Compressed Natural Gas Funding Request Decision Paper. Decision Paper

Similar documents
Gas Innovation Reporting Framework

Gas Networks Ireland Allowed Revenue and Distribution Tariffs 2016/17

PC4: REVIEW OF TRANSMISSION REVENUES COMMISSION FOR ENERGY REGULATION (CER) FINAL REPORT JUNE 2017 TECHNICAL AND ECONOMIC REVIEW

PC4: REVIEW OF DISTRIBUTION REVENUES COMMISSION FOR ENERGY REGULATION (CER) FINAL REPORT JUNE 2017 TECHNICAL AND ECONOMIC REVIEW

Irish Water 2019 Revenue Control

Impact Assessment (IA)

Gas Networks Ireland Transmission Tariffs and Tariff Information 2018/19

GNI PROPOSALS ON NEW CONNECTIONS POLICY JANUARY 2015

New Towns Analysis. Phase II Final Report

Decision on GNI Allowed Revenues and Gas Distribution Tariffs for 2015/16

Gas Networks Ireland Allowed Revenue and Transmission Tariffs 2017/18 Decision Paper

Gas Networks Ireland Distribution Tariffs and Allowed Revenue 2018/19

Investing In Our Transport Future: A Strategic Framework for Investment in Land Transport. Background Paper Thirteen

Distribution Tariffs. For the. Gas Year 2016/17

Gas Networks Ireland Allowed Revenues and Transmission Tariffs 2015/16. Decision Paper CER/15/ st August Colm Ó Gormáin

The CRC Energy Efficiency Scheme

GREEK RENEWABLES SUPPORT SCHEME PROPOSALS

Swords/ Airport to City Centre BRT Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC)

SAWEA submission to the public hearing relating to the NERSA review of the REFIT tariffs. By: Johan van den Berg, CEO.

Decision on Electricity Network Connection Policy

Government Policy Statement on land transport 2018 release for public engagement

Quality Assurance Report for Expenditure in 2016 Department of Transport, Tourism and Sport

Overview of the Northern Ireland Ireland - Scotland VA Programme. Electric Vehicles Call Workshop

GMARG forum. Ashling Hotel. Thursday 18 June Minutes of Meeting. Participants:

Customer Care Team Annual Report 2017

JOB DESCRIPTION. TBC within Asia region Asia Regional Office International/TBD 2 years (with possible extension) Head of Programmes

IRELAND S REGIONAL AIRPORTS PROGRAMME

Investing in the future

Impact Assessment (IA)

Implementing the UK s Exit from the European Union

Report. by the Comptroller and Auditor General. Department for Business, Energy & Industrial Strategy. Hinkley Point C

Consideration of applications to increase cash, Leap and pre-paid fares from Bus Éireann for 2014

Fingal/ North Dublin Transport Study Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC)

The barriers to renewable energy project investment in Wales

Response Paper to Consultation on GNI Revenue for PC4 Response Paper. Reference: CER/17/261 Date Published: 30/08/2017 Closing Date: N/A

Request for Advice on Cost Recovery for Mandated Smart Metering Infrastructure

ENV/EPOC/WPNEP/T(2009)2/FINAL. Working Party on National Environmental Policies Working Group on Transport

PRELIMINARY CERTIFICATION DECISION. GNI s GAS FOU CERTIFICATION APPLICATION

ICAEW s action plan to increase market transparency

SIPTU Submission to the Department of Transport, Tourism and Sport regarding the departments Statement of Strategy for

Minute of the first meeting of the Water Forum. Severn Trent Centre, Coventry. 2 March Milo Purcell. Ian Butterfield.

Tariff for Virtual Reverse Flow Product at Moffat

Fuel Poverty Forum Policy Brief

Meeting of the Joint Oireachtas Committee on Housing, Planning and Local Government 27 September 2018

NHS Working Longer Group Initial findings and recommendations. What do they say about older women at work?

