STANDARD INTERCONNECTION AGREEMENT FOR RENEWABLE GENERATION SYSTEM

Similar documents
Tier 1 Standard Interconnection Agreement Customer-Owned Renewable Generation System

STANDARD INTERCONNECTION AGREEMENT FOR TIER 1 RENEWABLE GENERATOR SYSTEMS

Standard Interconnection Agreement for Customer-Owned Renewable Generation System

STANDARD INTERCONNECTION AGREEMENT FOR TIER 2 RENEWABLE GENERATOR SYSTEMS

Standard Interconnection Agreement for Customer-Owned Renewable Generation System kw

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

STANDARD INTERCONNECTION AGREEMENT FOR INTERCONNECTED CUSTOMER-OWNED BATTERY SUBSYSTEMS 1 KW OR MORE

RECITALS. Now, Therefore, in consideration of the mutual covenants and agreements herein set forth, the Parties do hereby agree as follows:

Interconnection Application and Compliance Form For Photovoltaic Systems Up to 2 MW

Interconnection of Electric Generators

STANDARD INTERCONNECTION AGREEMENT Fayetteville Public Works Commission

Renewable Generation (Category 1-20 kw and less):

Renewable Generation (Category 1 20 kw and less):

Now, therefore, for and in consideration of the mutual covenants and agreements set forth herein, the Parties agree as follows:

ELECTRIC COOPERATIVE INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION RATED 2 MW AND LESS

INTERCONNECTION GENERATION AND NET METERING POLICY

PARALLEL OPERATION AGREEMENT FOR RENEWABLE GENERATION OPERATING UNDER TVA APPROVED PROGRAMS

INTERCONNECTION AGREEMENT FOR NET BILLING FOR RENEWABLE ELECTRICAL GENERATING FACILITIES OF ONE MEGAWATT OR LESS

Holden Municipal Light Department Interconnection Agreement for Net Metering Service

MEMPHIS LIGHT, GAS AND WATER INTERCONNECTION AND PARALLEL OPERATION AGREEMENT FOR DISTRIBUTED GENERATION

Town of Highlands Board Approved as of May 17, 2012

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

STANDARD INTERCONNECTION APPLICATION FOR NET METERING FACILITIES

Mason County PUD No. 1. Net Energy Metering Interconnection Agreement

STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR RESIDENTIAL NET METERING FACILITIES (for systems 20 kw or less)

SALEM CITY. NET METERING LICENSE AGREEMENT For Customer-Owned Electric Generating Systems of 100kW or Less

STANDARD GENERATION INTERCONNECTION AGREEMENT BETWEEN CITY OF ANAHEIM AND

Berkeley Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Up To 500 KVA with the Cooperative s Electric Systems (CES)

Parkland Light & Water Company Park Ave Tacoma, WA 98444

STANDARD INTERCONNECTION AGREEMENT FOR QUALIFYING FACILITIES (QF) 10 KW OR LESS

NET-ENERGY METER AGGREGATION INTERCONNECTION AGREEMENT FOR RESIDENTIAL AND COMMERCIAL ELECTRIC CUSTOMERS

Clark Public Utilities

ENTERGY MISSISSIPPI, INC. STANDARD INTERCONNECTION APPLICATION AND AGREEMENT FOR NON-RESIDENTIAL NET METERING FACILITIES (for kw systems)

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Palmetto Electric Cooperative, Inc. Standard for Interconnecting Distributed Resources Less Than 2 MVA With Cooperative s Electric Systems (CES)

INTERCONNECTION & NET ENERGY METERING AGREEMENT FOR RESIDENTIAL AND COMMERCIAL ELECTRIC GENERATING FACILITIES

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

INTERCONNECTION AND OPERATING AGREEMENT

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) 1. Overview:

Superseding REVISED Sheet No. 38 REVISED SHEET NO. 38 Effective March 20, 2008 Effective February 6, 2014 RULE NO. 18. Net Energy Metering

