Compendium of State Government Policies on Renewable Energy Sector in India ARUNACHAL PRADESH

Similar documents
GOVERNMENT OF KERALA

GOVERNMENT OF MADHYA PRADESH

POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT. Energy Department Government of Bihar

New and Renewable Energy Department Vallabh Bhavan, Bhopal

Implementation of Solar Based Projects in MP Dated 20 July, 2012

New and Renewable Energy Department Vallabh Bhavan, Bhopal

JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED

Uttar Pradesh Electricity Regulatory Commission

INTERNATIONAL CONFERENCE ON HYDRO POWER FOR SUSTAINABLE DEVELOPMENT FEB , 2015 DEHRADUN. Small Hydro Power Presentation by Arun Sharma President

Expression of Interest. Procurement of Renewable Energy Under Short Term basis. Reliance Industries Limited In Gujarat and Maharashtra

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Perspective on Financing Wind Energy Projects. June 16, 2016

DRAFT (To be signed on Non-judicial stamp paper of Rs.100/-)

CHAPTER I: PRELIMINARY Short title, commencement and interpretation

Comments on proposed amendments in Electricity Rules (with respect to Captive Power Plants) issued by Ministry of Power on 22 nd May 2018

JHARKHAND BIJLI VITRAN NIGAM LIMITED

KErala StatE ElECtriCity regulatory CommiSSion (Renewable Energy) Regulations, 2015.

Draft JSERC (Determination of Tariff for procurement of power from Small Hydro Power Projects) Regulations, 2016

GUJARAT ELECTRICITY REGULATORY COMMISSION. Notification No. 13 of 2005

GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF PLANNING

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Tariff Order No 1 of 2010 dated

State Policy on Chhattisgarh Special Economic Zone. Government of Chhattisgarh. Department of Commerce and Industries

Regulatory Framework for New Bagasse Based Cogeneration Projects

AGREEMENT FOR SYNCHRONOUS OPERATION OF CAPTIVE POWER PLANTS OF.. WITH JHARKHAND STATE ELECTRICITY BOARD SYSTEM

GOVERNMENT OF PUNJAB DEPARTMENT OF POWER (Power Reforms Wing) NOTIFICATION The 21 st June, 2010

2. APPLICABILITY AND SCOPE

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009

*29(510(172)-+$5.+$1' '(3$570(172),1'8675,(6 127,),&$7,21 5DQFKLWKH

Water Resources Rules, 2050 (1993)

Rajasthan Electricity Regulatory Commission

IMPLEMENTATION AGREEMENT FOR HYDRO POWER PROJECT (From 2 to 100 MW Capacity)

Draft Guidelines. for. Tariff Based Competitive Bidding Process. for. Grid Connected Solar PV Power Projects

Jawaharlal Nehru National Solar Mission

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3rd & 4th Floor, Chandralok Building, 36, Janpath, New Delhi : /

Case No. 52 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Mahati Hydro Power Projects Pvt. Ltd.

Industries Department Goa Industrial Development Corporation

M/S Harisons Hydel Construction Co (P) Ltd; Regd. Office at Akhara Bazar, Kullu (H.P.) V/s

Meghalaya State Electricity Regulatory Commission

THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA. NOTIFICATION Shimla, the 22 nd November, 2018

2. APPLICABILITY AND SCOPE

PRELIMINARY. (2) These Regulations shall come into force from the date of their publication in the Official Gazette.

GRANT THORNTON DRAFT CONCESSION AGREEMENT

Information Technology Investment Policy

Case No. 85 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

M/s Jaiprakash Power Ventures Ltd 113 Rajpur Road, Dehradun

M-SIPS Initial Application Form

NOTICE INVITING TENDER FOR SHORT TERM PURCHASE OF ENERGY TENDER SPECIFICATION NO. PPR 02/2014

CHAPTER - 1V GENERATION - SMALL HYDRO AND OTHER RENEWABLE SOURCES OF ENERGY

PROCEEDINGS OF GOVERNMENT OF KARNATAKA

1.1 These regulations shall extend to whole of the State of Punjab.

SOLAR ENERGY CORPORATION OF INDIA LIMITED DRAFT 1000 MW GRID CONNECTED ROOF TOP SOLAR PV SCHEME FOR GOVERNMENT BUILDINGS UNDER CAPEX AND RESCO MODELS