Employer Covenant Working Group

Prepayment Metering in the Electricity and Gas Markets

Irish Water. Interim Revenue Control Executive Summary

The role of electricity demand reduction in managing Levy Control Framework costs

ENERGY EFFICIENCY LOAN FUND EVALUATION FINAL

THE NEW EUROPEAN COMMISSION PROPOSAL ON COMMERCIAL FUEL DUTY

Philippines Natural Gas Master Plan Transaction Structure Phase Two Public Consultation 20 th March Prepared for: Supported by: Prepared by:

September 2014 Pagham Neighbourhood Plan

Aurora Energy Limited

Formulation of Financial Strategy

Greater Bristol Bus Network Major Scheme Business Case. Chapter 1. Developing the Full Approval Major Scheme Business Case

Attachment D: Capex IM incentive framework

Water Sector Reforms

SIPTU statement to Oireachtas Joint Committee on Transport to discuss the vision for Public Transport including the level of State Subvention

Procurement Functional Leadership Quarterly Report, January to March 2014

Endeavour Energy Regulatory proposal Submission to the AER Issues Paper August 2018

Joint Oireachtas Committee on Climate Change and Energy Security Comparison Between

Economic regulation of capacity expansion at Heathrow: policy update and consultation

Acquisition of Shell NZ Downstream Oil Assets. Marko Bogoievski CEO Infratil Limited March 29, 2010

Attachment C: How capital expenditure is proposed and approved under the capex IM

Operating Agreement S4C. Draft for consultation August 2012

Guide. Commission Recommendation

Producer Organisation Scheme

Interim Report Review of the financial system external dispute resolution and complaints framework

COMMON APPRAISAL FRAMEWORK FOR TRANSPORT PROJECTS AND PROGRAMMES

ECONOMY, JOBS AND FAIR WORK COMMITTEE

EU Funds for Road Safety Multiannual Financial Framework Saving Lives on EU Roads until 2020 January 2012

Central Credit Register Consultation Paper CP93

Challenges to Expediting Commercial RNG Production: A Developer s Perspective

RESULTS UNDERPINNED BY TIGHT COST MANAGEMENT

Advice to the Minister on the Economic Regulatory Framework for the public water services sector in Ireland

Exiting the EU: The financial settlement

Vehicles Advice financial analysis. Infrastructure Victoria FINAL REPORT

Brunel Pension Partnership Questions & Answers

Disclaimer of opinion by Auditor of the Financial Statements for the year ended 30 June 2017

B.29[17d] Medium-term planning in government departments: Four-year plans

SEQ Interim Price Monitoring Information Requirements for 2010/11

Facilities & Property Capital Expenditure

Consultation on Potential Changes to the Lending Framework for Credit Unions CP125

Investment Strategy Statement: September 2018

State Airports (Shannon Group) Bill Regulatory Impact Analysis

Successfully navigating the journey to pooling

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS

INVESTING IN GAS TRANSMISSION

Social Security (Scotland) Bill Financial Memorandum Briefing David Eiser, Committee Adviser

Horizon Work Programme Fast Track to Innovation Pilot

Simplifying the CRC Energy Efficiency Scheme: Next Steps

Decision on modifications to Generation Licences and Electricity Supply Licences. Decision Paper

Community and Renewable Energy Scheme Project Development Toolkit

Nottingham City Homes

Impact Assessment (IA)

2018/19 Technical Guidance Annex D NHS England Guidance for Finance Business Rules

Our taxes explained. A guide to our tax strategy and tax profile June 2017

Direction to ESB PES on Tariffs to apply from 1 st November 2007 CER/07/191

Consultation: Revised Specifi c TASs Annex 1: TAS 200 Insurance

Transcription:

Compressed Natural Gas Funding Request Decision Paper Decision Paper Reference: CER/16/313 Date Published: 24/11/2016

