election which the CUSTOMER made shall continue to be effective until the following Election Period. As used in this Section 7, the period between the date CUSTOMER makes his or her election in Section 7.2 and the following June 30 shall be known as the Initial Period. 7.3 THIS SECTION 7.3 APPLIES TO CUSTOMERS WHO HAVE ELECTED THE CREDIT OPTION. If, during any normal billing cycle, the energy supplied by ANAHEIM is less than the energy supplied to ANAHEIM by the Generating Facility, CUSTOMER will receive a net energy credit ( Net Energy Credit ) for the excess energy supplied to ANAHEIM; provided that, CUSTOMER has selected this option pursuant to Section 7.2 herein. This Net Energy Credit will be computed in accordance with the applicable ANAHEIM rate schedule, and ANAHEIM will apply the credit to offset the electric portion of CUSTOMER s subsequent utility bills until such time as the credit is either (a) extinguished; or (b) CUSTOMER s account is closed. If CUSTOMER s account is closed with a Net Energy Credit, the CUSTOMER shall 3

not be owed any compensation by ANAHEIM, except that ANAHEIM will offset any balance on the CUSTOMER s final electric bill by CUSTOMER s outstanding Net Energy Credit, if any. 7.4 THIS SECTION 7.4 APPLIES TO CUSTOMERS WHO HAVE ELECTED THE COMPENSATION OPTION. If, during any normal billing cycle, the energy supplied by ANAHEIM is less than the energy supplied to ANAHEIM by the Generating Facility, CUSTOMER will receive net surplus compensation ( Net Surplus Compensation ) from ANAHEIM; provided that, CUSTOMER has selected this option pursuant to Section 7.2 herein. ANAHEIM shall pay the Net Surplus Compensation within thirty (30) days(a) from either (a) the end of the Initial Period, or (b) the end of every twelve (12) month period commencing from July 1st following the Initial Period. Net Surplus Compensation shall be calculated in accordance with the applicable ANAHEIM rate schedule If CUSTOMER s account is closed prior to the end of a normal billing cycle, the CUSTOMER shall not be owed any compensation by ANAHEIM, except that ANAHEIM will offset any balance on the CUSTOMER s final utility bill by CUSTOMER s outstanding Net Surplus Compensation, if any. 7.5 If CUSTOMER purchases energy from alternative sources other than ANAHEIM, CUSTOMER shall not be eligible for a Net Energy Credit or Net Surplus Compensation. 8. ANNUAL BILLING 8.1 If CUSTOMER is a residential or small commercial customer and has elected to pay his bill annually, ANAHEIM will bill the CUSTOMER for his or her net energy consumption annually every July 1st or the first workday following. If, during the Initial Period (as defined in Section 8.2) or any twelve (12) month billing cycle thereafter, the energy supplied by ANAHEIM is greater than the energy supplied to ANAHEIM by the Generating Facility, CUSTOMER shall pay ANAHEIM for his or her energy consumption at the applicable energy rate schedule adopted by ANAHEIM. 8.2 CUSTOMER hereby elects to receive one of the following (PLEASE NOTE THAT IF "MONTHLY" BILLING IS SELECTED IN SECTION 6 ABOVE, THIS SECTION 8.2 SHOULD BE LEFT BLANK): a credit as set forth in Section 8.3; or compensation as set forth in Section 8.4. Thereafter, CUSTOMER shall only change this election in writing once a year between June 1 and June 30. For purposes of this Section 8, the foregoing shall be known as the Election Period CUSTOMER shall mail his or her election to ANAHEIM addressed to the Solar Energy Program Manager, 201 S. Anaheim Boulevard, Suite 801, Anaheim, California 92805. If CUSTOMER fails to make an election in any given year, the last election which the CUSTOMER made shall continue to be effective until the following election period. As used in this Section 8, the period between the date CUSTOMER makes his or her election in Section 8.2 and the following June 30 shall be known as the Initial Period. 8.3 THIS SECTION 8.3 APPLIES TO CUSTOMERS WHO HAVE ELECTED THE CREDIT OPTION. If, either (a) at the end of the Initial Period or (b) at the end of every twelve 4

