Mainstreaming Disaster Risk Reduction in. Project Cycle Management

Similar documents
Mainstreaming Disaster Risk Reduction into National Development Planning and Financing in Asia-Pacific

DISASTER RISK FINANCING ADB Operational Innovations in South Asia

Regional trends on gender data collection and analysis

Draft DRAFT. Bangladesh s Financing Strategy: What we can learn for the Asia-Pacific region? Goksu Aslan. Bangkok, November 15, 2018

National disaster loss and damage databases UNDP s experience and lessons learned Presented by Sanny Jegillos Senior Adviser

Perspectives on Earthquake Risk Assessment and Management in Trinidad and Tobago

Rationalle for the Sendai Framework for DRR Evidence from the 2009, 2011 and 2013 Global Assessment Report on DRR

A GUIDE TO BEST PRACTICE IN FLOOD RISK MANAGEMENT IN AUSTRALIA

National Disaster Mitigation Program NDMP Overview, Ontario Projects, and Final Call for Proposals

Dr. Joseph A. Weinstock Asian Development Bank

Earthquake 2005 Recovery and Reconstruction

Workshop Climate Change Adaptation (CCA)

Disaster Risk Reduction

Chapter 2: Natural Disasters and Sustainable Development

MEETING OF THE SOUTHERN AFRICA REGION FLASH FLOOD GUIDANCE SYSTEM (SARFFGS) Country Presentation for Malawi 28TH OCTOBER, 2015.

Section 2. Introduction and Purpose of the LMS

with the Ministry of Finance and Economic Development for the Republic of Mauritius 14 June 2016 NDA Strengthening & Country Programming

Investing in Business Continuity Planning (BCP) for Coastal Community

Palu, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Delaware River Basin Commission s Role in Flood Loss Reduction Efforts

Hazard Mitigation & Resiliency

Bone Bolango, Indonesia

UNFCCC Expert Meeting on Loss and Damage from Climate Change

MANAGING DISASTERS AND CONFLICTS

Are we ready to face another earthquake

Scaling up Climate Finance (Improving The Impact Of Our Interventions)

Making informed decisions for effective DRM programmes and actions. Dr. Carlos Villacis GRIP Coordinator

with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming

Disaster Risk Management

Challenges in flood risk management in urban areas of river deltas in South and South East Asia

Ex-Ante Evaluation (for Japanese ODA Loan)

G318 Local Mitigation Planning Workshop. Module 2: Risk Assessment. Visual 2.0

Climate Risk Management For A Resilient Asia-pacific Dr Cinzia Losenno Senior Climate Change Specialist Asian Development Bank

Disaster Risk Management & Mitigation

Kyrgyz Republic. Measuring Seismic Risk {P149630} Public Disclosure Authorized. Report No: AUS Public Disclosure Authorized.

Risk Transfer mechanisms. Dr Pavan Kumar Singh Senior Research Officer National Disaster Management Authority Govt of India

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015

ADB s Experiences in Disaster Management. Neil Britton Senior Disaster Risk Management Specialist Asian Development Bank 25 November 2007

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities

Sustainable Livelihoods

Padang Lawas, Indonesia

Survey launch in 37 locations

Chapter 2: Natural Disasters and Sustainable Development

Measuring Mitigation': Methodologies for Assessing Natural Hazard Risks and the Net Benefits of Mitigation

Measuring and Mapping the Welfare Effects of Natural Disasters A Pilot

Sustainable Recovery and Reconstruction Framework (SURRF)

Working Paper Regional Expert Group Meeting on Capacity Development for Disaster Information Management

9,697 Dead people. 96 million People affected. Lower mortality, higher cost

Binjai, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Barito Kuala, Indonesia

Regional HFA Monitor Template Regional HFA Monitor Template and Guidance

Development of an Integrated Simulation Model for Flood Risk Evaluation and Damage Assessment

Background and context of DRR and GIS

Integrating SADC HYCOS into Regional Disaster Risk Reduction and Flood Risk Management Strategies , October, 2013 Geneva, Switzerland

Birgunj Sub metropolitan City, Nepal

PHARE 2005 / Project: «Contributions to the development

Policy Implementation for Enhancing Community. Resilience in Malawi

CC is a development issue - not just an environmental concern CC impacts on human development, economic growth, poverty alleviation and the

SOUTH CENTRAL REGION MULTI-JURISDICTION HAZARD MITIGATION PLAN. Advisory Committee Meeting September 12, 2012

Hazard Mitigation Planning

Addressing disaster risk reduction and development through improved data on disasters*

Module 7. Costing, assessing and selecting adaptation and mitigation. Training workshops on mainstreaming climate change

The AIR Inland Flood Model for Great Britian

Asia-Pacific Meeting on Disability-inclusive Disaster Risk Reduction: Changing Mindsets through Knowledge April 2014 Sendai, Japan