Executive Summary The Commission for Energy Regulation (CER) is today, 24 November 2016, publishing a decision regarding a funding request submitted in September 2016 1 to the CER by Gas Networks Ireland (GNI). The funding request ( 12.83m) was for a trial to examine the impact of the introduction of Compressed Natural Gas (CNG) on the gas network through the installation of 13 CNG stations in Ireland. In February 2016, GNI submitted an application (the Causeway Study) 2 to the Connecting Europe Facility (CEF) 3. In July 2016, on foot of this application, GNI was provisionally awarded 5.96m to undertake the Causeway Study. However, the granting of the 5.96m was conditional on GNI committing to the total cost of the Causeway Study. The total cost of the study is 23.47m of which 5.96m will be CEF funding and 4.68m is available from previous innovation funding secured by GNI under Price Control 3, leaving a remaining shortfall of 12.83m. In September 2016, GNI submitted a request to the CER for the remaining amount of the cost of the Causeway Study ( 12.83m). On foot of this request for funding, the CER published a consultation paper (CER/16/258) 4 which included the GNI submission, outlining the basis upon which the funding was sought. The CER sought the views of interested parties as to whether GNI should be allowed to recover the shortfall of 12.83m in funding for the project from the gas customer. During the consultation period and in response to the GNI request, the CER sought further detailed costings from GNI to allow for a detailed review of the project to take place. Consequently, the CER in conjunction with its economic advisors carried out an analysis of the Net Present Value (NPV) of the proposed project and carried out a sensitivity analysis to test the underlying assumptions over a 25 year and 15 year basis. Following this assessment the CER found that in the event of minor fluctuations in some of the GNI projections, the NPV gain over the lifetime of the 15 year assessment diminishes or turns negative. It was also the case that the underlying assumptions 1 http://www.cer.ie/document-detail/compressed-natural-gas-funding-request/1107 2 See Section 2 for more detail 3 https://ec.europa.eu/inea/en/connecting-europe-facility 4 Compressed Natural Gas Funding Request i

presented by GNI were uncertain. This uncertainty is driven by the fact that CNG as a transport fuel is very much in its infancy in Ireland, and therefore it is difficult to predict the demand for its use over the medium to longer term. As such, the CER view the GNI proposed project to be still very much at the innovation stage and has not, as yet, moved to a full viable business model. However, recognising the potential benefits that CNG may bring to the gas customer and the positive responses received to consultation (CER/16/258), the CER has deemed it appropriate that GNI be provided with innovation funding of 12.83m as part of Price Control 4 (PC4), which will be recovered through network tariffs. Innovation funding is an allowance given to GNI for research and development and may include projects where the financial benefits are not yet certain. The CER recognises that the allowance of 12.83m for innovation funding represents a significant increase when compared to the innovation funding of 8m allowed to GNI under Price Control 3. Given this large increase, it is difficult to see how the CER would agree to provide further additional funding for innovation under PC4 unless there were exceptional circumstances. Should GNI use the innovation funding for the CNG trial it would be subject to a number of conditions set out in Section 4 of this paper. GNI will be required to: report on the findings of the pilot project to the CER on an annual basis; prepare and publish a final report on the benefits to the gas customer at the end of the project; install the infrastructure in line with CER safety requirements, and install the infrastructure in such a way so the assets can be sold once the pilot is complete. The consultation paper (CER/16/258), stated that the CER would consider the regulatory treatment of the CNG infrastructure within the context of PC4. Such consideration will be informed by the CER s decision on regulatory treatment of Electric Vehicles (EVs) which is due for publication shortly. ii