(12) month billing cycle commencing from July 1st following the Initial Period, the energy supplied by ANAHEIM is less than the energy supplied to ANAHEIM by the Generating Facility, CUSTOMER will receive a net energy credit ( Annual Net Energy Credit ) for the excess energy supplied to ANAHEIM; provided that, CUSTOMER has selected this option pursuant to Section 8.2 herein. This Annual Net Energy Credit will be computed in accordance with the applicable ANAHEIM rate schedule, and ANAHEIM will apply the credit to offset toward the electric portion of CUSTOMER s subsequent annual electric utility bill. If the CUSTOMER s account is closed with an Annual Net Energy Credit, the CUSTOMER shall not be owed any compensation by ANAHEIM, except that ANAHEIM will offset any balance on the CUSTOMER s final electric bill by CUSTOMER s outstanding Annual Net Energy Credit, if any. 8.4 THIS SECTION 8.4 APPLIES TO CUSTOMERS WHO HAVE ELECTED THE COMPENSATION OPTION If, either (a) at the end of the Initial Period or (b) at the end of every twelve (12) month billing cycle commencing from July 1st following the Initial Period, the energy supplied by ANAHEIM is less than the energy supplied to ANAHEIM by the Generating Facility, CUSTOMER will receive net surplus compensation ( Annual Net Surplus Compensation ) from ANAHEIM; provided that, CUSTOMER has selected this option pursuant to Section 8.2 herein. Annual Net Surplus Compensation shall be calculated in accordance with the applicable ANAHEIM rate schedule, and ANAHEIM shall pay it within thirty (30) days of the close of the twelve (12) month billing cycle. If CUSTOMER s account is closed prior to the end of a twelve month billing cycle, the CUSTOMER shall not be owed any compensation by ANAHEIM, except that ANAHEIM will offset any balance on the CUSTOMER s final utility bill by CUSTOMER s outstanding Annual Net Surplus Compensation, if any. 8.5 If CUSTOMER purchases energy from alternative sources other than ANAHEIM, CUSTOMER shall not be eligible for an Annual Net Energy Credit or Annual Net Surplus Compensation 9. ACCESS TO PREMISES ANAHEIM may enter the Property (a) to inspect, as ANAHEIM deems necessary, CUSTOMER s protective devices and to read or test meters; and/or (b) to disconnect, without notice, the Generating Facility if, in ANAHEIM s opinion, a hazardous condition exists and such immediate action is necessary to protect persons, or ANAHEIM s facilities, or property of others from damage or interference caused by the Generating Facilities, or lack of properly operating protective devices. 10. INDEMNITY AND LIABILITY 10.1 CUSTOMER agrees to indemnify, defend (at ANAHEIM s option) and hold harmless ANAHEIM, its officers, agents, employees, representatives and volunteers from and against any and all claims, demands, defense costs, actions, liability, or consequential damages of any kind or nature arising out of or in connection with CUSTOMER s engineering, design, construction, maintenance, repair, operation, supervision, inspection, testing, protection or ownership of the Generating Facilities, or the making of replacements, additions, betterments to, or reconstruction 5