Overview of PADR process

DRAFT STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT. Climate Change Sectoral Adaptation Plan for Flood Risk Management ( )

Sri Lanka: Preliminary Damage and Needs Assessment Page 25 of 29

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Climate Change, Disaster Management and Poverty: Towards an Integrated Framework

Role of Disaster Insurance in Improving Resilience: An Expert Meeting The Resilient America Roundtable

DISASTER RISK INSURANCE FOR SMES AND AGRICULTURE

Mainstreaming Disaster Risk Reduction into Development Policy, Planning and Implementation

Analysis of National Climate Change and Development Policies

Launch a Vulnerability Assessment. Building Regional Disaster Resilience

Infrastructure Prioritization Framework: Considering Resilience in Infrastructure Investment Decisions

Climate Risk Insurance Models from India

Strengthening the Governance of Climate Change Finance to Enhance Gender Equality

Quantifying Disaster Risk: measuring progress in the path towards resilience

The National Flood Insurance Program A Model for Risk Management

Executive Summary. Introduction and Purpose. Scope

Kathmandu, Nepal. Local progress report on the implementation of the Hyogo Framework for Action (First Cycle)

Implementing risk-based asset management strategies

REPUBLIC OF BULGARIA

Palu, Indonesia. Local progress report on the implementation of the Hyogo Framework for Action ( )

Myanmar Southeast Asia Disaster Risk Management Project (P160931)

Ex-Ante Evaluation (for Japanese ODA Loan)

Sharm El Sheikh Declaration on Disaster Risk Reduction. 16 September Adopted at the Second Arab Conference on Disaster Risk Reduction

Pidie Jaya, Indonesia

Stephanie Fried March 2015 Adapted from article forthcoming in BankWatch, NGO Forum on ADB

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Catastrophe Risk Engineering Solutions

Hyogo Framework for Action : Building the Resilience of Nations and Communities to Disasters... 15

C APABILITY A SSESSMENT

Disaster Risk Reduction and Management in St. Lucia

Mournag, Tunisia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Financing Strategies: Improving Public Expenditure Efficiency

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

2018 PREPARING FOR A CHANGING CLIMATE AND MANAGING THE RISING FLOOD RISK

Beirut, Lebanon. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

PRACTICAL APPROACHES TO FINANCING AND EXECUTING CLIMATE CHANGE ADAPTATION

Transcription:

Mainstreaming Disaster Risk Reduction in Project Cycle Management

Programmes, Activities, Projects (PAP) Programmes, Activities and Projects (PAP) provide good opportunities for mainstreaming DRR in development for reducing existing risks and preventing new risks of disasters o Programmes are schemes or channels through which activities and projects are conceptualized and funded. o Activities are not structured rigidly and may be performed on a continuing basis within or outside the projects o Projects are a set of structured interrelated tasks that are executed over a period of time with certain costs for achieving defined objectives

Project Cycle Management Every stage of Project Cycle Management provides good opportunities for mainstreaming DRR

Programming Programming is first stage in formulation of project Programming begins with defining goals and objectives and outlining specific tasks to be taken up in project. DRR may not be direct objective of projects, but it may be included as proxy objective of every project Proxy objectives of projects would be to: o Reduce potential threats of any project from disasters o Protecting gains of the project o Ensure that project does not exacerbate existing risks or create new risks of disasters

Identification Next phase in project cycle management is to identify tasks that need to be performed and design various structural and non-structural elements of project This involves analysis of problems, needs and interests of all possible stakeholders This provide opportunity to identify hazards, vulnerabilities, exposures and risks of disasters that may impact on project. This provide further opportunity to assess whether project would have any adverse impact on communities or environment Accordingly projects should be designed to minimize such impacts.

Appraisal In this phase feasibility of project is studied, taking into account Costs Benefit Analysis (CBA), Internal Rate Of Return (IRR) and other issues. Logical or results-based management frameworks and implementation schedules are developed and required inputs are calculated. CBA is a good entry point for incorporating DRR elements into project - these may enhance project costs but provide longer term benefits to society

Financing Financing is not always a separate stage in project cycle as financial decisions may be taken even at identification or appraisal phases Various options for project financing include budgetary support, equity, market borrowing, bonds, external assistance etc. This provides an entry point for considerations of various options of risk financing and risk transfer that may reduce the immediate burden of investment while incorporating elements of risk reduction into project

Implementation In this phase project managers have to ensure that all designed standards and specifications are complied and there is no compromise in agreed parameters and processes This is also the phase to o o o Closely monitor progress in implementation Adjust according to changing circumstances, and Do mid-course corrections, if necessary

Evaluation Project cycle ends with evaluation and auditing of results achieved and lessons leant. Tools & techniques of project evaluation: o Anticipatory impact analysis such as Environmental Impact Analysis (EIA) and Disaster Impact Analysis (DIA). Such tools are usually applied at the stage of project formulation. o Monitoring & Evaluation (ME) Framework with built in input, process, output, outcome and impact indicators o Concurrent evaluations during the course of project implementation o Performance auditing at conclusion of the project.