Jefferson Energy Cooperative Policy 124 DISTRIBUTED GENERATION POLICY

ENTERGY NEW ORLEANS, INC. STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES LOCATED IN ORLEANS PARISH

MODEL DISTRIBUTION COOPERATIVE AGREEMENT FOR INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION LONG FORM CONTRACT

Customer Information Packet on Net(B) Metering SYSTEM MUST BE OWNED AND OPERATED BY CUSTOMERS OF WAKEFIELD MUNICIPAL GAS AND LIGHT DEPARTMENT

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

FIRSTENERGY INTERCONNECTION AGREEMENT

Lane Electric Cooperative, Inc. Eugene, Oregon Policy 311 (Net-Metering Services)

Public Utility District No. 1 Of Jefferson County

CITY OF UKIAH PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR NET ENERGY METERING FROM SOLAR ELECTRIC GENERATING FACILITIES OF 1 KW (KILOWATT) TO 100 KW

Net Metering Interconnections Standards

Tier 1 Net Metering and Renewable Resource Interconnection Agreement. Grantee: Abbreviated Legal Description: Assessor s Tax Parcel Number(s):

TRI-COUNTY ELECTRIC COOPERATIVE APPLICATION AND AGREEMENT FOR INTERCONNECTION AND NET METERING OF SYSTEMS WITH CAPACITY OF 100 kw OR LESS

SURPLUS ENERGY PURCHASE AGREEMENT PARALLEL CUSTOMER GENERATION CGS 8 WISCONSIN AGGREGATE RENEWABLE CAPACITY OF 20 KILOWATTS OR LESS

ALAMEDA MUNICIPAL POWER INTERCONNECTION AGREEMENT GENERAL CONDITIONS

I. Members Applying for New Interconnection/Submission of Plans/Specifications.

ENTERGY LOUISIANA, LLC STANDARD INTERCONNECTION AGREEMENT FOR NET METERING FACILITIES

FIRSTENERGY INTERCONNECTION APPLICATION/AGREEMENT - PART

Electricity (Net-Metering) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 45 and 46) THE ELECTRICITY (NET-METERING) RULES, 2018

Steps/Process. <COOPERATIVE NAME> 10 kw INVERTER PROCESS Page 1

PHOTOVOLTAIC INTERCONNECTION AGREEMENT FOR ELECTRIC GENERATING FACILITES Customer Owned Generation-Distribution Rate (Schedule G-1)

7 th Revision of Sheet No. 150 Canceling 6 th Revision WN U-60 of Sheet No. 150

Taunton Municipal Lighting Plant. This INTERCONNECTION & NET METERING AGREEMENT 1. CUSTOMER ELECTRIC GENERATING SYSTEM

Tri-Party Net Billing Power Purchase Agreement

PEPCO CUSTOMER NET ENERGY METERING CONTRACT. Qualifying facility of 1000 KW or less

CAPE HATTERAS ELECTRIC COOPERATIVE

Solar: Wind: Total: (AC Nameplate Rating) x (720 hrs/mo) x (0.15 = solar/ 0.10 = wind) Date(s) of Parallel Operation Rebate Expiration

NET ENERGY METERING AND INTERCONNECTION AGREEMENT

WEST OREGON ELECTRIC COOPERATIVE, INC. VERNONIA, OREGON POLICY 311 NET METERING SERVICE

SAMPLE INTERCONNECTION AGREEMENT FOR NET ENERGY METERING

ALAMEDA MUNICIPAL POWER INTERCONNECTION AGREEMENT GENERAL CONDITIONS

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)

Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)

Please Refer to Attached Sample Form

SOLAR PV INSTALLATION AT USC BASEBALL STADIUM

NET METERING CUSTOMER SITED RENEWABLE GENERATION FACILITIES POLICY

Weatherford Municipal Utility System. Distributed Generation Procedures & Guidelines Manual for Customers

Application for Interconnection and Net Metering Level 1

2. IDENTITY AND LOCATION OF GC

South Carolina Standard for Interconnecting Small Generation 100 kw or Less With Electric Power Systems (EPS) (Interconnection Standard)

GARLAND POWER & LIGHT. GP&L s Solar Generation Installation Requirements 2018

Please Refer to Attached Sample Form

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No E.