Public/ Customer Impact Statement The CER is aware of the potential benefits regarding the uptake of CNG which has the potential to bring, through increased demand, downward pressure on individual gas tariffs. The potential benefits of CNG are not limited to just the gas market, but may extend to wider societal benefits. As identified by GNI, the uptake of CNG also has the potential to: reduce emissions from the transportation sector; provide a pathway for Renewable Natural Gas (RNG) to access the transportation market; reduce Ireland s dependence on imported petrol and diesel; provide businesses the opportunity to reduce transportation costs; and provide businesses the opportunity to reduce their transportation emissions. The CER has reviewed the GNI submission, the responses received and also an economic report from the CER s advisors. Given that the predicted demand of CNG is dependent on the level of vehicle uptake, the CER is, at present, not in a position to verify that the gas demand forecasts underpinning the projects will meet the level assumed by GNI. The CER has concerns that the level of forecast demand uptake may not be realised, given that CNG for transport purposes does not at this time exist in Ireland. Notwithstanding this, the CER has deemed it appropriate that GNI be provided with innovation funding of 12.83m as part of Price Control 4 (PC4), which will be recovered through network tariffs. Innovation funding is an allowance given to GNI for research and development and may include projects where the financial benefits are not yet certain. The CER is currently working on GNI s PC4, revenue allowances are not as yet known and it is not possible to accurately calculate the effect of this approval on overall revenue allowances. However, when compared to the Price Control 3 period the allowance equates to 2.56m per annum over a five year period. This would be the equivalent of 1.3% of distribution revenues for 2015/16. Based on the average customer bill for 2016/2017 this figure would translate to an additional 1.20 per customer per annum. iii

Table of Contents 1 Introduction... 1 1.1 Consultation responses... 2 Structure of Paper... 3 2 Overview of Causeway Study and Responses to Consultation... 4 2.1 The Causeway Study... 4 2.2 Overview of Consultation responses... 5 3 CER Analysis of GNI Submission... 8 3.1 NPV and Sensitivity Scenarios... 8 4 CER Decision... 10 5 Conclusion and Next Steps... 12 iv

Glossary of Terms and Abbreviations Abbreviation or Term Definition or Meaning CER CNG DTTAS GNI NGV NPF NPV PC RAB RNG Commission for Energy Regulation Compressed Natural Gas Department of Transport Tourism and Sport Gas Networks Ireland Natural Gas Vehicle National Framework Policy Net Present Value Price Control Regulated Asset Base Renewable Natural Gas v

1 Introduction This paper outlines the CER s decision in relation to a request submitted by Gas Networks Ireland (GNI) in September 2016, regarding funding for the roll out of thirteen CNG stations in Ireland. The request from GNI was in response to the Alternative Fuels Directive, 2014/94/EU (the Directive). The Directive outlines a number of requirements regarding the deployment of alternative fuels for use in the transportation sector. With regard to CNG, the Directive states that: Member States should ensure, by means of their national policy frameworks, that an appropriate number of refuelling points accessible to the public for the supply of CNG or compressed biomethane to motor vehicles is built up, in order to ensure that CNG motor vehicles can circulate in urban/suburban agglomerations and other densely populated areas as well as throughout the Union, at least along the existing TEN-T Core Network. The Directive indicates, that an appropriate distance between refuelling points is approximately 150 km. The CER is aware that the Department of Transport, Tourism and Sport (DTTAS) is currently consulting on a National Policy Framework (NPF) for the deployment of alternative fuels in Ireland. The Directive calls for Member States to notify the European Commission by November 2016, of their NPFs. While not within the remit of the CER, GNI notes a number of other potential positive impacts of CNG such as: reduce emissions from the transportation sector; provide a pathway for Renewable Natural Gas (RNG) to access the transportation market; reduce Ireland s dependence on imported petrol and diesel; provide businesses the opportunity to reduce transportation costs; and provide businesses the opportunity to reduce their transportation emissions. It is against this backdrop that GNI submitted a request for funding of 12.83m for the roll out of 13 CNG stations across the Ten-T Core network in Ireland. 1