of the Generating Facilities, except to the extent it arises out of the sole negligence of ANAHEIM. 10.2 The provisions of this Section 10 shall not be construed to relieve any insurer of its obligations to pay any insurance claims in accordance with the provisions of any valid insurance policy. 11. INSURANCE 11.1 To the extent that CUSTOMER has currently in force all risk property insurance and comprehensive personal liability insurance, CUSTOMER agrees that it will maintain such insurance in force for the duration of this Agreement in no less amounts than those currently in effect. ANAHEIM shall have the right to inspect or obtain a copy of the original policy or policies of insurance prior to commencing operation. 11.2 Such insurance required in Section 11.1 shall, by endorsement to the policy or policies, provide for thirty (30) calendar days written notice to ANAHEIM prior to cancellation, termination, alteration, or material change of such insurance. 11.3 ANAHEIM s Risk Manager is hereby authorized to modify the requirements set forth above in the event he determines that such reduction is in ANAHEIM s best interest. 12. GOVERNING LAW AND VENUE This Agreement shall be interpreted, governed, and construed under the laws of the State of California as if executed and to be performed wholly within the State of California. In the event that suit is brought by a Party, the Parties agree that trial of such action shall be vested exclusively in the State Court of California, County of Orange, or in the United States District Court, Central District of California, in the County of Orange regardless of choice of law or forum non convenience. 13. AMENDMENTS, MODIFICATIONS OR WAIVER Any amendments or modifications to this Agreement shall be in writing and agreed to by both Parties. The failure of any Party at any time or times to require performance of any provision hereof shall in no manner affect the right at a later time to enforce the same. No waiver by any Party of the breach of any term or covenant contained in this Agreement, whether by conduct or otherwise, shall be deemed to be construed as a further or continuing waiver of any such breach or a waiver of the breach of any other term or covenant unless such waiver is in writing. 14. ASSIGNMENT Neither party may assign this Agreement nor any of its rights or duties hereunder without the prior written consent of the other party which consent shall not be unreasonably withheld. Any such assignment or delegation made without such written consent shall be null or void. 6

15. NOTICES 15.1 Notices and communication concerning this Agreement shall be sent to the following addresses: ANAHEIM With a copy to City of Anaheim Public Utilities General Mgr. Attention: City Clerk 201 South Anaheim Blvd., Ste. 1101 200 South Anaheim Blvd., Ste 217 Anaheim, CA 92805 Anaheim, CA 92805 CUSTOMER [Customer Name - All caps] [Customer Street Address] [City, State, Zip Code] 15.2 Either party may, by notice to the other party, change the respective address specified above. Service of notice or communication shall be complete when received at the designated address. 15.3 CUSTOMER s notices to ANAHEIM pursuant to this Section shall refer to the CUSTOMER s Account Number. 15.4 In the event of an emergency, CUSTOMER shall immediately notify ANAHEIM at its Public Utilities Department (Phone No. (714) 765-3300) of any emergency situation related to the Generating Facility. 16. TERM AND TERMINATION OF AGREEMENT 16.1 The effective date of this Agreement shall be the latest date of execution hereinafter set forth opposite the names of the signators hereto. In the event CUSTOMER fails to set forth a date of execution opposite the name(s) of CUSTOMER s signator(s), CUSTOMER hereby authorizes ANAHEIM to insert the date of execution by CUSTOMER as the date said Agreement as executed by CUSTOMER is received by ANAHEIM. 16.2 This Agreement may be terminated by either party on thirty (30) days advance written notice in accordance with Section 15 hereof. 16.3 This Agreement shall terminate, without notice, upon (a) termination of the electric distribution service provided to CUSTOMER at the Property by ANAHEIM; or (b) changes to CUSTOMER s electric load which cause CUSTOMER to no longer satisfy all requirements of the definition of an Eligible Customer-Generator set forth in Section 2827 of the California Public Utilities Code, as may be amended from time to time. 17. SIGNATURES 7

CUSTOMER and CUSTOMER s signator(s) represent that the signators hold the positions set forth below their signatures and that the signators are authorized to execute this Agreement on behalf of CUSTOMER and to bind CUSTOMER hereto. {SIGNATURES ON FOLLOWING PAGE} 8

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed on the dates hereinafter respectively set forth. DATE OF EXECUTION: CITY OF ANAHEIM, a municipal corporation By: Dukku Lee Public Utilities General Manager ANAHEIM DATE OF EXECUTION: ATTEST: By: Linda N. Andal, City Clerk DATE OF EXECUTION: [Customer Name - All caps], [an individual or a corporation] By: [Customer Name] "CUSTOMER" APPROVED AS TO FORM: MICHAEL R.W. HOUSTON, CITY ATTORNEY By: Daniel J. Payne Deputy City Attorney 9