LEVEL 1: STANDARD APPLICATION FORM AND INTERCONNECTION AGREEMENT

Name: City: State: Zip Code: Is the applicant the property owner at the system address? Yes No. City: State: Zip Code: City: State: Zip Code:

PUBLIC SERVICE COMPANY OF NEW MEXICO AGREEMENT NO.

Exhibit A Simplified Process Interconnection Application

SCHEDULE SGI : SMALL GENERATOR INTERCONNECTIONS OTHER THAN NET METERING

Net Metering Interconnection Standards

POWER PURCHASE and INTERCONNECTION AGREEMENT FOR SNAP GENERATION

WITNESSETH: WHEREAS, This Agreement does not address the sale of electricity to or from Consumers; and

Please Refer to Attached Sample Form

EL PASO ELECTRIC COMPANY SCHEDULE NO. DG INTERCONNECTION AND PARALLEL OPERATION OF DISTRIBUTED GENERATION

Customer s Name: Address: Contact Person: Telephone Number: Service Point Address: (Name and Address) Signature

APPLICATION FOR STANDARD CONTRACT BY A QUALIFYING COGENERATOR OR SMALL POWER PRODUCER

Steuben Rural Electric Cooperative, Inc. Member-Owned Distributed Generation Interconnection Information Packet

AN APPLICATION FEE OF $50.00 MUST BE SUBMITTED WITH THE APPLICATION. Interconnection Applicant Contact Information. Name: Address:

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Transcription:

STANDARD INTERCONNECTION AGREEMENT FOR RENEWABLE GENERATION SYSTEM This Agreement is made and entered into this day of, 20, by and between, (hereinafter RGS Owner ), located at in, Florida, and Utility Board of the City of Key West, DBA Keys Energy Services, (hereinafter Utility ), a municipal owned utility, organized and existing under the laws of the State of Florida. RGS Owner and Utility shall collectively be called the Parties. The physical location/premises where the interconnection is taking place: (the Premises ). WITNESSETH Whereas, a Renewable Generation System (RGS) is an electric generating system that uses one or more of the following fuels or energy sources: hydrogen, biomass, solar energy, geothermal energy, wind energy, ocean energy, waste heat, or hydroelectric power as defined in Section 377.803, Florida Statues, a Tier 1 rated at no more than 10 kilowatts (10 kw), Tier 2 rated at greater than 10 kilowatts (10 kw) and less than or equal to 100 kilowatts (100 kw) and Tier 3 greater than 100 kilowatts (100 kw) and less than or equal to 2 megawatts (2 MW) alternating current (AC) power output and is primarily intended to offset part or all of the RGS Owner s current electrical requirements at the Premises; and Whereas, this agreement defines the terms and conditions under which the Utility and RGS Owner agree to interconnect a RGS and operate in parallel with Utility s electric distribution system. Whereas, Utility operates an electric distribution system serving the City of Key West to the Seven-Mile Bridge at Marathon; and Whereas, RGS Owner has made a written application to Utility, a copy being attached hereto, to interconnect its RGS with Utility s electrical supply grid at the location identified above; and Whereas, Utility and the Florida Municipal Power Agency (hereinafter FMPA ) have entered into the All-Requirements Power Supply Contract pursuant to which Utility has agreed to purchase and receive, and FMPA has agreed to sell and supply Utility with all energy and capacity necessary to operate Utility s electric system, which limits Utility s ability to directly purchase excess energy from RGS s; and Whereas, in order to promote the development of small renewable generation systems by permitting Utility to allow RGS owners to interconnect with Utility s electric system and to allow Utility customers to offset their electric consumption with renewable generation systems, FMPA, in accordance with the terms and conditions of this agreement, has agreed to purchase excess energy generated by renewable generation systems from Utility customers interconnected to Utility s electric system; and Whereas, Utility desires to provide interconnection of a RGS under conditions which will insure the safety of Utility customers and employees, reliability, and integrity of its distribution system; Page 1 of 10