Tools for Mainstreaming DRR in Project Cycle Management Mainstreaming DRR does not mean that huge fresh investments have to be made in every project Existing investments can be so designed and calibrated that these do not exacerbate the latent risks or create new risks of disasters. Toolkits for mainstreaming DRR in project design and management: o o o o o Marginal Investment Analysis Cost Benefit Analysis Multi-purpose development projects Disaster Impact Analysis Check Lists for disaster risk reduction

Marginal Investment Analysis Marginal investment analysis to determine effectiveness of additional investments for disaster risk reduction Marginal costs of earthquake resistant buildings is 2.5% for structural elements and 0.8% for non-structural elements Marginal benefits far exceed replacement costs of structures if these collapse in earthquakes Total marginal costs of all buildings in every seismic zone may make such analysis problematic

Cost Benefit Analysis Projects are viable if benefits outweigh costs Difficulties in quantifying benefits of DRR projects: o Uncertain nature of future risk patterns due to dynamic nature of hazards, vulnerabilities, exposures o No uniform standards for assessing effectiveness of risk reduction strategies o Data on vulnerabilities and impacts not available in many contexts and on many values o Techniques applied for quantifying avoided losses and valuing non-market benefits or costs vary and are controversial

Empirical evidences China invested USD 3.15 billion in sixties and seventies on flood control measures that averted damages over USD 12 billion Mangrove plantation in Vietnam at a cost of USD 7.2 million reduced costs of maintenance of dykes besides saving lives and property - CBR worked out as high as 52 during 1994-2001 Integrated water management and flood protection scheme for Semarang, Indonesia had IRR of 23% and CBR of 2.5 Combined disaster mitigation and preparedness program in Bihar and Andhra Pradesh, India had a cost-benefit of 3.76 Benefits of CBDR programme in Bangladesh implemented over a period of fifteen years exceeded costs between 3.05 and 4.90 160 school building retrofitted in Kathmandu valley in Nepal under an ADB supported school safety programme withstood the shock of 7.8 magnitude earthquake. CBR estimated 5.9

Regulatory framework for CBA Many countries are developing regulations for CBA for building resilience of infrastructures Japan has taken the lead: o Policy Evaluation Act 2001 o Technical Guidelines for Cost Benefit Analysis of Public Work Projects 2004. o Guidelines on Regulatory Impact Analysis (RIA), 2005 o MLIT guidelines for construction projects, 2009

Multi-purpose development projects DRR projects do not receive high priority due to competing demands of scarce resources from other priority sectors One way out of this impasse is to design innovative projects that combine long term benefits of risk mitigation with short term benefits of priority sectors Dual or multi- purpose projects can reduce risks of disasters and provide direct economic benefits that enhance both CBR and IRR

Three gorges dam of China Supports largest power station of world with installed capacity of 22,500 MW Avoids emission of greenhouse gas equivalent to 100 million tonnes of CO2 Releases 12 cubic kilometers of water for agriculture and industry Enhances shipping capacity of Yangtze River by 10 times Reduces potential risks of major downstream flooding from once every 10 to once in 100 years

Stormwater Management and Road Tunnel (SMART) in Kuala Lumpur 9.7 km long - longest storm water tunnel in South East Asia Tunnel has three levels: o Lowest for drainage o Highest for road traffic o Middle level tunnel can be used for road during dry season and drainage during heavy rainfall This simultaneously solves problem of flash floods and traffic jams during rush hours. This further ensures regular maintenance of drain

Disaster Impact Analysis (DIA) Drawing on Environmental Impact Assessment (EIA) some countries initiated Disaster Impact Assessment (DIA) Sri Lanka Roadmap for Disaster Risk Management (2005-2015) stipulated that DIA shall be integrated into approval process of all development projects Disaster Management Centre of Sri Lanka developed DIA Check Lists in four parts assessing risks, incorporating risk reduction measures into designs, monitoring during construction and maintenance, and analyzing post- disaster impact assessment. DIA check list was introduced and field tested in road sector and is proposed to be introduced in other sectors Under Comprehensive Disaster Management Project (CDMP) Bangladesh introduced Disaster Impact and Risk Assessment (DIRA) for analysis of all development projects, but detailed guidelines and tools for DIRA are yet to be developed

Check Lists for disaster risk reduction Government of India notification of 2009 requiring any new project costing more than INR1000 million to have a Check List for Natural Disaster Impact Assessment Check list provides complete information on hazards, risks and vulnerabilities of the project. These include both (a) probable effects of natural disasters on the project, and (b) possible impacts of the project in creating new risks of disasters. Costs involved in prevention and mitigation of both types of impacts shall be built into project costs and accordingly economics and viability of projects shall be worked out.