ROBERT A. BOTHMAN, INC. EXHIBIT "A" SUBCONTRACTORS SCOPE OF WORK EXHIBIT A SUBCONTRACTOR SCOPE OF WORK, dated this

Similar documents
Exhibit. Owner Controlled Insurance Program. Insurance Requirements

responsibility of Tenant and/or Construction Contractors or Construction Subcontractors to pay.

INSURANCE EXHIBIT TO CONSTRUCTION AGREEMENT Insurance Requirements Owner Controlled Insurance Program

SUBCONTRACT Attachment A

ADDENDUM A. Subcontractor Insurance Requirements

STANDARD SUBCONTRACT AGREEMENT FOR BUILDING CONSTRUCTION

Summary Description of Rail OCIP Coverage

2. Attachments a) Design Drawings Drawing(s) Revision Revision Date Specifications (T1.1-T2.8) N/A N/A A /06/17 A1.1 N/A N/A A2.

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES

SUBCONTRACTOR AGREEMENT

3940 E. Miraloma Ave Anaheim, California Phone (714) Fax (714)

CITY AND COUNTY OF SAN FRANCISCO Port of San Francisco. Contract No Pier 23 Roof Repair. ADDENDUM No. 1 Issued: December 16, 2016

CCIP ADDENDUM. Blasting or any blasting operations;

Contractor shall provide new thermal fused plastic laminate doors for each interior opening as scheduled. All openings are to receive new hardware.

Rail Owner Controlled Insurance Program Manual

AIA Document A201 TM 1997

W.E. O Neil Construction Co. of Arizona c/o (Project Coordinator) 4511 E. Kerby Avenue Phoenix, AZ Fax (480)

Subcontractor Contract and Scope of Work MECHANICAL Social Security Administration Auburn, AL Ross Clark Circle Dothan, Alabama 36301

Safety & Health Manual

EXHIBIT B. Insurance Requirements for Environmental Contractors and/or Consultants

Construction of the Leased Premises

EXHIBIT G. Insurance Requirements. [with CCIP]

PROFESSIONAL SERVICES and NON-CONSTRUCTION CONRACTS

WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT

WINDSOR NORTH WEST PARK NATURE CENTER ADDITION AND STRUCTURE PROJECT 145 LANG ROAD. WINDSOR, CT

OCIP Contract Language

SECTION SUPPLEMENTARY CONDITIONS

W I T N E S S E T H:

Dear Subcontractor, Please find enclosed the following items for your review and acceptance:

EXHIBIT B. Insurance Requirements for Construction Contracts

Subcontract Agreement

BUILDING SERVICES AGREEMENT

COMMUNITY COLLEGE DISTRICT OF JEFFERSON COUNTY, MISSOURI REQUEST FOR PROPOSAL: WELDING SPARK ARRESTOR INSTALLATION

Amount of Contract work per the plans and specifications for project. Specifications Attached. Plans Attached

Subcontractor Prequalification Statement

REQUEST FOR PROPOSAL (RFP) for PROFESSIONAL CONSULTING SERVICES. to perform an

PRODIGY. CONTRACTING GROUP INC. CommerCial residential industrial

DOCUMENT SUPPLEMENTARY CONDITIONS

Exhibit. Owner Controlled Insurance Program. Insurance Requirements

SUBCONTRACTOR INSURANCE REQUIREMENTS Version 3/1/2018

Diversified Engineering & Plastics General Safety & Environmental Process for Contractors

CITY OF LIVERMORE BID #4050 FOR: FIRE AND BURGLAR ALARM MONITORING NOTICE TO BIDDERS

SAFETY FIRST GRANT CONTRACT

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER. Pre-Construction and Construction Phase Services

SUBCONTRACTOR AGREEMENT

SUBCONTRACT (Short Form)

DESIGN PROFESSIONAL SERVICES (Type) MASTER CONTRACT CONTRACT NO.