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46))

Chhattisgarh State Electricity Regulatory Commission

TENDER SPECIFICATION. Procurement of Emergency Power for Vedanta Limited, Jharsuguda

M.P. Electricity Regulatory Commission Bhopal

SJVN LIMITED. (A joint venture of Govt. of India & Govt. of Himachal Pradesh) (An ISO-9001:2008, Schedule-A, Mini Ratna Company)

POWER PURCHASE AGREEMENT

REF: TEDA/4566/50MW(AC)-Kayathar/ ISSUED BY

Operational Guidelines for PRICE STABILISATION FUND (PSF)

Clarifications Sought No. 1 In what format the Bank Guarantee will be accepted if Bank Guarantee is from outside India.

- 1 - WEST BENGAL MINERAL DEVELOPMENT AND TRADING CORPORATION LIMITED (WBMDTCL) (Govt. of West Bengal Undertaking)

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA

TELANGANA STATE POWER COORDINATION COMMITTEE Request for Proposal (RfP) NOTICE No. TSPCC (Commercial)/02/15-16

Part A TECHNICAL BID (To be returned duly signed on all pages)

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL

PPP in Coal: The Next Big Thing!

NO. DOCUMENT IN PLACE OF PLEASE READ AS

ANIL AGRAWAL AND COMPANY Chartered Accountants

Procedure for Scheduling

RFQ-cum-RFP Document

West Bengal Renewable Energy Development Agency. Draft General Terms & Conditions of the Tender

1. Offers are invited on behalf of the Diu Municipal Council, Diu. Tender Issuing Authority : The Chief Officer, Diu Municipal council, Diu.

Tender No. COCONTS/00032D/PSCB/MDO/2016, Dt

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Maharashtra Electricity Regulatory Commission (Fees and Charges) Regulations, 2017

BPO/BPM Policy. Government of Madhya Pradesh

PROVIDING SUPPORT SERVICE FOR DOCUMENTATION, FILING & ALLIED SERVICES IN OFFICE AT CFS -KOLKATA

Solar Energy Corporation of India Limited भ रत य स र ऊर न गम न नमट ड (A Government of India Enterprise)

Response to Bidders Queries for Development of 50 MW of Solar Power Projects in the State of Karnataka. Clause No. Clause Query Response

JAWAHARLAL NEHRU NATIONAL SOLAR MISSION (JNNSM) Phase-II

Preamble : Policy Frame Work :

Scanned by CamScanner

India: Public Private Partnerships in Highways Sector

Rating Methodology for Wind Power Producers

Office of the Sutahata Panchayat Samiti

Indian Institute of Tropical Meteorology,

(INTERNATIONAL COMPETITIVE BIDDING)

Agenda. Enel: Introduction Auctions: Enel experience and key factors Case study: India Closing remarks

OFFICE OF THE GENERAL MANAGER / CONTRACTS CORPORATE OFFICE, NEYVELI NOTICE INVITING BID INTERNATIONAL COMPETITIVE BIDDING

NOTICE INVITING TENDER (E-Procurement mode) भ रत य व ज ञ न श क ष ए अन स ध न स स थ न प ण

Overview of the framework

Office of the Tamluk Panchayat Samity ri ii N.I.T NO.-21/WB/TAMLUKPS/EO/

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION

REQUEST FOR SELECTION (RfS) DOCUMENT FOR SETTING UP OF 2500 MW ISTS-CONNECTED WIND-SOLAR HYBRID POWER PROJECTS (TRANCHE-I)

Competitive Bidding Guidelines for procurement of Electricity

Uttar Pradesh Electricity Regulatory Commission

Minutes of Pre-bid meeting held on 29th June 2017 at GETRI, Vadodara with prospective bidders for Solar and Wind power tenders floated by GUVNL.