Following this request, in September 2016, the CER published (CER/16/258). The purpose of (CER/16/258) was to seek the views of the gas industry, potential users and suppliers of CNG and any other interested parties on GNI s request for funding. 1.1 Consultation responses The CER received 21 written submissions in response to (CER/16/258). In relation to (CER/16/258), submissions were received from the following organisations and have now been published on the CER s website alongside this decision paper: Air Liquide Bord Gáis Energy Bus Éireann Celtic Linen Diageo Department of Tourism, Transport, and Sport (DTTAS) Energy Cork ESB Farmgas Fingleton White Glanbia Green Forty Harris Transport Jerry Murphy NRGE Renewable Gas Forum Ireland SSE TCBB The Happy Pear Topaz Virginia Logistics. 2

Structure of Paper This paper is structured as follows: Section 1: Introduction Section 2: Overview of the Causeway Study and with an overview of the responses received Section 3: CER Decision 3

2 Overview of Causeway Study and Responses to Consultation 2.1 The Causeway Study In February 2016, GNI and its project partners (Phoenix Natural Gas Ltd., Firmus Energy and the National University of Ireland Galway (NUIG)) submitted a funding application to the Connecting Europe Facility (CEF) which opened on the 5th of November 2015 ( The Causeway Study ). The Causeway Study involves the testing of the progressive and rapid deployment of CNG stations across Ireland and an analysis of their impact on the operation of the gas network. The application outlined GNI s intention to undertake the study, which included the deployment of thirteen CNG refuelling stations in Ireland, a Renewable Natural Gas injection facility and the support of CNG vehicles, over a period of 5 years. As shown Figure 1 below the total cost of the GNI element of the Causeway Study is 23.47m, of which GNI has secured EU funding of 5.96m, and has previous funding of 4.68m from PC3. The EU funding is conditional on GNI securing the additional 12.83m shortfall to complete the study. Causeway Action Cost - GNI Original Submission CEF Funding GNI Innovation Fund Shortfall Activity 1 Project Management 2,559,700 1,037,702 400,000 1,121,998 Activity 2 Pilot CNG Network 16,543,297.00 3,152,457 2,725,697 10,665,143 Activity 3 CNG Vehicles and Supports 760,385 308,260 400,000 52,125 Activity 4 Biogas Injection Facility 1,945,135 788,558 1,156,577 - Activity 5 System Operation & Data Analysis 1,491,167 604,519-886,648 Activity 6 Communication and Dissemination 172,059 69,753 0 102,306 Total 23,471,743 5,961,249 4,682,274 12,828,220 Table 1 Causeway Study Action Cost The CER s legislative role is outlined in the Gas (Interim) (Regulation) Act, 2002, as amended (the Act). Under the Act, the CER is responsible for regulating charges in the natural gas market. Under Section 14 of the Act, the CER may set the basis for charges for transporting gas through distribution systems. 4

2.2 Overview of Consultation responses In (CER/16/258), the CER sought the views of the gas industry, potential users and suppliers of CNG and any other interested parties on (i) the proposal from GNI to undertake a study on the impact of CNG on the gas network and (ii) views on GNI s request for CER s approval to recover the shortfall from gas customers. The CER received 21 responses to (CER/16/258) and most were broadly in favour of GNI carrying out the study. Responses received were from existing natural gas suppliers, potential users of CNG, and also from potential producers of Renewable Natural Gas (RNG). Seven respondents expressed an interest in using CNG as a transportation fuel. A number of responses were received from potential producers of RNG, such respondents view CNG as a potential future market for RNG and as such, were in favour of the roll out of the CNG stations. Location of CNG stations One respondent, while supportive of the project, stated that the roll out of CNG stations should extend beyond the Core Ten-T network. CER Response The CER acknowledges the positive responses received to (CER/16/258) signalling the interest amongst industry participants in the use of CNG. Regarding the roll out of CNG stations, the CER expect that GNI will provide the best value for the gas customer. As such, it will be a matter for GNI to consider whether CNG station installations located off the Core Ten-T network will provide a higher throughput than an installation on the Core Ten-T network. Asset Ownership and Regulatory Treatment of Assets Two respondents expressed reservations regarding the ownership of the CNG stations by GNI. The respondents are of the view that it would be preferable if the ownership and operation of the CNG stations were tendered to the private sector by GNI. The respondents argued that this would enable private competition in the marketplace from the outset. The respondents further stated that GNI could provide oversight of the technical and operating standards in addition to providing capital and operating funding support. The respondents were of the view that this arrangement would provide the best value for the CNG customer. Another respondent, while supportive in general, was of the view that the CNG infrastructure should not be placed on the GNI Regulated Asset Base. 5