ANNEX A Standard Special Conditions For The Salvation Army

Bernards (Project Name) CCIP Insurance Manual

TRENTON AGRI PRODUCTS LLC INSURANCE & INDEMNIFICATION TERMS & CONDITIONS

SUBCONTRACT (SHORT FORM)

CASTAIC LAKE WATER AGENCY STANDARD CONTRACT RISK TRANSFER PROVISIONS, GENERAL CONDITIONS and REQUIRED INSURANCE for

Document A201 TM. General Conditions of the Contract for Construction. (Name and location or address)

Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project

Deluxe Corporation Purchase Terms and Conditions

Standard Form of Agreement Between Contractor and Subcontractor

AIA Document A201 TM 1997

Standard Form of Agreement Between Contractor and Subcontractor

5.0 TERREBONNE PARISH CONSOLIDATED GOVERNMENT, DEFINED.

NEW VENDOR INFORMATION

Transurban Standard Terms and Conditions

LONE TREE SCHOOL FLOORING REPLACEMENT

ITHACA COLLEGE EQUIPMENT LEASE MASTER AGREEMENT. 1. TERM: This Agreement is effective from (insert dates for a three year period).

CITY OF MOBILE ALABAMA REQUEST FOR QUOTES FEBRUARY 12, 2019

ARTICLE 1 ARTICLE 3 CONTRACTOR THE SUBCONTRACT DOCUMENTS ARTICLE 2 MUTUAL RIGHTS AND RESPONSIBILITIES

CONTRACT. Owner and Contractor agree as follows: 1. Scope of Work.

INDEPENDENT CONTRACTOR AND PROFESSIONAL SERVICES AGREEMENT

HOUSING CONSTRUCTION CONTRACT (Projects up to $10,000)

Subcontractor Qualification Statement

CITY OF MOBILE REQUEST FOR QUOTES. July 25, Museum Drive Mobile, AL 3660

Project # and Name Subcontract Firm Name Subcontract #: Appendix F - Subcontract Terms and Conditions

SPECIFICATIONS FOR FURNISHING LIQUID SODIUM BISULFITE (25% CONCENTRATION) DURING FY

MCGOUGH STANDARD INSURANCE REQUIREMENTS

REQUEST FOR QUOTES January 7, 2019

PROJECT SUBCONTRACT 2012 Edition

Insurance Requirements. The Bidder shall be required to procure, at its sole cost and expense, all insurance required by this Attachment.

INDOOR BLEACHER SAFETY RAILS MANDATORY WALK-THRU ON MONDAY, MAY 16, 2016 AT 10:00 A.M. AT CENTRAL OFFICE ANNEX, 24 SCHOOL RD.

SAMPLE DOCUMENT SUBCONTRACT AGREEMENT

Contractor for any and all liability, costs, expenses, fines, penalties, and attorney s fees resulting from its failure to perform such duties.

INSURANCE AND INDEMNIFICATION MANUAL. Supplement to Policy 560 i

CITY AND BOROUGH OF JUNEAU (CBJ) REQUEST for QUOTES (RFQ) Adair Kennedy Park Tree Removal. RFQ No. E18-239

Pella Certified Contractor Agreement. This Agreement is made this day of, 20, by and between. _ ( Pella Sales Entity ) and. ( Remodeler ).

(a) Implement and maintain this Safety and Health Program. (b) Conduct an aggressive loss prevention program.