Uttarakhand Electricity Regulatory Commission

IN THE SUPREME COURT OF INDIA ORIGINAL CIVIL JURISDICTION. I.A. NO.2134 of 2007 IN WRIT PETITION (CIVIL) NO.202 OF Versus

BRIEF ANALYSIS ON NEW OPEN ACCESS REGULATIONS IN THE STATE OF MAHARASHTRA

COMMERCIAL CIRCULAR No. 80

Transcription:

85 ARUNACHAL PRADESH Small Hydro Power Policy- 2007 Dated 24 th January, 2008 & Amendment Dated 13 th Oct. 2008 1. Order PWRS/HPD/W-1305/2005 dated 24 th January, 2008. And Amendment order No: PWRS/W-1305/2005/ Pt-I dated 13 th Oct. 08 2. Title Small Hydro Power Policy, 2007 3. Policy Objective Private participation in development of Small Hydro Project with certain attractive incentives Formulation and notification an of action plan for small hydro power generation with players such as private entrepreneurs, cooperative societies and NGOs 4. Classification of SHP Projects Category -I : Projects with installed capacity of above 1 MW up to 25 MW to operate in both Grid and Isolation mode. Category - II : Projects with installed capacity of above 100 kw up to 1MW to be designed for standalone mode with or without connectivity to grid. Power supply to the consumers to be at High Voltage or Low Voltage Category - III: Projects of up to 100 kw shall be designed for standalone mode without high tension systems. 5. Who Can Invest in SHP Preference in allocation of Projects to be given to Local entrepreneurs with sole proprietorship /NGOs/Co-operative Societies / Joint venture concerns or Consortium of companies in which one or more than one partners to be Arunachalee. Any registered company from outside the State with differentiation in free power, upfront money and processing fee with that of local entrepreneurs 6. Commercial Categories of Power Producers (A) Independent Power Producers (IPPs): To sell power to the State power Utilities / State Government under a Power Purchase Agreement (PPA) at a pre-determined Tariff as defined by the SERC or the State Government. Developer to be provided with open access facility for which a separate agreement with the State Transmission Utility (STU) at a tariff determined by the SERC / State Government. (B) Merchant Power Producers (MPPs): To sell power to limited number of permitted pre-determined third party (or parties), preferably heavy power consuming industries set up within the State. MPPs to be provided with open access facility for which agreement has to be settled with STU State is not bound to purchase Power from MPPs. However, the State reserves the right to purchase power at a price as may be determined by the State/SERC. MPPs shall not be eligible for retail sale of power to general consumers to replicate the function of a DISCOM without a license. (C) Captive Power Producers (CPPs): Power producers shall produce power only for their own consumption CPPs shall be treated at par with that of MPPs as far as the other conditions are concerned. 7. Qualifying Criteria Developers to furnish an undertaking on legal papers committing to engage the technical personnel, either as permanent employees or partners in the organization, at the time of submission of application for allotment of projects. Qualifications of personnel to be employed for various category of projects are detailed in the policy