CER Response The CER notes the views submitted regarding the status of the ownership of the assets developed during the trial. The CER will keep this issue under review over the course of the Causeway Study, and if appropriate, the CER will make a decision on this at the appropriate time. However at this point, it remains the position of the CER that should GNI use the innovation funding for the Causeway trial, the infrastructure should be developed in such a way so that it may be sold by GNI. The above approach is similar to the previous CER decision regarding the treatment of Electric Vehicle (EV) infrastructure 5. In this instance, the CER provided ESB Networks with monies for the roll out of EV charge points. Following this decision, the CER published a consultation paper (CER/16/286) 6 on a range of potential options regarding the ownership of EV assets. The CER is of the view that achieving interoperability should be an important element of this trial. The CER expects that GNI will engage with stakeholders and leverage different areas of expertise and experience. It is up to GNI to work with the appropriate agencies involved in the promotion of CNG infrastructure to attempt to safeguard interoperability. From the CER s point of view, interoperability should facilitate greater use of the CNG infrastructure and so should facilitate a more successful and robust trial. The CER also notes the comments that the assets should not be placed on GNI s Regulated Asset Base. The consultation paper (CER/16/258), stated that the CER would consider the regulatory treatment of the CNG infrastructure within the context of PC4. Such consideration will be informed by the CER s decision on regulatory treatment of Electric Vehicles (EVs) which is due for publication shortly. Scope of Study One respondent was of the view that the scope of the study was too narrow and should be broadened. The respondent stated that the Causeway Study should report detailed analysis on the following: The appetite for CNG conversion amongst transport fleet owners; The scope for and cost of the development of renewable gas in Ireland; and That the study should consider the overall impact on the gas customer. 5 CER/14/057 CER Decision Paper on ESB Electric Vehicle Pilot. 6 CER/16/286 ESBN Electric Vehicle Pilot and Associated Assets 6

CER Response The CER agrees with the response regarding the reporting arrangements. As such, should GNI use the innovation funding for the CNG trial it would be subject to a number of conditions as outlined in Section 4. Summary In summary, most responses to (CER/16/258) were positive and in favour of the progression of the Causeway Study and the roll out of the thirteen CNG stations in Ireland. 7

3 CER Analysis of GNI Submission 3.1 NPV and Sensitivity Scenarios Following an assessment of the submission from GNI the CER performed a sensitivity analysis (see Table 2) of the NPV of the project over a 25 year and 15 year basis. The CER were of the view that given the uncertainties associated with CNG infrastructure and potential for technological developments in this area that the analysis carried out over the 15 year period should be the focus. Scenario Sensitivity 1a Description Slower station roll out was assumed as follows: 2 stations in 2016; 3 stations in 2017; 3 stations in 2018; 5 stations in 2019. The slower station roll-out profile also results in lower CNG take up in the first years. The maximum demand level is reached one year later than the original forecast. Sensitivity 1b As above plus assumed that capex unit costs increase by 10% for the 11 stations delivered after 2016. Sensitivity 1c As above plus assumed that: Table 2: Scenario sensitivity analysis -15 years 1) opex base cost increases from 12,000 to 15,000 per station per year; and 2) electricity costs increase by 1.5% per year from 2019 onwards. The CER found that in the event of minor fluctuations in some of the GNI projections, the NPV gain over the lifetime of the project diminishes or turns negative. The impact of these fluctuations are outlined in Figure 1 below. 8