MASTER TRUCKING AGREEMENT

TERREBONNE PARISH CONSOLIDATED GOVERNMENT INSURANCE REQUIREMENTS CONTRACTORS

WINDSOR HIGH SCHOOL POOL HOUSE HVAC UNIT REPLACEMENT PROJECT 50 SAGE PARK ROAD. WINDSOR, CT

ADDENDUM No. 1. ITB No LED Video Wall. Due: May 25, 2017 at 10:00 A.M. (Local Time)

TRADE ALLY NETWORK REQUIREMENTS

STORM DRAIN ENGINEERING DESIGN SERVICES

MASTER SUBCONTRACT AGREEMENT

RICE UNIVERSITY SHORT FORM CONTRACT

General Contract Comments The contract s Insurance Requirements should include the following terms or similar wording: It is understood and agreed tha

OKEECHOBEE COUNTY ROAD STRIPING AND MARKING SERVICES

AIA Document A101 TM 2007

ConsensusDocs 751 STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR

DOWNTOWN REDEVELOPMENT AUTHORITY CITY OF HOUSTON TAX INCREMENT REINVESTMENT ZONE #3 PUBLIC IMPROVEMENTS REIMBURSEMENT GUIDELINES

Please ensure that the following information is enclosed in your subcontract package:

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.01

OGC-S Owner-Contractor Construction Agreement

CITY OF TACOMA Water Supply

Transcription:

ROBERT A. BOTHMAN, INC. EXHIBIT "A" SUBCONTRACTORS SCOPE OF WORK 5 - EXHIBIT A SUBCONTRACTOR SCOPE OF WORK, dated this All Work in strict accordance with Contract Documents. day of 216 (Where reference is made in the aforementioned specification section(s) to Contractor it shall mean Subcontractor and be part of the Work of this Subcontract Agreement.) The Subcontractor is responsible for supplying all labor, material, equipment, move-ins and subcontractors as required to complete the Work per Contract Documents. Below is a general detail of the scope of work to be performed by Subcontractor. Nothing in the below description is intended to create a substitution of materials, products, methods, quantities, warranty terms, etc. from those indicated in the Owner's plans and specifications. In the event of a conflict between the below general work details, inclusions, exclusions, conditions, and those stated in the Owner's plans and specifications, the Owner's plans and specifications shall govern. If Subcontractor desires to substitute any materials, products, methods, quantities, warranty terms, etc. the Subcontractor must follow the Owner's criteria for approving substitutions. FORWARDING ANY SUBMITTAL CONTAINING A DEVIATION FROM THE PLANS AND SPECIFICATIONS IS INSUFFICIENT TO EFFECTUATE A SUBSTITUTION. THE OWNER'S SUBSTITUTION PROCEDURE AND TIMING WILL BE SPECIFICALLY ADHERED TO BY SUBCONTRACTOR, IN THE EVENT A SUBSTITUTION IS REQUESTED. Scope of Work: Subcontractor to furnish all labor, materials, supplies, and tools necessary, in accordance with the Contract Documents, to perform the following: Item # Description Unit Qty Unit Price Price 1 EA $ 2 Total: $ Additional Conditions: Subcontractor shall be responsible for obtaining: * Labor & Material Bond and Performance Bond in the amount of 1% of the Subcontract Price * Professional Liability Insurance per Section 16 of the Subcontract Agreement and Exhibit C * Pollution Liability Insurance per Section 16 of the Subcontract Agreement Exhibit C * Preparation of the SWPPP per Section 28 of the Subcontract Agreement Enrollment into the OCIP is mandatory. Retention shall be set at 5%. This project is receiving Federal funding and therefore federal Davis- Bacon Act wages apply. Subcontractor shall comply with all wage requirements, applicable reporting requirements, and any other applicable requirements for federal funding. If conflict exists, Subcontractor is required to pay whatever prevailing rate is higher, taking into consideration the federal Davis- Bacon Act wages and the State of California prevailing wage rates.