86 Compendium of State Government Policies on Renewable Energy Sector in India 8. Projects Identification and Allocation 9. Process of Allotment - Application for Allotment (i) Category - 1 Projects (ii) Category - II & III Projects (iii) Earnest Application fee (iv) Selection of Developers (v) Processing Fee and Upfront Premium Project sites for development to be identified and notified by the State Government, A shelf of projects shall be maintained by the State Government for allocation. Developers may approach the State Government with self-identified projects with full pre-feasibility report (PFR) for development on concept to commissioning basis. Government shall allocate Projects to the eligible applicant for development on BOOT (Build, Own, Operate and Transfer) basis for a period of 50 years. Managing Director (MD), Hydro Power Development Corporation of Arunachal Pradesh Ltd., Itanagar Chief Engineer (CE), Department of Hydro Power Development, Itanagar Director, APEDA, Itanagar Non-refundable demand draft of Rs. 5000 per application drawn on State Bank of India, payable at Itanagar in favour of MD, CE and Director APEDA As per eligibility and qualification criteria Selected Developer to deposit the Processing fee and Upfront Premium (both nonrefundable) at the time of signing of the Memorandum of Agreement (MoA) with the State Government, failing which, the State Government shall have right to re-allocate the project to any other eligible developer Category of Hydro Project Category 1 (a)> 10MWupto25MW (b)>5mwupto10mw (c)> 1 MW up to 5MW Category II >100 kw up to 1000 kw Category III Up to 100kW Processing fee Rs. (per project) 50,000 1,00,000 35,000 70,000 25,000 50,000 15,000 30,000 10,000 Minimum Upfront Premium payment Rs. (per MW) 40,000 15,000 30,000 10,000 10,000 (per project) Note: The local entrepreneurs / Indigenous developers /NGOs/Co-operative Societies, if applies under Joint venture or Consortium of Companies, the chargeable Processing Fee and Minimum Upfront Payment will be that of elopers. (vi) Upfront premium Not to form part of the project cost (vii) Preference to indigenous In case of more than one applicant meeting the eligibility and other criteria, preference applicant to be given to indigenous applicant of the district in which the project is located (viii) Memorandum of Project completion time and COD as per proposal or agreed by the Government to Agreement (MoA) be incorporated in MoA 10. Single Window Selection A High Level Selection Committee to examine the proposals of the prospective developers and submit its observations/recommendations to the State Government. Selected developers to sign the (MoA) within 30 days from the date of issue of Letter of Selection.

87 11. Statutory Clearances Within 12 months from the date of signing of the MoA, the selected developer shall complete all post allotment obligations including preparation of Detailed Project Report ( DPR), possession of the project site and obtaining all statutory clearances of the State Government Developer to submit DPR with all clearances to the Secretary (Power), to enable State Government for examination and approval within three months. DPR of the selected developer submitted for System Coordination and Techno- Economic Clearance (SC&TEC) to be scruitnised by Standing Committee on Technical and Economic Affairs If project is not found feasible by the Standing Committee on Technical and Economic Affairs, the State Government, upon mutual understanding with the developer, shall terminate the agreement and the upfront payment shall be refunded to the developer without interest 12. Time Schedule for Commencement of Work 13. Compliance to Statutory Regulations by the Developer Upon failure of the developer to commence work at the project site within 18 months from the date of signing of the MoA, the agreement shall stand automatically terminated. Upfront payment shall be forfeited. Statutory regulations of the Central Government / CERC and the State Govt. / SERC while implementing the project. Provisions of the Forests (Conservation) Act, 1980. Developer to pay the cost of raising the compensatory afforestation including payment of the Net Present Value (NPV) of the forests land being diverted for nonforest purpose under relevant Forests (Conservation) Act, 1980 and Environmental Protection Act, 1986. To labour welfare under the Labour Laws/Acts during the implementation / operation and maintenance of the Project. The provisions of the Electricity Act 2003 and other laws and rules framed under such laws shall apply on the Projects under this policy. 14. Land Acquisition Land for project and other allied infrastructures shall be leased to the developer against payment of land revenue as per relevant tariff of the State Government. The period of lease to be continued till the BOOT period of the project. 15. Maintenance of Law and Order Is the responsibility of the State Government in and around the project area for security and safety of personnel and properties of the project. 16. Rehabilitation and Resettlement Rehabilitation and Re-settlement works for displaced persons due to the project shall be financed by the developer, as per relevant law/guidelines of the State. 17. Equity Participation The State Government shall reserve the right of equity participation on mutual understanding with the developer through its agency on Joint Venture. 18. Sale of Power IPP can enter into contract to sell power to the State Government through a PPA to be signed within 6 months after signing of MoA at a tariff 10 paise lower than the tariff as determined by the CERC/SERC or the State Government for sale outside the State. Point of sale of power to be at the place of injection to the State grid, unless incorporated in the PPA. Metering point shall be located at the point of sale defined in the PPA. Developer under IPP/MPP/CPP category may be allowed after prior approval of the Government to sell power outside the state only under a special license in the event of surrender of contracted power. Similar licensing can also be considered by the state in the situation of closure of the industries forcing the project to idle. State shall reserve the right to purchase the idle power from MPP/CPP. The State Government shall open Letter of Credit (LC) in favour of the Developer in State Bank of India, Itanagar for an amount whjch would be specified in the PPA for regular transactions of power purchased from the IPP/MPP/CPP etc. as the case may be.