NOW THEREFORE, for and in consideration of the mutual covenants and agreements herein set forth, the parties hereto covenant and agree as follows: 1. RGS Size. Gross Power Rating. (a) Gross power rating (GPR) means the total manufacturer s AC nameplate generating capacity of an on-site Renewable Generation System that will be interconnected to and operate in parallel with Utility s distribution facilities. For inverter based systems, the AC nameplate generating capacity shall be calculated by multiplying the total installed DC nameplate generating capacity by 0.85 in order to account for losses during the conversion from DC to AC. RGS Owner intends to interconnect a Renewable Generation System of the following gross power rating (check one): Tier 1 - Less than 10 kw; Tier 2 - Greater than 10 kw, and less than or equal to 100 kw; Tier 3 - Greater than 100 kw, and less than or equal to 2 MW. (b) It is the RGS Owner s responsibility to notify Utility of any change to the GPR of the RGS by submitting a new application for interconnection specifying the modifications at least 30 days prior to making the modifications. Prior to implementing modifications, RGS Owner must obtain approval from Utility and submit and execute a new Standard Interconnection Agreement and Tri-Party Net Metering Power Purchase Agreement. Increase in GPR would necessitate entering a new agreement which may impose additional requirements on the RGS Owner. In no cases should modifications to the RGS be made such that the GPR increases above the 2 megawatt (MW) limit. (c) The RGS GPR must not exceed 90% of Utility s distribution service rating at the RGS Owner s location. If the GPR does exceed the 90% limit, the RGS Owner shall be responsible to pay the costs of upgrades to the distribution facilities required to accommodate the GPR capacity and ensure that the 90% threshold is not breached. 2. Application & Study Fee. RGS Owner must complete and return to Utility an application for interconnection, all applicable fees must be submitted with the application. RGS Owner shall be required to pay the following non-refundable application fee and, if applicable, interconnection study fee (check one): Tier 1 - No application fee; no study fee; Tier 2 - $320.00 application fee; no study fee; Tier 3 - $470.00 application fee and RGS Owner will be responsible for the actual cost of the interconnection study to be paid in advance of the study Page 2 of 10

being performed. (This may include the aggregate installation of RGSs on the same electrical distribution circuit.) 3. Insurance Requirements/Recommendation. Utility requires the RGS Owner to maintain general liability insurance for personal injury and property damage in the following amount: Tier 1 Utility recommends but does not require general liability insurance in the amount of not less than one hundred thousand dollars ($100,000) coverage; Tier 2 Utility requires not less than one million dollars ($1,000,000) coverage; Tier 3 Utility requires not less than two million dollars ($2,000,000) coverage. 4. Agreements. (a) RGS Owner shall execute and return to Utility this Agreement and a Tri-Party Net Metering Power Purchase Agreement. (b) Upon receipt from RGS Owner of a (i) completed application and payment of all applicable application and study fees, (ii) executed copy of this Agreement, (iii) executed Tri-Party Net Metering Power Purchase Agreement, and (iv) evidence of the other certifications, approvals, and inspections required by this agreement, Utility shall, within thirty (30) calendar days thereafter, execute and return this Agreement to RGS Owner. (c) RGS Owner must commence parallel operations of its RGS within one (1) year after receipt of an executed copy of this Agreement from Utility. If RGS Owner does not commence parallel operations of its RGS within one (1) year after such receipt, this Agreement shall terminate, and RGS Owner must complete a new application, including payment of any then-applicable application and study fees, execute a new interconnection agreement and Tri-Party Net Metering Power Purchase Agreement, and meet the requirements therein prior to commencing parallel operation of its RGS. 5. Applicable Policies & Standards. (a) RGS Owner shall fully comply with Utility s Customer Service Policy Manual and Design Standards, which are incorporated into and made a material part of this agreement by this reference, as those documents may be amended or revised by Utility from time to time. (b) RGS Owner certifies that its installation, its operation and its maintenance shall be in compliance with the following standards: i. IEEE 1547, Standard for Interconnecting Distributed Resources with Electric Power Systems, latest published edition. Page 3 of 10