ROBERT A. BOTHMAN, INC. EXHIBIT "A" SUBCONTRACTORS SCOPE OF WORK 5 - By executing this Agreement, Subcontractor acknowledges that the Contract Documents include the Project Labor Agreement ("PLA"), which requires Subcontractor to be bound by each and every provision of the Agreement and to evidence its acceptance prior to the commencement of work by executing the Letter of Assent in the form attached to the PLA as Addendum A. Subcontractor shall comply with all of the terms and conditions of the PLA as if Subcontractor were a party to the Agreement, including signatory status if required and payment of all applicable fees, dues, wages rates and trust fund payments. Subcontractor further acknowledges that Contractor has expressly relied on Subcontractor's agreeing to comply with the PLA requirements in awarding Subcontractor work on this project such that inaccurate or incomplete compliance may result in delayed or withheld payments until such deficiences are fully remedied to the Owner's satisfaction per the Contract Documents. The Owner reserves the right to modify the quantities or amounts and final quantities or amounts may be greatly increased or decreased or reduced to zero. The increase or reduction of these quantities or amounts shall not constitute a basis for claim by the subcontractor for extra payment or damages. Payment for the actual work performed based upon the prices bid or work done for the items of work involved will be considered full compensation to Subcontractor for the work. Final payment to be determined by actual quantities of work installed. This is a unit price contract and is subject to verification of the quantities and deductions. If the actual quantities differs from the bid amount contained in this agreement, a corresponding change in this price may be made, subject to Owner approval. Billing requests to be quantified in field with contractor signature prior to submitting for billing. Subcontractors shall posses such State and local licenses as are required by law, and shall furnish satisfactory proof to the Contractor that such licenses are in effect during the entire period of the contract. The foregoing quantities, qualities and materials are for reference only and Subcontractor agrees to adhere to the quantities, qualities and materials set forth in the plans and specifications with out any change orders and or adjustments in the subcontract price. Subcontractor agrees that the cost of material and labor for any portion of the Work that is reasonably necessary to give effect to the scope of work,, including any reasonably inferable work or services that a prudent contractor would recognize as necessary from the Contract Documents, including without limitation the drawings and specification approved by the Owner is included in the Subcontract price. By way of example only if the Contract Documents have provided for a sink on a drawing but has omitted the necessary pipe work for the functioning of such sink, Subcontractor shall be responsible for ensuring that the bid price for any plumbing work shall include the pipe work omitted from the Contract Documents. Unless otherwise noted above, in the event there is a conflict between this Agreement and the Subcontractor s proposal, Robert A. Bothman, Inc. s standard terms and conditions shall govern. In addition to the above: 1) 2) 3) 4) 5) 6) 7) 8) It is Subcontractor's responsibility to examine the site and to familiarize itself with all existing conditions prior to commencing work. Subcontractor is responsible for its area of work as described in the Contract Documents. Subcontractor is responsible for all of its own material and equipment stored on site. Robert A. Bothman Inc. ("RAB") is not responsible for damaged or missing material or equipment stored on site. Storage locations to be coordinated with RAB's site superintendent. All material is to be palletized when left on site. Materials left in areas other than approved storage areas will be deemed debris and disposed of at Subcontractor's cost. Subcontractor is responsible for repairing or replacing any surfaces or structures damaged while completing its scope of work. Subcontractor is responsible for protection of its work until installed and accepted by Owner/Architect or their representative. Subcontractor is required to broom clean its own work areas daily at the end of the shift and to remove its debris from the work area to a disposal bin furnished by others as directed by the Contractor. Subcontractor is responsible to man the project with adequate personnel and equipment to maintain the construction schedule generated by Robert A. Bothman Inc. The subcontractor is responsible for providing shop drawings, submittals, samples, as-builts, operating manuals and overages per Contract Documents. Subcontractor to be responsible for all business licenses and associated fees required for the project.