88 Compendium of State Government Policies on Renewable Energy Sector in India 19. Banking of Power Not allowed without prior permission of the State Government. 20. Transmission System and Evacuation STU and the developer to enter into an Agreement about Power Evacuation System and open access facility before the final investment decision. Letter of Comfort on Transmission (LCT) can be obtained from the STU before submission of application/ expression of interest (EOI) for allotment of the project. Transmission System which forms a part of the project to be specified in the LCT. Developer to bear the cost of transmission network from the project to the point of sale. 21. Wheeling Charges Transmission system and other allied facilities will be made available to all developers for Open Access and Wheeling of Power. Developers to enter into an Agreement with the STU for payment of wheeling rate as may be determined by the SERC/State. 22. Transfer and Sale of Power Not allowed without the prior permission of the State Government Plant 23. Free Power and other Charges As an incentive for timely completion, there shall be a moratorium of free power. Free power concessions to be made at the concessional rates. Moratorium period to be counted from the COD. Category of Hydro Project (a)> 10MW to 25MW (b)>5mw to10mw (c)> 1 MW to 5MW (d) Up to 1000kW Moratorium Period from scheduled COD One Year One Year Two Years Two Years Three Years Three Years Rate of free power after Moratorium period up to 50 th Year Note: The local entrepreneurs / Indigenous developers /NGOs/Co-operative Societies, if applies under Joint Venture or Consortium of Companies, the chargeable Free Power will be same that of elopers. 24. Force Majeure State Government not responsible for any losses arising out of the force majeure situation, i.e., earthquake, flood, fire, external invasion, civil commotion, landslide etc. No claim by the developers on above account shall be entertained by the State Government. 25. Incentives by State Government 5% 10% 2.5% 8% 5% 2.5% State Govt, shall facilitate in obtaining subsidies, tax concession etc. as may be available from the Central Government for development of SHP. State Government shall allow 50% share of Carbon Credit benefit from Carbon Trading under CDM. Indigenous tribal entrepreneurs shall be exempted from supplying free power to the State Govt, for projects up to 5 MW capacity. 26. Intellectual Property Right In the event of transfer of Intellectual Properties related to the project design, data, DPRs, etc. the cost of such properties shall be payable to the owner of such properties by the party/(parties) to whom it would be transferred.

89 27. Employment Opportunities Developer to spell out the employment opportunities for the bonafide Arunachalees in the application. This shall be one of the selection criteria for allotment of project. Endeavours shall be made by the developers to employ local ITI Certificate holders during the construction, operation and maintenance of the projects. They should also be ready to take technical manpower on deputation from the State Government Departments and Organizations. 28. Monitoring of Projects Government shall have the right to monitor physical and financial progress of the projects on monthly/quarterly/half yearly basis through a Technical Committee headed by the Secretary (Power and NCER), Govt, of Arunachal Pradesh. 29. General Conditions Developers shall be liable to pay all the statutory levies viz. royalty on forest products, river bed materials, duties and taxes unless specifically exempted. Allotment of a project to a developer does not automatically confer him any territorial rights on both upstream and downstream sides of the project area. Developers shall facilitate using of tail race water for Agriculture / Horticulture purpose wherever it is found feasible and necessary. State Government shall have the right to use the tail race water for any other purpose including development of Hydro Projects on its own or allot to some other party. Developers shall make all necessary protective arrangements on upstream, downstream and tail race areas of the projects site to avoid soil erosion and damage to properties. Developer shall pay an amount worked out at the rate of 1 paise per unit of power sold during every financial year to the State Government for raising local area development fund effected by the Project (s).