OFFSHORE WIND REFERENCES
OFFSHORE WIND PROJECTS We helped to realise over 8 GW of offshore wind projects United Kingdom Galloper - 340 MW Sheringham Shoal - 315 MW The Netherlands Borssele 1&2-700 MW Borssele 3&4-700 MW Hollandse Kust (zuid) - 1400 MW WP Luchterduinen - 130 MW Gemini - 600 MW Prinses Amaliawindpark - 120 MW Tromp-Binnen - 295 MW Germany WP Nordsee One - 332 MW WP Nordsee Two & Three - 900 MW Godewind I - 400 MW Trianel Wind Farm Borkum - 203 MW Hohe See - 400 MW Belgium C-Power - 325 MW Belwind - 330 MW Norther - 350 MW Rentel - 309 MW 2
OFFSHORE PROJECTS
WIND FARM RENTEL BLIX supports Rentel with setting up an O&M organisation for Belgium offshore wind farm Rentel. RENTEL 4
BORSSELE I&II Consortium Innogy & Macquarie BLIX supported an international consortium of Innogy and Macquarie Capital with their bid. BLIX acted as senior project manager and provided package management on windturbines, foundations and cables 5
BORSSELE III&IV Undisclosed international consortium BLIX supported an international consortium with their bid. BLIX provided package management on wind turbines, foundations, cables and O&M. We helped identify more than 300 million Euro cost savings and optimisations 6
ASSEMBLY OF COMPONENTS TenneT TSO BV, Germany For TenneT, BLIX acted as interface manager, QHSE site supervisor. BLIX steered the supply chain parties assembling components at the offshore substations of German wind parks Nordsee One and Godewind I & II 7
OFFSHORE HIGH-VOLTAGE STATION C-Power, Belgium BLIX acted as marine and civil package manager, structured the project management processes, implemented a quality system and developed a strategy for the maintenance of the offshore highvoltage station 8
WIND FARM LUCHTERDUINEN Eneco Wind, Netherlands BLIX supported the project team of Eneco in the tender process for wind turbine foundations & related electrical works of offshore wind farm Eneco Luchterduinen (130 MW) and acted as interface manager 9
NORDSEE TWO & THREE Nordsee One, Germany Developing and documenting a pre- Financial Close development budget, including identification of optimisations for Nordsee Two and Three 10
BORSSELE & HOLLANDSE KUST (ZUID) Netherlands Enterprise Agency (RVO) BLIX supported RVO with the procurement and management of site investigations and site studies for Borssele and Hollandse Kust (zuid) to support the Dutch offshore wind energy tenders 11
BELWIND I Belwind, Netherlands BLIX provided an O&M package manager for the Balance of Plant and managed a large repair operation of the Belwind I offshore substation 12
PRINSES AMALIAWINDPARK Eneco Wind, Netherlands BLIX managed the operation and maintenance of the offshore wind farm Prinses Amaliawindpark in IJmuiden in the Netherlands for a period of three years 13
PRINSES AMALIAWINDPARK Eneco Wind, Netherlands Tender preparation & project management for the modification campaign of the grouted connections of the Prinses Amaliawindpark. 14
DELFZIJL NOORD Eneco Wind, Netherlands BLIX was responsible for the Balance of Plant & Windturbine tender management of onshore wind farm Delfzijl Noord (60 MW), which was constructed at a longitudinal dyke 15
WI N D FAR M GEM I NI TAQA Energy, United Arab Emirates BLIX experts performed a technical, contractual, commercial and organisational due diligence of the Dutch Gemini offshore wind project development consisting of 150 Siemens turbines and a then innovative grid connection at 220kV level 16
WIND FARM BORKUM Trianel Wind Farm Borkum, Germany BLIX performed an independent due diligence for the shareholders group on the O&M strategy, contracts and budgets of the Borkum offshore wind farm 17
DUTCH GRID INVESTMENT Ministry of Finance, Netherlands BLIX performed a technical and contractual due diligence on the 2 billion Euro investment decision requested by TenneT for 5 offshore substations, export cables and related infrastructure for the Dutch Grid at Sea 18
Taskforce offshore wind energy 2020, Netherlands In 2010 BLIX fulfilled the role of secretary of a Taskforce advising the Minister of Economic Affairs and the Dutch Parliament on the optimal route towards 6000 MW in 2020 19
33 kv or 66 kv Ministry of Economic Affairs, Netherlands Second opinion on the choice of TenneT for 33 kv or 66 kv infield cables for the Dutch Offshore Grid, including risk assessment and modelling of the impact upon the offshore wind developers business case 20
DOLWIN GAMMA Nordic Yards, Germany BLIX created an optimal O&M strategy for Dolwin Gamma, the 900 MW offshore HVDC platform, fabricated by Nordic Yards for TenneT Germany 21
WIND FARM GALLOPER Galloper, United Kingdom BLIX supported the project team with strategic advice on the contracting strategy of offshore wind farm Galloper. BLIX created two contracting scenarios on the basis of balance sheet finance and project finance 22
Energy Valley, Netherlands BLIX acted as programme manager offshore wind energy, with a focus on development of a supply chain, creation of the Northern Netherlands offshore wind network for SMEs, inward investment, international electrical connection projects, lobby, innovation and education 23
BELGIAN OFFSHORE GRID ELIA, Belgium Together with Rebel Group, in 2012, BLIX gave strategic advice to Belgian TSO ELIA on the organisational setup & financing options for a grid at sea. BLIX made an international comparison between market-led and TSO-led investment regimes 24
Interested? Please contact us BLIX Consultancy BV 2 e Daalsedijk 6A, 3551 EJ Utrecht www.blix-bv.com info@blix-bv.com