ROBERT A. BOTHMAN, INC. EXHIBIT "A" SUBCONTRACTORS SCOPE OF WORK 5-9) 1) 11) 12) 13) 14) 15) 16) 17) Subcontractor is responsible for providing notice of all materials with a lead time of over 2 weeks and for ensuring timely receipt and unloading of such materials to the job site. Should delays arise due to Subcontractor's breach of this obligation, Contractor may proceed per Sections 7, 14, 15, and 17 of the Subcontract Agreement. All RFI s shall be submitted in writing, in the designated format. Subcontractor to maintain the same foreman throughout this scope of work. A request to change or substitute foreman must be submitted in writing seven (7) days prior to personnel change. Subcontractor shall provide all task lighting. Task lighting shall be lighting required by subcontractor to perform the work of this agreement, and shall be in addition to the lighting provided by others to maintain OSHA minimum lighting Subcontractor shall provide all temporary power distribution required from the point of termination of temporary electrical power services (spider boxes) provided by others, to the point of performance of the work of this agreement. Subcontractor shall perform any and all field verification required for the performance of this agreement including but not limited to; field verification of existing conditions, field measurement and surveying from control and reference points. Unless otherwise agreed to in writing by Contractor and as required by California law, Subcontractor is responsible for obtaining all tickets and utility locations by USA markings for its scope of work prior to commencement of work. Said tickets must be on the job-site at the time work commences. Hard hats and personal protection equipment are required by all personnel at all times in all areas. Personnel not complying with hardhat requirements will be dismissed from the site. Subcontractors may be assessed $1. for cost of RAB Safety Officers' services for each non-compliance of Title 8, Cal OSHA. Subcontractor shall also ensure its employees and applicable workers attend all safety trainings and/or other meetings as required by the Contract Documents at no additional charge. This is a non-smoking site. NO SMOKING anywhere on site property. Should this be a Public Works/Prevailing Wage Project. all requests for Payment will be on a RAB s Application for Payment form with a Payroll Reporting Form and a Statement of Compliance Form attached, thereto. 18) All invoices from Subcontractor to RAB must be submitted on RAB s standard invoice form (Application for Payment). 19) Subcontractor is responsible for off-site parking of its vehicles and all associated costs, if any, for the duration of its work. Note: Unless otherwise noted herein, execution of this Subcontract Agreement shall supersede all other negotiations, stipulations, or bid proposals concerning its matter which preceded or accompanied the execution of this Agreement.

Project No.: Subcontract N 5- ='Route Sheet'!Q4 EXHIBIT B - LIST of CONTRACT DOCUMENTS For the Project commonly known as: The documents identified below, including, without limitation, plans, drawings, specifications, prime contract, general conditions and supplemental conditions constitute the Contract Documents as defined in the Subcontract Agreement: Date Sheet Page Sheet Title

Project No.: Subcontract N 5- ='Route Sheet'!Q4 EXHIBIT B - LIST of CONTRACT DOCUMENTS For the Project commonly known as: The documents identified below, including, without limitation, plans, drawings, specifications, prime contract, general conditions and supplemental conditions constitute the Contract Documents as defined in the Subcontract Agreement: Specification Book entitled " Addendum Prime Contract between Clarification emails Requests for Information and Responses thereto; Change Orders and subsequently issued and/or revised drawings; Subcontract Agreement between Robert A. Bothman, Inc. and all Exhibits thereto; All applicable codes and regulations, including but not limited to: Title 24 California Code of Regulations, Title 19 California Code of Regulations, State Fire Marshall Regulations. City Standard Specifications and Standard Drawings; County Fire and Building Codes, et. al.; California Department of Transportation regulations; Universal Building Code.