m 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0-0.5 GNI analysis Sensitivity 1a Sensitivity 1b Sensitivity 1c -1.0-1.5 Figure 1 Sensitivity analysis 15 year appraisal It was also the case that the underlying assumptions presented by GNI were uncertain. This uncertainty is driven by the fact that CNG as a transport fuel is very much in its infancy in Ireland, and therefore it is difficult to predict the demand for its use over the medium to longer term. As such, the CER view the GNI proposed project to be still very much at the innovation stage. It is important to note that the CER is supportive of projects that increase gas demand and place downward pressure on individual gas tariffs. In the case of new towns the CER is in a position to examine the previous energy demands of companies connecting to the gas network and make a determination with regard to future energy demands. This allows the CER to determine whether or not a new connection is likely to be NPV positive or NPV negative. In relation to GNI s submission, it is assumed that by 2024, the CNG market will be made up of 266 trucks and 254 busses, this assumption feeds into the projected demand of CNG and hence, the positivity of the assessment from GNI. However, given the uncertainties regarding the GNI assumptions the CER is not confident, at this juncture, that the growth of CNG will meet the levels that GNI is predicting. 9

4 CER Decision Recognising the potential benefits that CNG may bring to the gas customer and the positive responses received to consultation (CER/16/258), the CER has deemed it appropriate that GNI be provided with an innovation funding of 12.83m as part of PC4. Innovation funding is an allowance given to GNI for research and development and may include projects where the financial benefits are not yet certain. By way of precedent, the CER as part of Price Control 3 (PC3) allowed for the establishment of an innovation fund by GNI to support innovation in the gas industry. A total of 8m was allocated to this fund. To date, approximately 50% of the fund has been spent on CNG research and the conducting of trials with a number of potential commercial operators. The research from these trials indicated a significant interest in the use of CNG for vehicular transport. This further innovation funding will provide GNI with the opportunity to progress CNG to the next phase. The CER recognises that the allowance of 12.83m for innovation funding represents a significant increase when compared to the innovation funding of 8m allowed to GNI under PC3. As stated earlier, given this large increase, it is difficult to see how the CER would agree to provide further additional funding for innovation under PC4 unless there were exceptional circumstances. The consultation paper (CER/16/258), stated that the CER would consider the regulatory treatment of the CNG infrastructure within the context of PC4. Such consideration will be informed by the CER s decision on the regulatory treatment of Electric Vehicles (EVs) which is due for publication shortly. Should GNI proceed with the Causeway trial it must meet the following safety requirements: Safety Requirements GNI will be required to install and maintain the infrastructure in line with CER safety requirements. Additionally should GNI use the innovation funding for the CNG trial it would be subject to a number of conditions. GNI will be required to meet the following conditions: Reporting 10

GNI will be required to provide an innovation report to the CER on an annual basis outlining the findings of the trial. GNI will also be required to prepare and publish a final report on the benefits to the gas customer at the end of the trial. Sale of Assets GNI will be required to install the infrastructure in such a way so the assets could be sold to a third party once the pilot is complete. 11

5 Conclusion and Next Steps In conclusion, the CER deem it appropriate that GNI be provided with innovation funding of 12.83m as part of Price Control 4 (PC4), which will be recovered through network tariffs. The CER also notes that the Department of Transport, Tourism & Sport is currently consulting on a Draft National Framework Policy (NPF) for alternative fuels. The NPF makes a number of references to CNG and potential incentives to drive the development of CNG. The CER will engage with DTTAS regarding the draft NPF and welcomes the finalised National Framework Policy for alternative fuels. For further information on this decision, please contact: Seamus Byrne Commission for Energy Regulation sbyrne@cer.ie 12