ii. IEEE 1547.1, Standard for Conformance Tests Procedures for Equipment Interconnecting Distributed Resources with Electric Power Systems, latest published edition. iii. UL 1741, Inverters, Converters, Controllers and Interconnection System Equipment for Use with Distributed Energy Resources, latest published edition. iv. NFPA 70, National Electrical Code, latest published edition. (c) If the RGS is leased to the RGS Owner by a third party, or if the operation or maintenance of the RGS is to be performed by a third party, the lease and/or maintenance agreements and any pertinent documents related to these agreements shall be provided to Utility. 6. Lease; No Retail Sales. The RGS Owner is not precluded from contracting for the lease, operation or maintenance of the RGS with a third party. Such lease may not provide terms or conditions that provide for any payments under the agreement to any way indicate or reflect the purchase of energy produced by the RGS. RGS Owner shall not enter into any lease agreement that results in the retail purchase of electricity; or the retail sale of electricity from the Renewable Generation System. Notwithstanding this restriction, in the event that RGS Owner is determined to have engaged in the retail purchase of electricity from a party other than Utility, then RGS Owner shall be in breach of this Agreement and may be subject to the jurisdiction of the Florida Public Service Commission and to fines/penalties. 7. Permits, Inspections & Approvals. Prior to commencing parallel operation with Utility s electric system, RGS Owner must obtain all permits, inspections and approvals required by applicable jurisdictions with respect to the generating system and must use a licensed, bonded and insured contractor to design and install the generating system. The RGS Owner agrees to provide Utility with a copy of the local building code official inspection and certification of installation. The certification shall reflect that the local code official has inspected and certified that the installation was permitted, has been approved, and has met all electrical and mechanical qualifications. Utility will not install the bi-directional meter and RGS output meter, and RGS Owner shall not commence parallel operation of its RGS, until inspection is completed by the local code authorities. 8. Utility Inspection. The RGS Owner agrees to permit Utility, if it should so choose, to inspect the RGS and its component equipment and the documents necessary to ensure compliance with this Agreement both before and after the RGS goes into service and to witness the initial testing of the RGS equipment and protective apparatus. Utility will provide RGS Owner with as much notice as reasonably possible, either in writing, email, facsimile or by phone as to when Utility may conduct inspections and or document review. Upon reasonable notice, or at any time without notice in the event of an emergency or hazardous condition, RGS Owner agrees to provide Utility access to the RGS Owner s premises for any purpose in connection with the performance of the obligations required by this Agreement or, if necessary, to meet Utility s legal obligation to provide service to its customers. Page 4 of 10