EXHIBIT C - INSURANCE REQUIREMENT CHECK LIST Project: 5- The following insurance MUST be listed on the standard Accord Form with applicable endorsements attached and MUST have an AM Best Rating of A- VIII or better. (samples attached) 1 GENERAL LIABILITY $1,,. Each Occurrence (combined single limit for bodily injury and property damage). $1,,. Personal injury liability. $1,,. Aggregate for products and completed operations. $2,,. General Aggregate Occurrence Policy - Claims-made policy will not be accepted. Premises and Operations Products and Completed Operations Contractual Liability issuing tort obligations assumed by Subcontractor. Broad form property damage (including completed operations). Deductible/SIR over $25,. must be approved by Robert A. Bothman, Inc. Fire, Explosions, collapse and underground hazards (including subsidence and any other movement). WAIVER OF SUBROGATION: Endorsement Form must be submitted. PRIMARY WORDING: Endorsement Form must be submitted with non-contributory wording CG 21 or unmodified equivalent ADDITIONAL INSUREDS: Endorsement Form must include the following: MUST be a. Robert A. Bothman, Inc. named on the b. General c. Liability Policy. d. e. f. g. Additional Insured Completed Operations Coverage (CG21 and CG 237 or unmodified equivalent) FOR SUBCONTRACTS OVER $25, ONLY 2 EXCESS LIABILITY: $2,,. Shall be maintained OVER the General Liability and Auto Liability Coverage 3 BUSINESS AUTOMOBILES: $1,,. Minimum limit ANY AUTO - owned, hired or non-owned automobiles. Each accident for bodily injury and property damage. 4 WORKER'S COMPENSATION: Must be per statutory limits $1,,. Each accident for bodily injury by accident. $1,,. Policy limit for bodily injury by disease. $1,,. Each employee for bodily injury by disease. WAIVER OF SUBROGATION: Endorsement Form must be attached. 5 DESCRIPTION OF OPERATIONS: must be included on all certificates including workers compensation. Project # 5- Waiver of Subrogation applies as respect General Liability and Worker s Compensation Primary Wording applies as respect General Liability and Worker s Compensation, non-contributory See additional insureds listed above. 6 CERTIFICATE HOLDER: Robert A. Bothman, Inc. 269 Scott Boulevard, Santa Clara, CA 955 7 3-DAY CANCELLATION NOTICE: Endorsement Required 8 ADDITIONAL COVERAGES REQUIRED BY OWNER: The following requirements are located in the General and/or Supplemental Conditions of the Project Manual from which you obtained your specifications for your scope of work.

Exhibit D- Code of Safe Practices 1. All persons shall follow these safe practice rules, render every possible aid to safe operations, and report all unsafe conditions or practices to the foreman or superintendent. 2. Foremen shall insist on employees observing and obeying every rule, regulation, and order as is necessary to the safe conduct of the work, and shall take such action as is necessary to obtain observance. 3. All employees shall be given frequent accident prevention instructions (Safety Tool Box Talks). Instructions shall be given at least every 1 working days. 4. Anyone known to be under the influence of drugs or intoxicating substances that impair the employee s ability to safely perform the assigned duties shall not be allowed on the job while in that condition. 5. Horseplay, scuffling, and other acts that tend to have an adverse influence on the safety or well-being of the employees shall be prohibited. 6. Work shall be well planned and supervised to prevent injuries in the handling of materials and in working together with equipment. 7. No one shall knowingly be permitted or required to work while the employee s ability or alertness is so impaired by fatigue, illness, or other causes that it might unnecessarily expose the employee or others to injury. 8. Employees shall not enter manholes, underground vaults, chambers, tanks, silos, or other similar places that receive little ventilation, unless it has been determined that is safe to enter. 9. Employees shall be instructed to ensure that all guards and other protective devices are in proper places and adjusted, and shall report deficiencies promptly to the foreman or superintendent. 1. Crowding or pushing when boarding or leaving any vehicle or other conveyance shall be prohibited. 11. Workers shall not handle or tamper with any electrical equipment, machinery, or air or water lines in a manner not within the scope of their duties, unless they have received instructions from their foreman. 12. All injuries shall be reported promptly to the foreman or superintendent so that arrangements can be made for medical or first aid treatment. 13. When lifting heavy objects, the large muscles of the leg instead of the smaller muscles of the back shall be used. 14. Inappropriate footwear or shoes with thin or badly worn soles shall not be worn. 15. Materials, tools, or other objects shall not be thrown from buildings or structures until proper precautions are taken to protect others from the falling objects. Date: Subcontractor s Name Subcontractor Signature: Title