9. Inverter. RGS Owner certifies that the RGS equipment includes a Utility interactive inverter or interconnection system equipment that ceases to interconnect with the Utility system upon a loss of Utility s electric power. The inverter shall be considered certified for interconnected operation if it has been submitted by a manufacturer to a nationally recognized testing laboratory (NRTL) to comply with UL 1741. The NRTL shall be approved by the Occupational Safety & Health Administration (OSHA). 10. Meter Installation. (a) Utility shall install a bi-directional meter and RGS output meter within five (5) business days after receipt of all of the following documentation: (i) (ii) (iii) (iv) Completed application and payment of all applicable application and study fees; Executed Interconnection Agreement; Executed Tri-Party Net Metering Power Purchase Agreement Proof of compliance with all inspection, certification, and other documentary evidence required by this Agreement. (b) Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kwh) of energy. The RGS Owner's service associated with the RGS will be metered to measure the energy delivered by Utility to RGS Owner, and measure the energy delivered by RGS Owner to Utility. RGS Owner shall provide an additional meter enclosure and Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatthours (kwh) of energy produced by the RGS. RGS Owner agrees to provide safe and reasonable access to the premises for installation, maintenance and reading of the metering and related equipment. 11. Parallel Operation. (a) RGS owner shall not commence parallel operation of its RGS unless and until Utility has installed a bi-directional meter and RGS output meter in accordance with Section 10 of this Agreement. (b) Net metering Customers may energize a RGS system when Utility s system is de-energized. This shall be done with extreme care and verification that the RGS system is operating safely per IEEE 1547, IEEE 1547.1, UL 1741 and NFPA 70 (latest published editions). Owner shall verify the manual disconnect switch is in the open position and no back feed can occur on the Utility s system. The RGS customer shall only use the RGS to service its own load. There shall be no intentional islanding, as described in IEEE 1547, between the RGS Owner s and Utility s systems. 12. RGS Owner Equipment. The RGS Owner is responsible for the protection of its generation equipment, inverters, protection devices, and other system components Page 5 of 10

from damage from the normal and abnormal operations that occur on Utility s system in delivering and restoring system power. RGS Owner agrees that any damage to any of its property, including, without limitation, all components and related accessories of its RGS system, due to the normal or abnormal operation of Utility s system, is at RGS Owner s sole risk and expense. RGS Owner is also responsible for ensuring that the Renewable Generation System equipment is inspected, maintained, and tested regularly in accordance with the manufacturer s instructions to ensure that it is operating correctly and safely. 13. Manual Disconnect Switch. (a) The RGS Owner must install, at their expense, a manual disconnect switch of the visible load break type to provide a separation point between the AC power output of the Renewable Generation System and any RGS Owner wiring connected to Utility s system, such that back feed from the Renewable Generation System to Utility s system cannot occur when the switch is in the open position. The manual disconnect switch shall be mounted separate from the meter socket on an exterior surface adjacent to the meter. The switch shall be readily accessible to Utility and capable of being locked in the open position with a Utility padlock. When locked and tagged in the open position by Utility, this switch will be under the control of Utility. (b) RGS owner will install a sign at the meter noting the location of the manual disconnect switch to enable Utility employees to easily locate the disconnect switch. Utility may install, at its sole discretion, additional signage on or near the manual disconnect switch to, among other things, warn that both sides of the switch may be energized. 14. No Assumption of Risk; No Warranty. (a) The RGS Owner shall be solely responsible for all legal and financial obligations arising from the design, construction, installation, operation, maintenance and ownership of the RGS. (b) In no event shall any statement, representation, or lack thereof, either expressed or implied, by Utility, relieve the RGS Owner of exclusive responsibility for the RGS Owner's system. Specifically, any Utility inspection of the RGS shall not be construed as confirming or endorsing the system design or its operating or maintenance procedures or as a warranty or guarantee as to the safety, reliability, or durability of the RGS. Utility s inspection, acceptance, or its failure to inspect shall not be deemed an endorsement of any RGS equipment or procedure. Further, as set forth in Sections 15 and 17 of this Agreement, RGS Owner shall remain solely responsible for any and all losses, claims, damages and/or expenses related in any way to the operation or misoperation of its RGS equipment. 15. KEYS Isolation of RGS. Notwithstanding any other provision of this Interconnection Agreement, Utility, at its sole and absolute discretion, may isolate the RGS Owner's system from the distribution grid by whatever means necessary, without prior notice to the RGS Owner. To the extent practical, however, prior notice shall be given. The system will be reconnected as soon as practical once the conditions causing the disconnection cease to exist. Utility shall have no obligation to compensate the RGS Owner for any loss of energy during any and all periods when Page 6 of 10

RGS Owner s RGS is operating at reduced capacity or is disconnected from Utility s electrical distribution system pursuant to this Interconnection Agreement. Typical conditions which may require the disconnection of the RGS Owner's system include, but are not limited to, the following: (i) Utility system emergencies, forced outages, uncontrollable forces or compliance with prudent electric Utility practice. (ii) When necessary to investigate, inspect, construct, install, maintain, repair, replace or remove any Utility equipment, any part of Utility s electrical distribution system or RGS Owner s generating system. (iii) Hazardous conditions existing on Utility s system due to the operation of the RGS Owner's generation or protective equipment as determined by Utility. (iv) Adverse electrical affects (such as power quality problems) on the electrical equipment of Utility s other electric consumers caused by the RGS Owner's generation as determined by Utility. (v) When RGS Owner is in breach of any of its obligations under this Interconnection Agreement or any other applicable policies and procedures of Utility. (vi) When the RGS Owner fails to make any payments due to Utility by the due date thereof. 16. Termination. Upon termination of services pursuant to this Agreement, Utility shall open and padlock the manual disconnect switch and remove any additional metering equipment related to this Agreement. At the RGS Owner's expense, within thirty (30) working days following the termination, the RGS Owner shall permanently isolate the RGS and any associated equipment from Utility s electric supply system, notify Utility that the isolation is complete, and coordinate with Utility for return of Utility s lock. 17. Indemnification. To the fullest extent permitted by law, and in return for adequate, separate consideration, RGS Owner shall indemnify, defend and hold harmless Utility, any and all of their members of its governing bodies, and its officers, agents, and employees for, from and against any and all claims, demands, suits, costs of defense, attorney s fees, witness fees of any type, losses, damages, expenses, and liabilities, whether direct, indirect or consequential, related to, arising from, or in any way connected with: (i) RGS Owner s design, construction, installation, inspection, maintenance, testing or operation of RGS Owner s generating system or equipment used in connection with this Interconnection Agreement, irrespective of any fault on the part of Utility. Page 7 of 10

(ii) The interconnection of RGS Owner s generating system with, and delivery of energy from the generating system to, Utility s electrical distribution system, irrespective of any fault on the part of Utility. (iii) The performance or nonperformance of RGS Owner s obligations under this Interconnection Agreement or the obligations of any and all of the members of RGS Owner s governing bodies and its officers, agents, contractors (and any subcontractor or material supplier thereof) and employees. RGS Owner s obligations under this Section 17 shall survive the termination of this Interconnection Agreement. 18. Assignment; Lease of Premises. RGS Owner shall not have the right to assign its benefits or obligations under this Agreement without Utility s prior written consent and such consent shall not be unreasonably withheld. If there is a change in ownership of the RGS, RGS Owner shall provide written notice to Utility at least thirty (30) days prior to the change in ownership. The new owner will be required to execute a new Standard Interconnection Agreement and Tri-party Net Metering Power Purchase Agreement. The new owner will not be required to pay the application/ study fee, previously paid by the original owner if the existing system was previously approved by KEYS and no modifications or additions have been made to increase the Gross Power Rating at the premises. The new owner shall not be permitted to net meter or begin parallel operations until the new owner receives approval by Utility and executes the new Agreements. 19. Entire Agreement; Termination. This Agreement supersedes all previous agreements and representations either written or verbal heretofore made between Utility and RGS Owner with respect to matters herein contained. This Agreement, when duly executed, constitutes the only Agreement between parties hereto relative to the matters herein described. This Agreement shall continue in effect from year to year until either party gives sixty (60) days notice of its intent to terminate this Agreement. 20. Governing Law; Venue. This Agreement shall be governed by and construed and enforced in accordance with the laws, rules and regulations of the State of Florida and Utility s tariff as it may be modified, changed, or amended from time to time, including any amendments modification or changes to Utility s Net Metering Service Rate Schedule, the schedule applicable to this Agreement. The RGS Owner and Utility agree that any action, suit, or proceeding arising out of or relating to this Interconnection Agreement shall be initiated and prosecuted in the state court of competent jurisdiction located in Monroe County, Florida, and Utility and the RGS Owner irrevocably submit to the jurisdiction and venue of such court. To the fullest extent permitted by law, each Party hereby irrevocably waives any and all rights to a trial by jury and covenants and agrees that it will not request a trial by jury with respect to any legal proceeding arising out of or relating to this Interconnection Agreement. Page 8 of 10

21. Waiver. None of the provisions of this Interconnection Agreement shall be considered waived by either Party except when such waiver is given in writing. No waiver by either Party of any one or more defaults in the performance of the provisions of this Interconnection Agreement shall operate or be construed as a waiver of any other existing or future default or defaults. If any one or more of the provisions of this Interconnection Agreement or the applicability of any provision to a specific situation is held invalid or unenforceable, the provision shall be modified to the minimum extent necessary to make it or its application valid and enforceable, and the validity and enforceability of all other provisions of this Interconnection Agreement and all other applications of such provisions shall not be affected by any such invalidity or unenforceability. This Interconnection Agreement does not govern the terms and conditions for the delivery of power and energy to non-generating retail customers of Utility s electrical distribution system. 22. Incorporation of Tariff. This Agreement incorporates by reference the terms of the tariff filed with the Florida Public Service Commission by Utility, including Utility s Net Metering Service Rate Schedule, and associated technical terms and abbreviations, general rules and regulations and standard electric service requirements (as may be applicable) are incorporated by reference, as amended from time to time. To the extent of any conflict between this Agreement and such tariff, the tariff shall control. 23. Change in Law. Utility and RGS Owner recognize that the Florida Statutes and/or the Florida Public Service Commission Rules, including those directly addressing the subject of this Agreement, may be amended from time to time. In the event that such statutes and/or rules are amended that affect the terms and conditions of this Agreement, Utility and RGS Owner agree to supersede and replace this Agreement with a new Interconnection Agreement, which complies with the amended statutes/rules. 24. Net Metering Subscription Limit. RGS Owner acknowledges that its provision of electricity to Utility hereunder is on a first-offered, first-accepted basis and subject to diminution and/or rejection in the event the total amount of electricity delivered to Utility pursuant to the Utility s Net Metering Service Rate Schedule, (as filed with the Florida Public Service Commission), from all participating Utility customers, exceeds two and one-half percent (2.5%) of the aggregate customer peak demand on the Utility s system. 25. Beneficiaries. This Agreement is solely for the benefit of Utility and RGS Owner and no right nor any cause of action shall accrue upon or by reason, to or for the benefit of any third party not a formal party to this Agreement. Nothing in this Agreement, expressed or implied, is intended or shall be construed to confer upon any person or corporation other than Utility or RGS Owner, any right, remedy, or claim under or by reason of this Agreement or any of the provisions or conditions of this Agreement; and, all provisions, representations, covenants, and conditions contained in this Agreement shall inure to the sole benefit of and be binding upon Utility and RGS Owner and their respective representatives, successors, and assigns. Further, no term or condition contained in this Agreement shall be construed in any Page 9 of 10

way as a waiver by Utility of the sovereign immunity applicable to Utility as established by Florida Statutes, 768.28. 26. Headings. The headings contained in this Agreement are for convenience only and shall not be interpreted to limit or otherwise affect the provisions of this Agreement. IN WITNESS WHEREOF, RGS Owner and Utility agree the effective date is the first date written in the introductory paragraph of this agreement. Utility: RGS Owner: By: Title: Date: By: (Signature) (Print Name) Date: Utility Account Number: Page 10 of 10